You are on page 1of 9
You select the master data for production orders via production versions. Which information is contained in a production version? A) The explosion dates for the routing and BOM B) The routing and BOM alternatives to be used C) The default order type to be used D) The control parameters for selecting routings and BOM Answer: B Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three) A) Batch size optimization B) Midpoint scheduling ©) Lot size optimization ) Finite capacity scheduling ) Setup time reduction Answer: BDE ‘ure marandplring sang 9 10a stock rosin) ie marl mit (SAP EC) oa maa For te amigo. ye ve srr rurmartanth eater pa SF (vedo man sag) 1) Now, ou mato get equment yo rm Sa VF a ‘ouane vn pang arigy 0 print eee or egarenena be eahng poason Pah Wet feta seraon a apnea ths ca? (Cae Wo) 1) Yor can ert sty gai 4D he mr man tt requ pel charge ona or etn resonant 1 orm sharoe te rnsman yer srg tagy 0 VEF Conan, The etn ype ean rearrmts chond by bene parang ©) Yoreareung he say grup Hom 10110 he extn protutonplan nna mal masa, nthe aque pe rl oquemee henge eta 1) Yorcan rte erty go. 40 nt mati maser ard char ta rset equrenent th prs arly nh econ la. ‘Wes modeling inhouse prodstion wing SAP ECO, on which busines levels can you rate abi of material (BOM)? (Choose we) |) the company code vel B) Atte plant el (6) Ato besinoss ara vel 1) Alte cent evel Anower: BD ‘Arora wis pana Ba cont of HP ECC ater equenents pir The MAP cote suseaenysecessed he rately mary env specter ere roa oducen edt Te MAP crv ow css Pe cen Steger ane MP Ite Wat outa contr lt it a tg (Chee 1 Tm sockets twas ph ment as ceed 15) Tmt pays tbe peau owe, ©) TouaPiethaste sue "poreser 1) Tm toicequrners et apy th precacton ode Which objects can affect the calculation of capecity requirements for an operation? (Choose three) AA) Standard values (routing) B) In-house production time (material master) ©) Transport time (routing) D) Formulas (work center) ) Operation control key (routing) Explanation: straight answer. ‘Answer: ADE ‘Ate material has been included in a NETCH material requirements planing run you change is BOM (bilo materia). |Which of folowing planting fle enties fr this matoral are set bythe system? 'A) The BOM explosion and the NETPL planing indicater 1B) The BOM exslosion indicator ‘C) The BOM explosion, the NETCH, andthe NETPL planing indicators ) The NETCH and NETPL planing ireators Explanation: outclass answer Answer: ¢ Which of the following items of master data are needed for repetitive manufacturing? (Choose three) ‘A) Production supply area 8) Repetitive manufacturing profile ©) Production version D) Master record for serial numbers E) Product cost collector Explanation: efficient answer. Answer: BCE In SAP ECC, you calculate the standard avaiable capacity fora work center capacity using the following data: = Start: 7:00:00 a.m. ~ End: 3:00:00 p.m. Break duration: 1 hour - Rate of utilization: 80% = Overtoad:110% = Number of individual capactis: 1 How large isthe standard available capacity? A) Bhous, 8) 5.6 hours ©) 8.16 hours 0) 7 hous Answer: B ‘Anoop bazein e US protsoas ee pat at sso inh et ot mania poun (LD), The mer now be mata he EA ‘erat eat besa ear be st wt ba nt aaa 1), Watsne ass wy at he rome? Djaseconmenca Scsmengpanstuigere cromcon wenn mesateee nnn ©} Gate asow mara wer aeareral tw egal rd bo re neo eNews 1) cond tau sion ha srt corset msn ne nay tno stron ‘Which of the following functions does SAP Supply Chain Management (SCM) offer? ‘A) Product development, safety, quality, and maintenance B) Planning of supply chains across company boundaries C) Communication with customers through different interaction channels D) Optimization of the procurement strategy with the supplier poo! Answer: B ‘Which ofthe following are characteristics of ECC master production scheduling (MPS)? (Choose three) A) MPS items are planned in a standard MRP run. 