METRADOS DE OBRA

OBRA:

"MEJORAMIENTO VIAL DE LAS CALLES DEL CASCO URBANO DE LA LOCALIDAD DE QUILCAS , DISTRITO
DE QUILCAS HUANCAYO JUNN"

PPTO:

CONSTRUCCION DE PAVIMENTO

ENTIDAD: MUNICIPALIDAD DISTRITAL DE QUILCAS


FECHA:

PART.

MARZO DEL 2014

DISTRITO:

QUILCAS

PROVINCIA:

HUANCAYO

REGIN:

JUNN

DIMENSIONES
#
VECES LARGO ANCHO
ALTO

DESCRIPCION

01.00 OBRAS PROVISIONALES


01.01 Cartel de indentificacin de obra de 7.20x3.60m.

01

01.02 Campamento, Almacn, Oficina y Guardiana

04

01.03 Movilizacin y Desmovilizacin de Maq. y Equip.


01.04 Mantenimiento de Trnsito y Seguridad

METRADO
PARCIAL

TOTAL

UNID

1.00

1.00

glb.

48.00

48.00

01

1.00

1.00

glb.

08

8.00

8.00 mes

4.00

3.00

02.00 TRABAJOS PRELIMINARES


02.01 Limpieza de Terreno Manual

27,631.09

Jr. Los Incas (Tramo 28 de Julio - San Martn)

694.60

AEI-01

Area=

97.54

97.54

AEI-02

Area=

97.53

97.53

AEI-03

Area=

68.17

68.17

AEI-04

Area=

68.06

68.06

AEI-05

Area=

67.61

67.61

AEI-06

Area=

67.61

67.61

AEI-07

Area=

66.47

66.47

AEI-08

Area=

66.47

66.47

AEI-09

Area=

47.58

47.58

AEI-10

Area=

47.56

Jr. Los Incas (Tramo San Martn-Chacamarca)

47.56
5100.54

Pavimento

Area=

4354.28

4354.28

AEI-11

Area=

44.27

44.27

AEI-12

Area=

44.47

44.47

AEI-13

Area=

48.69

48.69

AEI-14

Area=

48.49

48.49

AEI-15

Area=

47.53

47.53

AEI-16

Area=

47.62

47.62

AEI-17

Area=

48.69

48.69

AEI-18

Area=

48.69

48.69

AEI-19

Area=

40.94

40.94

AEI-20

Area=

41.47

41.47

AEI-21

Area=

75.98

75.98

AEI-22

Area=

76.07

76.07

AEI-23

Area=

66.77

66.77

AEI-24

Area=

66.58

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

66.58
4123.96

Pavimento

Area=

3433.92

3433.92

AEFB-01

Area=

97.53

97.53

AEFB-02

Area=

97.53

97.53

AEFB-03

Area=

66.99

66.99

AEFB-04

Area=

66.91

66.91

AEFB-05

Area=

67.61

67.61

AEFB-06

Area=

67.61

67.61

AEFB-07

Area=

66.48

66.48

AEFB-08

Area=

66.48

66.48

AEFB-09

Area=

45.49

AEFB-10

Area=

47.41

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

45.49
47.41
4511.96

Pavimento

Area=

3845.63

3845.63

AEFB-11

Area=

46.03

46.03

AEFB-12

Area=

45.84

45.84

AEFB-13

Area=

48.69

48.69

AEFB-14

Area=

48.77

48.77

AEFB-15

Area=

48.69

48.69

AEFB-16

Area=

48.69

48.69

AEFB-17

Area=

48.04

48.04

AEFB-18

Area=

48.53

48.53

AEFB-19

Area=

77.29

77.29

AEFB-20

Area=

77.37

77.37

AEFB-21

Area=

64.28

64.28

AEFB-22

Area=

64.11

Jirn Los Andes (Tramo Bolivar - San Martn)

64.11
1506.88

Pavimento

Area=

1275.92

1275.92

AELA-01

Area=

68.15

68.15

AELA-02

Area=

68.28

68.28

AELA-03

Area=

47.25

47.25

AELA-04

Area=

47.28

Jirn 28 de Julio

47.28
753.89

APJ-01

Area=

649.45

649.45

APJ-02

Area=

42.39

42.39

AEJ-01

Area=

14.50

14.50

AEJ-02

Area=

47.55

Jirn Sucre

47.55
687.96

APS-01

Area=

35.75

35.75

APS-02

Area=

525.50

525.50

APS-03

Area=

32.99

32.99

AES-01

Area=

46.84

46.84

AES-02

Area=

46.88

Jirn Ramn Castilla

46.88
684.24

APRC-01

Area=

35.75

35.75

APRC-02

Area=

522.86

522.86

APRC-03

Area=

32.99

32.99

AERC-01

Area=

46.30

46.30

AERC-02

Area=

46.34

Jirn Bolivar

46.34
1293.19

APB-01

Area=

35.76

35.76

APB-02

Area=

520.03

520.03

APB-03

Area=

520.20

520.20

APB-04

Area=

32.94

32.94

AEB-01

Area=

45.76

45.76

AEB-02

Area=

45.80

45.80

AEB-03

Area=

46.40

46.40

AEB-04

Area=

46.30

Jirn Sebastin Chipana

46.30
1054.67

APSCH-01

Area=

26.95

26.95

APSCH-02

Area=

495.88

495.88

APSCH-03

Area=

507.77

507.77

APSCH-04

Area=

24.07

Calle San Martn

24.07
1482.28

APSM-01

Area=

696.64

696.64

APSM-02

Area=

559.73

559.73

AESM-01

Area=

68.27

68.27

AESM-02

Area=

68.20

68.20

AESM-03

Area=

44.62

44.62

AESM-04

Area=

44.82

Jirn Lima

44.82
642.22

APL-01

Area=

35.77

35.77

APL-02

Area=

516.35

516.35

AEL-01

Area=

45.07

45.07

AEL-02

Area=

45.03

Jirn Huancayo

45.03
1017.78

APH-01

Area=

26.92

26.92

APH-02

Area=

497.44

497.44

APH-03

Area=

493.42

Jirn Catalina Huanca

493.42
1020.38

APCH-01

Area=

26.91

26.91

APCH-02

Area=

500.05

500.05

APCH-03

Area=

493.42

Jirn Alfonso Ugarte

493.42
1023.04

APAU-01

Area=

26.90

26.90

APAU-02

Area=

502.67

502.67

APAU-03

Area=

493.47

Jirn 27 de Mayo

493.47
1028.17

AP27M-01

Area=

27.02

27.02

AP27M-02

Area=

506.46

506.46

AP27M-03

Area=

494.69

Jirn Santa Cruz

494.69
1005.33

APSC-01

Area=

510.21

510.21

APSC-02

Area=

495.12

495.12

02.02 Trazo, Nivelacin y Replanteo

27,631.09

Jr. Los Incas (Tramo 28 de Julio - San Martn)

694.60

AEI-01

Area=

97.54

97.54

AEI-02

Area=

97.53

97.53

AEI-03

Area=

68.17

68.17

AEI-04

Area=

68.06

68.06

AEI-05

Area=

67.61

67.61

AEI-06

Area=

67.61

67.61

AEI-07

Area=

66.47

66.47

AEI-08

Area=

66.47

66.47

AEI-09

Area=

47.58

47.58

AEI-10

Area=

47.56

Jr. Los Incas (Tramo San Martn-Chacamarca)

47.56
5100.54

Pavimento

Area=

4354.28

4354.28

AEI-11

Area=

44.27

44.27

AEI-12

Area=

44.47

44.47

AEI-13

Area=

48.69

48.69

AEI-14

Area=

48.49

48.49

AEI-15

Area=

47.53

47.53

AEI-16

Area=

47.62

47.62

AEI-17

Area=

48.69

48.69

AEI-18

Area=

48.69

48.69

AEI-19

Area=

40.94

40.94

AEI-20

Area=

41.47

41.47

AEI-21

Area=

75.98

75.98

AEI-22

Area=

76.07

76.07

AEI-23

Area=

66.77

66.77

AEI-24

Area=

66.58

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

66.58
4123.96

Pavimento

Area=

3433.92

3433.92

AEFB-01

Area=

97.53

97.53

AEFB-02

Area=

97.53

97.53

AEFB-03

Area=

66.99

66.99

AEFB-04

Area=

66.91

66.91

AEFB-05

Area=

67.61

67.61

AEFB-06

Area=

67.61

67.61

AEFB-07

Area=

66.48

66.48

AEFB-08

Area=

66.48

66.48

AEFB-09

Area=

45.49

45.49

AEFB-10

Area=

47.41

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

47.41
4511.96

Pavimento

Area=

3845.63

3845.63

AEFB-11

Area=

46.03

46.03

AEFB-12

Area=

45.84

45.84

AEFB-13

Area=

48.69

48.69

AEFB-14

Area=

48.77

48.77

AEFB-15

Area=

48.69

48.69

AEFB-16

Area=

48.69

48.69

AEFB-17

Area=

48.04

48.04

AEFB-18

Area=

48.53

48.53

AEFB-19

Area=

77.29

77.29

AEFB-20

Area=

77.37

77.37

AEFB-21

Area=

64.28

64.28

AEFB-22

Area=

64.11

Jirn Los Andes (Tramo Bolivar - San Martn)

64.11
1506.88

Pavimento

Area=

1275.92

1275.92

AELA-01

Area=

68.15

68.15

AELA-02

Area=

68.28

68.28

AELA-03

Area=

47.25

47.25

AELA-04

Area=

47.28

Jirn 28 de Julio

47.28
753.89

APJ-01

Area=

649.45

649.45

APJ-02

Area=

42.39

42.39

AEJ-01

Area=

14.50

14.50

AEJ-02

Area=

47.55

Jirn Sucre

47.55
687.96

APS-01

Area=

35.75

35.75

APS-02

Area=

525.50

525.50

APS-03

Area=

32.99

32.99

AES-01

Area=

46.84

46.84

AES-02

Area=

46.88

Jirn Ramn Castilla

46.88
684.24

APRC-01

Area=

35.75

35.75

APRC-02

Area=

522.86

522.86

APRC-03

Area=

32.99

32.99

AERC-01

Area=

46.30

46.30

AERC-02

Area=

46.34

Jirn Bolivar

46.34
1293.19

APB-01

Area=

35.76

35.76

APB-02

Area=

520.03

520.03

APB-03

Area=

520.20

520.20

APB-04

Area=

32.94

32.94

AEB-01

Area=

45.76

45.76

AEB-02

Area=

45.80

45.80

AEB-03

Area=

46.40

46.40

AEB-04

Area=

46.30

Jirn Sebastin Chipana

46.30
1054.67

APSCH-01

Area=

26.95

26.95

APSCH-02

Area=

495.88

495.88

APSCH-03

Area=

507.77

507.77

APSCH-04

Area=

24.07

Calle San Martn

24.07
1482.28

APSM-01

Area=

696.64

696.64

APSM-02

Area=

559.73

559.73

AESM-01

Area=

68.27

68.27

AESM-02

Area=

68.20

68.20

AESM-03

Area=

44.62

AESM-04

Area=

44.82

Jirn Lima

44.62
44.82
642.22

APL-01

Area=

35.77

35.77

APL-02

Area=

516.35

516.35

AEL-01

Area=

45.07

45.07

AEL-02

Area=

45.03

Jirn Huancayo

45.03
1017.78

APH-01

Area=

26.92

26.92

APH-02

Area=

497.44

497.44

APH-03

Area=

493.42

Jirn Catalina Huanca

493.42
1020.38

APCH-01

Area=

26.91

26.91

APCH-02

Area=

500.05

500.05

APCH-03

Area=

493.42

Jirn Alfonso Ugarte

493.42
1023.04

APAU-01

Area=

26.90

26.90

APAU-02

Area=

502.67

502.67

APAU-03

Area=

493.47

Jirn 27 de Mayo

493.47
1028.17

AP27M-01

Area=

27.02

27.02

AP27M-02

Area=

506.46

506.46

AP27M-03

Area=

494.69

Jirn Santa Cruz

494.69
1005.33

APSC-01

Area=

510.21

510.21

APSC-02

Area=

495.12

495.12

02.03 Demolicin de Veredas Existentes

1,590.45

Jr. Los Incas (Tramo 28 de Julio - San Martn)

266.89

ADVE-03

Area=

91.86

91.86

ADVE-07

Area=

24.88

24.88

ADVE-09

Area=

22.85

22.85

ADVE-11

Area=

9.38

9.38

ADVE-12

Area=

14.35

14.35

ADVE-24

Area=

5.66

5.66

ADVE-25

Area=

18.17

18.17

ADVE-26

Area=

17.55

17.55

ADVE-27

Area=

35.25

35.25

ADVE-28

Area=

26.94

Jr. Los Incas (Tramo San Martn-Chacamarca)

26.94
152.44

ADVE-35

Area=

25.75

25.75

ADVE-38

Area=

23.93

23.93

ADVE-39

Area=

7.06

7.06

ADVE-40

Area=

23.16

23.16

ADVE-43

Area=

9.31

9.31

ADVE-44

Area=

20.66

20.66

ADVE-50

Area=

19.08

19.08

ADVE-53

Area=

9.79

9.79

ADVE-60

Area=

10.32

10.32

ADVE-69

Area=

3.38

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

3.38
228.41

ADVE-04

Area=

7.36

ADVE-05

Area=

4.21

7.36
4.21

ADVE-08

Area=

16.76

16.76

ADVE-13

Area=

16.05

16.05

ADVE-17

Area=

6.73

6.73

ADVE-18

Area=

7.19

7.19

ADVE-19

Area=

9.08

9.08

ADVE-20

Area=

7.67

7.67

ADVE-21

Area=

30.22

30.22

ADVE-22

Area=

27.47

27.47

ADVE-23

Area=

31.70

31.70

ADVE-30

Area=

18.89

18.89

ADVE-32

Area=

27.25

27.25

ADVE-33

Area=

7.36

7.36

ADVE-34

Area=

10.47

10.47

ADVE-42

Area=

65.39

65.39

ADVE-46

Area=

27.95

27.95

ADVE-47

Area=

43.83

43.83

ADVE-48

Area=

42.74

42.74

ADVE-51

Area=

3.85

3.85

ADVE-52

Area=

178.34

178.34

ADVE-56

Area=

4.90

4.90

ADVE-57

Area=

4.48

4.48

ADVE-58

Area=

21.82

21.82

ADVE-59

Area=

13.42

13.42

ADVE-61

Area=

16.84

16.84

ADVE-62

Area=

6.77

6.77

ADVE-65

Area=

24.08

24.08

ADVE-66

Area=

5.39

5.39

ADVE-67

Area=

6.30

6.30

ADVE-68

Area=

14.48

14.48

ADVE-14

Area=

36.06

36.06

ADVE-15

Area=

6.55

6.55

ADVE-16

Area=

8.56

8.56

ADVE-31

Area=

7.52

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

480.58

Jirn Los Andes (Tramo Bolivar - San Martn)

58.69

Jirn 28 de Julio

7.52
43.23

ADVE-01

Area=

30.35

30.35

ADVE-02

Area=

12.88

12.88

ADVE-06

Area=

78.58

ADVE-10

Area=

95.36

ADVE-29

Area=

3.35

Jirn Ramn Castilla

78.58

Jirn Bolivar

78.58
95.36

Jirn Sebastin Chipana

95.36
3.35

Calle San Martn

3.35
12.59

ADVE-36

Area=

6.04

ADVE-37

Area=

6.55

Jirn Lima

6.04
6.55
39.23

ADVE-41

Area=

39.23

ADVE-45

Area=

16.82

ADVE-49

Area=

22.56

ADVE-54

Area=

14.72

14.72

ADVE-55

Area=

59.36

59.36

ADVE-63

Area=

5.27

5.27

ADVE-64

Area=

12.37

12.37

Jirn Huancayo

39.23
16.82

Jirn Catalina Huanca

16.82
22.56

Jirn Alfonso Ugarte

22.56
74.08

Jirn Santa Cruz

17.64

02.04 Demolicin de Estructuras Existentes de Adobe

4,156.51

Jr. Los Incas (Tramo 28 de Julio - San Martn)

883.15

ADVIV-02

Area=

85.20

85.20

ADVIV-04

Area=

60.52

60.52

ADVIV-06

Area=

57.06

57.06

ADVIV-07

Area=

49.28

49.28

ADVIV-10

Area=

79.43

79.43

ADVIV-12

Area=

38.36

38.36

ADVIV-14

Area=

97.17

97.17

ADVIV-18

Area=

32.54

32.54

ADVIV-19

Area=

20.69

20.69

ADVIV-20

Area=

7.02

7.02

ADVIV-24

Area=

58.80

58.80

ADVIV-37

Area=

141.25

141.25

ADVIV-38

Area=

42.19

42.19

ADVIV-47

Area=

113.64

113.64

ADVIV-51

Area=

210.58

210.58

ADVIV-52

Area=

20.79

20.79

ADVIV-53

Area=

48.39

48.39

ADVIV-62

Area=

32.58

32.58

ADVIV-63

Area=

5.73

5.73

ADVIV-66

Area=

17.37

17.37

ADVIV-67

Area=

35.05

35.05

ADVIV-68

Area=

18.09

18.09

ADVIV-70

Area=

67.48

67.48

ADVIV-71

Area=

149.72

149.72

ADVIV-74

Area=

29.92

29.92

ADVIV-80

Area=

24.72

24.72

ADVIV-83

Area=

70.51

70.51

ADVIV-85

Area=

22.62

22.62

ADVIV-86

Area=

34.40

34.40

ADVIV-87

Area=

33.78

Jr. Los Incas (Tramo San Martn-Chacamarca)

821.73

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

33.78
812.20

ADVIV-05

Area=

18.49

18.49

ADVIV-11

Area=

17.47

17.47

ADVIV-11'

Area=

13.27

13.27

ADVIV-15

Area=

28.74

28.74

ADVIV-16

Area=

159.05

159.05

ADVIV-17

Area=

69.26

69.26

ADVIV-25

Area=

28.12

28.12

ADVIV-27

Area=

17.17

17.17

ADVIV-28

Area=

23.37

23.37

ADVIV-29

Area=

106.58

106.58

ADVIV-30

Area=

14.76

14.76

ADVIV-39

Area=

221.56

221.56

ADVIV-44

Area=

94.36

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

94.36
355.45

ADVIV-55

Area=

4.90

ADVIV-59

Area=

0.79

0.79

ADVIV-72

Area=

13.87

13.87

ADVIV-73

Area=

78.70

78.70

ADVIV-81

Area=

1.24

1.24

ADVIV-82

Area=

194.56

194.56

ADVIV-84

Area=

15.66

15.66

ADVIV-88

Area=

17.68

17.68

ADVIV-89

Area=

28.05

Jirn Los Andes (Tramo Bolivar - San Martn)

4.90

28.05
283.29

ADVIV-26

Area=

10.71

10.71

ADVIV-31

Area=

17.87

17.87

ADVIV-32

Area=

40.51

40.51

ADVIV-33

Area=

85.91

85.91

ADVIV-40

Area=

19.78

19.78

ADVIV-41

Area=

14.53

14.53

ADVIV-42

Area=

80.09

80.09

ADVIV-43

Area=

13.89

13.89

Jirn 28 de Julio

62.66

ADVIV-01

Area=

16.97

16.97

ADVIV-03

Area=

45.69

45.69

ADVIV-08

Area=

19.08

19.08

ADVIV-09

Area=

73.47

73.47

Area=

5.06

Jirn Sucre

92.55

Jirn Ramn Castilla


ADVIV-13

5.06
5.06

Jirn Bolivar

75.25

ADVIV-21

Area=

43.10

43.10

ADVIV-22

Area=

13.91

13.91

ADVIV-23

Area=

18.24

18.24

Jirn Sebastin Chipana

120.49

ADVIV-34

Area=

21.83

21.83

ADVIV-35

Area=

42.34

42.34

ADVIV-36

Area=

56.32

56.32

Calle San Martn

117.92

ADVIV-45

Area=

50.15

50.15

ADVIV-46

Area=

16.13

16.13

ADVIV-48

Area=

31.45

31.45

ADVIV-49

Area=

5.23

5.23

ADVIV-50

Area=

14.96

14.96

Area=

52.67

Jirn Lima
ADVIV-54

52.67
52.67

Jirn Huancayo

102.66

ADVIV-56

Area=

43.74

43.74

ADVIV-57

Area=

12.36

12.36

ADVIV-58

Area=

4.49

4.49

ADVIV-60

Area=

31.20

31.20

ADVIV-61

Area=

10.87

10.87

ADVIV-64

Area=

19.83

ADVIV-65

Area=

5.91

Jirn Catalina Huanca

25.74
19.83
5.91

Jirn Alfonso Ugarte

150.91

ADVIV-69

Area=

110.57

ADVIV-69'

Area=

40.34

110.57
40.34

Jirn 27 de Mayo

194.78

ADVIV-75

Area=

2.60

2.60

ADVIV-76

Area=

5.06

5.06

ADVIV-77

Area=

106.71

106.71

ADVIV-78

Area=

21.15

21.15

ADVIV-79

Area=

59.26

59.26

03.00 EXPLANACIONES
03.01 Corte a nivel de sub Rasante con Maquinaria

19,131.97

Jirn Los Incas (Tramo 28 de Julio - San Martn)


AEI-01

Area=

97.54

0.55

53.65

AEI-02

Area=

97.53

0.55

53.64

AEI-03

Area=

68.17

0.55

37.49

AEI-04

Area=

68.06

0.55

37.43

AEI-05

Area=

67.61

0.55

37.19

AEI-06

Area=

67.61

0.55

37.19

AEI-07

Area=

66.47

0.55

36.56

AEI-08

Area=

66.47

0.55

36.56

AEI-09

Area=

47.58

0.55

26.17

AEI-10

Area=

47.56

0.55

26.16

Jirn Los Incas (Tramo San Martn-Chacamarca)

Explanaciones

3492.47

3492.47

Jr. Fco. Bolognesi (Tramo 28 de Julio-San Martn)

Explanaciones

2745.77

2745.77

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

Explanaciones

3170.25

3170.25

Jirn Los Andes

Explanaciones

900.55

900.55

Jirn 28 de Julio

Explanaciones

649.12

649.12

APJ-02

0.55

23.31

Jirn Sucre

442.67

442.67

APS-01

Area=

35.75

0.55

19.66

APS-03

Area=

32.99

0.55

18.14

Jirn Ramn Castilla

555.39

555.39

APRC-01

Area=

35.75

0.55

19.66

APRC-03

Area=

32.99

0.55

18.14

Jirn Bolivar

Explanaciones

386.47

386.47

Explanaciones

302.11

302.11
19.67

Area=

42.39

Explanaciones

Explanaciones

APB-01

Area=

35.76

0.55

APB-04

Area=

32.94

0.55

18.12

Jirn Sebastin Chipana

Explanaciones

385.77

385.77

Explanaciones

360.82

360.82

APSCH-01

Area=

26.95

0.55

14.82

APSCH-04

Area=

24.07

0.55

13.24

Calle San Martn

557.65

557.65

APSM-01

Area=

696.64

0.55

383.15

APSM-02

Area=

559.73

0.55

307.85

AESM-01

Area=

68.27

0.55

37.55

AESM-02

Area=

68.20

0.55

37.51

AESM-03

Area=

44.62

0.55

24.54

AESM-04

Area=

44.82

0.55

24.65

Jirn Lima

446.14

446.14

APL-01

0.55

19.67

Jirn Huancayo

Explanaciones

401.51

401.51

Explanaciones

239.26

239.26

APH-01

Jirn Catalina Huanca

1
1

APCH-01

Jirn Alfonso Ugarte

1
1

APAU-01

Jirn 27 de Mayo

1
1

AP27M-01

Jirn Santa Cruz

Explanaciones

Explanaciones
Area=

Area=

35.77

0.55

14.81

Explanaciones

332.56

332.56

Explanaciones

278.26

278.26

Area=

26.92

0.55

14.80

Explanaciones

383.77

383.77

Explanaciones

336.24

336.24

Area=

26.91

0.55

14.80

Explanaciones

354.99

354.99

Explanaciones

307.02

307.02

Area=

26.90

27.02

0.55

14.86

Explanaciones

321.21

321.21

Explanaciones

340.98

340.98

Jirn Los Incas (Tramo San Martn - Chacamarca)

Explanaciones

296.62

296.62

Jr. Fco. Bolognesi (Tramo 28 de Julio-San Martn)

Explanaciones

240.13

240.13

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

Explanaciones

164.80

164.80

Jirn Los Andes

Explanaciones

103.52

103.52

Jirn 28 de Julio

Explanaciones

12.25

12.25

Jirn Sucre

Explanaciones

8.85

8.85

Jirn Ramn Castilla

Explanaciones

27.51

27.51

Jirn Bolivar

Explanaciones

47.36

47.36

Explanaciones

63.08

63.08

Explanaciones

22.21

22.21

03.02 Relleno con Material Propio a Mquina

1,233.10

Jirn Sebastin Chipana

Explanaciones

17.61

Calle San Martn

Explanaciones

7.85

7.85

Jirn Lima

Explanaciones

12.55

12.55

Jirn Huancayo

Explanaciones

13.30

13.30

Explanaciones

21.44

21.44

Explanaciones

7.65

7.65

Explanaciones

34.47

34.47

Explanaciones

16.95

16.95

Explanaciones

11.40

11.40

Explanaciones

6.96

6.96

Explanaciones

34.03

34.03

Explanaciones

33.48

33.48

Explanaciones

29.08

29.08

Jirn Catalina Huanca


Jirn Alfonso Ugarte
Jirn 27 de Mayo
Jirn Santa Cruz

03.03 Perfilado y Compactado en Zona de Corte


Jr. Los Incas (Tramo 28 de Julio - San Martn)
AEI-01
AEI-02
AEI-03
AEI-04
AEI-05
AEI-06
AEI-07
AEI-08
AEI-09
AEI-10
Jr. Los Incas (Tramo R. Castilla - Chacamarca)
Pavimento
AEI-11
AEI-12
AEI-13
AEI-14
AEI-15
AEI-16
AEI-17
AEI-18
AEI-19
AEI-20
AEI-21
AEI-22
AEI-23
AEI-24
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)
Pavimento
AEFB-01
AEFB-02
AEFB-03
AEFB-04
AEFB-05
AEFB-06
AEFB-07
AEFB-08
AEFB-09
AEFB-10
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)
Pavimento
AEFB-11
AEFB-12
AEFB-13
AEFB-14

17.61

27,631.09
1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

97.54
97.53
68.17
68.06
67.61
67.61
66.47
66.47
47.58
47.56

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

4354.28
44.27
44.47
48.69
48.49
47.53
47.62
48.69
48.69
40.94
41.47
75.98
76.07
66.77
66.58

1
1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

3433.92
97.53
97.53
66.99
66.91
67.61
67.61
66.48
66.48
45.49
47.41

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

3845.63
46.03
45.84
48.69
48.77

694.60
97.54
97.53
68.17
68.06
67.61
67.61
66.47
66.47
47.58
47.56
5100.54
4354.28
44.27
44.47
48.69
48.49
47.53
47.62
48.69
48.69
40.94
41.47
75.98
76.07
66.77
66.58
4123.96
3433.92
97.53
97.53
66.99
66.91
67.61
67.61
66.48
66.48
45.49
47.41
4511.96
3845.63
46.03
45.84
48.69
48.77

AEFB-15
AEFB-16
AEFB-17
AEFB-18
AEFB-19
AEFB-20
AEFB-21
AEFB-22
Jirn Los Andes (Tramo Bolivar - San Martn)
Pavimento
AELA-01
AELA-02
AELA-03
AELA-04
Jirn 28 de Julio
APJ-01
APJ-02
AEJ-01
AEJ-02

