Professional Documents
Culture Documents
DEF NO.
A/C REG.
DATE
IN-FLIGHT DEFECTS
1 9N-AKQ
2 9N-AKQ
3 9N-AKQ
4 9N-AKQ
5 9N-AKQ
6 9N-AKQ
TCAS PROCESSOR UNIT REMOVED CLEANED & RE-INSTALLED AS AMM 34-43-00 REV
NAC 242
3 TCAS SYSTEM TEST FOUND NORMAL, P1SIDE TCAS DISPLAY SATIS.
TCAS CONTROL PNL MODE SELECTKNOB OBSERVED LOOSEN SAME TIGHTEN &
TCAS TEST CARRIED OUT IAW AMM 34-43-00 REV 3 FOUND NORMAL.
NAC 242
TCAS CONTROL BOX BACK -CONNECTOR CLEANED & RE-INSTALLED TCAS TEST C/OUT IAW
NAC 242
AMM 34-43-00 REV 3.FOUND SATIS.
PA SYSTEM AUDIO JUNCTION BOX CONNECTOR NO. P2/162RJ6 CLEANED & RE-FIXED
OPS TEST CARRIED OUT IAW 23-51-00 REV 07 FOUND SATIS
NAC 242
NAC 242
PA SYS POWER AMP RE-RACKED 7 OPS TEST C/OUT IAW AMM 23-51-00 REV 07 FOUND SATIS.
NAC 242
PA SYS POWER AMP RE-RACKED 7 OPS TEST C/OUT IAW AMM 23-51-00 REV 07 FOUND SATIS.
NAC 242
TLP
REMARKS
156044
156047
14401
310812
310813
310831
REPEATITIVE DEFECTS' ST
DEF NO.
A/C REG.
Date
IN-FLIGHT DEFECTS
9N-AKS
15-Dec-14
9N-AKS
1-Jan-15
9N-AKS
7-Jan-15
9N-AKS
7-Jan-15
9N-AKS
11-Jan-15
9N-AKS
23-Feb-15
9N-AKS
6-Mar-15
9N-AKS
7-Apr-15
9N-AKS
9-Apr-15
10
9N-AKS
31-May-15
11
9N-AKS
1-Jun-15
13
9N-AKS
5-Aug-15
14
9N-AKS
10-Aug-15
15
9N-AKS
14-Aug-15
16
9N-AKS
16-Aug-15
17
9N-AKS
19-Aug-15
18
9N-AKS
24-Aug-15
19
9N-AKS
24-Aug-15
20
9N-AKS
29-Aug-15
21
9N-AKS
2-Sep-15
22
9N-AKS
2-Sep-15
23
9N-AKS
12-Sep-15
24
9N-AKS
12-Sep-15
25
9N-AKS
23-Sep-15
NOSE LDG SHIMMY DAMPER SERVICE AND HYDRAULIC REFILLED IAW AMM
CHAP 32-22-00. OPERATION CHECK ON GROUND AND FOUND NORMAL.
NAC 293/KTM
NAC 292/KTM
NOSE WHEEL TYRE PRESSURE & SHIMMY DAMPER CHECKED ,NOSE LANDING
GEAR ATTACHEMENT ALSO CHECKED AND FOUND NORMAL.
NAC 293/KTM
NAC 293/KTM
NAC 293/KTM
NAC 293/KTM
NAC 293/KTM
NAC 292/KTM
RIGHT MAIN WHEEL TYRE R/R WITH NEW ONE IAW AMM CHAP 32-41-00-WHEEL
ROTATION CARRIED OUT , FOUND SATIS (GENERAL INSPECTION OF HUB
FOUND SATIS)
NAC 292/KTM
NAC 292/KTM
NAC 293/KTM
NAC 292/KTM
NAC 292/KTM
LEFT MAILN WHEEL WORN OUT IS WITHIN LIMIT AS PER 32-41-00 REV 00.
NAC 292/KTM
NAC 292/KTM
NAC 293
1. ALL FIRE SENSORS CLEANED & SECURITY CHECK C/OUT IAW 26-11-00.RT
ENGINE G/RUN OBSERVED FIRE WARNING SYSTEM FOUND NORMAL.
2.RIGHT ENGINE GROUND RUN C/OUT FIRE WARNING FOUND NORMAL.
EGPS CLEANED & CHECKED AS PER AMM 34-42-00 FOUND SATIS.
