Cement
Concrete
Curing
Reinforcement
Plastering
Planning & Estimation
Questions:Cement
What is Portland cement?
Is there any shelf life of cement?
Does fineness of cement affect strength gain?
What is initial and final setting time of cement?
What are the reasons for slow or fast setting of concrete or mortar?
What are the different grades of Ordinary Portland Cement (OPC)?
What is Portland pozzolana cement?
What are the advantages of using Portland pozzolana cement over OPC?
Does the shade of cement affect quality?
What is the effect of long storage periods on cement?
How should cement be stored?
How to identify the time for which the cement was stored before use?
Questions:Concrete
What is concrete?
What is RCC?
What is mortar?
How much water should be added in a concrete mix of one bag of cement for normal construction work?
How does color affect the quality of cement & its concrete?
What precautions should one take for water to be used in concrete construction?
What is the minimumrecommended concrete mix proportion for RCC works?
What are the common mistakes, which affect the quality of concrete?
What are the factors responsible for governing the compressive strength of concrete?
Within how much time the freshly prepared mortar / concrete should be consumed?
Why is compaction essential?
Questions:Curing
What is curing and why is it so important?
What is the correct method of curing?
What methods are commonly employed to ensure sufficient moisture for curing?
When should curing be started and when is it complete?
Questions:Reinforcement
converted by W eb2PDFConvert.com
Questions:Reinforcement
What is steel reinforcement? Why is it required in a concrete structure?
What is bar-bending-schedule?
What are the different types of steel reinforcements being used in a reinforced concrete structure?
Why cover blocks are required to be placed before concreting? What are their sizes?
How important are transverse reinforcements like links and stirrups? What precautions should be taken
while tying them?
What is a lap or development length? Where and how should they be provided?
What is anchorage length?
What is the checklist for steel reinforcement before the placement/pour of concrete?
For a given diameter, how do we calculate the weight of steel per meter length of the steel bar and vice
versa?
Can we receive the quality test certificate of steel fromthe supplier?
Questions:Plastering
Why plastering is required?
What precautions should be taken during plaster works?
CEMENT
Q. What is portland cement?
Portland cement is composed of calcium silicates and aluminate and aluminoferrite It is obtained by blending
predetermined proportions limestone clay and other minerals in small quantities which is pulverized and heated at high
temperature around 1500 deg centigrade to produce clinker. The clinker is then ground with small quantities of
gypsumto produce a fine powder called Ordinary Portland Cement (OPC). When mixed with water, sand and stone, it
combines slowly with the water to forma hard mass called concrete.
Q. What are the reasons for slow or fast setting of concrete or mortar?
Slow or fast setting normally depends on the nature of cement. It could also be due to extraneous factors not related
to the cement. The ambient conditions play an important role. In hot weather, the setting is faster, in cold weather,
setting is delayed Some types of salts, chemicals, clay, etc if inadvertently get mixed with the sand, aggregate and
water could accelerate or delay the setting of concrete.
converted by W eb2PDFConvert.com
Q. What are the advantages of using Portland Pozzolana Cement over OPC?
Pozzolana combines with lime and alkali in cement when water is added and forms compounds which contribute to
strength, impermeability and sulphate resistance It also contributes to workability, reduced bleeding and controls
destructive expansion from alkali-aggregate reaction. It reduces heat of hydration thereby controlling temperature
differentials, which causes thermal strain and resultant cracking n mass concrete structures like dams.
Q. How to identify the time for which the cement was stored before use?
On the cement bag, week number, month and year of manufacturing are being mentioned and this can be checked
before use.
--Back to Questions-CONCRETE
Q. What is concrete?
Concrete is a mixture of cement, sand, stone aggregates and water.
Q. What is RCC?
If a concrete mix is placed in and around a cage of steel rods, it is called Reinforced Cement Concrete (RCC).
Q. What is mortar?
Mortar is a mix of cement, sand and water, to be used for brick works/block works and plaster.
Q. How much water should be added in a concrete mix of one bag of cement for normal
construction work?
Normally the amount of water that is required per bag of cement is 25 -28 liters only.
Q. How does color affect the quality of cement & its concrete?
Quality of cement has nothing to do with its color.