'B) The planning of MPS and non-MPS iteme is alwaye carriod out in one planning run. ©) Non-MPS toms can be taken into consideration by an MPS run. 1D) NPS liems can be defined on plant level. E) MPS items can be defined on MRP area level ‘Answer: CDE In which scenario will the error message shown in the attached screenshot occur? Exhibit: Noroutng found atonal P-100 vanty 10PC ioosion Date 05.06 2009, Exhibit ‘A) Avalid routing exists, but the material master is set to manual routing selection. B) A vald routing exists, but the Customizing forthe order type is set to manual routing selection. C) The routing is not valid at the exposion date. ) The selection method is set to "selection only by production version” in the material master. What could be a consequence of confirming an operation? A) The planned costs are updated B) The capacity requirements are updated C) The production order is rescheduled D) The actual costs are settled Explanation: confirmed. Answer: B Wen anayng te SAP EO rrp oa pled xr ra ished prot, youSBcon hat neo ho asenblas Wl not ral n ne for Ine screle leery bemn ol edo trwar scat ‘er sanng proce 6 you ue ce sie oduct lan Yom aegurenerts pain pepe? 2 out paneg one 1) Masivelsngetom paving woh ss. natura a elon Cl racoe sroie tom saving tho aye core ) Mubievtengesom png wih mon mo ep. never Which ofthe folowing activites witin the KANGAN procedure norma tigger subsequent stack esting ofthe goods recab? A) Sat"Container in process! 8) Sat"Container omay” ©) S2t*Containe in vansport 1) Set"Container utr Anewer: D Wat do you have io onsderrgasing ATP checks ih SAP EOC tata tiggered tom customer orders? Atte ATP check detormines nor aval, then checs inte nx! stop whether timely procurement o production is possble. 18) Tho ATP quart isthe avalable quarity that can be used to confi coring customer ord. (©) An ATP chock crates fed inks between custome orders ae hor confirmed reoipts. ') Th ATP chock doos ot ake stacks and recipi nto acsount.t checks consumption planed independent requrenents. Answer: 8 What are characteristics of repetitive manufacturing? (Choose three) ‘A) Production without using production orders and without status management B) Shop fabrication C) Automatic line loading based on capacity limits across all production lines D) Continuous material consumption, production flow and output E) Period-based planning of the quantities to be produced Answer: ADE Where in the SAP ECC system can you define production versions? A) In the material master B) In the routing C) In the bill of material D) In the work center Answer: A ‘You vant toreduor he wneranty assed by Wutating equrementor a fish rode by sing adnan ality slokin SAP ECC ‘on wc specications te ram aft stack catcuatonbasoa? 1) Te stat say stock and te mati foocast 18) Tre average day donand and tne say ene (©) Tre average daly donand and the desire range of coverage 10) The sat eal sac por dy ano ely tne newer: ‘What isa feature of the simulation mode for material requirements planning in SAP ECC? ‘A) It caloulates the delay time which may occur in planning. B) It triggers multilevel bottom-up scheduling. ) It propagates exception messages from a component to the finished product. D) It posts planning results to the database automatically. Answer: What do you have to consider when you use SAP ECC jong-term plaming (LTP)? (Choose two) ‘A) Aplanning scenario must be released before it can be used in LTP. B) Reorder point planned materials can be included in LTP. ©) LTP focuses on the operational planning of important components. 1D) LTP creates purchase requisitions for external procurement. Answer: AB ‘What master data do you need for material replenishment using the KANBAN procedure? (Choose two) ‘A) Production supply area B) Rate routing ©) Product cost collector D) Control cycle ) Production version. ‘Answer: AD For which of the following objects can you enter a confirmation? (Choose two) A) Work Center B) Production order operation C) Production order D) Trigger Point Explanation: upgrade. Answer: BC ‘re soctreasrome at a nse put cents ens roe ta plas cer wih te sare au Te aati dose {th NP morte on vray. arab or be sar ore sta edt antec or esr Oe. ono a mespongrecheung extpon nessa doe tp What au eth nse? (Choos) ‘eat sna wt ee wn etn aso, ©} Rexam paring has ret bea care ot 1) TheMRP donons are into nos 90 ‘ic issue can eccur il be lt size-dnendoet in-house production tein the maori maser snl updated ater charging he outing? ‘A Lexa tne senosung cannot ako pcs. 1) Dependent requramerts request the carparans rom te bill mates al wrong mes when using base das Schosng (©) Reaves ann erotes an soponrata aceon mastage ase cates seaulne 1 Stbsequant capacty planing is nolonge posse due the esol scheduling parartars Anonee 8 Which of the following features are offered by MAP areas in SAP ECC? (Choose two) A) Astorage location may be assigned to different MRP areas. B) An MRP area may include different storage locations. C) Make-to-order production is supported by storage location MP areas. 