1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

48.69
48.69
48.04
48.53
77.29
77.37
64.28
64.11

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

1275.92
68.15
68.28
47.25
47.28

1
1
1
1

Area=
Area=
Area=
Area=

649.45
42.39
14.50
47.55

APS-01

Area=

35.75

35.75

APS-02

Area=

525.50

525.50

APS-03

Area=

32.99

32.99

AES-01

Area=

46.84

46.84

AES-02

Area=

46.88

Jirn Sucre

687.96

Jirn Ramn Castilla

46.88
684.24

APRC-01

Area=

35.75

35.75

APRC-02

Area=

522.86

522.86

APRC-03

Area=

32.99

32.99

AERC-01

Area=

46.30

46.30

AERC-02

Area=

46.34

Jirn Bolivar

46.34
1293.19

APB-01

Area=

35.76

35.76

APB-02

Area=

520.03

520.03

APB-03

Area=

520.20

520.20

APB-04

Area=

32.94

32.94

AEB-01

Area=

45.76

45.76

AEB-02

Area=

45.80

45.80

AEB-03

Area=

46.40

46.40

AEB-04

Area=

46.30

Jirn Sebastin Chipana

46.30
1054.67

APSCH-01

Area=

26.95

26.95

APSCH-02

Area=

495.88

495.88

APSCH-03

Area=

507.77

507.77

APSCH-04

Area=

24.07

Calle San Martn

24.07
1482.28

APSM-01

Area=

696.64

696.64

APSM-02

Area=

559.73

559.73

AESM-01

Area=

68.27

68.27

AESM-02

Area=

68.20

68.20

AESM-03

Area=

44.62

44.62

AESM-04

Area=

44.82

Jirn Lima

44.82
642.22

APL-01

Area=

35.77

35.77

APL-02

Area=

516.35

516.35

AEL-01

Area=

45.07

45.07

AEL-02

Area=

45.03

Jirn Huancayo

Jirn Catalina Huanca

48.69
48.69
48.04
48.53
77.29
77.37
64.28
64.11
1506.88
1275.92
68.15
68.28
47.25
47.28
753.89
649.45
42.39
14.50
47.55

45.03
1017.78

APH-01

Area=

26.92

26.92

APH-02

Area=

497.44

497.44

APH-03

Area=

493.42

493.42
1020.38

APCH-01

Area=

26.91

26.91

APCH-02

Area=

500.05

500.05

APCH-03

Area=

493.42

493.42

Jirn Alfonso Ugarte

1023.04
APAU-01

Area=

26.90

26.90

APAU-02

Area=

502.67

502.67

APAU-03

Area=

493.47

493.47

Jirn 27 de Mayo

1028.17
AP27M-01

Area=

27.02

27.02

AP27M-02

Area=

506.46

506.46

AP27M-03

Area=

494.69

494.69

Jirn Santa Cruz

1005.33
APSC-01

Area=

510.21

510.21

APSC-02

Area=

495.12

495.12

03.04 Eliminacin de Material Excedente (Maquinaria)

F(e)

Total excavacin

20%

17,899

Corte

19,132

Relleno

1,233

3,580

21,478.65

27,631.09

21478.65

04.00 BASE GRANULAR


04.01 Sub Base E=0.15m. Rend.=2560 m2/da
Jr. Los Incas (Tramo 28 de Julio - San Martn)

694.60

AEI-01

Area=

97.54

97.54

AEI-02

Area=

97.53

97.53

AEI-03

Area=

68.17

68.17

AEI-04

Area=

68.06

68.06

AEI-05

Area=

67.61

67.61

AEI-06

Area=

67.61

67.61

AEI-07

Area=

66.47

66.47

AEI-08

Area=

66.47

66.47

AEI-09

Area=

47.58

47.58

AEI-10

Area=

47.56

Jr. Los Incas (Tramo San Martn - Chacamarca)

47.56
5100.54

Pavimento

Area=

4354.28

4354.28

AEI-11

Area=

44.27

44.27

AEI-12

Area=

44.47

44.47

AEI-13

Area=

48.69

48.69

AEI-14

Area=

48.49

48.49

AEI-15

Area=

47.53

47.53

AEI-16

Area=

47.62

47.62

AEI-17

Area=

48.69

48.69

AEI-18

Area=

48.69

48.69

AEI-19

Area=

40.94

40.94

AEI-20

Area=

41.47

41.47

AEI-21

Area=

75.98

75.98

AEI-22

Area=

76.07

76.07

AEI-23

Area=

66.77

66.77

AEI-24

Area=

66.58

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

66.58
4123.96

Pavimento

Area=

3433.92

3433.92

AEFB-01

Area=

97.53

97.53

AEFB-02

Area=

97.53

97.53

AEFB-03

Area=

66.99

66.99

AEFB-04

Area=

66.91

66.91

AEFB-05

Area=

67.61

67.61

AEFB-06

Area=

67.61

67.61

AEFB-07

Area=

66.48

66.48

AEFB-08

Area=

66.48

66.48

AEFB-09

Area=

45.49

45.49

AEFB-10

Area=

47.41

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

47.41
4511.96

Pavimento

Area=

3845.63

3845.63

AEFB-11

Area=

46.03

46.03

AEFB-12

Area=

45.84

45.84

AEFB-13

Area=

48.69

48.69

AEFB-14

Area=

48.77

48.77

AEFB-15

Area=

48.69

48.69

AEFB-16

Area=

48.69

48.69

AEFB-17

Area=

48.04

48.04

AEFB-18

Area=

48.53

48.53

AEFB-19

Area=

77.29

77.29

AEFB-20

Area=

77.37

77.37

AEFB-21

Area=

64.28

64.28

AEFB-22

Area=

64.11

Jirn Los Andes (Tramo Bolivar - San Martn)

64.11
1506.88

Pavimento

Area=

1275.92

1275.92

AELA-01

Area=

68.15

68.15

AELA-02

Area=

68.28

68.28

AELA-03

Area=

47.25

47.25

AELA-04

Area=

47.28

Jirn 28 de Julio

47.28
753.89

APJ-01

Area=

649.45

649.45

APJ-02

Area=

42.39

42.39

AEJ-01

Area=

14.50

14.50

AEJ-02

Area=

47.55

Jirn Sucre

47.55
687.96

APS-01

Area=

35.75

35.75

APS-02

Area=

525.50

525.50

APS-03

Area=

32.99

32.99

AES-01

Area=

46.84

46.84

AES-02

Area=

46.88

Jirn Ramn Castilla

46.88
684.24

APRC-01

Area=

35.75

35.75

APRC-02

Area=

522.86

522.86

APRC-03

Area=

32.99

32.99

AERC-01

Area=

46.30

46.30

AERC-02

Area=

46.34

Jirn Bolivar

46.34
1293.19

APB-01

Area=

35.76

35.76

APB-02

Area=

520.03

520.03

APB-03

Area=

520.20

520.20

APB-04

Area=

32.94

32.94

AEB-01

Area=

45.76

45.76

AEB-02

Area=

45.80

45.80

AEB-03

Area=

46.40

46.40

AEB-04

Area=

46.30

Jirn Sebastin Chipana

46.30
1054.67

APSCH-01

Area=

26.95

26.95

APSCH-02

Area=

495.88

495.88

APSCH-03

Area=

507.77

507.77

APSCH-04

Area=

24.07

Calle San Martn

24.07
1482.28

APSM-01

Area=

696.64

696.64

APSM-02

Area=

559.73

559.73

AESM-01

Area=

68.27

68.27

AESM-02

Area=

68.20

68.20

AESM-03

Area=

44.62

44.62

AESM-04

Area=

44.82

Jirn Lima
APL-01

44.82
642.22

Area=

35.77

35.77

APL-02

Area=

516.35

516.35

AEL-01

Area=

45.07

45.07

AEL-02

Area=

45.03

Jirn Huancayo

45.03
1017.78

APH-01

Area=

26.92

26.92

APH-02

Area=

497.44

497.44

APH-03

Area=

493.42

Jirn Catalina Huanca

493.42
1020.38

APCH-01

Area=

26.91

26.91

APCH-02

Area=

500.05

500.05

APCH-03

Area=

493.42

Jirn Alfonso Ugarte

493.42
1023.04

APAU-01

Area=

26.90

26.90

APAU-02

Area=

502.67

502.67

APAU-03

Area=

493.47

Jirn 27 de Mayo

493.47
1028.17

AP27M-01

Area=

27.02

27.02

AP27M-02

Area=

506.46

506.46

AP27M-03

Area=

494.69

Jirn Santa Cruz

494.69
1005.33

APSC-01

Area=

510.21

510.21

APSC-02

Area=

495.12

495.12

04.02 Base Granular E=0.20m. Rend.=2090 m2/da

27,631.09

Jr. Los Incas (Tramo 28 de Julio - San Martn)

694.60

AEI-01

Area=

97.54

97.54

AEI-02

Area=

97.53

97.53

AEI-03

Area=

68.17

68.17

AEI-04

Area=

68.06

68.06

AEI-05

Area=

67.61

67.61

AEI-06

Area=

67.61

67.61

AEI-07

Area=

66.47

66.47

AEI-08

Area=

66.47

66.47

AEI-09

Area=

47.58

47.58

AEI-10

Area=

47.56

Jr. Los Incas (Tramo San Martn - Chacamarca)

47.56
5100.54

Pavimento

Area=

4354.28

4354.28

AEI-11

Area=

44.27

44.27

AEI-12

Area=

44.47

44.47

AEI-13

Area=

48.69

48.69

AEI-14

Area=

48.49

48.49

AEI-15

Area=

47.53

47.53

AEI-16

Area=

47.62

47.62

AEI-17

Area=

48.69

48.69

AEI-18

Area=

48.69

48.69

AEI-19

Area=

40.94

40.94

AEI-20

Area=

41.47

41.47

AEI-21

Area=

75.98

75.98

AEI-22

Area=

76.07

76.07

AEI-23

Area=

66.77

66.77

AEI-24

Area=

66.58

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

66.58
4123.96

Pavimento

Area=

3433.92

3433.92

AEFB-01

Area=

97.53

97.53

AEFB-02

Area=

97.53

97.53

AEFB-03

Area=

66.99

66.99

AEFB-04

Area=

66.91

66.91

AEFB-05

Area=

67.61

67.61

AEFB-06

Area=

67.61

67.61

AEFB-07

Area=

66.48

66.48

AEFB-08

Area=

66.48

66.48

AEFB-09

Area=

45.49

45.49

AEFB-10

Area=

47.41

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

47.41
4511.96

Pavimento

Area=

3845.63

3845.63

AEFB-11

Area=

46.03

46.03

AEFB-12

Area=

45.84

45.84

AEFB-13

Area=

48.69

48.69

AEFB-14

Area=

48.77

48.77

AEFB-15

Area=

48.69

48.69

AEFB-16

Area=

48.69

48.69

AEFB-17

Area=

48.04

48.04

AEFB-18

Area=

48.53

48.53

AEFB-19

Area=

77.29

77.29

AEFB-20

Area=

77.37

77.37

AEFB-21

Area=

64.28

64.28

AEFB-22

Area=

64.11

Jirn Los Andes (Tramo Bolivar - San Martn)

64.11
1506.88

Pavimento

Area=

1275.92

1275.92

AELA-01

Area=

68.15

68.15

AELA-02

Area=

68.28

68.28

AELA-03

Area=

47.25

47.25

AELA-04

Area=

47.28

Jirn 28 de Julio

47.28
753.89

APJ-01

Area=

649.45

649.45

APJ-02

Area=

42.39

42.39

AEJ-01

Area=

14.50

14.50

AEJ-02

Area=

47.55

Jirn Sucre

47.55
687.96

APS-01

Area=

35.75

35.75

APS-02

Area=

525.50

525.50

APS-03

Area=

32.99

32.99

AES-01

Area=

46.84

46.84

AES-02

Area=

46.88

Jirn Ramn Castilla

46.88
684.24

APRC-01

Area=

35.75

35.75

APRC-02

Area=

522.86

522.86

APRC-03

Area=

32.99

32.99

AERC-01

Area=

46.30

46.30

AERC-02

Area=

46.34

Jirn Bolivar

46.34
1293.19

APB-01

Area=

35.76

35.76

APB-02

Area=

520.03

520.03

APB-03

Area=

520.20

520.20

APB-04

Area=

32.94

32.94

AEB-01

Area=

45.76

45.76

AEB-02

Area=

45.80

45.80

AEB-03

Area=

46.40

46.40

AEB-04

Area=

46.30

Jirn Sebastin Chipana

46.30
1054.67

APSCH-01

Area=

26.95

26.95

APSCH-02

Area=

495.88

495.88

APSCH-03

Area=

507.77

507.77

APSCH-04

Area=

24.07

Calle San Martn

24.07
1482.28

APSM-01

Area=

696.64

696.64

APSM-02

Area=

559.73

559.73

AESM-01

Area=

68.27

68.27

AESM-02

Area=

68.20

68.20

AESM-03

Area=

44.62

AESM-04

Area=

44.82

44.62
44.82

Jirn Lima

642.22

APL-01

Area=

35.77

35.77

APL-02

Area=

516.35

516.35

AEL-01

Area=

45.07

45.07

AEL-02

Area=

45.03

45.03

Jirn Huancayo

1017.78

APH-01

Area=

26.92

26.92

APH-02

Area=

497.44

497.44

APH-03

Area=

493.42

493.42

Jirn Catalina Huanca

1020.38

APCH-01

Area=

26.91

26.91

APCH-02

Area=

500.05

500.05

APCH-03

Area=

493.42

493.42

Jirn Alfonso Ugarte

1023.04

APAU-01

Area=

26.90

26.90

APAU-02

Area=

502.67

502.67

APAU-03

Area=

493.47

493.47

Jirn 27 de Mayo

1028.17

AP27M-01

Area=

27.02

27.02

AP27M-02

Area=

506.46

506.46

AP27M-03

Area=

494.69

494.69

Jirn Santa Cruz

1005.33

APSC-01

Area=

510.21

510.21

APSC-02

Area=

495.12

495.12

Jr. Los Incas (Tramo San Martn - Chacamarca)

Area=

4354.28

0.20

870.86

05.00 PAVIMENTO RIGIDO


05.01 Concreto f'c=210 kg/cm2 - Pavimento
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

Area=

3433.92

0.20

686.78

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

Area=

3845.63

0.20

769.13

Jirn Los Andes (Tramo Bolivar - San Martn)

Area=

1275.92

0.20

255.18

Jirn 28 de Julio

Area=

691.84

0.20

138.37

Jirn Sucre

Area=

594.24

0.20

118.85

Jirn Ramn Castilla

Area=

591.60

0.20

118.32

Jirn Bolivar

Area=

1108.93

0.20

221.79

Jirn Sebastin Chipana

Area=

1054.67

0.20

210.93

Calle San Martn

Area=

1256.37

0.20

251.27

Jirn Lima

Area=

552.12

0.20

110.42

Jirn Huancayo

Area=

1017.78

0.20

203.56

Jirn Catalina Huanca

Area=

1020.38

0.20

204.08

Jirn Alfonso Ugarte

Area=

1023.04

0.20

204.61

Jirn 27 de Mayo

Area=

1028.17

0.20

205.63

Jirn Santa Cruz

Area=

1005.33

0.20

201.07

Jr. Los Incas (Tramo 28 de Julio - San Martn )

Area=

694.60

0.20

138.92

Jr. Los Incas (Tramo San Martn - Chacamarca)

Area=

746.26

0.20

149.25

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

Area=

690.04

0.20

138.01

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

Area=

666.33

0.20

133.27

Jirn Los Andes (Tramo Bolivar - San Martn)

Area=

230.96

0.20

46.19

Jirn 28 de Julio

Area=

62.05

0.20

12.41

Jirn Sucre

Area=

93.72

0.20

18.74

Jirn Ramn Castilla

Area=

92.64

0.20

18.53

Jirn Bolivar

Area=

184.26

0.20

36.85

Calle San Martn

Area=

225.91

0.20

45.18

Jirn Lima

Area=

90.10

0.20

18.02

05.02 Concreto f'c=175 kg/cm2 - Estacionamiento

05.03 Encofrado y Desencofrado Normal

4,770.84

755.37

4,689.86

Jr. Los Incas (Tramo 28 de Julio - San Martn)


AEI-01

AEI-02

AEI-03

AEI-04

AEI-05

AEI-06

AEI-07

AEI-08

AEI-09

AEI-10

Jr. Los Incas (Tramo San Martn-Chacamarca)


Pavimento
Transversal Final
Lado Izq.
Arco
Lado Der.
Arco
AEI-11

AEI-12

AEI-13

AEI-14

AEI-15

AEI-16

AEI-17

1
17
2
1
17
2
1
11
2
1
11
2
1
11
2
1
11
2
1
11
2
1
11
2
1
8
2
1
8
2

80.28
1.20
1.56
80.27
1.20
1.56
55.81
1.20
1.56
55.72
1.20
1.56
55.34
1.20
1.56
55.34
1.20
1.56
54.39
1.20
1.56
54.39
1.20
1.56
38.65
1.20
1.56
38.64
1.20
1.56

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1
148
1
1
1
1
1
1
1
7
2
1
1
7
2
1
1
8
2
1
1
8
2
1
1
8
2
1
1
8
2
1

666.94
6.50
16.62
661.70
7.66
662.10
8.21
35.89
37.89
1.20
1.56
36.05
38.05
1.20
1.56
39.58
41.58
1.20
1.56
39.41
41.41
1.20
1.56
38.61
40.61
1.20
1.56
38.68
40.68
1.20
1.56
39.57

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

131.79
16.06
4.08
0.62
16.05
4.08
0.62
11.16
2.64
0.62
11.14
2.64
0.62
11.07
2.64
0.62
11.07
2.64
0.62
10.88
2.64
0.62
10.88
2.64
0.62
7.73
1.92
0.62
7.73
1.92
0.62
884.78
133.39
192.40
3.32
132.34
1.53
132.42
1.64
7.18
7.58
1.68
0.62
7.21
7.61
1.68
0.62
7.92
8.32
1.92
0.62
7.88
8.28
1.92
0.62
7.72
8.12
1.92
0.62
7.74
8.14
1.92
0.62
7.91

1
8
2
1
1
8
2
1
1
7
2
1
1
7
2
1
1
13
2
1
1
13
2
1
1
12
2
1
1
12
2

41.57
1.20
1.56
39.57
41.57
1.20
1.56
33.12
35.12
1.20
1.56
33.56
35.56
1.20
1.56
62.32
64.32
1.20
1.56
62.40
64.40
1.20
1.56
54.64
56.64
1.20
1.56
54.49
56.49
1.20
1.56

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Pavimento

560.45

0.20

112.09

Transversal

125

6.10

0.20

152.50

AEI-18

AEI-19

AEI-20

AEI-21

AEI-22

AEI-23

AEI-24

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

8.31
1.92
0.62
7.91
8.31
1.92
0.62
6.62
7.02
1.68
0.62
6.71
7.11
1.68
0.62
12.46
12.86
3.12
0.62
12.48
12.88
3.12
0.62
10.93
11.33
2.88
0.62
10.90
11.30
2.88
0.62
759.91

Transversal Final

17.98

0.20

3.60

Lado Izq.

554.53

0.20

110.91

Arco Final

9.39

0.20

1.88

Lado Der.

554.46

0.20

110.89

Arco Final

9.30

0.20

1.86

AEFB-01

80.28

0.20

16.06

AEFB-02

AEFB-03

AEFB-04

AEFB-05

AEFB-06

82.28

0.20

16.46

17

1.20

0.20

4.08

1.56

0.20

0.62

80.28

0.20

16.06

82.28

0.20

16.46

17

1.20

0.20

4.08

1.56

0.20

0.62

54.83

0.20

10.97

56.83

0.20

11.37

12

1.20

0.20

2.88

1.56

0.20

0.62

54.76

0.20

10.95

56.76

0.20

11.35

12

1.20

0.20

2.88

1.56

0.20

0.62

55.34

0.20

11.07

57.34

0.20

11.47

12

1.20

0.20

2.88

1.56

0.20

0.62

55.34

0.20

11.07

57.34

0.20

11.47

12

1.20

0.20

2.88

AEFB-07

AEFB-08

AEFB-09

AEFB-10

1.56

0.20

0.62

54.40

0.20

10.88

56.40

0.20

11.28

12

1.20

0.20

2.88

1.56

0.20

0.62

54.40

0.20

10.88

56.40

0.20

11.28

12

1.20

0.20

2.88

1.56

0.20

0.62

38.52

0.20

7.70

40.52

0.20

8.10

1.20

0.20

1.92

1.56

0.20

0.62

38.51

0.20

7.70

40.51

0.20

8.10

1.20

0.20

1.92

1.56

0.20

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

0.62
781.03

Pavimento

Transversal

128

580.15

0.20

116.03

6.60

0.20

168.96
2.29

Transversal Inicial

11.46

0.20

Transversal Final

16.13

0.20

3.23

Lado Izq.

575.22

0.20

115.04

Arco Final

7.19

0.20

1.44

Lado Der.

569.82

0.20

113.96

Arco Inicio

7.88

0.20

1.58

Arco Final

7.74

0.20

1.55

AEFB-11

37.36

0.20

7.47

39.36

0.20

7.87

1.20

0.20

1.92

2
1
1
8
2
1
1
8
2
1
1
8
2
1
1
8
2
1
1
8
2
1
1
8
2
1
1
8
2
1
1
14
2

1.56
37.20
39.20
1.20
1.56
39.57
41.57
1.20
1.56
39.64
41.64
1.20
1.56
39.57
41.57
1.20
1.56
39.57
41.57
1.20
1.56
39.03
41.03
1.20
1.56
39.44
41.44
1.20
1.56
63.41
65.41
1.20
1.56

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.62
7.44
7.84
1.92
0.62
7.91
8.31
1.92
0.62
7.93
8.33
1.92
0.62
7.91
8.31
1.92
0.62
7.91
8.31
1.92
0.62
7.81
8.21
1.92
0.62
7.89
8.29
1.92
0.62
12.68
13.08
3.36
0.62

AEFB-12

AEFB-13

AEFB-14

AEFB-15

AEFB-16

AEFB-17

AEFB-18

AEFB-19

AEFB-20

1
1
14
2
1
1
11
2
1
1
11
2

63.48
65.48
1.20
1.56
52.57
54.57
1.20
1.56
52.42
54.42
1.20
1.56

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1
46
1
1
1
1
1
1
1
12
2
1
1
12
2
1
1
8
2
1
1
8
2

206.72
6.10
18.01
200.68
9.51
200.77
9.19
55.79
57.79
1.20
1.56
55.90
57.90
1.20
1.56
38.41
40.41
1.20
1.56
38.40
40.40
1.20
1.56

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

APJ-01
Transversal
Transversal Inicial

1
18
1

84.64
7.50
12.64

0.20
0.20
0.20

16.93
27.00
2.53

Transversal Final
Lado Izq.
Arco Inicial
Arco Final
Lado Der.

1
1
1
1
1

12.23
74.83
5.88
5.50
74.76

0.20
0.20
0.20
0.20
0.20

2.45
14.97
1.18
1.10
14.95

Arco Inicial
Arco Final
APJ-02
Transversal
Transversal Inicial

1
1
1
1
1

5.87
5.50
4.75
7.50
12.23

0.20
0.20
0.20
0.20
0.20

1.17
1.10
0.95
1.50
2.45

Arco
AEJ-01

2
1
1
8

5.50
38.60
40.59
1.20

0.20
0.20
0.20
0.20

2.20
7.72
8.12
1.92

2
1
1
8
2

1.56
38.62
40.62
1.20
1.56

0.20
0.20
0.20
0.20
0.20

1
1
1
2
1

4.75
6.10
10.83
5.50
84.09

0.20
0.20
0.20
0.20
0.20

0.62
7.72
8.12
1.92
0.62
126.34
0.95
1.22
2.17
2.20
16.82

AEFB-21

AEFB-22

Jirn Los Andes (Tramo Bolivar - San Martn)


Pavimento
Transversal
Transversal Final
Lado Izq.
Arco Final
Lado Der.
Arco Final
AELA-01

AELA-02

AELA-03

AELA-04

Jirn 28 de Julio

AEJ-02

Jirn Sucre
APS-01
Transversal
Transversal Final
Arco
APS-02

12.70
13.10
3.36
0.62
10.51
10.91
2.64
0.62
10.48
10.88
2.64
0.62
274.19
41.34
56.12
3.60
40.14
1.90
40.15
1.84
11.16
11.56
2.88
0.62
11.18
11.58
2.88
0.62
7.68
8.08
1.92
0.62
7.68
8.08
1.92
0.62
127.24

Transversal
Transversal Inicial
Transversal Final
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final
APS-03
Transversal
Transversal Inicial
Arco
AES-01

18
1
1
1
1
1
1
1
1
1
1
1
2
1
1
8
2
1
1
8
2

6.10
10.82
10.43
74.87
5.50
5.12
74.90
5.50
5.12
4.45
6.10
10.44
5.12
38.04
40.04
1.20
1.56
38.07
40.07
1.20
1.56

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Jirn Ramn Castilla


APRC-01
Transversal
Transversal Final
Arco
APRC-02
Transversal
Transversal Inicial
Transversal Final
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final

1
1
1
2
1
18
1
1
1
1
1
1
1
1

4.75
6.10
10.83
5.50
83.64
6.10
10.83
10.44
74.43
5.50
5.12
74.45
5.50
5.12

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

21.96
2.16
2.09
14.97
1.10
1.02
14.98
1.10
1.02
0.89
1.22
2.09
2.05
7.61
8.01
1.92
0.62
7.61
8.01
1.92
0.62
125.72
0.95
1.22
2.17
2.20
16.73
21.96
2.17
2.09
14.89
1.10
1.02
14.89
1.10
1.02

APRC-03
Transversal
Transversal Inicial

1
1
1

4.45
6.10
10.44

0.20
0.20
0.20

0.89
1.22
2.09

Arco

2
1
1
8
2

5.12
37.59
39.59
1.20
1.56

0.20
0.20
0.20
0.20
0.20

2.05
7.52
7.92
1.92
0.62

1
1
8
2

37.62
39.62
1.20
1.56

0.20
0.20
0.20
0.20

7.52
7.92
1.92
0.62
236.54

AES-02

AERC-01

AERC-02

Jirn Bolivar
APB-01

4.75

0.20

0.95

Transversal

6.10

0.20

1.22

Transversal Final

10.84

0.20

2.17

Arco

5.50

0.20

2.20

APB-02

83.19

0.20

16.64

Transversal

17

6.10

0.20

20.74

Transversal Inicial

10.83

0.20

2.17

Transversal Final

10.41

0.20

2.08

Lado Izq.

73.98

0.20

14.80

Arco Inicial

5.50

0.20

1.10

Arco Final

5.13

0.20

1.03

Lado Der.

74.00

0.20

14.80

Arco Inicial

5.50

0.20

1.10

Arco Final

5.12

0.20

1.02

APB-03

83.36

0.20

16.67

Transversal

18

6.10

0.20

21.96

Transversal Inicial

10.44

0.20

2.09

Transversal Final

10.44

0.20

2.09

Lado Izq.

74.51

0.20

14.90

Arco Inicial

5.12

0.20

1.02

Arco Final

5.12

0.20

1.02

Lado Der.

74.42

0.20

14.88

Arco Inicial

5.12

0.20

1.02

Arco Final

5.12

0.20

1.02

APB-04

4.45

0.20

0.89

Transversal

6.10

0.20

1.22

Transversal Inicial

10.41

0.20

2.08

Arco

5.12

0.20

2.05

AEB-01

37.14

0.20

7.43

39.14

0.20

7.83

1.20

0.20

1.92

1.56

0.20

0.62

37.17

0.20

7.43

39.17

0.20

7.83

1.20

0.20

1.92

1.56

0.20

0.62

37.67

0.20

7.53

39.67

0.20

7.93

1.20

0.20

1.92

1.56

0.20

0.62

37.58

0.20

7.52

39.58

0.20

7.92

1.20

0.20

1.92

1.56

0.20

AEB-02

AEB-03

AEB-04

Jirn Sebastin Chipana

0.62
161.12

APSCH-01

3.85

0.20

0.77

Transversal

5.90

0.20

1.18

Transversal Final

10.84

0.20

2.17

Arco

4.38

0.20

1.75

APSCH-02

82.75

0.20

16.55

Transversal

17

5.90

0.20

20.06

Transversal Inicial

9.44

0.20

1.89

Transversal Final

9.09

0.20

1.82

Lado Izq.

75.34

0.20

15.07

Arco Inicial

4.38

0.20

0.88

Arco Final

3.97

0.20

0.79

Lado Der.

75.36

0.20

15.07

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

APSCH-03

84.87

0.20

16.97

Transversal

18

5.90

0.20

21.24

Transversal Inicial

9.09

0.20

1.82

Transversal Final

9.21

0.20

1.84

Lado Izq.

77.71

0.20

15.54

Arco Inicial

4.01

0.20

0.80

Arco Final

4.01

0.20

0.80

Lado Der.

77.73

0.20

15.55

Arco Inicial

4.01

0.20

0.80

Arco Final

4.01

0.20

0.80

APSCH-04

3.50

0.20

0.70

Transversal

5.90

0.20

1.18

Transversal Inicial

8.98

0.20

1.80

Arco

4.01

0.20

1.60

Calle San Martn

265.10

APSM-01

103.15

0.20

20.63

Transversal

22

6.50

0.20

28.60

Transversal Inicial

19.01

0.20

3.80

Transversal Final

11.66

0.20

2.33

Lado Izq.

92.13

0.20

18.43

Arco Inicial

9.91

0.20

1.98

Arco Final

5.88

0.20

1.18

Lado Der.

