This Addendum/Bid Bulletin No. 16-001 is issued in response to the queries raised during the pre-bid conference conducted on 24 February 2016 for the project Construction of Elevator shaft. Bidders should take note of the following: 1. On Section V. Special Conditions of Contract, GCC Clause 6.5 - List of Key Personnel requirements No. 7. Project Registered Mechanical Engineer should be omitted since the installation of the elevator unit is not in the contractors scope of work. 2. Personnel with multiple expertise and qualifications may be designated for up to three different positions mentioned under GCC Clause 6.5, provided he/she is qualified for these positions and can provide the necessary documentation in support of his/her qualifications, such as an appropriate license, certificate of training, accreditation, and the like, except in the case of the General Foreman, who shall perform the function of a General Foreman as his or her sole function. This bid bulletin shall form an integral part of the bid documents for the project, for inclusion in the submission of technical and financial proposal. For the guidance and information of all concerned bidders.
Competence Profiles For MHKIE (Mechanical Discipline) Applicant Via Formal Training or General Experience Route Guidance Note For Applicants and Assessors (AUG 2023)