NAC 293/NAC292
NAC 293
NAC 293
NAC 292/NAC293
NAC 293
NAC293/NAC292
NAC 293
ALL FIRE DETECTORS SENSORS OF RT ENG REMOVED & CLEANED REINSTALLED ON SAME POSITION .
2. RT ENG FIRE DETRECTOR SENSOR LOCATED AT UPPER PORTION ON
FRAME 6(C 16) INTERCHANGED FOR SNAG COPNFORMATION BOTH ENG G?RUN OBSERVED ON HIGH POWER SETTING
FOUND SATIS. IAW 26-11-00.
3. BOTH ENG G/RUN C/OUT ON HIGH POWER FIRE
WARNING SYSTEM FOUND NORMAL
TLP
303157
303174
303179
303179
303182
310127
310142
310460
310462
REMARKS
312112
312113
312146
312148
311601
311601
311605
311609
311609
311613
311615
311615
311625
311625
REPEATITIVE DEFECTS' S
DEF NO.
A/C REG.
Date
IN-FLIGHT DEFECTS
9N-ABU
18-Jul-15
9N-ABU
24-Jul-15
9N-ABU
24-Jul-15
9N-ABU
24-Jul-15
9N-ABU
25-Jul-15
9N-ABU
30-Jul-15
9N-ABU
3-Aug-15
9N-ABU
3-Aug-15
9N-ABU
4-Aug-15
10
9N-ABU
5-Aug-15
11
9N-ABU
5-Aug-15
12
9N-ABU
8-Aug-15
13
9N-ABU
29-Aug-15
14
9N-ABU
3-Sep-15
15
9N-ABU
3-Sep-15
16
9N-ABU
4-Sep-15
17
9N-ABU
12-Oct-15
18
9N-ABU
13-Oct-15
19
9N-ABU
13-Oct-15
20
9N-ABU
14-Oct-15
21
9N-ABU
14-Oct-15
22
9N-ABU
15-Oct-15
9N-ABU
16-Oct-15
9N-ABU
17-Oct-15
9N-ABU
18-Oct-15
9N-ABU
18-Oct-15
BOTH VOR (P1 & P2) OPS. TEST C/O ON GROUND. FOUND 'NORMAL'.
NAC 242
NO. 2 VHF TX / RX REPLACED IAW AMM 23 REV 18. TEST C/OUT WITH KTM TWR
& GNO FOUND NORMAL.
AFT FUEL QTY GUAGE FOUND DEFECTIVE (O/R) REMOVED AND REPLACE AS
PER AMM CHAPTER 28-20-00. FUNCTION CHKED FOUND OK.
AFT FUEL QTY IND. TEST C/OUT ON GND IAW AMM 28-42-00 REV 18. FOUND
SATIS.
ATC XPNDR CONTROLLER (CTL 90) R/R FOR DEFECT CONFIRMATION IAW AMM
34 REV 113. POST INSTALLATION OPS "SATIS". PLS REPORT FURTHER.
FUEL QTY SYS POWER FEED LINE INSULATION CHECKED, 'NORMAL'. GND
POINT OF CO-AXIAL CABLE REPAIRED DUE FOUND BROKEN, OPS TEST
'NORMAL'.
NO. 2 VOR RX REPLACED IAW AMM 23 DUE FOUND WEAK RECEPTION. POST
INSTALLATION TEST FOUND SATIS.
NO. 1 VHF CHECKED WITH KTM GND & TWR FOUND S/S.
BRAKE BLEEDING C/OUT FROM BOTH BRAKE ASSY. FOUND SATIS AS PER AMM
32-40-31 REV 17 ON RHS.
NAC 129/KTM
LHS BRAKE UNIT ASSY R/R DUE HYD SEEPAGE FOUND FROM BRAKE PISTON &
MAIN WHEEL ASSY R/R DUE SEVERAL CUTS FOUND. JOB C/OUT AS PER AMM 3240-31 & 32-40-51 OPN CHECKED FOUND SATIS. (REV 17)
NAC 129/KTM
FUEL QTY SYS POWER FEED LINE INSULATION CHECKED, 'NORMAL'. GND POINT OF
CO-AXIAL CABLE REPAIRED DUE FOUND BROKEN, OPS TEST 'NORMAL'.
AFT FUEL LOW LEVEL CHECKED ON GROUND CAUTION LIGHT AND PARAMETER AFT
FUEL FOUND NORMAL As PER AMM 28-20-12.
# AFT FUEL BOOSTER PUMP SECURITY CHECKED OPERATION CHECK
FUEL BOOSTER AFT No# 1 FOUND IAW 28-20-1 REVISION 18 SATIS.