92.07

0.20

18.41

Arco Inicial

9.73

0.20

1.95

Arco Final

5.88

0.20

1.18

APSM-02

83.65

0.20

16.73

Transversal

18

6.50

0.20

23.40

Transversal Inicial

11.64

0.20

2.33

Transversal Final

12.75

0.20

2.55

Lado Izq.

72.34

0.20

14.47

Arco Inicial

5.80

0.20

1.16

Arco Final

9.80

0.20

1.96

Lado Der.

78.58

0.20

15.72

Arco Inicial

5.89

0.20

1.18

AESM-01

55.89

0.20

11.18

AESM-02

57.89

0.20

11.58

12

1.20

0.20

2.88

1.56

0.20

0.62

55.83

0.20

11.17

57.83

0.20

11.57

12

1.20

0.20

2.88

1.56

0.20

0.62

36.10

0.20

7.22

38.11

0.20

7.62

1.20

0.20

1.68

1.56

0.20

0.62

36.35

0.20

7.27

38.35

0.20

7.67

1.20

0.20

1.92

1.56

0.20

Jirn Lima
APL-01
Transversal
Transversal Final
Arco
APL-02
Transversal

1
1
1
2
1
17

4.75
6.10
10.84
5.50
82.58
6.10

0.20
0.20
0.20
0.20
0.20
0.20

0.62
116.77
0.95
1.22
2.17
2.20
16.52
20.74

Transversal Inicial
Transversal Final
Lado Izq.
Arco Inicial
Arco Final

1
1
1
1
1

10.84
10.44
73.39
5.50
5.12

0.20
0.20
0.20
0.20
0.20

2.17
2.09
14.68
1.10
1.02

Lado Der.
Arco Inicial
Arco Final
AEL-01

1
1
1
1

73.36
5.50
5.12
36.56

0.20
0.20
0.20
0.20

14.67
1.10
1.02
7.31

1
8
2
1
1

38.56
1.20
1.56
36.52
38.53

0.20
0.20
0.20
0.20
0.20

7.71
1.92
0.62
7.30
7.71

8
2

1.20
1.56

0.20
0.20

1.92
0.62

AESM-03

AESM-04

AEL-02

Jirn Huancayo

137.49

APH-01

3.85

0.20

0.77

Transversal

5.90

0.20

1.18

Transversal Final

9.47

0.20

1.89

Arco

4.38

0.20

1.75

APH-02

83.01

0.20

16.60

Transversal

17

5.90

0.20

20.06

Transversal Inicial

9.47

0.20

1.89

Transversal Final

9.09

0.20

1.82

Lado Izq.

75.63

0.20

15.13

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

Lado Der.

75.60

0.20

15.12

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

APH-03

81.79

0.20

16.36

Transversal

17

0.90

0.20

3.06

Transversal Inicial

9.09

0.20

1.82

Transversal Final

14.20

0.20

2.84

Lado Izq.

74.09

0.20

14.82

Arco Inicial

4.01

0.20

0.80

Arco Final

6.50

0.20

1.30

Lado Der.

74.09

0.20

14.82

Arco Inicial

4.01

0.20

0.80

Arco Final
Jirn Catalina Huanca
APCH-01
Transversal
Transversal Final
Arco
APCH-02
Transversal
Transversal Inicial
Transversal Final
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final

6.53

0.20

1
1
1
2
1
18
1
1
1
1
1
1
1
1

3.85
5.90
9.47
4.38
83.45
5.90
9.46
9.09
76.07
4.38
4.01
76.04
4.38
4.01

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.31
155.94
0.77
1.18
1.89
1.75
16.69
21.24
1.89
1.82
15.21
0.88
0.80
15.21
0.88
0.80

APCH-03

81.79

0.20

16.36

Transversal

17

5.90

0.20

20.06

Transversal Inicial

9.09

0.20

1.82

Transversal Final

14.20

0.20

2.84

Lado Izq.

74.09

0.20

14.82

Arco Inicial

4.01

0.20

0.80

Arco Final

6.55

0.20

1.31

Lado Der.

74.09

0.20

14.82

Arco Inicial

4.01

0.20

0.80

Arco Final

6.49

0.20

Jirn Alfonso Ugarte

1.30
97.63

APAU-01

3.85

0.20

0.77

Transversal

5.90

0.20

1.18

Transversal Final

9.46

0.20

1.89

Arco

4.37

0.20

1.75

APAU-02

83.90

0.20

16.78

Transversal

18

5.90

0.20

21.24

Transversal Inicial

9.46

0.20

1.89

Transversal Final

9.09

0.20

1.82

Lado Izq.

76.51

0.20

15.30

Arco Inicial

4.38

0.20

Arco Final

4.01

0.20

0.88
0.80

Lado Der.

76.49

0.20

15.30

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

APAU-03

81.79

0.20

16.36

Transversal

17

5.90

0.20

20.06

Transversal Inicial

9.09

0.20

1.82

Transversal Final

14.20

0.20

2.84

Lado Izq.

74.10

0.20

14.82

Arco Inicial

4.01

0.20

0.80

Arco Final

6.55

0.20

1.31

Lado Der.

74.09

0.20

14.82

Arco Inicial

4.01

0.20

0.80

Arco Final

6.49

0.20

Jirn 27 de Mayo

1.30
156.72

AP27M-01

3.86

0.20

0.77

Transversal

5.90

0.20

1.18

Transversal Final

9.50

0.20

1.90

Arco

4.38

0.20

1.75

AP27M-02

84.52

0.20

16.90

Transversal

18

5.90

0.20

21.24

Transversal Inicial

9.50

0.20

1.90

Transversal Final

9.13

0.20

1.83

Lado Izq.

77.12

0.20

15.42

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

Lado Der.

77.09

0.20

15.42

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

AP27M-03

81.99

0.20

16.40

Transversal

17

5.90

0.20

20.06

Transversal Inicial

9.13

0.20

1.83

Transversal Final

14.23

0.20

2.85

Lado Izq.

74.27

0.20

14.85

Arco Inicial

4.01

0.20

0.80

Arco Final

6.81

0.20

1.36

Lado Der.

74.27

0.20

14.85

Arco Inicial

4.01

0.20

0.80

Arco Final

6.23

0.20

Jirn Santa Cruz

1.25
151.54

APSC-01

85.15

0.20

17.03

Transversal

18

5.90

0.20

21.24

Transversal Inicial

9.51

0.20

1.90

Transversal Final

9.14

0.20

1.83

Lado Izq.

77.74

0.20

15.55

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

Lado Der.

77.71

0.20

15.54

Arco Inicial

4.38

0.20

0.88

Arco Final

4.01

0.20

0.80

APSC-02

82.05

0.20

16.41

Transversal

17

5.90

0.20

20.06

Transversal Inicial

9.14

0.20

1.83

Transversal Final

14.25

0.20

2.85

Lado Izq.

74.33

0.20

14.87

Arco Inicial

4.01

0.20

Arco Final
Lado Der.

0.80

6.86

0.20

1.37

74.33

0.20

14.87

Arco Inicial

4.01

0.20

0.80

Arco Final

6.19

0.20

1.24

05.03 Barra dowells - Apoyo Fijo FR Liso D=5/8"

26,579.70

Jr. Los Incas (Tramo San Martn-Chacamarca)


Pavimento

2642.85
666.94

2223

0.35

778.05

148

6.50

3207

0.35

1122.45

AEI-11

37.89

126

0.35

44.10

AEI-12

38.05

127

0.35

44.45

AEI-13

41.58

139

0.35

48.65

AEI-14

41.41

138

0.35

48.30

AEI-15

40.61

135

0.35

47.25

AEI-16

40.68

136

0.35

47.60

AEI-17

41.57

139

0.35

48.65

AEI-18

41.57

139

0.35

48.65

AEI-19

35.12

117

0.35

40.95

AEI-20

35.56

119

0.35

41.65

AEI-21

64.32

214

0.35

74.90

AEI-22

64.40

215

0.35

75.25

AEI-23

56.64

189

0.35

66.15

AEI-24

56.49

188

0.35

65.80

Pavimento

560.45

1868

0.35

653.80

Transversal

125

6.10

2542

0.35

889.70

AEFB-01

82.28

274

0.35

95.90

AEFB-02

82.28

274

0.35

95.90

AEFB-03

56.83

189

0.35

66.15

AEFB-04

56.76

189

0.35

66.15

AEFB-05

57.34

191

0.35

66.85

AEFB-06

57.34

191

0.35

66.85

AEFB-07

56.40

188

0.35

65.80

AEFB-08

56.40

188

0.35

65.80

AEFB-09

40.52

135

0.35

47.25

AEFB-10
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)
Pavimento
Transversal
Transversal Inicial
AEFB-11
AEFB-12
AEFB-13
AEFB-14
AEFB-15
AEFB-16
AEFB-17
AEFB-18
AEFB-19
AEFB-20
AEFB-21
AEFB-22

40.51

135

0.35

1
128
1
1
1
1
1
1
1
1
1
1
1
1
1

580.15
6.60
11.46
39.36
39.20
41.57
41.64
41.57
41.57
41.03
41.44
65.41
65.48
54.57
54.42

1934
2816
38
131
131
139
139
139
139
137
138
218
218
182
181

0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

47.25
2338.00
676.90
985.60
13.30
45.85
45.85
48.65
48.65
48.65
48.65
47.95
48.30
76.30
76.30
63.70
63.35

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

Jirn Los Andes (Tramo Bolivar - San Martn)

2227.40

798.00

ml.

Pavimento

206.72

689

0.35

241.15

Transversal

46

6.10

935

0.35

327.25

AELA-01

57.79

193

0.35

67.55

AELA-02

57.90

193

0.35

67.55

AELA-03

40.41

135

0.35

47.25

AELA-04

40.40

135

0.35

Jirn 28 de Julio

47.25
365.05

APJ-01

84.64

282

0.35

98.70

Transversal

18

7.50

450

0.35

157.50
5.60

APJ-02

4.75

16

0.35

Transversal

7.50

25

0.35

8.75

AEJ-01

40.59

135

0.35

47.25

AEJ-02

40.62

135

0.35

Jirn Sucre

47.25
344.40

APS-01

4.75

16

0.35

Transversal

6.10

20

0.35

7.00

APS-02

84.09

280

0.35

98.00

Transversal

18

6.10

366

0.35

128.10

APS-03

4.45

15

0.35

5.25

Transversal

6.10

20

0.35

7.00

AES-01

40.04

133

0.35

46.55

AES-02

40.07

134

0.35

Jirn Ramn Castilla

5.60

46.90
343.00

APRC-01

4.75

16

0.35

Transversal

6.10

20

0.35

7.00

APRC-02

83.64

279

0.35

97.65

Transversal

18

6.10

366

0.35

128.10

APRC-03

4.45

15

0.35

5.25

Transversal

6.10

20

0.35

7.00

AERC-01

39.59

132

0.35

46.20

AERC-02

39.62

132

0.35

Jirn Bolivar

5.60

46.20
652.05

APB-01

4.75

16

0.35

Transversal

6.10

20

0.35

5.60
7.00

APB-02

83.19

277

0.35

96.95

Transversal

17

6.10

346

0.35

121.10

APB-03

83.36

278

0.35

97.30

Transversal

18

6.10

366

0.35

128.10
5.25

APB-04

4.45

15

0.35

Transversal

6.10

20

0.35

7.00

AEB-01

39.14

130

0.35

45.50

AEB-02

39.17

131

0.35

45.85

AEB-03

39.67

132

0.35

46.20

AEB-04

39.58

132

0.35

46.20

APSCH-01

3.85

13

0.35

Transversal

5.90

20

0.35

7.00

APSCH-02

82.75

276

0.35

96.60

Transversal

17

5.90

334

0.35

116.90

APSCH-03

84.87

283

0.35

99.05

Transversal

18

5.90

354

0.35

123.90

APSCH-04

3.50

12

0.35

4.20

Transversal

5.90

20

0.35

Jirn Sebastin Chipana

459.20

Calle San Martn

4.55

7.00
745.85

APSM-01

103.15

344

0.35

120.40

Transversal

22

6.50

477

0.35

166.95

APSM-02

83.65

279

0.35

97.65

Transversal

18

6.50

390

0.35

136.50

AESM-01

57.89

193

0.35

67.55

AESM-02

57.83

193

0.35

67.55

AESM-03

38.11

127

0.35

44.45

AESM-04

38.35

128

0.35

44.80

APL-01

4.75

16

0.35

Transversal

6.10

20

0.35

7.00

APL-02

82.58

275

0.35

96.25

Transversal

17

6.10

346

0.35

121.10

AEL-01

38.56

129

0.35

45.15

AEL-02

38.53

128

0.35

Jirn Lima

319.90

Jirn Huancayo

5.60

44.80
338.80

APH-01

3.85

13

0.35

Transversal

5.90

20

0.35

7.00

APH-02

83.01

277

0.35

96.95

Transversal

17

5.90

334

0.35

116.90

APH-03

81.79

273

0.35

95.55

Transversal

17

0.90

51

0.35

17.85

APCH-01

3.85

13

0.35

Transversal

5.90

20

0.35

7.00

APCH-02

83.45

278

0.35

97.30

Transversal

18

5.90

354

0.35

123.90

APCH-03

81.79

273

0.35

95.55

Transversal

17

5.90

334

0.35

116.90

APAU-01

3.85

13

0.35

Transversal

5.90

20

0.35

7.00

APAU-02

83.90

280

0.35

98.00

Transversal

18

5.90

354

0.35

123.90

APAU-03

81.79

273

0.35

95.55

Transversal

17

5.90

334

0.35

116.90

AP27M-01

3.86

13

0.35

Transversal

5.90

20

0.35

7.00

AP27M-02

84.52

282

0.35

98.70

Transversal

18

5.90

354

0.35

123.90

AP27M-03

81.99

273

0.35

95.55

Transversal

17

5.90

334

0.35

116.90

APSC-01

85.15

284

0.35

99.40

Transversal

18

5.90

354

0.35

123.90

APSC-02

82.05

274

0.35

95.90

Transversal

17

5.90

334

0.35

116.90

Jirn Catalina Huanca

4.55

445.20

Jirn Alfonso Ugarte

4.55

329.00

Jirn 27 de Mayo

4.55

446.60

Jirn Santa Cruz

4.55

436.10

05.04 Juntas Asflticas E=1"

12,123.31

Jr. Los Incas (Tramo 28 de Julio - R. Castilla)

139.20

AEI-01

17

1.20

20.40

AEI-02

17

1.20

20.40

AEI-03

11

1.20

13.20

AEI-04

11

1.20

13.20

AEI-05

11

1.20

13.20

AEI-06

11

1.20

13.20

AEI-07

11

1.20

13.20

AEI-08

11

1.20

13.20

ml.

AEI-09

1.20

AEI-10

1.20

Jr. Los Incas (Tramo San Martn - Chacamarca)


Pavimento
AEI-11
AEI-12
AEI-13
AEI-14
AEI-15
AEI-16
AEI-17
AEI-18
AEI-19
AEI-20
AEI-21
AEI-22
AEI-23

9.60
9.60
2416.03

666.94

666.94

148

6.50

962.00

37.89

37.89

1.20

8.40

38.05

38.05

1.20

8.40

41.58

41.58

1.20

9.60

41.41

41.41

1.20

9.60

40.61

40.61

1.20

9.60

40.68

40.68

1.20

9.60

41.57

41.57

1.20

9.60

41.57

41.57

1.20

9.60

35.12

35.12

1.20

8.40

35.56

35.56

1.20

8.40

64.32

64.32

13

1.20

15.60

64.40

64.40

13

1.20

15.60

56.64

56.64

12

1.20

14.40

56.49

56.49

12

1.20

14.40

Pavimento

560.45

560.45

Transversal

125

6.10

762.50

AEI-24
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

AEFB-01
AEFB-02
AEFB-03
AEFB-04
AEFB-05
AEFB-06
AEFB-07
AEFB-08
AEFB-09

2056.01

82.28

82.28

17

1.20

20.40

82.28

82.28

17

1.20

20.40

56.83

56.83

12

1.20

14.40

56.76

56.76

12

1.20

14.40

57.34

57.34

12

1.20

14.40

57.34

57.34

12

1.20

14.40

56.40

56.40

12

1.20

14.40

56.40

56.40

12

1.20

14.40

40.52

40.52

1.20

9.60

AEFB-10

40.51

40.51

1.20

9.60

Pavimento

580.15

580.15

Transversal

128

6.60

844.80

Transversal Inicial

11.46

11.46

AEFB-11

39.36

39.36

1.20

9.60

39.20

39.20

1.20

9.60

41.57

41.57

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

AEFB-12
AEFB-13
AEFB-14
AEFB-15
AEFB-16
AEFB-17
AEFB-18
AEFB-19
AEFB-20
AEFB-21
AEFB-22

2140.47

1.20

9.60

41.64

41.64

1.20

9.60

41.57

41.57

1.20

9.60

41.57

41.57

1.20

9.60

41.03

41.03

1.20

9.60

41.44

41.44

1.20

9.60

65.41

65.41

14

1.20

16.80

65.48

65.48

14

1.20

16.80

54.57

54.57

11

1.20

13.20

54.42

54.42

11

1.20

Jirn Los Andes (Tramo Bolivar - San Martn)


Pavimento

Transversal
AELA-01
AELA-02
AELA-03
AELA-04

13.20
731.82

206.72

206.72

46

6.10

280.60

57.79

57.79

12

1.20

14.40

57.90

57.90

12

1.20

14.40

40.41

40.41

1.20

9.60

40.40

40.40

1.20

Jirn 28 de Julio

9.60
332.30

APJ-01

84.64

84.64

Transversal

18

7.50

135.00
4.75

APJ-02

4.75

Transversal

7.50

7.50

AEJ-01

40.59

40.59

AEJ-02

1.20

9.60

40.62

40.62

1.20

9.60

Jirn Sucre

314.60

APS-01

4.75

4.75

Transversal

6.10

6.10

APS-02

84.09

84.09

Transversal

18

6.10

109.80

APS-03

Transversal

6.10

6.10

AES-01

40.04

40.04

1.20

9.60

40.07

40.07

1.20

9.60

APRC-01

4.75

4.75

Transversal

6.10

6.10

APRC-02

83.64

83.64

Transversal

18

6.10

109.80

AES-02

4.45

Jirn Ramn Castilla

4.45

313.25

APRC-03

4.45

4.45

Transversal

6.10

6.10

AERC-01

39.59

39.59

1.20

9.60

39.62

39.62

1.20

9.60

AERC-02

Jirn Bolivar

597.41

APB-01

4.75

4.75

Transversal

6.10

6.10

APB-02

83.19

83.19

Transversal

17

6.10

103.70

APB-03

83.36

83.36

Transversal

18

6.10

109.80

APB-04

4.45

4.45

Transversal

6.10

6.10

AEB-01

39.14

39.14

1.20

9.60

39.17

39.17

AEB-02

AEB-03

AEB-04

1.20

9.60

39.67

39.67

1.20

9.60

39.58

39.58

1.20

Jirn Sebastin Chipana

9.60
393.27

APSCH-01

3.85

3.85

Transversal

5.90

5.90

APSCH-02

82.75

82.75

Transversal

17

5.90

100.30

APSCH-03

84.87

84.87

Transversal

18

5.90

106.20

APSCH-04

3.50

3.50

Transversal

5.90

Calle San Martn

5.90
685.78

APSM-01

103.15

103.15

Transversal

22

6.50

143.00

APSM-02

83.65

83.65

Transversal

18

6.50

117.00

AESM-01
AESM-02
AESM-03
AESM-04

57.89

57.89

12

1.20

14.40

57.83

57.83

12

1.20

14.40

38.11

38.11

1.20

8.40

38.35

38.35

1.20

Jirn Lima

9.60
293.42

APL-01

4.75

Transversal

6.10

6.10

APL-02

82.58

82.58

Transversal

17

6.10

103.70

AEL-01

38.56

38.56

1.20

9.60

38.53

38.53

1.20

9.60

APH-01

3.85

Transversal

5.90

5.90

APH-02

83.01

83.01

Transversal

17

5.90

100.30

APH-03

81.79

81.79

Transversal

17

0.90

AEL-02
Jirn Huancayo

4.75

290.15

Jirn Catalina Huanca

3.85

15.30
381.49

APCH-01

3.85

Transversal

5.90

5.90

APCH-02

83.45

83.45

Transversal

18

5.90

106.20

APCH-03

81.79

81.79

Transversal

17

5.90

100.30

Jirn Alfonso Ugarte

3.85

281.64

APAU-01

3.85

Transversal

5.90

5.90

APAU-02

83.90

83.90

Transversal

18

5.90

106.20

APAU-03

81.79

81.79

Transversal

17

5.90

100.30

AP27M-01

3.86

3.86

Transversal

5.90

5.90

Jirn 27 de Mayo

3.85

382.77

AP27M-02

84.52

84.52

Transversal

18

5.90

106.20

AP27M-03

81.99

81.99

Transversal

17

5.90

100.30

APSC-01

85.15

85.15

Transversal

18

5.90

106.20

APSC-02

82.05

82.05

Transversal

17

5.90

100.30

Jirn Santa Cruz

373.70

06.00 SEALIZACION
06.01 Pintura de Lnea Discontnua
Jr. Los Incas (Tramo 28 de Julio - San Martn )

2,520.00
56

3.00

168.00

ml.

Estacionamiento

72

3.00

216.00

Jr. Los Incas (Tramo San Martn-Chacamarca)

67

3.00

201.00

Estacionamiento

78

3.00

234.00

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

56

3.00

168.00

Estacionamiento

72

3.00

216.00

Jr. Fco. Bolognesi (Tramo Lima-Chacamarca)

59

3.00

177.00

Estacionamiento

70

3.00

210.00

Jirn Los Andes (Tramo Bolivar - San Martn)

20

3.00

60.00

Estacionamiento

24

3.00

72.00

Jirn 28 de Julio

3.00

27.00

Estacionamiento

10

3.00

30.00

Jirn Sucre

3.00

27.00

Estacionamiento

10

3.00

30.00

Jirn Ramn Castilla

3.00

27.00

Estacionamiento

10

3.00

30.00

Jirn Bolivar

18

3.00

54.00

Estacionamiento

20

3.00

60.00

Jirn Sebastin Chipana

18

3.00

54.00

Calle San Martn

20

3.00

60.00

Estacionamiento

24

3.00

72.00

Jirn Lima

3.00

27.00

Estacionamiento

10

3.00

30.00

Jirn Huancayo

18

3.00

54.00

Jirn Catalina Huanca

18

3.00

54.00

Jirn Alfonso Ugarte

18

3.00

54.00

Jirn 27 de Mayo

18

3.00

54.00

Jirn Santa Cruz

18

3.00

54.00

06.02 Pintura Zonal y Smbolos

1,801.92

Jr. Los Incas (Tramo 28 de Julio - San Martn )

210.55

Crucero Peatonal

70

4.00

0.50

140.00

Transversal Crucero Peatonal


Seal de Sentido

10

2.75

0.50

13.75

10

Area=

2.50

Seal de Pare

25.00

10

Area=

3.18

Jr. Los Incas (Tramo San Martn-Chacamarca)

31.80
294.77

Crucero Peatonal

98

4.00

0.50

196.00

Transversal Crucero Peatonal

14

2.75

0.50

19.25

Seal de Sentido

14

Area=

2.50

35.00

Seal de Pare

14

Area=

3.18

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S.Martn)

44.52
189.30

Crucero Peatonal

60

4.00

0.50

120.00

Transversal Crucero Peatonal

10

2.50

0.50

12.50

Seal de Sentido

10

Area=

2.50

25.00

Seal de Pare

10

Area=

3.18

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

31.80
228.66

Crucero Peatonal

72

4.00

0.50

144.00

Transversal Crucero Peatonal

12

2.75

0.50

16.50

Seal de Sentido

12

Area=

2.50

30.00

Seal de Pare

12

Area=

3.18

38.16

Jirn Los Andes (Tramo Bolivar - San Martn)

75.72

Crucero Peatonal

24

4.00

0.50

Transversal Crucero Peatonal

2.50

0.50

48.00
5.00

Seal de Sentido

Area=

2.50

10.00

Seal de Pare
Jirn 28 de Julio
Crucero Peatonal

Area=

3.18

16

4.00

0.50

12.72
46.86
32.00

m.

Transversal Crucero Peatonal


Seal de Sentido
Seal de Pare
Jirn Sucre
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Ramn Castilla
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Bolivar
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Sebastin Chipana
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Calle San Martn
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Lima
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Huancayo
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Catalina Huanca
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Alfonso Ugarte
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn 27 de Mayo
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare
Jirn Santa Cruz
Crucero Peatonal
Transversal Crucero Peatonal
Seal de Sentido
Seal de Pare

2
2
2

3.50
Area=
Area=

0.50
2.50
3.18

12
2
2
2

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

12
6
6
6

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

24
4
4
4

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

24
4
4
4

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

28
4
4
4

4.00
3.00
Area=
Area=

0.50
0.50
2.50
3.18

12
2
2
2

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

24
4
4
4

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

24
4
4
4

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

24
4
4
4

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

24
4
4
4

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

24
4
4
4

4.00
2.50
Area=
Area=

0.50
0.50
2.50
3.18

3.50
5.00
6.36
37.86
24.00
2.50
5.00
6.36
65.58
24.00
7.50
15.00
19.08
75.72
48.00
5.00
10.00
12.72
75.72
48.00
5.00
10.00
12.72
84.72
56.00
6.00
10.00
12.72
37.86
24.00
2.50
5.00
6.36
75.72
48.00
5.00
10.00
12.72
75.72
48.00
5.00
10.00
12.72
75.72
48.00
5.00
10.00
12.72
75.72
48.00
5.00
10.00
12.72
75.72
48.00
5.00
10.00
12.72

07.00 VARIOS
07.02 Reubicacin de Postes de Luz

58.00 und.
Postes dentro del area

58.00

58.00

07.03 Nivelacin de Buzones en General


Postes dentro del area

67.00

67.00

67.00 und.

METRADOS DE OBRA
OBRA:

"MEJORAMIENTO VIAL DE LAS CALLES DEL CASCO URBANO DE LA LOCALIDAD DE QUILCAS , DISTRITO
DE QUILCAS HUANCAYO JUNN"

PPTO:

CONSTRUCCION DE VEREDAS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE QUILCAS


FECHA:

PART.