1D) Subcontracting is supported by MAP areas. Explanation: rectified answor. Answer: BD ‘Which functions can be triggered before releasing a production order? (Choose three) A) Selection of a routing B) Selection of a BOM ©) Stock determination D) Confirmation E) Scheduling Explanation: rectified answer. Answer: ABE ‘ou wert posic nse rod on when equa y a cure eden Take Dower pesicon, Honeer. i assis od be prone lochane How cn you st ese gitar in S4P ECC? (Coes ot 2) use sre 20 warning ita ra ase or ses pen ae saya aseene ne erat 15) Use seatogy 30 ocucn by) Be tied roan ay 70 paring at he asso vel a assorses in Ro Dit aoa (©) Use state 20 (ake tre poductenor bo fited ptt ant sly 7 (Sern al ease lever alassontesin Pe Bel 1} Use tae 40 (arring wn fal asso) fee ished rod and selgy 7 (annng ale assenby ee ra assenbles nthe to Anew: AC ‘What features elated io proses oder can be used ull Goed Manufacturing Practess(GUP) requirements? (Choose tree) 1) Aoproved mastr recipes 8) Datta signatro (©) Boonie bach recor 1) Avalabity check ) Resource selacion ‘Anewer: ABC Which activities lead to a reduction of the capacity requirements for an operation? (Choose three) ‘A) Rescheduling the operation B) Posting the gcods receipt for the production order ©) Confirming the operation 1D) Setting the status techrically complete (TECO) E) Reducing the order quantity ‘Answer: CDE |Whic of tte following properies about te planning functions avalabloin SAP ECC apples? ‘A) Long: tem planning [LTP isa long torn form of forecast. 8) Indemand management (OM) aerial shoriage stations are deified ard conespording receipt elements ae crested. ‘C) Matrial roquiemerts planning MFP) includes aulomatic capacity leveling. 1) Master production schedung (NPS) refers to preferred planning of important materia Answer: D ‘Where cen you define the defaut storage location for the material component of a production order? (Choose three) ‘A) Routing 8) Production supply area ofa work center (©) BOM header (product) 1) Proguston version (prosuct) ) Material master (component) ‘Answer: BDE uring poe ph, ou sonra some quests conarng armtredl be pontoon the mi sore SAP ECC tm, et be own rcuemen ype pues a? (Cree We {9 t0on ponent ypesaratons win onyx procures) queens pana assumes nts PON 1} Penremer ype ntoue suey) at oneal roremer) aaj fave be ut ere wh speca ocseTect C8 ©} Peamer ype En tous psu Fetal wocuronnt eX fon prone yes) obec a el Rooper raters yom Dy ocronent ie (cuneate eel rem may tb peti, Sepending on male Woe) fe otoneg stamens best dons SAP ERP? 1) SAP ERE is an apeaton at supp al ocesis ining Src cistome conta hreghouthe ete cusomar lator ie yo. 15) SAP ERE i an aplcaon ft a conary can veo asap ls buses processes fice. (©) SAP ERPs aptemn wich advrond pring and opmzaon processes canbe Mapp 1) S4P ERP sytem tarbrreat reise: congonets such ss Purchasing Sls an Dnrn, Marl Management and Prt, newer: 8 Which option for selecting a routing exists when you create a production order? ‘A) Automatic selection of a reference operation set 8) Manual selection based on settings in the order type-depencent parameters C) Automatic selection based on the selection ID in the material master 'D) Manual selection based on the list of routings maintained in the material master Answer: B Which function is supported by production orders? A) Automatic selection of a work center at order release B) Automatic creation of transfer orders at order release C) Automatic reading of PP master data at order release D) Automatic printing of order documents at order creation Answer: B ‘rich of oon acts incest caacty arab hak hat an be carraou automata wna pectoris baad? ‘A eat tnt sertuig nda an aogn cheng tin ewok ener ee cpraen tobe chad ©) Atal Fe avality chock ard ass an evra te to chocing coward po pan conbnatan, (©) Asin an appro avait haan oth matt mar ro pra. Dy pctv evant haa bog evra pti peor ear aN nem: ‘oor stone does ot wat macagevave-nanve mon he woh. Thee mars tule roid ray rhe podaton ete men BOM em ctgey mt ya eo A Weer? 1810 locum am 8) (enema orecueren ‘O1M Graton rates D)N coma tom) xpunaton ct ane Which of the following requirements is supported by using process orders? A) Linkage of documents to orders. B) Use of production/resource tools C) Documentation of the production using an electronic batch record D) Use of reference operation sets Answer: C

You might also like