Q. What precautions should one take for water to be used in concrete construction?
It is good to use potable quality of water. It should be free from impurities and harmful ingredients. Seawater
converted by W eb2PDFConvert.com
It is good to use potable quality of water. It should be free from impurities and harmful ingredients. Seawater
isnt recommended. The water fit for mixing is fit for curing too. Use of minimum quantity of mixing water,
consistent with the degree of workability required to enable easy placing and compaction of concrete, is
advisable Ensure that water is measured and added Low water to cement ratio is essential for good
performance of the structure in the long run.
Q. What is the minimum recommended concrete mix proportion for RCC works?
1:1.5:3, where 1 part of cement is to be mixed with 1.5 parts of sand and 3 parts of coarse aggregates. Water
requirement for the mix would be less than 25 liters per bag of cement.
Q. What are the common mistakes, which affect the quality of concrete?
The ways in which concrete maybe spoilt are many, most common of them being: Use of too much or too
little water for mixing, or water carelessly added during mixing. Incomplete mixing of aggregate with cement
Improper grading of aggregates resulting in segregation or bleeding of concrete. Inadequate compaction of
concrete Using concrete which has already begun to set. Placing of concrete on a dry foundation without
properly wetting it with water. Use of dirty aggregate or water containing earthy matter, clay or lime. Too
much troweling of the concrete surface. Leaving the finished concrete surface exposed to sun and wind
during the first ten days after placing without protecting it and keeping it damp by proper methods of curing.
Q. What are the factors responsible for governing the compressive strength of concrete?
The compressive strength is governed by the following factors:
(i)w/c ratio
(ii)characteristics of cement
(iii)characteristics of aggregates
(iv)time of mixing
(v)degree of compaction
(vi)temperature and period of curing
(vii)age of concrete
(viii)air entertainment
(ix)conditions of testing
Q. Within how much time the freshly prepared mortar / concrete should be consumed?
The mortar / concrete should be consumed as early as possible after addition of water to it. The hydration of
cement starts the moment water is added to it. As the hydration progresses the cement paste starts stiffening
and loses its plasticity. The concrete should not be disturbed after this. Normally, this is about 45 50 minutes.
--Back to Questions--
CURING
Q. What is curing and why is it so important?
The term curing is used to include maintenance of a favorable environment for the continuation of chemical
reactions, i.e. retention of moisture within, or supplying moisture to the concrete from an external and protection
against extremes of temperature.
Walls
:Water should be sprinkled fromthe top such that it covers the whole area of the wall and
Slab
Beams and columns :The beams and columns can be maintained wet by tying gunny bags around the periphery
and by maintaining it wet
always.
Q. What methods are commonly employed to ensure sufficient moisture for curing?
Ponding, continuous sprinkling, covering with wet cloth, cotton mats or similar materials, covering with specially
prepared paper, polyethylene, sealing coat applied as a liquid commonly known as curing compound which hardens to
forma thin protective membrane, are some of the methods by which concrete is cured.
--Back to Questions--
Reinforcement
Q. What is steel reinforcement? Why is it required in a concrete structure?
Steel reinforcements are used, generally, in the formof bars of circular cross section in concrete structure. They are
like a skeleton in human body. Plain concrete steel or any other reinforcement is strong in compression but weak in
tension. Steel is one of the best forms of reinforcements, to take care of those stresses and to strengthen concrete
to bear all kinds of loads.
converted by W eb2PDFConvert.com
Q. What is bar-bending-schedule?
Bar-bending-schedule is the schedule of reinforcement bars prepared in advance before cutting and bending of
rebars. This schedule contains all details of size, shape and dimension of rebars to be cut.
Q. What are the different types of steel reinforcements being used in a reinforced concrete
structure?
Mild steel bars conforming to IS: 432 (Part I) and Cold-worked steel high strength deformed bars conforming to IS:
1786 (grade Fe 415 and grade Fe 500, where 415 and 500 indicate yield stresses 415 N/mm2 and 500 N/mm2
respectively) are commonly used. Grade Fe 415 is being used most commonly nowadays. This has limited the use of
plain mild steel bars because of higher yield stress and bond strength resulting in saving of steel quantity. Some
companies have brought thermo mechanically treated (TMT) and corrosion resistant steel (CRS) bars with added
features. Bars range in diameter from 6 to 50 mm. Cold-worked steel high strength deformed bars start from 8 mm
diameter. For general house constructions, bars of diameter 6 to 20 mmare used.