MARZO DEL 2014

DISTRITO:

QUILCAS

PROVINCIA:

HUANCAYO

REGIN:

JUNN

DIMENSIONES
#
VECES LARGO ANCHO
ALTO

DESCRIPCION

METRADO
PARCIAL

TOTAL

UNID

01.00 TRABAJOS PRELIMINARES


01.01 Limpieza de Terreno Manual

16,987.71

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

2106.35

AMI-01

Area=

10.29

10.29

AVI L.I.-01

Area=

221.73

221.73

AVI L.D.-01

Area=

221.73

221.73

AVI L.I.-02

Area=

177.63

177.63

AVI L.D.-02

Area=

177.53

177.53

AVI L.I.-03

Area=

176.84

176.84

AVI L.D.-03

Area=

176.82

176.82

AVI L.I.-04

Area=

175.13

175.13

AVI L.D.-04

Area=

175.13

175.13

AVI L.I.-05

Area=

146.75

146.75

AVI L.D.-05

Area=

146.77

146.77

Jardineria

20

Area=

15.00

Jr. Los Incas (Tramo San Martn-Chacamarca)

300.00
2672.61

AVI L.I.-06

Area=

141.82

AVI L.D.-06

Area=

142.11

142.11

AVI L.I.-07

Area=

148.46

148.46

AVI L.D.-07

Area=

148.16

148.16

AVI L.I.-08

Area=

146.72

146.72

AVI L.D.-08

Area=

146.85

146.85

AVI L.I.-09

Area=

148.46

148.46

AVI L.D.-09

Area=

148.45

148.45

AVI L.I.-10

Area=

136.82

136.82

AVI L.D.-10

Area=

137.61

137.61

AVI L.I.-11

Area=

189.35

189.35

AVI L.D.-11

Area=

189.50

189.50

AVI L.I.-11'

Area=

48.11

48.11

AVI L.I.-12

Area=

175.57

175.57

AVI L.D.-12

Area=

175.26

175.26

AMI-02

Area=

13.73

13.73

AMI-03

Area=

15.63

15.63

Jardineria

28

Area=

15.00

420.00

AVFB L.I.-01

Area=

188.36

188.36

AVFB L.D.-01

Area=

188.39

188.39

AVFB L.I.-02

Area=

150.20

150.20

AVFB L.D.-02

Area=

150.11

150.11

AVFB L.I.-03

Area=

150.85

150.85

AVFB L.D.-03

Area=

150.84

150.84

AVFB L.I.-04

Area=

149.56

149.56

AVFB L.D.-04

Area=

149.70

149.70

AVFB L.I.-05

Area=

125.75

125.75

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

141.82

1829.49

AVFB L.D.-05

Area=

125.73

125.73

Jardineria

20

Area=

15.00

300.00

AVFB L.I.-06

Area=

124.03

124.03

AVFB L.D.-06

Area=

123.75

123.75

AVFB L.I.-07

Area=

127.32

127.32

AVFB L.D.-07

Area=

127.44

127.44

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

2015.44

AVFB L.I.-08

Area=

127.33

127.33

AVFB L.D.-08

Area=

127.33

127.33

AVFB L.I.-09

Area=

126.45

126.45

AVFB L.D.-09

Area=

127.18

127.18

AVFB L.I.-10

Area=

163.03

163.03

AVFB L.D.-10

Area=

163.16

163.16

AVFB L.I.-11

Area=

146.80

146.80

AVFB L.D.-11

Area=

145.55

145.55

AMFB-01

Area=

12.13

12.13

AMFB-02

Area=

13.94

13.94

Jardineria

24

Area=

15.00

360.00

AVLA L.I.-01

Area=

151.66

151.66

AVLA L.D.-01

Area=

151.82

151.82

Jirn Los Andes (Tramo Bolivar - San Martn)

713.43

AVLA L.I.-02

Area=

125.58

125.58

AVLA L.D.-02

Area=

125.55

125.55

AMLA-01

Area=

20.01

20.01

AMLA-02

Area=

18.81

18.81

Jardineria

Area=

15.00

120.00

AMJ-01

Area=

21.03

21.03

AVJ L.I.-01

Area=

146.69

146.69

AMJ-02

Area=

19.53

19.53

AMJ-03

Area=

19.34

19.34

Jirn 28 de Julio

473.63

AMJ-04

Area=

21.48

21.48

AVJ L.D.-01

Area=

146.75

146.75

AMJ-05

Area=

19.32

19.32

AMJ-06

Area=

19.49

19.49

Jardineria

Area=

15.00

Jirn Sucre

60.00
453.55

AMS-01

Area=

19.61

AMS-02

Area=

16.20

16.20

AVS L.I.-01

Area=

123.27

123.27

AMS-03

Area=

17.72

17.72

AMS-04

Area=

17.53

17.53

AMS-05

Area=

19.23

19.23

AMS-06

Area=

19.70

19.70

AVS L.D.-01

Area=

125.07

125.07

AMS-02

Area=

17.52

17.52

AMS-05

Area=

17.70

17.70

Jardineria

Area=

15.00

Jirn Ramn Castilla

19.61

60.00
456.88

AMRC-01

Area=

19.36

19.36

AMRC-02

Area=

19.48

19.48

AVRC L.I.-01

Area=

124.35

124.35

AMRC-03

Area=

17.46

17.46

AMRC-04

Area=

17.74

17.74

AMRC-05

Area=

19.48

19.48

AMRC-06

Area=

19.36

19.36

AVRC L.D.-01

Area=

124.40

124.40

AMRC-02

Area=

17.76

17.76

AMRC-05

Area=

17.49

17.49

Jardineria

Area=

15.00

60.00

AMB-01

Area=

19.37

19.37

AMB-02

Area=

19.47

19.47

AVB L.I.-01

Area=

123.69

123.69

AMB-03

Area=

17.46

17.46

AMB-04

Area=

18.14

18.14

AVB L.I.-02

Area=

124.49

124.49

AMB-05

Area=

17.42

17.42

AMB-06

Area=

17.78

17.78

AMB-07

Area=

19.46

19.46

AMB-08

Area=

19.36

19.36

AVB L.D.-01

Area=

123.72

123.72

AMB-09

Area=

17.76

17.76

AMB-10

Area=

17.08

17.08

AVB L.D.-02

Area=

124.34

124.34

AMB-11

Area=

17.78

17.78

AMB-12

Area=

17.56

17.56

Jardineria

Area=

15.00

120.00

Jirn Bolivar

834.88

Jirn Sebastin Chipana

714.02
AMSCH-01

Area=

14.64

14.64

AMSCH-02

Area=

14.72

14.72

AVSCH L.I.-01

Area=

97.88

97.88

AMSCH-03

Area=

12.92

12.92

AMSCH-04

Area=

13.13

13.13

AVSCH L.I.-02

Area=

100.73

100.73

AMSCH-05

Area=

12.58

12.58

AMSCH-06

Area=

13.42

13.42

AMSCH-07

Area=

14.71

14.71

AMSCH-08

Area=

14.63

14.63

AVSCH L.D.-01

Area=

97.91

97.91

AMSCH-09

Area=

13.13

13.13

AMSCH-10

Area=

12.91

12.91

AVSCH L.D.-02

Area=

100.76

100.76

AMSCH-11

Area=

12.89

12.89

AMSCH-12

Area=

13.14

13.14

Jardineria

62.93

0.60

37.76

62.96

0.60

37.78

65.31

0.60

39.19

65.33

0.60

Calle San Martn

39.20
948.24

AMSM-01

Area=

21.63

21.63

AVSM L.I.-01

Area=

177.84

177.84

AMSM-02

Area=

21.06

21.06

AMSM-03

Area=

21.49

21.49

AVSM L.I.-02

Area=

142.26

142.26

AMSM-04

Area=

21.22

21.22

AMSM-05

Area=

20.92

20.92

AVSM L.D.-01

Area=

177.72

177.72

AMSM-06

Area=

21.38

21.38

AMSM-07

Area=

21.17

21.17

AVSM L.D.-02

Area=

142.65

142.65

AMSM-08

Area=

19.62

19.62

AMSM-09

Area=

19.28

19.28

Jardineria

Area=

15.00

120.00
427.98

AML-01
AML-02
AVL L.I.-01
AML-03
AML-04

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

19.77
19.04
122.81
18.06
9.42

19.77
19.04
122.81
18.06
9.42

AML-05
AML-06
AVL L.D.-01
AML-02

1
1
1
1

Area=
Area=
Area=
Area=

19.07
19.80
122.77
17.24

19.07
19.80
122.77
17.24

Jardineria

Area=

15.00

AMH-01
AMH-02
AVH L.I.-01
AMH-03
AMH-04
AVH L.I.-02
AMH-05
AMH-06
AMH-07
AVH L.D.-01
AMH-08
AMH-09
AVH L.D.-02
AMH-10
Jardineria

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
63.23
63.20
61.69
61.75

14.52
14.85
98.23
12.96
13.09
96.39
10.10
14.83
14.51
98.19
13.09
12.96
96.39
10.19
0.60
0.60
0.60
0.60

AMCH-01
AMCH-02
AVCH L.I.-01
AMCH-03
AMCH-04
AVCH L.I.-02
AMCH-05
AMCH-06
AMCH-07
AVCH L.D.-01
AMCH-08
AMCH-09
AVCH L.D.-02
AMCH-10
Jardineria

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
63.67
63.64
61.69
61.69

14.68
14.64
98.76
13.14
12.91
96.39
10.22
14.65
14.71
98.73
12.99
13.14
96.39
10.07
0.60
0.60
0.60
0.60

AMAU-01
AMAU-02
AVAU L.I.-01
AMAU-03
AMAU-04
AVAU L.I.-02
AMAU-05

1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=

14.71
14.64
99.30
13.14
12.91
96.39
10.21

60.00
670.22
14.52
14.85
98.23
12.96
13.09
96.39
10.10
14.83
14.51
98.19
13.09
12.96
96.39
10.19
37.94
37.92
37.01
37.05
671.83
14.68
14.64
98.76
13.14
12.91
96.39
10.22
14.65
14.71
98.73
12.99
13.14
96.39
10.07
38.20
38.18
37.01
37.01
673.32
14.71
14.64
99.30
13.14
12.91
96.39
10.21

Jirn Lima

Jirn Huancayo

Jirn Catalina Huanca

Jirn Alfonso Ugarte

AMAU-06
AMAU-07
AVAU L.D.-01
AMAU-08
AMAU-09
AVAU L.D.-02

1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=

14.65
14.71
99.26
12.91
13.14
96.34

14.65
14.71
99.26
12.91
13.14
96.34

AMAU-10

Area=

10.07

10.07

Jardineria

64.11

0.60

38.47

64.08

0.60

38.45

61.69

0.60

37.01

61.69

0.60

37.01

AM27M-01

Area=

15.83

Jirn 27 de Mayo

676.32
15.83

AM27M-02

Area=

13.42

13.42

AV27M L.I.-01

Area=

100.02

100.02

AM27M-03

Area=

14.26

14.26

AM27M-04

Area=

11.82

11.82

AV27M L.I.-02

Area=

96.55

96.55

AM27M-05

Area=

10.95

10.95

AM27M-06

Area=

13.54

13.54

AM27M-07

Area=

15.97

15.97

AV27M L.D.-01

Area=

99.98

99.98

AM27M-08

Area=

11.83

11.83

AM27M-09

Area=

14.26

14.26

AV27M L.D.-02

Area=

96.60

96.60

AM27M-10

Area=

9.38

9.38

Jardineria

64.73

0.60

38.84

64.70

0.60

38.82

61.88

0.60

37.13

61.88

0.60

Jirn Santa Cruz

37.13
649.51

AMSC-01

Area=

13.20

13.20

AVSC L.I.-01

Area=

100.71

100.71

AMSC-02

Area=

14.52

14.52

AMSC-03

Area=

11.64

11.64

AVSC L.I.-02

Area=

96.67

96.67

AMSC-04

Area=

11.08

11.08

AMSC-05

Area=

16.19

16.19

AVSC L.D.-01

Area=

100.73

100.73

AMSC-06

Area=

11.64

11.64

AMSC-07

Area=

14.46

14.46

AVSC L.D.-02

Area=

96.68

96.68

AMSC-08

Area=

9.26

9.26

Jardineria

65.35

0.60

39.21

65.32

0.60

39.19

61.94

0.60

37.16

61.94

0.60

37.16

01.02 Trazo, Nivelacin y Replanteo

16,987.71

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

2106.35

AMI-01

Area=

10.29

10.29

AVI L.I.-01

Area=

221.73

221.73

AVI L.D.-01

Area=

221.73

221.73

AVI L.I.-02

Area=

177.63

177.63

AVI L.D.-02

Area=

177.53

177.53

AVI L.I.-03

Area=

176.84

176.84

AVI L.D.-03

Area=

176.82

176.82

AVI L.I.-04

Area=

175.13

175.13

AVI L.D.-04

Area=

175.13

175.13

AVI L.I.-05

Area=

146.75

146.75

AVI L.D.-05

Area=

146.77

146.77

Jardineria
Jr. Los Incas (Tramo San Martn-Chacamarca)
AVI L.I.-06
AVI L.D.-06
AVI L.I.-07
AVI L.D.-07
AVI L.I.-08
AVI L.D.-08
AVI L.I.-09
AVI L.D.-09
AVI L.I.-10
AVI L.D.-10
AVI L.I.-11
AVI L.D.-11
AVI L.I.-11'
AVI L.I.-12
AVI L.D.-12
AMI-02
AMI-03
Jardineria
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)
AVFB L.I.-01
AVFB L.D.-01
AVFB L.I.-02
AVFB L.D.-02
AVFB L.I.-03
AVFB L.D.-03
AVFB L.I.-04
AVFB L.D.-04
AVFB L.I.-05
AVFB L.D.-05
Jardineria
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)
AVFB L.I.-06
AVFB L.D.-06
AVFB L.I.-07
AVFB L.D.-07
AVFB L.I.-08
AVFB L.D.-08
AVFB L.I.-09
AVFB L.D.-09
AVFB L.I.-10
AVFB L.D.-10
AVFB L.I.-11
AVFB L.D.-11
AMFB-01
AMFB-02
Jardineria
Jirn Los Andes (Tramo Bolivar - San Martn)
AVLA L.I.-01
AVLA L.D.-01
AVLA L.I.-02
AVLA L.D.-02
AMLA-01
AMLA-02

20

Area=

15.00

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
28

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

141.82
142.11
148.46
148.16
146.72
146.85
148.46
148.45
136.82
137.61
189.35
189.50
48.11
175.57
175.26
13.73
15.63
15.00

1
1
1
1
1
1
1
1
1
1
20

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

188.36
188.39
150.20
150.11
150.85
150.84
149.56
149.70
125.75
125.73
15.00

1
1
1
1
1
1
1
1
1
1
1
1
1
1
24

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

124.03
123.75
127.32
127.44
127.33
127.33
126.45
127.18
163.03
163.16
146.80
145.55
12.13
13.94
15.00

1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=

151.66
151.82
125.58
125.55
20.01
18.81

300.00
2672.61
141.82
142.11
148.46
148.16
146.72
146.85
148.46
148.45
136.82
137.61
189.35
189.50
48.11
175.57
175.26
13.73
15.63
420.00
1829.49
188.36
188.39
150.20
150.11
150.85
150.84
149.56
149.70
125.75
125.73
300.00
2015.44
124.03
123.75
127.32
127.44
127.33
127.33
126.45
127.18
163.03
163.16
146.80
145.55
12.13
13.94
360.00
713.43
151.66
151.82
125.58
125.55
20.01
18.81

Jardineria

Area=

15.00

AMJ-01
AVJ L.I.-01
AMJ-02
AMJ-03
AMJ-04
AVJ L.D.-01
AMJ-05
AMJ-06
Jardineria

1
1
1
1
1
1
1
1
4

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

21.03
146.69
19.53
19.34
21.48
146.75
19.32
19.49
15.00

AMS-01

Area=

19.61

AMS-02

Area=

16.20

16.20

AVS L.I.-01

Area=

123.27

123.27

AMS-03

Area=

17.72

17.72

AMS-04

Area=

17.53

17.53

AMS-05

Area=

19.23

19.23

AMS-06

Area=

19.70

19.70

AVS L.D.-01

Area=

125.07

125.07

AMS-02

Area=

17.52

17.52

AMS-05

Area=

17.70

17.70

Jardineria

Area=

15.00

Jirn 28 de Julio

Jirn Sucre

120.00
473.63
21.03
146.69
19.53
19.34
21.48
146.75
19.32
19.49
60.00
453.55

Jirn Ramn Castilla

19.61

60.00
456.88

AMRC-01

Area=

19.36

AMRC-02

Area=

19.48

19.48

AVRC L.I.-01

Area=

124.35

124.35

AMRC-03

Area=

17.46

17.46

AMRC-04

Area=

17.74

17.74

AMRC-05

Area=

19.48

19.48

AMRC-06

Area=

19.36

19.36

AVRC L.D.-01

Area=

124.40

124.40

AMRC-02

Area=

17.76

17.76

AMRC-05

Area=

17.49

17.49

Jardineria

Area=

15.00

Jirn Bolivar

19.36

60.00
834.88

AMB-01

Area=

19.37

AMB-02

Area=

19.47

19.37
19.47

AVB L.I.-01

Area=

123.69

123.69

AMB-03

Area=

17.46

17.46

AMB-04

Area=

18.14

18.14

AVB L.I.-02

Area=

124.49

124.49

AMB-05

Area=

17.42

17.42

AMB-06

Area=

17.78

17.78

AMB-07

Area=

19.46

19.46

AMB-08

Area=

19.36

19.36

AVB L.D.-01

Area=

123.72

123.72

AMB-09

Area=

17.76

17.76

AMB-10

Area=

17.08

17.08

AVB L.D.-02

Area=

124.34

124.34
17.78

AMB-11

Area=

17.78

AMB-12

Area=

17.56

17.56

Jardineria

Area=

15.00

120.00

AMSCH-01

Area=

14.64

14.64

AMSCH-02

Area=

14.72

14.72

AVSCH L.I.-01

Area=

97.88

97.88

AMSCH-03

Area=

12.92

12.92

AMSCH-04

Area=

13.13

13.13

AVSCH L.I.-02

Area=

100.73

100.73

AMSCH-05

Area=

12.58

12.58

AMSCH-06

Area=

13.42

13.42

Jirn Sebastin Chipana

714.02

AMSCH-07

Area=

14.71

14.71

AMSCH-08

Area=

14.63

14.63

AVSCH L.D.-01

Area=

97.91

97.91

AMSCH-09

Area=

13.13

13.13

AMSCH-10

Area=

12.91

12.91

AVSCH L.D.-02

Area=

100.76

100.76

AMSCH-11

Area=

12.89

12.89

AMSCH-12

Area=

13.14

13.14

Jardineria

62.93

0.60

37.76

62.96

0.60

37.78

65.31

0.60

39.19

65.33

0.60

AMSM-01
AVSM L.I.-01
AMSM-02
AMSM-03
AVSM L.I.-02

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

21.63
177.84
21.06
21.49
142.26

39.20
948.24
21.63
177.84
21.06
21.49
142.26

AMSM-04
AMSM-05
AVSM L.D.-01
AMSM-06

1
1
1
1

Area=
Area=
Area=
Area=

21.22
20.92
177.72
21.38

21.22
20.92
177.72
21.38

AMSM-07
AVSM L.D.-02

1
1

Area=
Area=

21.17
142.65

21.17
142.65

AMSM-08
AMSM-09

1
1

Area=
Area=

19.62
19.28

19.62
19.28

Jardineria

Area=

15.00

120.00
427.98

AML-01
AML-02
AVL L.I.-01

1
1
1

Area=
Area=
Area=

19.77
19.04
122.81

19.77
19.04
122.81

AML-03
AML-04

1
1

Area=
Area=

18.06
9.42

18.06
9.42

AML-05
AML-06
AVL L.D.-01
AML-02

1
1
1
1

Area=
Area=
Area=
Area=

19.07
19.80
122.77
17.24

19.07
19.80
122.77
17.24

Jardineria

Area=

15.00

AMH-01
AMH-02
AVH L.I.-01
AMH-03
AMH-04
AVH L.I.-02
AMH-05
AMH-06
AMH-07
AVH L.D.-01
AMH-08
AMH-09
AVH L.D.-02
AMH-10
Jardineria

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
63.23
63.20
61.69
61.75

14.52
14.85
98.23
12.96
13.09
96.39
10.10
14.83
14.51
98.19
13.09
12.96
96.39
10.19
0.60
0.60
0.60
0.60

AMCH-01
AMCH-02
AVCH L.I.-01
AMCH-03

1
1
1
1

Area=
Area=
Area=
Area=

14.68
14.64
98.76
13.14

60.00
670.22
14.52
14.85
98.23
12.96
13.09
96.39
10.10
14.83
14.51
98.19
13.09
12.96
96.39
10.19
37.94
37.92
37.01
37.05
671.83
14.68
14.64
98.76
13.14

Calle San Martn

Jirn Lima

Jirn Huancayo

Jirn Catalina Huanca

AMCH-04
AVCH L.I.-02
AMCH-05
AMCH-06
AMCH-07
AVCH L.D.-01
AMCH-08
AMCH-09
AVCH L.D.-02
AMCH-10
Jardineria

1
1
1
1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
63.67
63.64
61.69

12.91
96.39
10.22
14.65
14.71
98.73
12.99
13.14
96.39
10.07
0.60
0.60
0.60

61.69

0.60

Jirn Alfonso Ugarte

12.91
96.39
10.22
14.65
14.71
98.73
12.99
13.14
96.39
10.07
38.20
38.18
37.01
37.01
673.32

AMAU-01

Area=

14.71

14.71

AMAU-02

Area=

14.64

14.64

AVAU L.I.-01

Area=

99.30

99.30

AMAU-03

Area=

13.14

13.14

AMAU-04

Area=

12.91

12.91

AVAU L.I.-02

Area=

96.39

96.39

AMAU-05

Area=

10.21

10.21

AMAU-06

Area=

14.65

14.65

AMAU-07

Area=

14.71

14.71

AVAU L.D.-01

Area=

99.26

99.26

AMAU-08

Area=

12.91

12.91

AMAU-09

Area=

13.14

13.14

AVAU L.D.-02

Area=

96.34

96.34

AMAU-10

Area=

10.07

10.07

Jardineria

64.11

0.60

38.47

64.08

0.60

38.45

61.69

0.60

37.01

61.69

0.60

37.01

AM27M-01

Area=

15.83

AM27M-02

Area=

13.42

13.42

AV27M L.I.-01

Area=

100.02

100.02

AM27M-03

Area=

14.26

14.26

AM27M-04

Area=

11.82

11.82

AV27M L.I.-02

Area=

96.55

96.55

AM27M-05

Area=

10.95

10.95

AM27M-06

Area=

13.54

13.54

AM27M-07

Area=

15.97

15.97

AV27M L.D.-01

Area=

99.98

99.98

AM27M-08

Area=

11.83

11.83

Jirn 27 de Mayo

676.32
15.83

AM27M-09

Area=

14.26

14.26

AV27M L.D.-02

Area=

96.60

96.60

AM27M-10

Area=

9.38

9.38

Jardineria

64.73

0.60

38.84

64.70

0.60

38.82

61.88

0.60

37.13

61.88

0.60

Jirn Santa Cruz

37.13
649.51

AMSC-01

Area=

13.20

13.20

AVSC L.I.-01

Area=

100.71

100.71

AMSC-02

Area=

14.52

14.52

AMSC-03

Area=

11.64

11.64

AVSC L.I.-02

Area=

96.67

96.67

AMSC-04

Area=

11.08

11.08

AMSC-05

Area=

16.19

16.19

AVSC L.D.-01

Area=

100.73

100.73

AMSC-06

Area=

11.64

11.64

AMSC-07

Area=

14.46

14.46

AVSC L.D.-02

Area=

96.68

96.68

AMSC-08

Area=

9.26

9.26

Jardineria

65.35

0.60

39.21

65.32

0.60

39.19

61.94

0.60

37.16

61.94

0.60

37.16

02.00 MOVIMIENTO DE TIERRAS


02.01 Corte de Terreno a Mano E=0.20 m.

3,397.54

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

421.27

AMI-01

Area=

10.29

0.20

2.06

AVI L.I.-01

Area=

221.73

0.20

44.35

AVI L.D.-01

Area=

221.73

0.20

44.35

AVI L.I.-02

Area=

177.63

0.20

35.53

AVI L.D.-02

Area=

177.53

0.20

35.51

AVI L.I.-03

Area=

176.84

0.20

35.37

AVI L.D.-03

Area=

176.82

0.20

35.36

AVI L.I.-04

Area=

175.13

0.20

35.03

AVI L.D.-04

Area=

175.13

0.20

35.03

AVI L.I.-05

Area=

146.75

0.20

29.35

AVI L.D.-05

Area=

146.77

0.20

29.35

Jardineria

20

Area=

15.00

0.20

Jr. Los Incas (Tramo San Martn-Chacamarca)

60.00
534.52

AVI L.I.-06

Area=

141.82

0.20

28.36

AVI L.D.-06

Area=

142.11

0.20

28.42

AVI L.I.-07

Area=

148.46

0.20

29.69

AVI L.D.-07

Area=

148.16

0.20

29.63

AVI L.I.-08

Area=

146.72

0.20

29.34

AVI L.D.-08

Area=

146.85

0.20

29.37

AVI L.I.-09

Area=

148.46

0.20

29.69

AVI L.D.-09

Area=

148.45

0.20

29.69

AVI L.I.-10

Area=

136.82

0.20

27.36

AVI L.D.-10

Area=

137.61

0.20

27.52

AVI L.I.-11

Area=

189.35

0.20

37.87

AVI L.D.-11

Area=

189.50

0.20

37.90

AVI L.I.-11'

Area=

48.11

0.20

9.62

AVI L.I.-12

Area=

175.57

0.20

35.11

AVI L.D.-12

Area=

175.26

0.20

35.05

AMI-02

Area=

13.73

0.20

2.75

AMI-03

Area=

15.63

0.20

3.13

Jardineria

28

Area=

15.00

0.20

84.00

AVFB L.I.-01

Area=

188.36

0.20

37.67

AVFB L.D.-01

Area=

188.39

0.20

37.68

AVFB L.I.-02

Area=

150.20

0.20

30.04

AVFB L.D.-02

Area=

150.11

0.20

30.02

AVFB L.I.-03

Area=

150.85

0.20

30.17

AVFB L.D.-03

Area=

150.84

0.20

30.17

AVFB L.I.-04

Area=

149.56

0.20

29.91

AVFB L.D.-04

Area=

149.70

0.20

29.94

AVFB L.I.-05

Area=

125.75

0.20

25.15

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

365.90

AVFB L.D.-05

Area=

125.73

0.20

25.15

Jardineria
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

20

Area=

15.00

0.20

60.00
403.09

AVFB L.I.-06
AVFB L.D.-06
AVFB L.I.-07
AVFB L.D.-07
AVFB L.I.-08

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

124.03
123.75
127.32
127.44
127.33

0.20
0.20
0.20
0.20
0.20

24.81
24.75
25.46
25.49
25.47

AVFB L.D.-08
AVFB L.I.-09
AVFB L.D.-09
AVFB L.I.-10

1
1
1
1

Area=
Area=
Area=
Area=

127.33
126.45
127.18
163.03

0.20
0.20
0.20
0.20

25.47
25.29
25.44
32.61

AVFB L.D.-10
AVFB L.I.-11
AVFB L.D.-11
AMFB-01
AMFB-02

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

163.16
146.80
145.55
12.13
13.94

0.20
0.20
0.20
0.20
0.20

32.63
29.36
29.11
2.43
2.79

Jardineria

24

Area=

15.00

0.20

Jirn Los Andes (Tramo Bolivar - San Martn)