125/KEP
125/KEP
No.2 FUEL CELL VENT NECK FOUND WET WITH FUEl AND SAME
TIGHTENED(NECK TO VENT PIPE) A/C SHAKED UP & DOWN FROM TAIL PART 7
FOUND SATIS PLZ REPORT FURTHER
NAC 282/KTM
SUPECTED BELLY & CABIN AREAS WIPED TO CLEAN & THROUGHLY VISUALLY
INSP.C/ OUT FOUND SATIS PLS REPORT FURTHER.
NAC 282/KTM
A) RT FUEL FLOW TX r/r IAW 73-30-12 G/RUN OBSERVED FUEL FLOW FOUND
SATIS.
B) RT ENGINE G/RUN C/OUT FUEL FLOW IND. FOUND NORMAL.
NAC 129/KTM
NAC174/KTM
NAC129/KTM
TLP
313905
313913
313913
313913
313915
313928
313935
313935
313937
REMARKS
313938
313938
313940
311520
311529
311529
311530
315821
315822
315823
315825
315825
315826
315827
315829
315833
315833
A/C REG.
Date
IN-FLIGHT DEFECTS
9N-ABT
22-Sep-15
9N-ABT
28-Sep-15
9N-ABT
29-Sep-15
9N-ABT
2-Oct-15
9N-ABT
8-Oct-15
9N-ABT
9-Oct-15
9N-ABT
10-Oct-15
9N-ABT
4-Nov-15
9N-ABT
5-Nov-15
10
9N-ABT
7-Nov-15
11
9N-ABT
8-Nov-15
12
9N-ABT
12-Nov-15
HYD. CUT-IN,CUT-OUT IS VERY FAST P/S CHECK.
INTERCOM CHKD FROM BOTH SIDES FOUND NORMAL PLZ REPORT FURTHER.
NAC180/KTM
BOTH P1 AND P2 SIDE AUDIO CONT . UNITS CLEANED & RE.INSTALLED IAW
AMM 23-40-00 REV. 18 OPS TEST C/OUT, FOUND NORMAL.
NAC242/KTM
SUSPECTED CAPT (P1)SIDE AUDIO CONT. UNIT CHANGED DUE FOUND SOUND
QUALITY CHANGE INTERMITTENTLY WHEN PRESS ON BACK CONNECTOR
COMPONENET CHANGED FOR DEFECT CONFORMATION INSTALLATION & TEST
C/OUT IAW AMM 23-40-00 REV 19 INTERCOM & COMM OPS FOUND SATIS.
NAC242/KTM
P2 SIDE AUDIO CONTROL UNIT INTERCOM OUT FOUND VERY WEAK ON TEST,
SAME ITEM REPLACED WITH NEW ONE & OPS TEST C/OUT IAW AMM 23-40-00
REV 19 INTERCOM & COMM TEST FOUND SATIS.
NAC242/KTM
WIRING DIAGRAM AUDIO SYSSTEM RCA AVA 310 FOLLOWED CO-PILOT XMIT
PTT P/N NO.40 AT BACK CANNON FOUND LOOSE FITTING SAME PIN FIXED
PROPERLY & COMM. TEST CARRIED OUT FROM BOTH SIDE IAW 23-40-00 REV 29
"SATIS".
NAC242/KTM
VHF NO.2 TX ,RX BACK CONNECTOR CLEANED & RE-INSTALLED. COMM TEST
CARRIED OUT, FOUND NORMAL(REF.AMM 23-40-00 REV.19)
NAC242/KTM
NAC242/KTM
VHFNO1 & VHF NO2 APPROPRIAT SELECTION WITH KTM (LOCAL) TWR
TRANSMISSION & RECEPTION TEST C/OUTn, FOUND NORMAL HOWEVER P2
SIDE AUDIO CONTROL BOX VOLUME CONTRO: KNOB SCREW FOUND LOOSE &
SAME FIXED. AUDIO INTEGRATING SYS CHECKED IAW AMM 23-50-00 REV 18
SATIS
NAC242/KTM
P2 SIDE VHF XCVR & AUDIO CONTROL BOX RE-RACKED & INTERCOM +
TRANSMISSION TEST C/OUT FOUND "SATIS" ON GND
NAC242/KTM
NAC 282/KTM
NAC 240/KTM
NAC 240/KTM
TLP
312551
312557
312560
212562
312576
312578
312579
REMARKS
313555
313559
313561
313562
313572