Q. Why cover blocks are required to be placed before concreting? What are their sizes?
Cover blocks are placed to prevent the steel rods fromgetting exposed to the atmosphere, and to place and fix the
reinforcements as per the design drawings. Once the steel is exposed to the atmosphere, corrosion starts. Sometimes
it is commonly seen that the cover gets misplaced during the concreting activity. To prevent this, tying of cover with
steel bars using thin steel wires called binding wires (projected from cover surface and placed during making or
casting of cover blocks) is recommended. Covers should be made of cement sand mortar (1:3). Ideally, cover should
have strength similar to the surrounding concrete, with the least perimeter so that chances of water to penetrate
through periphery will be minimized. Provision of minimum covers as per the Indian standards for durability of the
whole structure should be ensured.
Shape of the cover blocks could be cubical or cylindrical. However, cover indicates thickness of the cover block.
Normally, cubical cover blocks are used. As a thumb rule, minimumcover of 2 in footings, 1.5 in columns and 1 for
other structures may be ensured.
Q. How important are transverse reinforcements like links and stirrups? What precautions
should be taken while tying them?
Transverse reinforcements are very important. They not only take care of structural requirements but also help main
reinforcements to remain in desired position. They play a very significant role while abrupt changes or reversal of
stresses like earthquake etc. They should be closely spaced as per the drawing and properly tied to the
main/longitudinal reinforcement.
Q. What is a lap or development length? Where and how should they be provided?
Lap length is the length overlap of bars tied to extend the reinforcement length.. Lap length about 50 times the
diameter of the bar is considered safe. Laps of neighboring bar lengths should be staggered and should not be
provided at one level/line. At one cross section, a maximumof 50% bars should be lapped. In case, required lap length
is not available at junction because of space and other constraints, bars can be joined with couplers or welded (with
correct choice of method of welding).
Q. What is the checklist for steel reinforcement before the placement/pour of concrete?
Reinforcement should be free from loose rust, oil paints, mud etc. it should be cut, bent and fixed properly. The
reinforcement shall be placed and maintained in position by providing proper cover blocks, spacers, supporting bars,
laps etc. Reinforcements shall be placed and tied such that concrete placement is possible without segregation, and
compaction possible by an immersion vibrator.
Q. For a given diameter, how do we calculate the weight of steel per meter length of the steel
bar and vice versa?
For any steel reinforcement bar, weight per running meter is equal to d2/162 Kg, where d is diameter of the bar in
mm. For example, 10 mmdiameter bar will weigh 10x10/162 = 0.617 Kg/m.
Q. Can we receive the quality test certificate of steel from the supplier?
Yes. We can receive the test certificate of the batch of materials supplied at our site. The certificate will confirmthe
compliance of quality of supplied materials as per the requirement of relevant Indian standard code.
--Back to Questions--
Plastering
converted by W eb2PDFConvert.com
--Back to Questions--
Q. What are the things one should keep in mind before finalizing a land deal?
Some points which one must pay attention to prior to land deal
a) House plot should not be under any acquisition proceedings of any government bodies .
b) Verify fromthe planning authorities whether the land was designated for residential use.
c) The survey number of land is critical.
d) Certificate obtained fromregistrars office should confirmthat there is no encumbrance on the property.
e) The title deed of the land should be clear and an advocate should be consulted for this.
f) Verify the rates after contacting some property consultants and some people who have purchased their plots
recently. You
should also refer guidelines and the market rates published in the government manual of your city/town.
g) Stamp duty at the time of registration is mandatory.
Q. What are the points, one should pay attention to while awarding the contracts for house
construction?
Whatever the type of contract, one needs to pay close attention to the following aspects a)
b)
c)
d)
e)
Type of materials
Quality of work
Advance payment, if any
Progress & time schedule
Future measurement & payment conditions
Q. What is the ratio of material, labor and other expenditures for house construction?
60:30:10
Q. What would be the approximate cost break up for various works in terms of percentage of
construction cost of house?
Expenditure in terms of
percentage
of
construction cost of
the building
Sl.No.
Materials/Activities
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
Cost
of
Total
Construction (%)
15
25
15
5
10
converted by W eb2PDFConvert.com
10
13
17
Total
100
Youtube
converted by W eb2PDFConvert.com