72.00
142.69

AVLA L.I.-01

Area=

151.66

0.20

30.33

AVLA L.D.-01

Area=

151.82

0.20

30.36

AVLA L.I.-02

Area=

125.58

0.20

25.12

AVLA L.D.-02

Area=

125.55

0.20

25.11

AMLA-01

Area=

20.01

0.20

4.00

AMLA-02

Area=

18.81

0.20

3.76

Jardineria

Area=

15.00

0.20

24.00

AMJ-01

Area=

21.03

0.20

4.21

AVJ L.I.-01

Area=

146.69

0.20

29.34

AMJ-02

Area=

19.53

0.20

3.91

AMJ-03

Area=

19.34

0.20

3.87

AMJ-04

Area=

21.48

0.20

4.30

AVJ L.D.-01

Area=

146.75

0.20

29.35

AMJ-05

Area=

19.32

0.20

3.86

AMJ-06

Area=

19.49

0.20

3.90

Jardineria

Area=

15.00

0.20

12.00

AMS-01

Area=

19.61

0.20

AMS-02

Area=

16.20

0.20

3.24

AVS L.I.-01

Area=

123.27

0.20

24.65

AMS-03

Area=

17.72

0.20

3.54

AMS-04

Area=

17.53

0.20

3.51

AMS-05

Area=

19.23

0.20

3.85

Jirn 28 de Julio

94.73

Jirn Sucre

90.71
3.92

AMS-06

Area=

19.70

0.20

3.94

AVS L.D.-01

Area=

125.07

0.20

25.01

AMS-02

Area=

17.52

0.20

3.50

AMS-05

Area=

17.70

0.20

3.54

Jardineria

Area=

15.00

0.20

12.00

AMRC-01

Area=

19.36

0.20

AMRC-02

Area=

19.48

0.20

3.90

AVRC L.I.-01

Area=

124.35

0.20

24.87

AMRC-03

Area=

17.46

0.20

3.49

AMRC-04

Area=

17.74

0.20

3.55

AMRC-05

Area=

19.48

0.20

3.90

AMRC-06

Area=

19.36

0.20

3.87

AVRC L.D.-01

Area=

124.40

0.20

24.88

AMRC-02

Area=

17.76

0.20

3.55

AMRC-05

Area=

17.49

0.20

3.50

Jirn Ramn Castilla

91.38
3.87

Jardineria

Area=

15.00

0.20

Jirn Bolivar

12.00
166.98

AMB-01

Area=

19.37

0.20

AMB-02

Area=

19.47

0.20

3.87
3.89

AVB L.I.-01

Area=

123.69

0.20

24.74

AMB-03

Area=

17.46

0.20

3.49

AMB-04

Area=

18.14

0.20

3.63

AVB L.I.-02

Area=

124.49

0.20

24.90

AMB-05

Area=

17.42

0.20

3.48

AMB-06

Area=

17.78

0.20

3.56

AMB-07

Area=

19.46

0.20

3.89

AMB-08

Area=

19.36

0.20

3.87

AVB L.D.-01

Area=

123.72

0.20

24.74

AMB-09

Area=

17.76

0.20

3.55

AMB-10

Area=

17.08

0.20

3.42

AVB L.D.-02

Area=

124.34

0.20

24.87
3.56

AMB-11

Area=

17.78

0.20

AMB-12

Area=

17.56

0.20

3.51

Jardineria

Area=

15.00

0.20

24.00

AMSCH-01

Area=

14.64

0.20

AMSCH-02

Area=

14.72

0.20

2.94

AVSCH L.I.-01

Area=

97.88

0.20

19.58

AMSCH-03

Area=

12.92

0.20

2.58

AMSCH-04

Area=

13.13

0.20

2.63

AVSCH L.I.-02

Area=

100.73

0.20

20.15

AMSCH-05

Area=

12.58

0.20

2.52

AMSCH-06

Area=

13.42

0.20

2.68

AMSCH-07

Area=

14.71

0.20

2.94

AMSCH-08

Area=

14.63

0.20

2.93

AVSCH L.D.-01

Area=

97.91

0.20

19.58

AMSCH-09

Area=

13.13

0.20

2.63

AMSCH-10

Area=

12.91

0.20

2.58

AVSCH L.D.-02

Area=

100.76

0.20

20.15

Jirn Sebastin Chipana

142.80
2.93

AMSCH-11

Area=

12.89

0.20

2.58

AMSCH-12

Area=

13.14

0.20

2.63

Jardineria

62.93

0.60

0.20

7.55

62.96

0.60

0.20

7.56

65.31

0.60

0.20

7.84

65.33

0.60

0.20

Calle San Martn

7.84
189.65

AMSM-01

Area=

21.63

0.20

4.33

AVSM L.I.-01

Area=

177.84

0.20

35.57

AMSM-02

Area=

21.06

0.20

4.21

AMSM-03

Area=

21.49

0.20

4.30

AVSM L.I.-02

Area=

142.26

0.20

28.45

AMSM-04

Area=

21.22

0.20

4.24

AMSM-05

Area=

20.92

0.20

4.18

AVSM L.D.-01

Area=

177.72

0.20

35.54

AMSM-06

Area=

21.38

0.20

4.28

AMSM-07

Area=

21.17

0.20

4.23

AVSM L.D.-02

Area=

142.65

0.20

28.53

AMSM-08

Area=

19.62

0.20

3.92

AMSM-09

Area=

19.28

0.20

3.86

Jardineria

Area=

15.00

0.20

24.00

AML-01

Area=

19.77

0.20

AML-02

Area=

19.04

0.20

3.81

AVL L.I.-01

Area=

122.81

0.20

24.56

Jirn Lima

85.60
3.95

AML-03

Area=

18.06

0.20

3.61

AML-04

Area=

9.42

0.20

1.88

AML-05

Area=

19.07

0.20

3.81

AML-06

Area=

19.80

0.20

3.96

AVL L.D.-01

Area=

122.77

0.20

24.55

AML-02

Area=

17.24

0.20

3.45

Jardineria

Area=

15.00

0.20

AMH-01
AMH-02
AVH L.I.-01

1
1
1

Area=
Area=
Area=

14.52
14.85
98.23

0.20
0.20
0.20

12.00
134.04
2.90
2.97
19.65

AMH-03
AMH-04
AVH L.I.-02
AMH-05

1
1
1
1

Area=
Area=
Area=
Area=

12.96
13.09
96.39
10.10

0.20
0.20
0.20
0.20

2.59
2.62
19.28
2.02

AMH-06
AMH-07
AVH L.D.-01
AMH-08
AMH-09

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

14.83
14.51
98.19
13.09
12.96

0.20
0.20
0.20
0.20
0.20

2.97
2.90
19.64
2.62
2.59

AVH L.D.-02
AMH-10

1
1

Area=
Area=

96.39
10.19

0.20
0.20

19.28
2.04

Jardineria

63.23

0.60

0.20

7.59

63.20

0.60

0.20

7.58

61.69

0.60

0.20

7.40

61.75

0.60

0.20

Jirn Huancayo

Jirn Catalina Huanca

7.41
134.37

AMCH-01

Area=

14.68

0.20

AMCH-02

Area=

14.64

0.20

2.93

AVCH L.I.-01

Area=

98.76

0.20

19.75

AMCH-03

Area=

13.14

0.20

2.63

AMCH-04

Area=

12.91

0.20

2.58

AVCH L.I.-02

Area=

96.39

0.20

19.28

AMCH-05

Area=

10.22

0.20

2.04

AMCH-06

Area=

14.65

0.20

2.93

AMCH-07

Area=

14.71

0.20

2.94

AVCH L.D.-01

Area=

98.73

0.20

19.75

AMCH-08

Area=

12.99

0.20

2.60

AMCH-09

Area=

13.14

0.20

2.63

AVCH L.D.-02

Area=

96.39

0.20

19.28

AMCH-10

Area=

10.07

0.20

2.01

Jardineria

63.67

0.60

0.20

7.64

63.64

0.60

0.20

7.64

61.69

0.60

0.20

7.40

61.69

0.60

0.20

Jirn Alfonso Ugarte

2.94

7.40
134.66

AMAU-01

Area=

14.71

0.20

AMAU-02

Area=

14.64

0.20

2.94
2.93

AVAU L.I.-01

Area=

99.30

0.20

19.86

AMAU-03

Area=

13.14

0.20

2.63

AMAU-04

Area=

12.91

0.20

2.58

AVAU L.I.-02

Area=

96.39

0.20

19.28

AMAU-05

Area=

10.21

0.20

2.04

AMAU-06

Area=

14.65

0.20

2.93

AMAU-07

Area=

14.71

0.20

2.94

AVAU L.D.-01

Area=

99.26

0.20

19.85

AMAU-08

Area=

12.91

0.20

2.58

AMAU-09

Area=

13.14

0.20

2.63

AVAU L.D.-02

Area=

96.34

0.20

19.27

AMAU-10

Area=

10.07

0.20

2.01

Jardineria

64.11

0.60

0.20

7.69

64.08

0.60

0.20

7.69

61.69

0.60

0.20

7.40

61.69

0.60

0.20

Jirn 27 de Mayo

7.40
135.26

AM27M-01

Area=

15.83

0.20

AM27M-02

Area=

13.42

0.20

2.68

AV27M L.I.-01

Area=

100.02

0.20

20.00

AM27M-03

Area=

14.26

0.20

2.85

AM27M-04

Area=

11.82

0.20

2.36

AV27M L.I.-02

Area=

96.55

0.20

19.31

AM27M-05

Area=

10.95

0.20

2.19

AM27M-06

Area=

13.54

0.20

2.71

AM27M-07

Area=

15.97

0.20

3.19

AV27M L.D.-01

Area=

99.98

0.20

20.00

AM27M-08

Area=

11.83

0.20

2.37

AM27M-09

Area=

14.26

0.20

2.85

AV27M L.D.-02

Area=

96.60

0.20

19.32

AM27M-10

Area=

9.38

0.20

1.88

Jardineria

64.73

0.60

0.20

7.77

64.70

0.60

0.20

7.76

61.88

0.60

0.20

7.43

61.88

0.60

0.20

Jirn Santa Cruz

3.17

7.43
129.90

AMSC-01

Area=

13.20

0.20

2.64

AVSC L.I.-01

Area=

100.71

0.20

20.14

AMSC-02

Area=

14.52

0.20

2.90

AMSC-03

Area=

11.64

0.20

2.33

AVSC L.I.-02

Area=

96.67

0.20

19.33

AMSC-04

Area=

11.08

0.20

2.22

AMSC-05

Area=

16.19

0.20

3.24

AVSC L.D.-01

Area=

100.73

0.20

20.15

AMSC-06

Area=

11.64

0.20

2.33

AMSC-07

Area=

14.46

0.20

2.89

AVSC L.D.-02

Area=

96.68

0.20

19.34

AMSC-08

Area=

9.26

0.20

1.85

Jardineria

65.35

0.60

0.20

7.84

65.32

0.60

0.20

7.84

61.94

0.60

0.20

7.43

61.94

0.60

0.20

7.43

02.02 Compactacin de la Sub Rasante en Veredas

14,097.87

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

1806.35

AMI-01

Area=

10.29

10.29

AVI L.I.-01

Area=

221.73

221.73

AVI L.D.-01

Area=

221.73

221.73

AVI L.I.-02

Area=

177.63

177.63

AVI L.D.-02

Area=

177.53

177.53

AVI L.I.-03

Area=

176.84

176.84

AVI L.D.-03

Area=

176.82

176.82

AVI L.I.-04

Area=

175.13

175.13

AVI L.D.-04

Area=

175.13

175.13

AVI L.I.-05

Area=

146.75

146.75

AVI L.D.-05

Area=

146.77

Jr. Los Incas (Tramo San Martn-Chacamarca)

146.77
2252.61

AVI L.I.-06

Area=

141.82

AVI L.D.-06

Area=

142.11

141.82
142.11

AVI L.I.-07

Area=

148.46

148.46

AVI L.D.-07

Area=

148.16

148.16

AVI L.I.-08

Area=

146.72

146.72

AVI L.D.-08

Area=

146.85

146.85

AVI L.I.-09

Area=

148.46

148.46

AVI L.D.-09

Area=

148.45

148.45

AVI L.I.-10

Area=

136.82

136.82

AVI L.D.-10

Area=

137.61

137.61

AVI L.I.-11

Area=

189.35

189.35

AVI L.D.-11

Area=

189.50

189.50

AVI L.I.-11'

Area=

48.11

48.11

AVI L.I.-12

Area=

175.57

175.57

AVI L.D.-12

Area=

175.26

175.26

AMI-02

Area=

13.73

13.73

AMI-03

Area=

15.63

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

15.63
1529.49

AVFB L.I.-01

Area=

188.36

188.36

AVFB L.D.-01

Area=

188.39

188.39

AVFB L.I.-02

Area=

150.20

150.20

AVFB L.D.-02

Area=

150.11

150.11

AVFB L.I.-03

Area=

150.85

150.85

AVFB L.D.-03

Area=

150.84

150.84

AVFB L.I.-04

Area=

149.56

149.56

AVFB L.D.-04

Area=

149.70

149.70

AVFB L.I.-05

Area=

125.75

125.75

AVFB L.D.-05

Area=

125.73

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

125.73
1655.44

AVFB L.I.-06

Area=

124.03

124.03

AVFB L.D.-06

Area=

123.75

123.75

AVFB L.I.-07

Area=

127.32

127.32

AVFB L.D.-07

Area=

127.44

127.44

AVFB L.I.-08

Area=

127.33

127.33

AVFB L.D.-08

Area=

127.33

127.33

AVFB L.I.-09

Area=

126.45

126.45

AVFB L.D.-09

Area=

127.18

127.18

AVFB L.I.-10

Area=

163.03

163.03

AVFB L.D.-10

Area=

163.16

163.16

AVFB L.I.-11

Area=

146.80

146.80

AVFB L.D.-11

Area=

145.55

145.55

AMFB-01

Area=

12.13

12.13

AMFB-02

Area=

13.94

13.94

AVLA L.I.-01

Area=

151.66

151.66

AVLA L.D.-01

Area=

151.82

151.82

Jirn Los Andes (Tramo Bolivar - San Martn)

593.43

AVLA L.I.-02

Area=

125.58

125.58

AVLA L.D.-02

Area=

125.55

125.55

AMLA-01

Area=

20.01

20.01

AMLA-02

Area=

18.81

18.81

AMJ-01

Area=

21.03

21.03

AVJ L.I.-01

Area=

146.69

146.69

AMJ-02

Area=

19.53

19.53

AMJ-03

Area=

19.34

19.34

Jirn 28 de Julio

413.63

AMJ-04

Area=

21.48

21.48

AVJ L.D.-01

Area=

146.75

146.75

AMJ-05

Area=

19.32

19.32

AMJ-06

Area=

19.49

Jirn Sucre

19.49
393.55

AMS-01

Area=

19.61

19.61

AMS-02

Area=

16.20

16.20

AVS L.I.-01

Area=

123.27

123.27

AMS-03

Area=

17.72

17.72

AMS-04

Area=

17.53

17.53

AMS-05

Area=

19.23

19.23

AMS-06

Area=

19.70

19.70

AVS L.D.-01

Area=

125.07

125.07

AMS-02

Area=

17.52

17.52

AMS-05

Area=

17.70

17.70

AMRC-01

Area=

19.36

19.36

AMRC-02

Area=

19.48

19.48

AVRC L.I.-01

Area=

124.35

124.35

AMRC-03

Area=

17.46

17.46

AMRC-04

Area=

17.74

17.74

AMRC-05

Area=

19.48

19.48

AMRC-06

Area=

19.36

19.36

AVRC L.D.-01

Area=

124.40

124.40

AMRC-02

Area=

17.76

17.76

AMRC-05

Area=

17.49

Jirn Ramn Castilla

396.88

Jirn Bolivar

17.49
714.88

AMB-01

Area=

19.37

AMB-02

Area=

19.47

19.47

AVB L.I.-01

Area=

123.69

123.69

AMB-03

Area=

17.46

17.46

AMB-04

Area=

18.14

18.14

AVB L.I.-02

Area=

124.49

124.49

AMB-05

Area=

17.42

17.42

AMB-06

Area=

17.78

17.78

AMB-07

Area=

19.46

19.46

AMB-08

Area=

19.36

19.36

AVB L.D.-01

Area=

123.72

123.72

AMB-09

Area=

17.76

17.76

AMB-10

Area=

17.08

17.08

AVB L.D.-02

Area=

124.34

124.34

AMB-11

Area=

17.78

17.78

AMB-12

Area=

17.56

Jirn Sebastin Chipana

19.37

17.56
560.10

AMSCH-01

Area=

14.64

14.64

AMSCH-02

Area=

14.72

14.72

AVSCH L.I.-01

Area=

97.88

97.88

AMSCH-03

Area=

12.92

12.92

AMSCH-04

Area=

13.13

13.13

AVSCH L.I.-02

Area=

100.73

100.73

AMSCH-05

Area=

12.58

12.58

AMSCH-06

Area=

13.42

13.42

AMSCH-07

Area=

14.71

14.71

AMSCH-08

Area=

14.63

14.63

AVSCH L.D.-01

Area=

97.91

97.91

AMSCH-09

Area=

13.13

13.13

AMSCH-10

Area=

12.91

12.91

AVSCH L.D.-02

Area=

100.76

100.76

AMSCH-11

Area=

12.89

12.89

AMSCH-12

Area=

13.14

Calle San Martn

13.14
828.24

AMSM-01

Area=

21.63

21.63

AVSM L.I.-01

Area=

177.84

177.84

AMSM-02

Area=

21.06

21.06

AMSM-03

Area=

21.49

21.49

AVSM L.I.-02

Area=

142.26

142.26

AMSM-04

Area=

21.22

21.22

AMSM-05

Area=

20.92

20.92

AVSM L.D.-01

Area=

177.72

177.72

AMSM-06

Area=

21.38

21.38

AMSM-07

Area=

21.17

21.17

AVSM L.D.-02

Area=

142.65

142.65

AMSM-08

Area=

19.62

19.62

AMSM-09

Area=

19.28

Jirn Lima

19.28
367.98

AML-01

Area=

19.77

AML-02

Area=

19.04

19.77
19.04

AVL L.I.-01

Area=

122.81

122.81

AML-03

Area=

18.06

18.06

AML-04

Area=

9.42

9.42

AML-05

Area=

19.07

19.07

AML-06

Area=

19.80

19.80

AVL L.D.-01

Area=

122.77

122.77

AML-02

Area=

17.24

17.24

AMH-01

Area=

14.52

14.52

AMH-02

Area=

14.85

14.85

AVH L.I.-01

Area=

98.23

98.23

AMH-03

Area=

12.96

12.96

AMH-04

Area=

13.09

13.09

AVH L.I.-02

Area=

96.39

96.39

AMH-05

Area=

10.10

10.10

AMH-06

Area=

14.83

14.83

AMH-07

Area=

14.51

14.51

AVH L.D.-01

Area=

98.19

98.19

AMH-08

Area=

13.09

13.09

AMH-09

Area=

12.96

12.96

AVH L.D.-02

Area=

96.39

96.39

AMH-10

Area=

10.19

10.19

AMCH-01

Area=

14.68

14.68

AMCH-02

Area=

14.64

14.64

AVCH L.I.-01

Area=

98.76

98.76

AMCH-03

Area=

13.14

13.14

AMCH-04

Area=

12.91

12.91

AVCH L.I.-02

Area=

96.39

96.39

AMCH-05

Area=

10.22

10.22

AMCH-06

Area=

14.65

14.65

AMCH-07

Area=

14.71

14.71

AVCH L.D.-01

Area=

98.73

98.73

AMCH-08

Area=

12.99

12.99

AMCH-09

Area=

13.14

13.14

AVCH L.D.-02

Area=

96.39

96.39

AMCH-10

Area=

10.07

10.07

Jirn Huancayo

520.30

Jirn Catalina Huanca

521.42

Jirn Alfonso Ugarte

522.38
AMAU-01

Area=

14.71

14.71

AMAU-02

Area=

14.64

14.64

AVAU L.I.-01

Area=

99.30

99.30

AMAU-03

Area=

13.14

13.14

AMAU-04

Area=

12.91

12.91

AVAU L.I.-02

Area=

96.39

96.39

AMAU-05

Area=

10.21

10.21

AMAU-06

Area=

14.65

14.65

AMAU-07

Area=

14.71

14.71

AVAU L.D.-01

Area=

99.26

99.26

AMAU-08

Area=

12.91

12.91

AMAU-09

Area=

13.14

13.14

AVAU L.D.-02

Area=

96.34

96.34

AMAU-10

Area=

10.07

Jirn 27 de Mayo

10.07
524.41

AM27M-01

Area=

15.83

AM27M-02

Area=

13.42

13.42

AV27M L.I.-01

Area=

100.02

100.02

AM27M-03

Area=

14.26

14.26

AM27M-04

Area=

11.82

11.82

AV27M L.I.-02

Area=

96.55

96.55

AM27M-05

Area=

10.95

10.95

AM27M-06

Area=

13.54

13.54

AM27M-07

Area=

15.97

15.97

AV27M L.D.-01

Area=

99.98

99.98

AM27M-08

Area=

11.83

11.83

AM27M-09

Area=

14.26

14.26

AV27M L.D.-02

Area=

96.60

96.60

AM27M-10

Area=

9.38

Jirn Santa Cruz

15.83

9.38
496.78

AMSC-01

Area=

13.20

13.20

AVSC L.I.-01

Area=

100.71

100.71

AMSC-02

Area=

14.52

14.52

AMSC-03

Area=

11.64

11.64

AVSC L.I.-02

Area=

96.67

96.67

AMSC-04

Area=

11.08

11.08

AMSC-05

Area=

16.19

16.19

AVSC L.D.-01

Area=

100.73

100.73

AMSC-06

Area=

11.64

11.64

AMSC-07

Area=

14.46

14.46

AVSC L.D.-02

Area=

96.68

96.68

AMSC-08

Area=

9.26

9.26

02.03 Base Granular Compactado E=0.10 m.

14,097.87

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

1806.35

AMI-01

Area=

10.29

10.29

AVI L.I.-01

Area=

221.73

221.73

AVI L.D.-01

Area=

221.73

221.73

AVI L.I.-02

Area=

177.63

177.63

AVI L.D.-02

Area=

177.53

177.53

AVI L.I.-03

Area=

176.84

176.84

AVI L.D.-03

Area=

176.82

176.82

AVI L.I.-04

Area=

175.13

175.13

AVI L.D.-04

Area=

175.13

175.13

AVI L.I.-05

Area=

146.75

146.75

AVI L.D.-05

Area=

146.77

AVI L.I.-06

Area=

141.82

AVI L.D.-06

Area=

142.11

142.11

AVI L.I.-07

Area=

148.46

148.46

AVI L.D.-07

Area=

148.16

148.16

AVI L.I.-08

Area=

146.72

146.72

AVI L.D.-08

Area=

146.85

146.85

AVI L.I.-09

Area=

148.46

148.46

AVI L.D.-09

Area=

148.45

148.45

AVI L.I.-10

Area=

136.82

136.82

AVI L.D.-10

Area=

137.61

137.61

AVI L.I.-11

Area=

189.35

189.35

AVI L.D.-11

Area=

189.50

189.50

AVI L.I.-11'

Area=

48.11

48.11

AVI L.I.-12

Area=

175.57

175.57

AVI L.D.-12

Area=

175.26

175.26

AMI-02

Area=

13.73

13.73

AMI-03

Area=

15.63

Jr. Los Incas (Tramo San Martn-Chacamarca)

146.77
2252.61

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

141.82

15.63
1529.49

AVFB L.I.-01

Area=

188.36

188.36

AVFB L.D.-01

Area=

188.39

188.39

AVFB L.I.-02

Area=

150.20

150.20

AVFB L.D.-02

Area=

150.11

150.11

AVFB L.I.-03

Area=

150.85

150.85

AVFB L.D.-03

Area=

150.84

150.84

AVFB L.I.-04

Area=

149.56

149.56

AVFB L.D.-04

Area=

149.70

149.70

AVFB L.I.-05

Area=

125.75

125.75

AVFB L.D.-05

Area=

125.73

125.73

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)


AVFB L.I.-06
AVFB L.D.-06
AVFB L.I.-07
AVFB L.D.-07

1
1
1
1

Area=
Area=
Area=
Area=

124.03
123.75
127.32
127.44

1655.44
124.03
123.75
127.32
127.44

AVFB L.I.-08
AVFB L.D.-08
AVFB L.I.-09
AVFB L.D.-09
AVFB L.I.-10

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

127.33
127.33
126.45
127.18
163.03

127.33
127.33
126.45
127.18
163.03

AVFB L.D.-10
AVFB L.I.-11
AVFB L.D.-11
AMFB-01

1
1
1
1

Area=
Area=
Area=
Area=

163.16
146.80
145.55
12.13

163.16
146.80
145.55
12.13

AMFB-02
Jirn Los Andes (Tramo Bolivar - San Martn)
AVLA L.I.-01
AVLA L.D.-01
AVLA L.I.-02

Area=

13.94

1
1
1

Area=
Area=
Area=

151.66
151.82
125.58

13.94
593.43
151.66
151.82
125.58

AVLA L.D.-02
AMLA-01
AMLA-02

1
1
1

Area=
Area=
Area=

125.55
20.01
18.81

AMJ-01
AVJ L.I.-01
AMJ-02
AMJ-03
AMJ-04

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

21.03
146.69
19.53
19.34
21.48

Jirn 28 de Julio

125.55
20.01
18.81
413.63
21.03
146.69
19.53
19.34
21.48

AVJ L.D.-01
AMJ-05
AMJ-06

1
1
1

Area=
Area=
Area=

146.75
19.32
19.49

AMS-01
AMS-02
AVS L.I.-01
AMS-03
AMS-04
AMS-05
AMS-06
AVS L.D.-01
AMS-02
AMS-05

1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

19.61
16.20
123.27
17.72
17.53
19.23
19.70
125.07
17.52
17.70

AMRC-01
AMRC-02
AVRC L.I.-01
AMRC-03
AMRC-04
AMRC-05
AMRC-06
AVRC L.D.-01
AMRC-02
AMRC-05

1
1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

19.36
19.48
124.35
17.46
17.74
19.48
19.36
124.40
17.76
17.49

AMB-01
AMB-02
AVB L.I.-01
AMB-03
AMB-04
AVB L.I.-02
AMB-05
AMB-06
AMB-07

1
1
1
1
1
1
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

19.37
19.47
123.69
17.46
18.14
124.49
17.42
17.78
19.46

Jirn Sucre

Jirn Ramn Castilla

Jirn Bolivar

146.75
19.32
19.49
393.55
19.61
16.20
123.27
17.72
17.53
19.23
19.70
125.07
17.52
17.70
396.88
19.36
19.48
124.35
17.46
17.74
19.48
19.36
124.40
17.76
17.49
714.88
19.37
19.47
123.69
17.46
18.14
124.49
17.42
17.78
19.46

AMB-08

Area=

19.36

19.36

AVB L.D.-01

Area=

123.72

123.72

AMB-09

Area=

17.76

17.76

AMB-10

Area=

17.08

17.08

AVB L.D.-02

Area=

124.34

124.34

AMB-11

Area=

17.78

17.78

AMB-12

Area=

17.56

Jirn Sebastin Chipana

17.56
560.10

AMSCH-01

Area=

14.64

14.64

AMSCH-02

Area=

14.72

14.72

AVSCH L.I.-01

Area=

97.88

97.88

AMSCH-03

Area=

12.92

12.92

AMSCH-04

Area=

13.13

13.13

AVSCH L.I.-02

Area=

100.73

100.73

AMSCH-05

Area=

12.58

12.58

AMSCH-06

Area=

13.42

13.42

AMSCH-07

Area=

14.71

14.71

AMSCH-08

Area=

14.63

14.63

AVSCH L.D.-01

Area=

97.91

97.91

AMSCH-09

Area=

13.13

13.13

AMSCH-10

Area=

12.91

12.91

AVSCH L.D.-02

Area=

100.76

100.76

AMSCH-11

Area=

12.89

12.89

AMSCH-12

Area=

13.14

Calle San Martn

13.14
828.24

AMSM-01

Area=

21.63

21.63

AVSM L.I.-01

Area=

177.84

177.84

AMSM-02

Area=

21.06

AMSM-03

Area=

21.49

21.49

AVSM L.I.-02

Area=

142.26

142.26

AMSM-04

Area=

21.22

21.22

AMSM-05

Area=

20.92

20.92

AVSM L.D.-01

Area=

177.72

177.72

AMSM-06

Area=

21.38

21.38

AMSM-07

Area=

21.17

21.17

AVSM L.D.-02

Area=

142.65

142.65

AMSM-08

Area=

19.62

19.62

AMSM-09

Area=

19.28

Jirn Lima

21.06

19.28
367.98

AML-01

Area=

19.77

AML-02

Area=

19.04

19.77
19.04

AVL L.I.-01

Area=

122.81

122.81

AML-03

Area=

18.06

18.06

AML-04

Area=

9.42

9.42

AML-05

Area=

19.07

19.07

AML-06

Area=

19.80

19.80

AVL L.D.-01

Area=

122.77

122.77

AML-02

Area=

17.24

Jirn Huancayo

17.24
520.30

AMH-01

Area=

14.52

14.52

AMH-02

Area=

14.85

14.85

AVH L.I.-01

Area=

98.23

98.23

AMH-03

Area=

12.96

12.96

AMH-04

Area=

13.09

13.09

AVH L.I.-02

Area=

96.39

96.39

AMH-05

Area=

10.10

10.10

AMH-06

Area=

14.83

14.83

AMH-07

Area=

14.51

14.51

AVH L.D.-01

Area=

98.19

98.19

AMH-08

Area=

13.09

13.09

AMH-09

Area=

12.96

12.96

AVH L.D.-02

Area=

96.39

96.39

AMH-10

Area=

10.19

Jirn Catalina Huanca

10.19
521.42

AMCH-01

Area=

14.68

14.68

AMCH-02

Area=

14.64

14.64

AVCH L.I.-01

Area=

98.76

98.76

AMCH-03

Area=

13.14

13.14

AMCH-04

Area=

12.91

12.91

AVCH L.I.-02

Area=

96.39

96.39

AMCH-05

Area=

10.22

10.22

AMCH-06

Area=

14.65

14.65

AMCH-07

Area=

14.71

14.71

AVCH L.D.-01

Area=

98.73

98.73

AMCH-08

Area=

12.99

12.99

AMCH-09

Area=

13.14

13.14

AVCH L.D.-02

Area=

96.39

96.39

AMCH-10

Area=

10.07

Jirn Alfonso Ugarte

10.07
522.38

AMAU-01

Area=

14.71

14.71

AMAU-02

Area=

14.64

14.64

AVAU L.I.-01

Area=

99.30

99.30

AMAU-03

Area=

13.14

13.14

AMAU-04

Area=

12.91

12.91

AVAU L.I.-02

Area=

96.39

96.39

AMAU-05

Area=

10.21

10.21

AMAU-06

Area=

14.65

14.65

AMAU-07

Area=

14.71

14.71

AVAU L.D.-01

Area=

99.26

99.26

AMAU-08

Area=

12.91

12.91

AMAU-09

Area=

13.14

13.14

AVAU L.D.-02

Area=

96.34

96.34

AMAU-10

Area=

10.07

10.07

Jirn 27 de Mayo

524.41
AM27M-01

Area=

15.83

AM27M-02

Area=

13.42

15.83
13.42

AV27M L.I.-01

Area=

100.02

100.02

AM27M-03

Area=

14.26

14.26

AM27M-04

Area=

11.82

11.82

AV27M L.I.-02

Area=

96.55

96.55

AM27M-05

Area=

10.95

10.95

AM27M-06

Area=

13.54

13.54

AM27M-07

Area=

15.97

15.97

AV27M L.D.-01

Area=

99.98

99.98

AM27M-08

Area=

11.83

11.83

AM27M-09

Area=

14.26

14.26

AV27M L.D.-02

Area=

96.60

96.60

AM27M-10

Area=

9.38

9.38

Jirn Santa Cruz

496.78
AMSC-01

Area=

13.20

13.20

AVSC L.I.-01

Area=

100.71

100.71

AMSC-02

Area=

14.52

14.52

AMSC-03

Area=

11.64

11.64

AVSC L.I.-02

Area=

96.67

96.67

AMSC-04

Area=

11.08

11.08

AMSC-05

Area=

16.19

16.19

AVSC L.D.-01

Area=

100.73

100.73

AMSC-06

Area=

11.64

11.64

AMSC-07

Area=

14.46

14.46

AVSC L.D.-02

Area=

96.68

96.68

AMSC-08

Area=

9.26

9.26

02.04 Excavacin de Zanja para Sardinel

777.24

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

83.58

AMI-01

3.14

0.15

0.50

0.24

AVI L.I.-01

80.51

0.15

0.50

6.04

AVI L.D.-01

80.51

0.15

0.50

6.04

AVI L.I.-02

56.04

0.15

0.50

4.20

AVI L.D.-02

55.95

0.15

0.50

4.20

AVI L.I.-03

55.58

0.15

0.50

4.17

AVI L.D.-03

55.46

0.15

0.50

4.16

AVI L.I.-04

54.63

0.15

0.50

4.10

AVI L.D.-04

54.63

0.15

0.50

4.10

AVI L.I.-05

38.88

0.15

0.50

2.92

AVI L.D.-05

38.87

0.15

0.50

2.92

Vereda Martillo-Jardn

20

5.00

0.15

0.50

7.50

20

1.35

0.15

0.20

0.81

20

13.00

0.15

0.20

7.80

20

12.00

0.15

0.60

21.60

20

1.56

0.15

0.60

Jardineria
Jr. Los Incas (Tramo San Martn-Chacamarca)

2.81
104.90

AVI L.I.-06

36.12

0.15

0.50

2.71

AVI L.D.-06

36.28

0.15

0.50

2.72

AVI L.I.-07

39.81

0.15

0.50

2.99

AVI L.D.-07

39.64

0.15

0.50

2.97

AVI L.I.-08

38.84

0.15

0.50

2.91

AVI L.D.-08

38.92

0.15

0.50

2.92

AVI L.I.-09

39.81

0.15

0.50

2.99

AVI L.D.-09

39.81

0.15

0.50

2.99

AVI L.I.-10

33.35

0.15

0.50

2.50

AVI L.D.-10

33.79

0.15

0.50

2.53

AVI L.I.-11

62.55

0.15

0.50

4.69

AVI L.D.-11

62.63

0.15

0.50

4.70

AVI L.I.-11'

16.04

0.15

0.50

1.20

AVI L.I.-12

54.88

0.15

0.50

4.12

AVI L.D.-12

54.72

0.15

0.50

4.10

AMI-02

7.29

0.15

0.50

0.55

AMI-03

7.80

0.15

0.50

0.59

Vereda Martillo-Jardn

28

5.00

0.15

0.50

10.50

28

1.35

0.15

0.20

1.13

28

13.00

0.15

0.20

10.92

28

12.00

0.15

0.60

30.24

28

1.56

0.15

0.60

Jardineria
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

3.93
83.21

AVFB L.I.-01

80.51

0.15

0.50

6.04

AVFB L.D.-01

80.71

0.15

0.50

6.05

AVFB L.I.-02

55.06

0.15

0.50

4.13

AVFB L.D.-02

54.99

0.15

0.50

4.12

AVFB L.I.-03

55.58

0.15

0.50

4.17

AVFB L.D.-03

55.58

0.15

0.50

4.17

AVFB L.I.-04

54.63

0.15

0.50

4.10

AVFB L.D.-04

54.63

0.15

0.50

4.10

AVFB L.I.-05

38.75

0.15

0.50

2.91

AVFB L.D.-05

38.74

0.15

0.50

2.91

Vereda Martillo-Jardn

20

5.00

0.15

0.50

7.50

20

1.35

0.15

0.20

0.81

20

13.00

0.15

0.20

7.80

20

12.00

0.15

0.60

21.60

20

1.56

0.15

0.60

Jardineria
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

2.81
90.64

AVFB L.I.-06

37.59

0.15

0.50

2.82

AVFB L.D.-06

37.43

0.15

0.50

2.81

AVFB L.I.-07

39.81

0.15

0.50

2.99

AVFB L.D.-07

39.88

0.15

0.50

2.99

AVFB L.I.-08

39.81

0.15

0.50

2.99

AVFB L.D.-08

39.81

0.15

0.50

2.99

AVFB L.I.-09

39.27

0.15

0.50

2.95

AVFB L.D.-09

39.68

0.15

0.50

2.98

AVFB L.I.-10

63.64

0.15

0.50

4.77

AVFB L.D.-10

63.71

0.15

0.50

4.78

AVFB L.I.-11

52.80

0.15

0.50

3.96

AVFB L.D.-11

52.65

0.15

0.50

3.95

AMFB-01

6.81

0.15

0.50

0.51

AMFB-02

7.34

0.15

0.50

0.55

Vereda Martillo-Jardn

24

5.00

0.15

0.50

9.00

24

1.35

0.15

0.20

0.97

24

13.00

0.15

0.20

9.36

24

12.00

0.15

0.60

25.92

24

1.56

0.15

0.60

3.37

Jardineria

Jirn Los Andes (Tramo Bolivar - San Martn)

31.76

AVLA L.I.-01

56.03

0.15

0.50

4.20

AVLA L.D.-01

56.13

0.15

0.50

4.21

AVLA L.I.-02

38.65

0.15

0.50

2.90

AVLA L.D.-02

38.64

0.15

0.50

2.90

AMLA-01

9.11

0.15

0.50

0.68

AMLA-02

8.80

0.15

0.50

0.66

Vereda Martillo-Jardn

5.00

0.15

0.50

3.00

1.35

0.15

0.20

0.32

13.00

0.15

0.20

3.12

12.00

0.15

0.60

8.64

1.56

0.15

0.60

Jardineria
Jirn 28 de Julio

1.12
18.03

AMJ-01

9.38

0.15

0.50

0.70

AVJ L.I.-01

38.83

0.15

0.50

2.91

AMJ-02

8.98

0.15

0.50

0.67

AMJ-03

8.93

0.15

0.50

0.67

AMJ-04

9.47

0.15

0.50

0.71

AVJ L.D.-01

38.86

0.15

0.50

2.91

AMJ-05

8.93

0.15

0.50

0.67

AMJ-06

8.98

0.15

0.50

0.67

Vereda Martillo-Jardn

5.00

0.15

0.50

1.50

1.35

0.15

0.20

0.16

13.00

0.15

0.20

1.56

12.00

0.15

0.60

4.32

1.56

0.15

0.60

Jardineria
Jirn Sucre

0.56
19.08

AMS-01

9.00

0.15

0.50

0.68

AMS-02

8.91

0.15

0.50

0.67

AVS L.I.-01

38.27

0.15

0.50

2.87

AMS-03

8.51

0.15

0.50

0.64

AMS-04

8.46

0.15

0.50

0.63

AMS-05

8.91

0.15

0.50

0.67

AMS-06

9.01

0.15

0.50

0.68

AVS L.D.-01

38.30

0.15

0.50

2.87

AMS-02

8.46

0.15

0.50

0.63

AMS-05

8.50

0.15

0.50

0.64

Vereda Martillo-Jardn

5.00

0.15

0.50

1.50

1.35

0.15

0.20

0.16

13.00

0.15

0.20

1.56

12.00

0.15

0.60

4.32

1.56

0.15

0.60

Jardineria
Jirn Ramn Castilla

0.56
19.01

AMRC-01

8.94

0.15

0.50

0.67

AMRC-02

8.97

0.15

0.50

0.67

AVRC L.I.-01

37.82

0.15

0.50

2.84

AMRC-03

8.45

0.15

0.50

0.63

AMRC-04

8.52

0.15

0.50

0.64

AMRC-05

8.97

0.15

0.50

0.67

AMRC-06

8.94

0.15

0.50

0.67

AVRC L.D.-01

37.85

0.15

0.50

2.84

AMRC-02

8.52

0.15

0.50

0.64

AMRC-05

8.45

0.15

0.50

0.63

Vereda Martillo-Jardn

5.00

0.15

0.50

1.50

1.35

0.15

0.20

0.16

13.00

0.15

0.20

1.56

12.00

0.15

0.60

4.32

1.56

0.15

0.60

Jardineria
Jirn Bolivar
AMB-01

0.56
35.27

8.94

0.15

0.50

0.67

AMB-02

8.96

0.15

0.50

0.67

AVB L.I.-01

37.38

0.15

0.50

2.80

AMB-03

8.45

0.15

0.50

0.63

AMB-04

8.60

0.15

0.50

0.65

AVB L.I.-02

37.91

0.15

0.50

2.84

AMB-05

8.44

0.15

0.50

0.63

AMB-06

8.53

0.15

0.50

0.64

AMB-07

8.94

0.15

0.50

0.67

AMB-08

8.96

0.15

0.50

0.67

AVB L.D.-01

37.40

0.15

0.50

2.81

AMB-09

8.52

0.15

0.50

0.64

AMB-10

8.36

0.15

0.50

0.63

AVB L.D.-02

37.82

0.15

0.50

2.84

AMB-11

8.53

0.15

0.50

0.64

AMB-12

8.45

0.15

0.50

0.63

Vereda Martillo-Jardn

5.00

0.15

0.50

3.00

1.35

0.15

0.20

0.32

13.00

0.15

0.20

3.12

12.00

0.15

0.60

8.64

1.56

0.15

0.60

Jardineria
Jirn Sebastin Chipana

1.12
41.19

AMSCH-01

7.53

0.15

0.50

0.56

AMSCH-02

7.55

0.15

0.50

0.57

AVSCH L.I.-01

62.93

0.15

0.20

1.89

AMSCH-03

7.04

0.15

0.50

0.53

AMSCH-04

7.10

0.15

0.50

0.53

AVSCH L.I.-02

62.96

0.15

0.20

1.89

AMSCH-05

6.95

0.15

0.50

0.52

AMSCH-06

7.18

0.15

0.50

0.54

AMSCH-07

7.55

0.15

0.50

0.57

AMSCH-08

7.53

0.15

0.50

0.56

AVSCH L.D.-01

65.31

0.15

0.20

1.96

AMSCH-09

7.10

0.15

0.50

0.53

AMSCH-10

7.04

0.15

0.50

0.53

AVSCH L.D.-02

65.33

0.15

0.20

1.96

AMSCH-11

7.03

0.15

0.50

0.53

AMSCH-12

7.10

0.15

0.50

0.53

Vereda Martillo-Jardn

6.20

0.15

0.50

3.72

0.75

0.15

0.20

0.18

62.93

0.15

0.60

5.66

62.96

0.15

0.60

5.67

65.31

0.15

0.60

5.88

65.33

0.15

0.60

Jardineria

Calle San Martn

5.88
36.40

AMSM-01

9.51

0.15

0.50

0.71

AVSM L.I.-01

56.32

0.15

0.50

4.22

AMSM-02

9.38

0.15

0.50

0.70

AMSM-03

9.47

0.15

0.50

0.71

AVSM L.I.-02

36.34

0.15

0.50

2.73

AMSM-04

9.41

0.15

0.50

0.71

AMSM-05

9.34

0.15

0.50

0.70

AVSM L.D.-01

56.07

0.15

0.50

4.21

AMSM-06

9.45

0.15

0.50

0.71

AMSM-07

9.40

0.15

0.50

0.71

AVSM L.D.-02

36.58

0.15

0.50

2.74

AMSM-08

9.00

0.15

0.50

0.68

AMSM-09

8.91

0.15

0.50

0.67

Vereda Martillo-Jardn

Jardineria

5.00

0.15

0.50

3.00

1.35

0.15

0.20

0.32

13.00

0.15

0.20

3.12

12.00

0.15

0.60

8.64

1.56

0.15

0.60

Jirn Lima

1.12
18.12

AML-01

9.04

0.15

0.50

0.68

AML-02

8.87

0.15

0.50

0.67

AVL L.I.-01

36.80

0.15

0.50

2.76

AML-03

8.59

0.15

0.50

0.64

AML-04

7.18

0.15

0.50

0.54

AML-05

8.87

0.15

0.50

0.67

AML-06

9.04

0.15

0.50

0.68

AVL L.D.-01

36.76

0.15

0.50

2.76

AML-02

8.37

0.15

0.50

0.63

Vereda Martillo-Jardn

5.00

0.15

0.50

1.50

1.35

0.15

0.20

0.16

13.00

0.15

0.20

1.56

12.00

0.15

0.60

4.32

1.56

0.15

0.60

Jardineria
Jirn Huancayo

0.56
39.19

AMH-01

7.50

0.15

0.50

0.56

AMH-02

7.58

0.15

0.50

0.57

AVH L.I.-01

63.23

0.15

0.20

1.90

AMH-03

7.05

0.15

0.50

0.53

AMH-04

7.09

0.15

0.50

0.53

AVH L.I.-02

63.20

0.15

0.20

1.90

AMH-05

6.11

0.15

0.50

0.46

AMH-06

7.58

0.15

0.50

0.57

AMH-07

7.50

0.15

0.50

0.56

AVH L.D.-01

61.69

0.15

0.20

1.85

AMH-08

7.09

0.15

0.50

0.53

AMH-09

7.05

0.15

0.50

0.53

AVH L.D.-02

61.75

0.15

0.20

1.85

AMH-10

6.14

0.15

0.50

0.46

Vereda Martillo-Jardn

6.20

0.15

0.50

3.72

0.75

0.15

0.20

0.18

63.23

0.15

0.60

5.69

63.20

0.15

0.60

5.69

61.69

0.15

0.60

5.55

61.75

0.15

0.60

Jirn Catalina Huanca


AMCH-01
AMCH-02
AVCH L.I.-01

1
1
1

7.55
7.53
63.67

0.15
0.15
0.15

0.50
0.50
0.20

5.56
39.28
0.57
0.56
1.91

AMCH-03
AMCH-04
AVCH L.I.-02
AMCH-05
AMCH-06

1
1
1
1
1

7.10
7.04
63.64
6.15
7.53

0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.20
0.50
0.50

0.53
0.53
1.91
0.46
0.56

AMCH-07
AVCH L.D.-01
AMCH-08
AMCH-09

1
1
1
1

7.55
61.69
7.04
7.10

0.15
0.15
0.15
0.15

0.50
0.20
0.50
0.50

0.57
1.85
0.53
0.53

AVCH L.D.-02

61.69

0.15

0.20

1.85

Jardineria

AMCH-10
Vereda Martillo-Jardn

1
8

6.10
6.20

0.15
0.15

0.50
0.50

0.46
3.72

8
1
1
1
1

0.75
63.67
63.64
61.69
61.69

0.15
0.15
0.15
0.15
0.15

0.20
0.60
0.60
0.60
0.60

Jirn Alfonso Ugarte


AMAU-01
AMAU-02
AVAU L.I.-01

1
1
1

7.55
7.53
64.11

0.15
0.15
0.15

0.50
0.50
0.20

0.18
5.73
5.73
5.55
5.55
39.39
0.57
0.56
1.92

AMAU-03
AMAU-04
AVAU L.I.-02
AMAU-05
AMAU-06

1
1
1
1
1

7.10
7.04
64.08
6.15
7.53

0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.20
0.50
0.50

0.53
0.53
1.92
0.46
0.56

AMAU-07
AVAU L.D.-01
AMAU-08
AMAU-09

1
1
1
1

7.55
61.69
7.04
7.10

0.15
0.15
0.15
0.15

0.50
0.20
0.50
0.50

0.57
1.85
0.53
0.53

AVAU L.D.-02
AMAU-10
Vereda Martillo-Jardn

1
1
8
8

61.69
6.10
6.20
0.75

0.15
0.15
0.15
0.15

0.20
0.50
0.50
0.20

1.85
0.46
3.72
0.18

Jardineria

1
1

64.11
64.08

0.15
0.15

0.60
0.60

5.77
5.77

1
1

61.69
61.69

0.15
0.15

0.60
0.60

5.55
5.55

AM27M-01

7.86

0.15

0.50

0.59

AM27M-02

7.23

0.15

0.50

0.54

AV27M L.I.-01

64.73

0.15

0.20

1.94

AM27M-03

7.39

0.15

0.50

0.55

AM27M-04

6.76

0.15

0.50

0.51

AV27M L.I.-02

64.70

0.15

0.20

1.94

AM27M-05

6.40

0.15

0.50

0.48

AM27M-06

7.23

0.15

0.50

0.54

AM27M-07

7.86

0.15

0.50

0.59

AV27M L.D.-01

61.88

0.15

0.20

1.86

AM27M-08

6.76

0.15

0.50

0.51

AM27M-09

7.39

0.15

0.50

0.55

AV27M L.D.-02

61.88

0.15

0.20

1.86

AM27M-10

5.86

0.15

0.50

0.44

Vereda Martillo-Jardn

6.20

0.15

0.50

3.72

0.75

0.15

0.20

0.18

64.73

0.15

0.60

5.83

64.70

0.15

0.60

5.82

61.88

0.15

0.60

5.57

61.88

0.15

0.60

1
1
1
1
1
1
1
1
1
1
1
1

7.18
65.35
7.44
6.71
65.32
6.45
7.91
61.94
6.71
7.44
61.94
5.82

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.20
0.50
0.50
0.20
0.50
0.50
0.20
0.50
0.50
0.20
0.50

5.57
38.62
0.54
1.96
0.56
0.50
1.96
0.48
0.59
1.86
0.50
0.56
1.86
0.44

Jardineria

Jirn 27 de Mayo

Jardineria

Jirn Santa Cruz


AMSC-01
AVSC L.I.-01
AMSC-02
AMSC-03
AVSC L.I.-02
AMSC-04
AMSC-05
AVSC L.D.-01
AMSC-06
AMSC-07
AVSC L.D.-02
AMSC-08

39.59

Vereda Martillo-Jardn
Jardineria

02.05 Eliminacin de Material Excedente (Maquinaria)


Total excavacin
Corte Manual
Excavacin de zanja
03.00 SARDINEL
03.01 Concreto F'c=175 kg/cm2 para Sardinel
Jirn Los Incas (Tramo 28 d/Julio-San Martn)
AMI-01
AVI L.I.-01
AVI L.D.-01
AVI L.I.-02
AVI L.D.-02
AVI L.I.-03
AVI L.D.-03
AVI L.I.-04
AVI L.D.-04
AVI L.I.-05
AVI L.D.-05
Vereda Martillo-Jardn

Jardineria
Jr. Los Incas (Tramo San Martn-Chacamarca)
AVI L.I.-06
AVI L.D.-06
AVI L.I.-07
AVI L.D.-07
AVI L.I.-08
AVI L.D.-08
AVI L.I.-09
AVI L.D.-09
AVI L.I.-10
AVI L.D.-10
AVI L.I.-11
AVI L.D.-11
AVI L.I.-11'
AVI L.I.-12
AVI L.D.-12
AMI-02
AMI-03
Vereda Martillo-Jardn

Jardineria

8
8
1
1
1
1

6.20
0.75
65.35
65.32
61.94
61.94

F(e)
20%

0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.20
0.60
0.60
0.60
0.60

3.72
0.18
5.88
5.88
5.57
5.57

4,174.8

834.96

5009.74

5,009.74

777.24

3,397.5
777.24

1
1
1
1
1
1
1
1
1
1
1
20
20
20
20
20

3.14
80.51
80.51
56.04
55.95
55.58
55.46
54.63
54.63
38.88
38.87
5.00
1.35
13.00
12.00
1.56

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
28
28
28
28

36.12
36.28
39.81
39.64
38.84
38.92
39.81
39.81
33.35
33.79
62.55
62.63
16.04
54.88
54.72
7.29
7.80
5.00
1.35
13.00
12.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.60

28

1.56

0.15

0.60

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

83.58
0.24
6.04
6.04
4.20
4.20
4.17
4.16
4.10
4.10
2.92
2.92
7.50
0.81
7.80
21.60
2.81
104.90
2.71
2.72
2.99
2.97
2.91
2.92
2.99
2.99
2.50
2.53
4.69
4.70
1.20
4.12
4.10
0.55
0.59
10.50
1.13
10.92
30.24
3.93
83.21

AVFB L.I.-01

80.51

0.15

0.50

6.04

AVFB L.D.-01

80.71

0.15

0.50

6.05

AVFB L.I.-02

55.06

0.15

0.50

4.13

AVFB L.D.-02

54.99

0.15

0.50

4.12

AVFB L.I.-03

55.58

0.15

0.50

4.17

AVFB L.D.-03

55.58

0.15

0.50

4.17

AVFB L.I.-04

54.63

0.15

0.50

4.10

AVFB L.D.-04

54.63

0.15

0.50

4.10

AVFB L.I.-05

38.75

0.15

0.50

2.91

AVFB L.D.-05

38.74

0.15

0.50

2.91

Vereda Martillo-Jardn

20

5.00

0.15

0.50

7.50

20

1.35

0.15

0.20

0.81

20

13.00

0.15

0.20

7.80

20

12.00

0.15

0.60

21.60

20

1.56

0.15

0.60

Jardineria
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

2.81
90.64

AVFB L.I.-06

37.59

0.15

0.50

2.82

AVFB L.D.-06

37.43

0.15

0.50

2.81

AVFB L.I.-07

39.81

0.15

0.50

2.99

AVFB L.D.-07

39.88

0.15

0.50

2.99

AVFB L.I.-08

39.81

0.15

0.50

2.99

AVFB L.D.-08

39.81

0.15

0.50

2.99

AVFB L.I.-09

39.27

0.15

0.50

2.95

AVFB L.D.-09

39.68

0.15

0.50

2.98

AVFB L.I.-10

63.64

0.15

0.50

4.77

AVFB L.D.-10

63.71

0.15

0.50

4.78

AVFB L.I.-11

52.80

0.15

0.50

3.96

AVFB L.D.-11

52.65

0.15

0.50

3.95

AMFB-01

6.81

0.15

0.50

0.51

AMFB-02

7.34

0.15

0.50

0.55

Vereda Martillo-Jardn

24

5.00

0.15

0.50

9.00

24

1.35

0.15

0.20

0.97

24

13.00

0.15

0.20

9.36

24

12.00

0.15

0.60

25.92

24

1.56

0.15

0.60

Jardineria
Jirn Los Andes (Tramo Bolivar - San Martn)

3.37
31.76

AVLA L.I.-01

56.03

0.15

0.50

4.20

AVLA L.D.-01

56.13

0.15

0.50

4.21

AVLA L.I.-02

38.65

0.15

0.50

2.90

AVLA L.D.-02

38.64

0.15

0.50

2.90

AMLA-01

9.11

0.15

0.50

0.68

AMLA-02

8.80

0.15

0.50

0.66

Vereda Martillo-Jardn

5.00

0.15

0.50

3.00

1.35

0.15

0.20

0.32

13.00

0.15

0.20

3.12

12.00

0.15

0.60

8.64

1.56

0.15

0.60

Jirn 28 de Julio
AMJ-01
AVJ L.I.-01
AMJ-02
AMJ-03

1
1
1
1

9.38
38.83
8.98
8.93

0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50

1.12
18.03
0.70
2.91
0.67
0.67

AMJ-04
AVJ L.D.-01
AMJ-05
AMJ-06
Vereda Martillo-Jardn

1
1
1
1
4

9.47
38.86
8.93
8.98
5.00

0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50

0.71
2.91
0.67
0.67
1.50

4
4
4
4

1.35
13.00
12.00
1.56

0.15
0.15
0.15
0.15

0.20
0.20
0.60
0.60

1
1
1
1
1
1
1
1

9.00
8.91
38.27
8.51
8.46
8.91
9.01
38.30

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.16
1.56
4.32
0.56
19.08
0.68
0.67
2.87
0.64
0.63
0.67
0.68
2.87

Jardineria

Jardineria
Jirn Sucre
AMS-01
AMS-02
AVS L.I.-01
AMS-03
AMS-04
AMS-05
AMS-06
AVS L.D.-01

AMS-02
AMS-05
Vereda Martillo-Jardn

Jardineria
Jirn Ramn Castilla
AMRC-01
AMRC-02
AVRC L.I.-01
AMRC-03
AMRC-04
AMRC-05
AMRC-06
AVRC L.D.-01
AMRC-02
AMRC-05
Vereda Martillo-Jardn

Jardineria
Jirn Bolivar
AMB-01
AMB-02
AVB L.I.-01
AMB-03
AMB-04
AVB L.I.-02
AMB-05
AMB-06
AMB-07
AMB-08
AVB L.D.-01
AMB-09
AMB-10
AVB L.D.-02
AMB-11
AMB-12
Vereda Martillo-Jardn

Jardineria
Jirn Sebastin Chipana
AMSCH-01
AMSCH-02
AVSCH L.I.-01
AMSCH-03
AMSCH-04
AVSCH L.I.-02
AMSCH-05
AMSCH-06
AMSCH-07
AMSCH-08
AVSCH L.D.-01
AMSCH-09
AMSCH-10
AVSCH L.D.-02
AMSCH-11
AMSCH-12
Vereda Martillo-Jardn
Jardineria

1
1
4
4
4
4
4

8.46
8.50
5.00
1.35
13.00
12.00
1.56

0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.20
0.20
0.60
0.60

1
1
1
1
1
1
1
1
1
1
4
4
4
4
4

8.94
8.97
37.82
8.45
8.52
8.97
8.94
37.85
8.52
8.45
5.00
1.35
13.00
12.00
1.56

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
8
8
8
8
8

8.94
8.96
37.38
8.45
8.60
37.91
8.44
8.53
8.94
8.96
37.40
8.52
8.36
37.82
8.53
8.45
5.00
1.35
13.00
12.00
1.56

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1

7.53
7.55
62.93
7.04
7.10
62.96
6.95
7.18
7.55
7.53
65.31
7.10

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.20
0.50
0.50
0.20
0.50
0.50
0.50
0.50
0.20
0.50

0.63
0.64
1.50
0.16
1.56
4.32
0.56
19.01
0.67
0.67
2.84
0.63
0.64
0.67
0.67
2.84
0.64
0.63
1.50
0.16
1.56
4.32
0.56
35.27
0.67
0.67
2.80
0.63
0.65
2.84
0.63
0.64
0.67
0.67
2.81
0.64
0.63
2.84
0.64
0.63
3.00
0.32
3.12
8.64
1.12
41.19
0.56
0.57
1.89
0.53
0.53
1.89
0.52
0.54
0.57
0.56
1.96
0.53

1
1
1
1
8
8
1
1

7.04
65.33
7.03
7.10
6.20
0.75
62.93
62.96

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.20
0.50
0.50
0.50
0.20
0.60
0.60

0.53
1.96
0.53
0.53
3.72
0.18
5.66
5.67

Calle San Martn


AMSM-01
AVSM L.I.-01
AMSM-02
AMSM-03
AVSM L.I.-02
AMSM-04
AMSM-05
AVSM L.D.-01
AMSM-06
AMSM-07
AVSM L.D.-02
AMSM-08
AMSM-09
Vereda Martillo-Jardn

Jardineria
Jirn Lima
AML-01
AML-02
AVL L.I.-01
AML-03
AML-04
AML-05
AML-06
AVL L.D.-01
AML-02
Vereda Martillo-Jardn

Jardineria
Jirn Huancayo
AMH-01
AMH-02
AVH L.I.-01
AMH-03
AMH-04
AVH L.I.-02
AMH-05
AMH-06
AMH-07
AVH L.D.-01
AMH-08
AMH-09
AVH L.D.-02
AMH-10
Vereda Martillo-Jardn
Jardineria

1
1

65.31
65.33

0.15
0.15

0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
8
8
8
8
8

9.51
56.32
9.38
9.47
36.34
9.41
9.34
56.07
9.45
9.40
36.58
9.00
8.91
5.00
1.35
13.00
12.00
1.56

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.60
0.60

1
1
1
1
1
1
1
1
1
4
4
4
4
4

9.04
8.87
36.80
8.59
7.18
8.87
9.04
36.76
8.37
5.00
1.35
13.00
12.00
1.56

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.60
0.60

1
1
1
1
1
1
1
1
1
1
1
1
1
1
8
8
1
1
1

7.50
7.58
63.23
7.05
7.09
63.20
6.11
7.58
7.50
61.69
7.09
7.05
61.75
6.14
6.20
0.75
63.23
63.20
61.69

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.50
0.50
0.20
0.50
0.50
0.20
0.50
0.50
0.50
0.20
0.50
0.50
0.20
0.50
0.50
0.20
0.60
0.60
0.60

61.75

0.15

0.60

Jirn Catalina Huanca

5.88
5.88
36.40
0.71
4.22
0.70
0.71
2.73
0.71
0.70
4.21
0.71
0.71
2.74
0.68
0.67
3.00
0.32
3.12
8.64
1.12
18.12
0.68
0.67
2.76
0.64
0.54
0.67
0.68
2.76
0.63
1.50
0.16
1.56
4.32
0.56
39.19
0.56
0.57
1.90
0.53
0.53
1.90
0.46
0.57
0.56
1.85
0.53
0.53
1.85
0.46
3.72
0.18
5.69
5.69
5.55
5.56
39.28

AMCH-01

7.55

0.15

0.50

0.57

AMCH-02

7.53

0.15

0.50

0.56

AVCH L.I.-01

63.67

0.15

0.20

1.91

AMCH-03

7.10

0.15

0.50

0.53

AMCH-04

7.04

0.15

0.50

0.53

AVCH L.I.-02

63.64

0.15

0.20

1.91

AMCH-05

6.15

0.15

0.50

0.46

AMCH-06

7.53

0.15

0.50

0.56

AMCH-07

7.55

0.15

0.50

0.57

AVCH L.D.-01

61.69

0.15

0.20

1.85

AMCH-08

7.04

0.15

0.50

0.53

AMCH-09

7.10

0.15

0.50

0.53

AVCH L.D.-02

61.69

0.15

0.20

1.85

AMCH-10

6.10

0.15

0.50

0.46

Vereda Martillo-Jardn

6.20

0.15

0.50

3.72

0.75

0.15

0.20

0.18

63.67

0.15

0.60

5.73

63.64

0.15

0.60

5.73

61.69

0.15

0.60

5.55

61.69

0.15

0.60

Jardineria

Jirn Alfonso Ugarte

5.55
39.39

AMAU-01

7.55

0.15

0.50

0.57

AMAU-02

7.53

0.15

0.50

0.56

AVAU L.I.-01

64.11

0.15

0.20

1.92

AMAU-03

7.10

0.15

0.50

0.53

AMAU-04

7.04

0.15

0.50

0.53

AVAU L.I.-02

64.08

0.15

0.20

1.92

AMAU-05

6.15

0.15

0.50

0.46

AMAU-06

7.53

0.15

0.50

0.56

AMAU-07

7.55

0.15

0.50

0.57

AVAU L.D.-01

61.69

0.15

0.20

1.85

AMAU-08

7.04

0.15

0.50

0.53

AMAU-09

7.10

0.15

0.50

0.53

AVAU L.D.-02

61.69

0.15

0.20

1.85

AMAU-10

6.10

0.15

0.50

0.46

Vereda Martillo-Jardn

6.20

0.15

0.50

3.72

0.75

0.15

0.20

0.18

64.11

0.15

0.60

5.77

64.08

0.15

0.60

5.77

61.69

0.15

0.60

5.55

61.69

0.15

0.60

Jardineria

Jirn 27 de Mayo

5.55
39.59

AM27M-01

7.86

0.15

0.50

0.59

AM27M-02

7.23

0.15

0.50

0.54

AV27M L.I.-01

64.73

0.15

0.20

1.94

AM27M-03

7.39

0.15

0.50

0.55

AM27M-04

6.76

0.15

0.50

0.51

AV27M L.I.-02

64.70

0.15

0.20

1.94

AM27M-05

6.40

0.15

0.50

0.48

AM27M-06

7.23

0.15

0.50

0.54

AM27M-07

7.86

0.15

0.50

0.59

AV27M L.D.-01

61.88

0.15

0.20

1.86

AM27M-08

6.76

0.15

0.50

0.51

AM27M-09

7.39

0.15

0.50

0.55

AV27M L.D.-02

61.88

0.15

0.20

1.86

AM27M-10

5.86

0.15

0.50

0.44

Vereda Martillo-Jardn

6.20

0.15

0.50

3.72

0.75

0.15

0.20

0.18

64.73

0.15

0.60

5.83

64.70

0.15

0.60

5.82

61.88

0.15

0.60

5.57

61.88

0.15

0.60

Jardineria

Jirn Santa Cruz

5.57
38.62

AMSC-01

7.18

0.15

0.50

0.54

AVSC L.I.-01

65.35

0.15

0.20

1.96

AMSC-02

7.44

0.15

0.50

0.56

AMSC-03

6.71

0.15

0.50

0.50

AVSC L.I.-02

65.32

0.15

0.20

1.96

AMSC-04

6.45

0.15

0.50

0.48

AMSC-05

7.91

0.15

0.50

0.59

AVSC L.D.-01

61.94

0.15

0.20

1.86

AMSC-06

6.71

0.15

0.50

0.50

AMSC-07

7.44

0.15

0.50

0.56

AVSC L.D.-02

61.94

0.15

0.20

1.86

AMSC-08

5.82

0.15

0.50

0.44

Vereda Martillo-Jardn

6.20

0.15

0.50

3.72

0.75

0.15

0.20

0.18

65.35

0.15

0.60

5.88

65.32

0.15

0.60

5.88

61.94

0.15

0.60

5.57

61.94

0.15

0.60

5.57

Jardineria

03.02 Encofrado y Desencofrado Normal

4,659.77

Jirn Los Incas (Tramo 28 d/Julio-San Martn)


AMI-01
AVI L.I.-01
AVI L.D.-01
AVI L.I.-02
AVI L.D.-02
AVI L.I.-03
AVI L.D.-03
AVI L.I.-04
AVI L.D.-04
AVI L.I.-05
AVI L.D.-05
Vereda Martillo-Jardn

Jardineria

618.56
1

3.14

0.40

0.15

0.40

0.12

80.51

0.40

32.20

19

0.15

0.40

1.14

80.51

0.40

32.20

19

0.15

0.40

1.14

56.04

0.40

22.42

13

0.15

0.40

0.78

55.95

0.40

22.38

13

0.15

0.40

0.78

55.58

0.40

22.23

13

0.15

0.40

0.78

55.46

0.40

22.18

13

0.15

0.40

0.78

54.63

0.40

21.85

13

0.15

0.40

0.78

54.63

0.40

21.85

13

0.15

0.40

0.78

38.88

0.40

15.55

10

0.15

0.40

0.60

38.87

0.40

15.55

10

0.15

0.40

0.60

20

5.00

0.40

40.00

20

0.15

0.40

1.20

20

1.35

0.20

5.40

20

13.00

0.20

52.00

60

0.15

0.20

1.80

40

12.00

0.50

240.00

120

0.15

0.50

9.00

40

1.56

0.50

31.20
603.33

1
9
1
9

36.12
0.15
36.28
0.15

0.40
0.40
0.40
0.40

14.45
0.54
14.51
0.54

1
10
1
10

39.81
0.15
39.64
0.15

0.40
0.40
0.40
0.40

15.92
0.60
15.86
0.60

38.84

0.40

15.54

10

0.15

0.40

0.60

Jr. Los Incas (Tramo San Martn-Chacamarca)


AVI L.I.-06
AVI L.D.-06
AVI L.I.-07
AVI L.D.-07
AVI L.I.-08

1.26

AVI L.D.-08
AVI L.I.-09
AVI L.D.-09
AVI L.I.-10
AVI L.D.-10
AVI L.I.-11
AVI L.D.-11
AVI L.I.-11'
AVI L.I.-12
AVI L.D.-12
AMI-02
AMI-03
Vereda Martillo-Jardn

Jardineria

38.92

0.40

10

0.15

0.40

0.60

39.81

0.40

15.92

10

0.15

0.40

0.60

39.81

0.40

15.92

10

0.15

0.40

0.60

33.35

0.40

13.34

0.15

0.40

0.48

33.79

0.40

13.52

0.15

0.40

0.54

62.55

0.40

25.02

15

0.15

0.40

0.90

62.63

0.40

25.05

15

0.15

0.40

0.90

16.04

0.40

6.42

0.15

0.40

0.30

54.88

0.40

21.95

13

0.15

0.40

0.78

54.72

0.40

21.89

13

0.15

0.40

0.78

7.29

0.40

2.92

0.15

0.40

0.18

7.80

0.40

3.12

0.15

0.40

0.18

28

5.00

0.40

56.00

28

0.15

0.40

1.68

28

1.35

0.20

7.56

28

13.00

0.20

72.80

84

0.15

0.20

2.52

28

12.00

0.50

168.00

84

0.15

0.50

6.30

28

1.56

0.50

21.84

80.51

0.40

19

0.15

0.40

1.14

80.71

0.40

32.28

19

0.15

0.40

1.14

55.06

0.40

22.02

13

0.15

0.40

0.78

54.99

0.40

22.00

13

0.15

0.40

0.78

55.58

0.40

22.23

13

0.15

0.40

0.78

55.58

0.40

22.23

13

0.15

0.40

0.78

54.63

0.40

21.85

13

0.15

0.40

0.78

54.63

0.40

21.85

13

0.15

0.40

0.78

38.75

0.40

15.50

10

0.15

0.40

0.60

38.74

0.40

15.50

10

0.15

0.40

0.60

20

5.00

0.40

40.00

20

0.15

0.40

1.20

20

1.35

0.20

5.40

20

13.00

0.20

52.00

60

0.15

0.20

1.80

20

12.00

0.50

120.00

60

0.15

0.50

4.50

20

1.56

0.50

15.60

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)


AVFB L.I.-01
AVFB L.D.-01
AVFB L.I.-02
AVFB L.D.-02
AVFB L.I.-03
AVFB L.D.-03
AVFB L.I.-04
AVFB L.D.-04
AVFB L.I.-05
AVFB L.D.-05
Vereda Martillo-Jardn

Jardineria

15.57

476.33
32.20

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)


AVFB L.I.-06
AVFB L.D.-06
AVFB L.I.-07
AVFB L.D.-07
AVFB L.I.-08
AVFB L.D.-08
AVFB L.I.-09
AVFB L.D.-09
AVFB L.I.-10
AVFB L.D.-10
AVFB L.I.-11
AVFB L.D.-11
AMFB-01
AMFB-02
Vereda Martillo-Jardn

Jardineria

521.09
1

37.59

0.40

0.15

0.40

0.54

37.43

0.40

14.97

0.15

0.40

0.54

39.81

0.40

15.92

10

0.15

0.40

0.60

39.88

0.40

15.95

10

0.15

0.40

0.60

39.81

0.40

15.92

10

0.15

0.40

0.60

39.81

0.40

15.92

10

0.15

0.40

0.60

39.27

0.40

15.71

10

0.15

0.40

0.60

39.68

0.40

15.87

10

0.15

0.40

0.60

63.64

0.40

25.46

15

0.15

0.40

0.90

63.71

0.40

25.48

15

0.15

0.40

0.90

52.80

0.40

21.12

13

0.15

0.40

0.78

52.65

0.40

21.06

13

0.15

0.40

0.78

6.81

0.40

2.72

0.15

0.40

0.18

7.34

0.40

2.94

0.15

0.40

0.18

24

5.00

0.40

48.00

24

0.15

0.40

1.44

24

1.35

0.20

6.48

24

13.00

0.20

62.40

72

0.15

0.20

2.16

24

12.00

0.50

144.00

72

0.15

0.50

5.40

24

1.56

0.50

18.72

Jirn Los Andes (Tramo Bolivar - San Martn)


AVLA L.I.-01
AVLA L.D.-01
AVLA L.I.-02
AVLA L.D.-02
AMLA-01
AMLA-02
Vereda Martillo-Jardn

Jardineria

15.04

182.26
1

56.03

0.40

13

0.15

0.40

22.41
0.78

56.13

0.40

22.45

13

0.15

0.40

0.78

38.65

0.40

15.46

10

0.15

0.40

0.60

38.64

0.40

15.46

10

0.15

0.40

0.60

9.11

0.40

3.64

0.15

0.40

0.18

8.80

0.40

3.52

0.15

0.40

0.18

5.00

0.40

16.00

0.15

0.40

0.48

1.35

0.20

2.16

13.00

0.20

20.80

24

0.15

0.20

0.72

12.00

0.50

48.00

24

0.15

0.50

1.80

1.56

0.50

6.24

9.38

0.40

0.15

0.40

0.18

38.83

0.40

15.53

10

0.15

0.40

0.60

8.98

0.40

3.59

0.15

0.40

0.18

8.93

0.40

3.57

0.15

0.40

0.18

9.47

0.40

3.79

0.15

0.40

0.18

38.86

0.40

15.54

10

0.15

0.40

0.60

8.93

0.40

3.57

0.15

0.40

0.18

8.98

0.40

3.59

0.15

0.40

0.18

5.00

0.40

8.00

0.15

0.40

0.24

1.35

0.20

1.08

13.00

0.20

10.40

12

0.15

0.20

0.36

12.00

0.50

24.00

12

0.15

0.50

0.90

1.56

0.50

Jirn 28 de Julio
AMJ-01
AVJ L.I.-01
AMJ-02
AMJ-03
AMJ-04
AVJ L.D.-01
AMJ-05
AMJ-06
Vereda Martillo-Jardn

Jardineria

103.32

Jirn Sucre
AMS-01
AMS-02
AVS L.I.-01
AMS-03
AMS-04
AMS-05
AMS-06
AVS L.D.-01
AMS-02
AMS-05
Vereda Martillo-Jardn

3.75

3.12
109.27

9.00

0.40

3.60

0.15

0.40

0.18

8.91

0.40

3.56

0.15

0.40

0.18

38.27

0.40

15.31

10

0.15

0.40

0.60

8.51

0.40

3.40

0.15

0.40

0.18

8.46

0.40

3.38

0.15

0.40

0.18

8.91

0.40

3.56

0.15

0.40

0.18

9.01

0.40

3.60

0.15

0.40

0.18

38.30

0.40

15.32

10

0.15

0.40

0.60

8.46

0.40

3.38

0.15

0.40

0.18

8.50

0.40

3.40

0.15

0.40

0.18

5.00

0.40

8.00

0.15

0.40

0.24

1.35

0.20

1.08

13.00

0.20

10.40

Jardineria

12

0.15

0.20

0.36

12.00

0.50

24.00

12

0.15

0.50

0.90

1.56

0.50

Jirn Ramn Castilla


AMRC-01
AMRC-02
AVRC L.I.-01
AMRC-03
AMRC-04
AMRC-05
AMRC-06
AVRC L.D.-01
AMRC-02
AMRC-05
Vereda Martillo-Jardn

Jardineria

8.94

0.40

3.58

0.15

0.40

0.18

8.97

0.40

3.59

0.15

0.40

0.18

37.82

0.40

15.13

0.15

0.40

0.54

8.45

0.40

3.38

0.15

0.40

0.18

8.52

0.40

3.41

0.15

0.40

0.18

8.97

0.40

3.59

0.15

0.40

0.18

8.94

0.40

3.58

0.15

0.40

0.18

37.85

0.40

15.14

0.15

0.40

0.54

8.52

0.40

3.41

0.15

0.40

0.18

8.45

0.40

3.38

0.15

0.40

0.18

5.00

0.40

8.00

0.15

0.40

0.24

1.35

0.20

1.08

13.00

0.20

10.40

12

0.15

0.20

0.36

12.00

0.50

24.00

12

0.15

0.50

0.90

1.56

0.50

Jirn Bolivar
AMB-01
AMB-02
AVB L.I.-01
AMB-03
AMB-04
AVB L.I.-02
AMB-05
AMB-06
AMB-07
AMB-08

3.12
108.79

3.12
202.20

8.94

0.40

3.58

0.15

0.40

0.18

8.96

0.40

3.58

0.15

0.40

0.18

37.38

0.40

14.95

0.15

0.40

0.54

8.45

0.40

3.38

0.15

0.40

0.18

8.60

0.40

3.44

0.15

0.40

0.18

37.91

0.40

15.16

0.15

0.40

0.54

8.44

0.40

3.38

0.15

0.40

0.18

8.53

0.40

3.41

0.15

0.40

0.18

8.94

0.40

3.58

0.15

0.40

0.18

8.96

0.40

3.58

0.15

0.40

0.18

AVB L.D.-01
AMB-09
AMB-10
AVB L.D.-02
AMB-11
AMB-12
Vereda Martillo-Jardn

Jardineria

37.40

0.40

14.96

0.15

0.40

0.54

8.52

0.40

3.41

0.15

0.40

0.18

8.36

0.40

3.34

0.15

0.40

0.18

37.82

0.40

15.13

0.15

0.40

0.54

8.53

0.40

3.41

0.15

0.40

0.18

8.45

0.40

3.38

0.15

0.40

0.18

5.00

0.40

16.00

0.15

0.40

0.48

1.35

0.20

2.16

13.00

0.20

20.80

24

0.15

0.20

0.72

12.00

0.50

48.00

24

0.15

0.50

1.80

1.56

0.50

Jirn Sebastin Chipana


AMSCH-01
AMSCH-02
AVSCH L.I.-01
AMSCH-03
AMSCH-04
AVSCH L.I.-02
AMSCH-05
AMSCH-06
AMSCH-07
AMSCH-08
AVSCH L.D.-01
AMSCH-09
AMSCH-10
AVSCH L.D.-02
AMSCH-11
AMSCH-12
Vereda Martillo-Jardn

6.24
245.76

7.53

0.40

3.01

0.15

0.40

0.18

7.55

0.40

3.02

0.15

0.40

0.18

62.93

0.20

12.59

15

0.15

0.20

0.45

7.04

0.40

2.82

0.15

0.40

0.18

7.10

0.40

2.84

0.15

0.40

0.18

62.96

0.20

12.59

15

0.15

0.20

0.45

6.95

0.40

2.78

0.15

4.00

1.80

7.18

0.40

2.87

0.15

0.40

0.18

7.55

0.40

3.02

0.15

0.40

0.18

7.53

0.40

3.01

0.15

0.40

0.18

65.31

0.20

13.06

16

0.15

0.20

0.48

7.10

0.40

2.84

0.15

0.40

0.18

7.04

0.40

2.82

0.15

0.40

0.18

65.33

0.20

13.07

16

0.15

0.20

0.48

7.03

0.40

2.81

0.15

0.40

0.18

7.10

0.40

2.84

0.15

0.40

0.18

6.20

0.40

19.84

0.15

0.40

0.48

Jardineria

0.75

0.20

1.20

62.93

0.50

31.47

14

0.15

0.50

1.05

62.96

0.50

31.48

14

0.15

0.50

1.05

65.31

0.50

32.66

15

0.15

0.50

1.13

65.33

0.50

32.67

15

0.15

0.50

Calle San Martn


AMSM-01
AVSM L.I.-01
AMSM-02
AMSM-03
AVSM L.I.-02
AMSM-04
AMSM-05
AVSM L.D.-01
AMSM-06
AMSM-07
AVSM L.D.-02
AMSM-08
AMSM-09
Vereda Martillo-Jardn

Jardineria

9.51

0.40

0.15

0.40

0.18

56.32

0.40

22.53

14

0.15

0.40

0.84

9.38

0.40

3.75

0.15

0.40

0.18

9.47

0.40

3.79

0.15

0.40

0.18

36.34

0.40

14.54

0.15

0.40

0.54

9.41

0.40

3.76

0.15

0.40

0.18

9.34

0.40

3.74

0.15

0.40

0.18

56.07

0.40

22.43

13

0.15

0.40

0.78

9.45

0.40

3.78

0.15

0.40

0.18

9.40

0.40

3.76

0.15

0.40

0.18

36.58

0.40

14.63

0.15

0.40

0.54

9.00

0.40

3.60

0.15

0.40

0.18

8.91

0.40

3.56

0.15

0.40

0.18

5.00

0.40

16.00

0.15

0.40

0.48

1.35

0.20

2.16

13.00

0.20

20.80

24

0.15

0.20

0.72

12.00

0.50

48.00

24

0.15

0.50

1.80

1.56

0.50

Jirn Lima
AML-01
AML-02
AVL L.I.-01
AML-03
AML-04
AML-05
AML-06

1.13
208.19
3.80

6.24
103.85

9.04

0.40

3.62

0.15

0.40

0.18

8.87

0.40

3.55

0.15

0.40

0.18

36.80

0.40

14.72

0.15

0.40

0.54

8.59

0.40

3.44

0.15

0.40

0.18

7.18

0.40

2.87

0.15

0.40

0.18

8.87

0.40

3.55

0.15

0.40

0.18

9.04

0.40

3.62

0.15

0.40

0.18

AVL L.D.-01
AML-02
Vereda Martillo-Jardn

Jardineria

36.76

0.40

14.70

0.15

0.40

0.54

8.37

0.40

3.35

0.15

0.40

0.18

5.00

0.40

8.00

0.15

0.40

0.24

1.35

0.20

1.08

13.00

0.20

10.40

12

0.15

0.20

0.36

12.00

0.50

24.00

12

0.15

0.50

0.90

1.56

0.50

Jirn Huancayo
AMH-01
AMH-02
AVH L.I.-01
AMH-03
AMH-04
AVH L.I.-02
AMH-05
AMH-06
AMH-07
AVH L.D.-01
AMH-08
AMH-09
AVH L.D.-02
AMH-10
Vereda Martillo-Jardn

Jardineria

7.50

0.40

3.00

0.15

0.40

0.18

7.58

0.40

3.03

0.15

0.40

0.18

63.23

0.20

12.65

15

0.15

0.20

0.45

7.05

0.40

2.82

0.15

0.40

0.18

7.09

0.40

2.84

0.15

0.40

0.18

63.20

0.20

12.64

15

0.15

0.20

0.45

6.11

0.40

2.44

0.15

0.40

0.12

7.58

0.40

3.03

0.15

0.40

0.18

7.50

0.40

3.00

0.15

0.40

0.18

61.69

0.20

12.34

15

0.15

0.20

0.45

7.09

0.40

2.84

0.15

0.40

0.18

7.05

0.40

2.82

0.15

0.40

0.18

61.75

0.20

12.35

15

0.15

0.20

0.45

6.14

0.40

2.46

0.15

0.40

0.12

6.20

0.40

19.84

0.15

0.40

0.48

0.75

0.20

1.20

63.23

0.50

31.62

14

0.15

0.50

1.05

63.20

0.50

31.60

14

0.15

0.50

1.05

61.69

0.50

30.85

14

0.15

0.50

1.05

61.75

0.50

30.88

14

0.15

0.50

1.05

7.55

0.40

3.02

0.15

0.40

0.18

7.53

0.40

3.01

0.15

0.40

0.18

Jirn Catalina Huanca


AMCH-01
AMCH-02

3.12
232.39

233.66

AVCH L.I.-01
AMCH-03
AMCH-04
AVCH L.I.-02
AMCH-05
AMCH-06
AMCH-07
AVCH L.D.-01
AMCH-08
AMCH-09
AVCH L.D.-02
AMCH-10
Vereda Martillo-Jardn

Jardineria

63.67

0.20

12.73

15

0.15

0.20

0.45

7.10

0.40

2.84

0.15

0.40

0.18

7.04

0.40

2.82

0.15

0.40

0.18

63.64

0.20

12.73

15

0.15

0.20

0.45

6.15

0.40

2.46

0.15

0.40

0.12

7.53

0.40

3.01

0.15

0.40

0.18

7.55

0.40

3.02

0.15

0.40

0.18

61.69

0.20

12.34

15

0.15

0.20

0.45

7.04

0.50

3.52

0.15

0.40

0.18

7.10

0.40

2.84

0.15

0.40

0.18

61.69

0.20

12.34

15

0.15

0.20

0.45

6.10

0.40

2.44

0.15

0.40

0.12

6.20

0.40

19.84

0.15

0.40

0.48

0.75

0.20

1.20

63.67

0.50

31.84

14

0.15

0.50

1.05

63.64

0.50

31.82

14

0.15

0.50

1.05

61.69

0.50

30.85

14

0.15

0.50

1.05

61.69

0.50

30.85

14

0.15

0.50

Jirn Alfonso Ugarte


AMAU-01
AMAU-02
AVAU L.I.-01
AMAU-03
AMAU-04
AVAU L.I.-02
AMAU-05
AMAU-06
AMAU-07
AVAU L.D.-01
AMAU-08
AMAU-09

1.05
233.58

7.55

0.40

3.02

0.15

0.40

0.18

7.53

0.40

3.01

0.15

0.40

0.18

64.11

0.20

12.82

15

0.15

0.20

0.45

7.10

0.40

2.84

0.15

0.40

0.18

7.04

0.40

2.82

0.15

0.40

0.18

64.08

0.20

12.82

15

0.15

0.20

0.45

6.15

0.40

2.46

0.15

0.40

0.12

7.53

0.40

3.01

0.15

0.40

0.18

7.55

0.40

3.02

0.15

0.40

0.18

61.69

0.20

12.34

15

0.15

0.20

0.45

7.04

0.40

2.82

0.15

0.40

0.18

7.10

0.40

2.84

AVAU L.D.-02
AMAU-10
Vereda Martillo-Jardn

Jardineria

0.15

0.40

0.18

61.69

0.20

12.34

15

0.15

0.20

0.45

6.10

0.40

2.44

0.15

0.40

0.12

6.20

0.40

19.84

0.15

0.40

0.48

0.75

0.20

1.20

64.11

0.50

32.06

14

0.15

0.50

1.05

64.08

0.50

32.04

14

0.15

0.50

1.05

61.69

0.50

30.85

14

0.15

0.50

1.05

61.69

0.50

30.85

14

0.15

0.50

Jirn 27 de Mayo
AM27M-01
AM27M-02
AV27M L.I.-01
AM27M-03
AM27M-04
AV27M L.I.-02
AM27M-05
AM27M-06
AM27M-07
AV27M L.D.-01
AM27M-08
AM27M-09
AV27M L.D.-02
AM27M-10
Vereda Martillo-Jardn

Jardineria

7.86

0.40

3.14

0.15

0.40

0.18

7.23

0.40

2.89

0.15

0.40

0.18

64.73

0.20

12.95

15

0.15

0.20

0.45

7.39

0.40

2.96

0.15

0.40

0.18

6.76

0.40

2.70

0.15

0.40

0.18

64.70

0.20

12.94

15

0.15

0.20

0.45

6.40

0.40

2.56

0.15

0.40

0.12

7.23

0.40

2.89

0.15

0.40

0.18

7.86

0.40

3.14

0.15

0.40

0.18

61.88

0.20

12.38

15

0.15

0.20

0.45

6.76

0.40

2.70

0.15

0.40

0.18

7.39

0.40

2.96

0.15

0.40

0.18

61.88

0.20

12.38

15

0.15

0.20

0.45

5.86

0.40

2.34

0.15

0.40

0.12

6.20

0.40

19.84

0.15

0.40

0.48

0.75

0.20

1.20

64.73

0.50

32.37

14

0.15

0.50

1.05

64.70

0.50

32.35

14

0.15

0.50

1.05

61.88

0.50

30.94

14

0.15

0.50

1.05

61.88

0.50

30.94

14

0.15

0.50

Jirn Santa Cruz


AMSC-01

1.05
234.73

1.05
242.45

7.18

0.40

2.87

0.15

0.40

0.18

AVSC L.I.-01
AMSC-02
AMSC-03
AVSC L.I.-02
AMSC-04
AMSC-05
AVSC L.D.-01
AMSC-06
AMSC-07
AVSC L.D.-02
AMSC-08
Vereda Martillo-Jardn

Jardineria

65.35

0.40

26.14

16

0.15

0.20

0.48

7.44

0.40

2.98

0.15

0.40

0.18

6.71

0.40

2.68

0.15

0.40

0.12

65.32

0.20

13.06

16

0.15

0.20

0.48

6.45

0.40

2.58

0.15

0.40

0.12

7.91

0.40

3.16

0.15

0.40

0.18

61.94

0.20

12.39

15

0.15

0.20

0.45

6.71

0.40

2.68

0.15

0.40

0.12

7.44

0.40

2.98

0.15

0.40

0.18

61.94

0.20

12.39

15

0.15

0.20

0.45

5.82

0.40

2.33

0.15

0.40

0.12

6.20

0.40

19.84

0.15

0.40

0.48

0.75

0.20

1.20
32.68

65.35

0.50

15

0.15

0.50

1.13

65.32

0.50

32.66

15

0.15

0.50

1.13

61.94

0.50

30.97

14

0.15

0.50

1.05

61.94

0.50

30.97

14

0.15

0.50

1.05

03.03 Juntas Asflticas E=1"

1,622.10

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

170.90

AMI-01

0.55

1.10

AVI L.I.-01

19

0.55

10.45

AVI L.D.-01

19

0.55

10.45

AVI L.I.-02

13

0.55

7.15

AVI L.D.-02

13

0.55

7.15

AVI L.I.-03

13

0.55

7.15

AVI L.D.-03

13

0.55

7.15

AVI L.I.-04

13

0.55

7.15

AVI L.D.-04

13

0.55

7.15

AVI L.I.-05

10

0.55

5.50

AVI L.D.-05

10

0.55

5.50

Vereda Martillo-Jardn

20

0.55

11.00

60

0.55

33.00

60

0.85

Jardineria
Jr. Los Incas (Tramo San Martn-Chacamarca)

51.00
222.10

AVI L.I.-06

0.55

4.95

AVI L.D.-06

0.55

4.95

AVI L.I.-07

10

0.55

5.50

AVI L.D.-07

10

0.55

5.50

AVI L.I.-08

10

0.55

5.50

AVI L.D.-08

10

0.55

5.50

AVI L.I.-09

10

0.55

5.50

ml.

AVI L.D.-09

10

0.55

5.50

AVI L.I.-10

0.55

4.40

AVI L.D.-10

0.55

4.95

AVI L.I.-11

15

0.55

8.25

AVI L.D.-11

15

0.55

8.25

AVI L.I.-11'

0.55

2.75

AVI L.I.-12

13

0.55

7.15

AVI L.D.-12

13

0.55

7.15

AMI-02

0.55

1.65

AMI-03

0.55

1.65

Vereda Martillo-Jardn

28

0.55

15.40

84

0.55

46.20

84

0.85

Jardineria
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

71.40
169.80

AVFB L.I.-01

19

0.55

10.45

AVFB L.D.-01

19

0.55

10.45

AVFB L.I.-02

13

0.55

7.15

AVFB L.D.-02

13

0.55

7.15

AVFB L.I.-03

13

0.55

7.15

AVFB L.D.-03

13

0.55

7.15

AVFB L.I.-04

13

0.55

7.15

AVFB L.D.-04

13

0.55

7.15

AVFB L.I.-05

10

0.55

5.50

AVFB L.D.-05

10

0.55

5.50

Vereda Martillo-Jardn

20

0.55

11.00

60

0.55

33.00

60

0.85

Jardineria
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

51.00
191.00

AVFB L.I.-06

0.55

4.95

AVFB L.D.-06

0.55

4.95

AVFB L.I.-07

10

0.55

5.50

AVFB L.D.-07

10

0.55

5.50

AVFB L.I.-08

10

0.55

5.50

AVFB L.D.-08

10

0.55

5.50

AVFB L.I.-09

10

0.55

5.50

AVFB L.D.-09

10

0.55

5.50

AVFB L.I.-10

15

0.55

8.25

AVFB L.D.-10

15

0.55

8.25

AVFB L.I.-11

13

0.55

7.15

AVFB L.D.-11

13

0.55

7.15

AMFB-01

0.55

1.65

AMFB-02

0.55

1.65

Vereda Martillo-Jardn

24

0.55

13.20

72

0.55

39.60

72

0.85

61.20

AVLA L.I.-01

13

0.55

7.15

AVLA L.D.-01

13

0.55

7.15

AVLA L.I.-02

10

0.55

5.50

AVLA L.D.-02

10

0.55

5.50

AMLA-01

0.55

1.65

AMLA-02

0.55

1.65

Vereda Martillo-Jardn

0.55

4.40

24

0.55

13.20

Jardineria

24

0.85

20.40

AMJ-01

0.55

1.65

AVJ L.I.-01

10

0.55

5.50

AMJ-02

0.55

1.65

Jardineria
Jirn Los Andes (Tramo Bolivar - San Martn)

66.60

Jirn 28 de Julio

39.90

AMJ-03

0.55

1.65

AMJ-04

0.55

1.65

AVJ L.D.-01

10

0.55

5.50

AMJ-05

0.55

1.65

AMJ-06

0.55

1.65

Vereda Martillo-Jardn

0.55

2.20

12

0.55

6.60

Jardineria

12

0.85

10.20

AMS-01

0.55

1.65

AMS-02

0.55

1.65

AVS L.I.-01

10

0.55

5.50

AMS-03

0.55

1.65

AMS-04

0.55

1.65

AMS-05

0.55

1.65

AMS-06

0.55

1.65

AVS L.D.-01

10

0.55

5.50

AMS-02

0.55

1.65

AMS-05

0.55

1.65

Vereda Martillo-Jardn

0.55

2.20

12

0.55

6.60

Jardineria

12

0.85

10.20
42.10

AMRC-01
AMRC-02

3
3

0.55
0.55

1.65
1.65

AVRC L.I.-01
AMRC-03
AMRC-04

9
3
3

0.55
0.55
0.55

4.95
1.65
1.65

AMRC-05
AMRC-06

3
3

0.55
0.55

1.65
1.65

AVRC L.D.-01
AMRC-02
AMRC-05

9
3
3

0.55
0.55
0.55

4.95
1.65
1.65

Vereda Martillo-Jardn

4
12
12

0.55
0.55
0.85

Jardineria

3
3
9
3
3
9
3
3
3
3
9
3
3
9
3
3
8
24
24

0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.85

AMSCH-01
AMSCH-02
AVSCH L.I.-01
AMSCH-03

3
3
15
3

0.55
0.55
0.20
0.55

2.20
6.60
10.20
77.60
1.65
1.65
4.95
1.65
1.65
4.95
1.65
1.65
1.65
1.65
4.95
1.65
1.65
4.95
1.65
1.65
4.40
13.20
20.40
84.45
1.65
1.65
3.00
1.65

Jirn Sucre

43.20

Jirn Ramn Castilla

Jardineria
Jirn Bolivar
AMB-01
AMB-02
AVB L.I.-01
AMB-03
AMB-04
AVB L.I.-02
AMB-05
AMB-06
AMB-07
AMB-08
AVB L.D.-01
AMB-09
AMB-10
AVB L.D.-02
AMB-11
AMB-12
Vereda Martillo-Jardn

Jirn Sebastin Chipana

AMSCH-04
AVSCH L.I.-02
AMSCH-05
AMSCH-06
AMSCH-07
AMSCH-08
AVSCH L.D.-01
AMSCH-09
AMSCH-10
AVSCH L.D.-02
AMSCH-11
AMSCH-12
Vereda Martillo-Jardn
Jardineria

3
15
3
3
3
3
16
3
3
16
3
3
8
14
14
15
15

0.55
0.20
0.55
0.55
0.55
0.55
0.20
0.55
0.55
0.20
0.55
0.55
0.55
0.85
0.80
0.85
0.80

3
14
3
3
9
3

0.55
0.55
0.55
0.55
0.55
0.55

1.65
3.00
1.65
1.65
1.65
1.65
3.20
1.65
1.65
3.20
1.65
1.65
4.40
11.90
11.20
12.75
12.00
77.60
1.65
7.70
1.65
1.65
4.95
1.65

Calle San Martn


AMSM-01
AVSM L.I.-01
AMSM-02
AMSM-03
AVSM L.I.-02
AMSM-04
AMSM-05

0.55

1.65

AVSM L.D.-01

13

0.55

7.15

AMSM-06

0.55

1.65

AMSM-07

0.55

1.65

AVSM L.D.-02

0.55

4.95

AMSM-08

0.55

1.65

AMSM-09

0.55

1.65

Vereda Martillo-Jardn

0.55

4.40

24

0.55

13.20

Jardineria

24

0.85

20.40

AML-01

0.55

1.65

AML-02

0.55

1.65

AVL L.I.-01

0.55

4.95

AML-03

0.55

1.65

AML-04

0.55

1.65

AML-05

0.55

1.65

AML-06

0.55

1.65

AVL L.D.-01

0.55

4.95

AML-02

0.55

1.65

Vereda Martillo-Jardn

0.55

2.20

12

0.55

6.60

Jardineria

12

0.85

10.20

AMH-01

0.55

1.65

AMH-02

0.55

1.65

AVH L.I.-01

15

0.20

3.00

AMH-03

0.55

1.65

AMH-04

0.55

1.65

AVH L.I.-02

15

0.20

3.00

AMH-05

0.55

1.10

AMH-06

0.55

1.65

AMH-07

0.55

1.65

AVH L.D.-01

15

0.20

3.00

AMH-08

0.55

1.65

AMH-09

0.55

1.65

AVH L.D.-02

15

0.20

3.00

Jirn Lima

40.45

Jirn Huancayo

79.40

AMH-10

0.55

Vereda Martillo-Jardn

0.55

4.40

Jardineria

14

0.85

11.90

14

0.85

11.90

14

0.85

11.90

14

0.85

Jirn Catalina Huanca

1.10

11.90
79.40

AMCH-01

0.55

1.65

AMCH-02

0.55

1.65

AVCH L.I.-01

15

0.20

3.00

AMCH-03

0.55

1.65

AMCH-04

0.55

1.65

AVCH L.I.-02

15

0.20

3.00

AMCH-05

0.55

1.10

AMCH-06

0.55

1.65

AMCH-07

0.55

1.65

AVCH L.D.-01

15

0.20

3.00

AMCH-08

0.55

1.65

AMCH-09

0.55

1.65

AVCH L.D.-02

15

0.20

3.00

AMCH-10

0.55

1.10

Vereda Martillo-Jardn

0.55

4.40

Jardineria

14

0.85

11.90

14

0.85

11.90

14

0.85

11.90

14

0.85

Jirn Alfonso Ugarte

11.90
79.40

AMAU-01

0.55

1.65

AMAU-02

0.55

1.65

AVAU L.I.-01

15

0.20

3.00

AMAU-03

0.55

1.65

AMAU-04

0.55

1.65

AVAU L.I.-02

15

0.20

3.00

AMAU-05

0.55

1.10

AMAU-06

0.55

1.65

AMAU-07

0.55

1.65

AVAU L.D.-01

15

0.20

3.00

AMAU-08

0.55

1.65

AMAU-09

0.55

1.65

AVAU L.D.-02

15

0.20

3.00
1.10

AMAU-10

0.55

Vereda Martillo-Jardn

0.55

4.40

Jardineria

14

0.85

11.90

14

0.85

11.90

14

0.85

11.90

14

0.85

Jirn 27 de Mayo

11.90
79.40

AM27M-01

0.55

1.65

AM27M-02

0.55

1.65

AV27M L.I.-01

15

0.20

3.00

AM27M-03

0.55

1.65

AM27M-04

0.55

1.65

AV27M L.I.-02

15

0.20

3.00

AM27M-05

0.55

1.10

AM27M-06

0.55

1.65

AM27M-07

0.55

1.65

AV27M L.D.-01

15

0.20

3.00

AM27M-08

0.55

1.65

AM27M-09

0.55

1.65

AV27M L.D.-02

15

0.20

3.00

AM27M-10

0.55

1.10

Vereda Martillo-Jardn

0.55

4.40

Jardineria

14

0.85

11.90

14

0.85

11.90

14

0.85

11.90

14

0.85

11.90

Jirn Santa Cruz

78.80
AMSC-01

0.55

1.65

AVSC L.I.-01

16

0.20

3.20

AMSC-02

0.55

1.65

AMSC-03

0.55

1.10

AVSC L.I.-02

16

0.20

3.20

AMSC-04

0.55

1.10

AMSC-05

0.55

1.65

AVSC L.D.-01

15

0.20

3.00

AMSC-06

0.55

1.10

AMSC-07

0.55

1.65

AVSC L.D.-02

15

0.20

3.00

AMSC-08

0.55

1.10

Vereda Martillo-Jardn

0.55

4.40

Jardineria

15

0.85

12.75

15

0.85

12.75

15

0.85

12.75

15

0.85

12.75

04.00 VEREDAS
04.01 Vereda d/Concreto F'c=140 kg/cm2 Frot. y Bru. E=4"

14,097.87

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

1806.35

AMI-01

Area=

10.29

10.29

AVI L.I.-01

Area=

221.73

221.73

AVI L.D.-01

Area=

221.73

221.73

AVI L.I.-02

Area=

177.63

177.63

AVI L.D.-02

Area=

177.53

177.53

AVI L.I.-03

Area=

176.84

176.84

AVI L.D.-03

Area=

176.82

176.82

AVI L.I.-04

Area=

175.13

175.13

AVI L.D.-04

Area=

175.13

175.13

AVI L.I.-05

Area=

146.75

146.75

AVI L.D.-05

Area=

146.77

Jr. Los Incas (Tramo San Martn-Chacamarca)

146.77
2252.61

AVI L.I.-06

Area=

141.82

AVI L.D.-06

Area=

142.11

141.82
142.11

AVI L.I.-07

Area=

148.46

148.46

AVI L.D.-07

Area=

148.16

148.16

AVI L.I.-08

Area=

146.72

146.72

AVI L.D.-08

Area=

146.85

146.85

AVI L.I.-09

Area=

148.46

148.46

AVI L.D.-09

Area=

148.45

148.45

AVI L.I.-10

Area=

136.82

136.82

AVI L.D.-10

Area=

137.61

137.61

AVI L.I.-11

Area=

189.35

189.35

AVI L.D.-11

Area=

189.50

189.50

AVI L.I.-11'

Area=

48.11

48.11

AVI L.I.-12

Area=

175.57

175.57

AVI L.D.-12

Area=

175.26

175.26

AMI-02

Area=

13.73

13.73

AMI-03

Area=

15.63

15.63

AVFB L.I.-01

Area=

188.36

188.36

AVFB L.D.-01

Area=

188.39

188.39

AVFB L.I.-02

Area=

150.20

150.20

AVFB L.D.-02

Area=

150.11

150.11

AVFB L.I.-03

Area=

150.85

150.85

AVFB L.D.-03

Area=

150.84

150.84

AVFB L.I.-04

Area=

149.56

149.56

AVFB L.D.-04

Area=

149.70

149.70

AVFB L.I.-05

Area=

125.75

125.75

AVFB L.D.-05

Area=

125.73

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

1529.49

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

125.73
1655.44

AVFB L.I.-06

Area=

124.03

124.03

AVFB L.D.-06

Area=

123.75

123.75

AVFB L.I.-07

Area=

127.32

127.32

AVFB L.D.-07

Area=

127.44

127.44

AVFB L.I.-08

Area=

127.33

127.33

AVFB L.D.-08

Area=

127.33

127.33

AVFB L.I.-09

Area=

126.45

126.45

AVFB L.D.-09

Area=

127.18

127.18

AVFB L.I.-10

Area=

163.03

163.03

AVFB L.D.-10

Area=

163.16

163.16

AVFB L.I.-11

Area=

146.80

146.80

AVFB L.D.-11

Area=

145.55

145.55

AMFB-01

Area=

12.13

12.13

AMFB-02

Area=

13.94

Jirn Los Andes (Tramo Bolivar - San Martn)

13.94
593.43

AVLA L.I.-01

Area=

151.66

151.66

AVLA L.D.-01

Area=

151.82

151.82

AVLA L.I.-02

Area=

125.58

125.58

AVLA L.D.-02

Area=

125.55

125.55

AMLA-01

Area=

20.01

20.01

AMLA-02

Area=

18.81

18.81

AMJ-01

Area=

21.03

21.03

AVJ L.I.-01

Area=

146.69

146.69

AMJ-02

Area=

19.53

19.53

AMJ-03

Area=

19.34

19.34

AMJ-04

Area=

21.48

21.48

AVJ L.D.-01

Area=

146.75

146.75

AMJ-05

Area=

19.32

19.32

AMJ-06

Area=

19.49

19.49

AMS-01

Area=

19.61

19.61

AMS-02

Area=

16.20

16.20

AVS L.I.-01

Area=

123.27

123.27

AMS-03

Area=

17.72

17.72

AMS-04

Area=

17.53

17.53

AMS-05

Area=

19.23

19.23

AMS-06

Area=

19.70

19.70

AVS L.D.-01

Area=

125.07

125.07

AMS-02

Area=

17.52

17.52

Jirn 28 de Julio

413.63

Jirn Sucre

393.55

AMS-05

Area=

17.70

AMRC-01

Area=

19.36

Jirn Ramn Castilla

17.70
396.88
19.36

AMRC-02

Area=

19.48

19.48

AVRC L.I.-01

Area=

124.35

124.35

AMRC-03

Area=

17.46

17.46

AMRC-04

Area=

17.74

17.74

AMRC-05

Area=

19.48

19.48

AMRC-06

Area=

19.36

19.36

AVRC L.D.-01

Area=

124.40

124.40

AMRC-02

Area=

17.76

17.76

AMRC-05

Area=

17.49

17.49

AMB-01

Area=

19.37

19.37

AMB-02

Area=

19.47

19.47

AVB L.I.-01

Area=

123.69

123.69

AMB-03

Area=

17.46

17.46

AMB-04

Area=

18.14

18.14

AVB L.I.-02

Area=

124.49

124.49

AMB-05

Area=

17.42

17.42

AMB-06

Area=

17.78

17.78

AMB-07

Area=

19.46

19.46

AMB-08

Area=

19.36

19.36

AVB L.D.-01

Area=

123.72

123.72

AMB-09

Area=

17.76

17.76

AMB-10

Area=

17.08

17.08

AVB L.D.-02

Area=

124.34

124.34

AMB-11

Area=

17.78

17.78

AMB-12

Area=

17.56

Jirn Bolivar

714.88

Jirn Sebastin Chipana

17.56
560.10

AMSCH-01

Area=

14.64

14.64

AMSCH-02

Area=

14.72

14.72

AVSCH L.I.-01

Area=

97.88

97.88

AMSCH-03

Area=

12.92

12.92

AMSCH-04

Area=

13.13

13.13

AVSCH L.I.-02

Area=

100.73

100.73

AMSCH-05

Area=

12.58

12.58

AMSCH-06

Area=

13.42

13.42

AMSCH-07

Area=

14.71

14.71

AMSCH-08

Area=

14.63

14.63

AVSCH L.D.-01

Area=

97.91

97.91

AMSCH-09

Area=

13.13

13.13

AMSCH-10

Area=

12.91

12.91

AVSCH L.D.-02

Area=

100.76

100.76

AMSCH-11

Area=

12.89

12.89

AMSCH-12

Area=

13.14

13.14

AMSM-01

Area=

21.63

21.63

AVSM L.I.-01

Area=

177.84

177.84

AMSM-02

Area=

21.06

21.06

Calle San Martn

828.24

AMSM-03

Area=

21.49

21.49

AVSM L.I.-02

Area=

142.26

142.26

AMSM-04

Area=

21.22

21.22

AMSM-05

Area=

20.92

20.92

AVSM L.D.-01

Area=

177.72

177.72

AMSM-06

Area=

21.38

21.38

AMSM-07

Area=

21.17

21.17

AVSM L.D.-02

Area=

142.65

142.65

AMSM-08

Area=

19.62

19.62

AMSM-09

Area=

19.28

Jirn Lima

19.28
367.98

AML-01

Area=

19.77

19.77

AML-02

Area=

19.04

19.04

AVL L.I.-01

Area=

122.81

122.81

AML-03

Area=

18.06

18.06

AML-04

Area=

9.42

9.42

AML-05

Area=

19.07

19.07

AML-06

Area=

19.80

19.80

AVL L.D.-01

Area=

122.77

122.77

AML-02

Area=

17.24

17.24

AMH-01

Area=

14.52

14.52

AMH-02

Area=

14.85

14.85

AVH L.I.-01

Area=

98.23

98.23

AMH-03

Area=

12.96

12.96

AMH-04

Area=

13.09

13.09

AVH L.I.-02

Area=

96.39

96.39

AMH-05

Area=

10.10

10.10

AMH-06

Area=

14.83

14.83

Jirn Huancayo

520.30

AMH-07

Area=

14.51

14.51

AVH L.D.-01

Area=

98.19

98.19

AMH-08

Area=

13.09

13.09

AMH-09

Area=

12.96

12.96

AVH L.D.-02

Area=

96.39

96.39

AMH-10

Area=

10.19

10.19

AMCH-01

Area=

14.68

14.68

AMCH-02

Area=

14.64

14.64

AVCH L.I.-01

Area=

98.76

98.76

AMCH-03

Area=

13.14

13.14

AMCH-04

Area=

12.91

12.91

AVCH L.I.-02

Area=

96.39

96.39

AMCH-05

Area=

10.22

10.22

AMCH-06

Area=

14.65

14.65

AMCH-07

Area=

14.71

14.71

AVCH L.D.-01

Area=

98.73

98.73

AMCH-08

Area=

12.99

12.99

AMCH-09

Area=

13.14

13.14

AVCH L.D.-02

Area=

96.39

96.39

AMCH-10

Area=

10.07

Jirn Catalina Huanca

521.42

Jirn Alfonso Ugarte

10.07
522.38

AMAU-01

Area=

14.71

14.71

AMAU-02

Area=

14.64

14.64

AVAU L.I.-01

Area=

99.30

99.30

AMAU-03

Area=

13.14

13.14

AMAU-04

Area=

12.91

12.91

AVAU L.I.-02

Area=

96.39

96.39

AMAU-05

Area=

10.21

10.21

AMAU-06

Area=

14.65

14.65

AMAU-07

Area=

14.71

14.71

AVAU L.D.-01

Area=

99.26

99.26

AMAU-08

Area=

12.91

12.91

AMAU-09

Area=

13.14

13.14

AVAU L.D.-02

Area=

96.34

96.34

AMAU-10

Area=

10.07

10.07

Jirn 27 de Mayo

524.41
AM27M-01

Area=

15.83

AM27M-02

Area=

13.42

15.83
13.42

AV27M L.I.-01

Area=

100.02

100.02

AM27M-03

Area=

14.26

14.26

AM27M-04

Area=

11.82

11.82

AV27M L.I.-02

Area=

96.55

96.55

AM27M-05

Area=

10.95

10.95

AM27M-06

Area=

13.54

13.54

AM27M-07

Area=

15.97

15.97

AV27M L.D.-01

Area=

99.98

99.98

AM27M-08

Area=

11.83

11.83

AM27M-09

Area=

14.26

14.26

AV27M L.D.-02

Area=

96.60

96.60

AM27M-10

Area=

9.38

9.38

Jirn Santa Cruz

496.78
AMSC-01

Area=

13.20

13.20

AVSC L.I.-01

Area=

100.71

100.71

AMSC-02

Area=

14.52

14.52

AMSC-03

Area=

11.64

11.64

AVSC L.I.-02

Area=

96.67

96.67

AMSC-04

Area=

11.08

11.08

AMSC-05

Area=

16.19

16.19

AVSC L.D.-01

Area=

100.73

100.73

AMSC-06

Area=

11.64

11.64

AMSC-07

Area=

14.46

14.46

AVSC L.D.-02

Area=

96.68

96.68

AMSC-08

Area=

9.26

9.26

4.02 Encofrado y Desencofrado Normal


Jirn Los Incas (Tramo 28 d/Julio-San Martn)
AMI-01
AVI L.I.-01
AVI L.D.-01
AVI L.I.-02
AVI L.D.-02
AVI L.I.-03
AVI L.D.-03
AVI L.I.-04
AVI L.D.-04
AVI L.I.-05
AVI L.D.-05
Vereda Martillo-Jardn

1,177.02
1
1
1
19
1
19
1
13
1
13
1
13
1
13
1
13
1
13
1
10
1
10
20

3.14
3.00
80.51
1.80
80.51
1.80
56.04
1.80
55.95
1.80
55.58
1.80
55.46
1.80
54.63
1.80
54.63
1.80
38.88
1.80
38.87
1.80
5.00

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

137.70
0.31
0.30
8.05
3.42
8.05
3.42
5.60
2.34
5.60
2.34
5.56
2.34
5.55
2.34
5.46
2.34
5.46
2.34
3.89
1.80
3.89
1.80
10.00

Jr. Los Incas (Tramo San Martn-Chacamarca)


AVI L.I.-06
AVI L.D.-06
AVI L.I.-07
AVI L.D.-07
AVI L.I.-08
AVI L.D.-08
AVI L.I.-09
AVI L.D.-09
AVI L.I.-10
AVI L.D.-10
AVI L.I.-11
AVI L.D.-11
AVI L.I.-11'
AVI L.I.-12
AVI L.D.-12
AMI-02
AMI-03
Vereda Martillo-Jardn

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)


AVFB L.I.-01
AVFB L.D.-01
AVFB L.I.-02
AVFB L.D.-02
AVFB L.I.-03
AVFB L.D.-03
AVFB L.I.-04
AVFB L.D.-04
AVFB L.I.-05

20
20
20
60

3.00
1.35
13.00
1.80

0.10
0.10
0.10
0.10

1
9
1
9
1
10
1
10
1
10
1
10
1
10
1
10
1
8
1
9
1
15
1
15
1
5
1
13
1
13
1
2
1

36.12
1.80
36.28
1.80
39.81
1.80
39.64
1.80
38.84
1.80
38.92
1.80
39.81
1.80
39.81
1.80
33.35
1.80
33.79
1.80
62.55
1.80
62.63
1.80
16.04
1.80
54.88
1.80
54.72
1.80
7.29
3.00
7.80

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

2
28
28
28
28
84

3.00
5.00
3.00
1.35
13.00
1.80

0.10
0.10
0.10
0.10
0.10
0.10

1
19
1
19
1
13
1
13
1
13
1
13
1
13
1
13
1
10

80.51
1.50
80.71
1.50
55.06
1.50
54.99
1.50
55.58
1.50
55.58
1.50
54.63
1.50
54.63
1.50
38.75
1.50

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

6.00
2.70
26.00
10.80
171.21
3.61
1.62
3.63
1.62
3.98
1.80
3.96
1.80
3.88
1.80
3.89
1.80
3.98
1.80
3.98
1.80
3.34
1.44
3.38
1.62
6.26
2.70
6.26
2.70
1.60
0.90
5.49
2.34
5.47
2.34
0.73
0.60
0.78
0.60
14.00
8.40
3.78
36.40
15.12
130.42
8.05
2.85
8.07
2.85
5.51
1.95
5.50
1.95
5.56
1.95
5.56
1.95
5.46
1.95
5.46
1.95
3.88
1.50

AVFB L.D.-05
Vereda Martillo-Jardn

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)


AVFB L.I.-06
AVFB L.D.-06
AVFB L.I.-07
AVFB L.D.-07
AVFB L.I.-08
AVFB L.D.-08
AVFB L.I.-09
AVFB L.D.-09
AVFB L.I.-10
AVFB L.D.-10
AVFB L.I.-11
AVFB L.D.-11
AMFB-01
AMFB-02
Vereda Martillo-Jardn

Jirn Los Andes (Tramo Bolivar - San Martn)


AVLA L.I.-01
AVLA L.D.-01
AVLA L.I.-02
AVLA L.D.-02
AMLA-01
AMLA-02
Vereda Martillo-Jardn

1
10
20
20
20
20
60

38.74
1.50
5.00
2.70
1.35
13.00
1.50

0.10
0.10
0.10
0.10
0.10
0.10
0.10

1
9
1
9
1
10
1
10
1
10
1
10
1
10
1
10
1
15
1
15
1
13
1
13
1
3
1
3
24
24
24
24

37.59
1.50
37.43
1.50
39.81
1.50
39.88
1.50
39.81
1.50
39.81
1.50
39.27
1.50
39.68
1.50
63.64
1.50
63.71
1.50
52.80
1.50
52.65
1.50
6.81
1.50
7.34
1.50
5.00
2.70
1.35
13.00

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

72

1.50

0.10

1
13
1
13
1
10
1
10
1
3
1
3
8
8
8
8
24

56.03
1.50
56.13
1.50
38.65
1.50
38.64
1.50
9.11
1.50
8.80
1.50
5.00
2.70
1.35
13.00
1.50

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

1
2
1
10

9.38
3.00
38.83
1.80

0.10
0.10
0.10
0.10

Jirn 28 de Julio
AMJ-01
AVJ L.I.-01

3.87
1.50
10.00
5.40
2.70
26.00
9.00
140.74
3.76
1.35
3.74
1.35
3.98
1.50
3.99
1.50
3.98
1.50
3.98
1.50
3.93
1.50
3.97
1.50
6.36
2.25
6.37
2.25
5.28
1.95
5.27
1.95
0.68
0.45
0.73
0.45
12.00
6.48
3.24
31.20
10.80
49.78
5.60
1.95
5.61
1.95
3.87
1.50
3.86
1.50
0.91
0.45
0.88
0.45
4.00
2.16
1.08
10.40
3.60
31.54
0.94
0.60
3.88
1.80

AMJ-02

1
2
1
2
1
2
1
10
1
2
1
2
4
4
4
4
12

8.98
3.00
8.93
3.00
9.47
3.00
38.86
1.80
8.93
3.00
8.98
3.00
5.00
3.00
1.35
13.00
1.80

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

1
2
1
2
1
10
1
2
1
2
1
2
1
2
1
10
1
2
1
2
4
4
4
4

9.00
2.70
8.91
2.70
38.27
1.50
8.51
2.70
8.46
2.70
8.91
2.70
9.01
2.70
38.30
1.50
8.46
2.70
8.50
2.70
5.00
2.70
1.35
13.00

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

12

1.50

0.10

AMRC-01

1
2

8.94
2.70

0.10
0.10

1.80
32.18
0.89
0.54

AMRC-02

1
2
1
9

8.97
2.70
37.82
1.50

0.10
0.10
0.10
0.10

0.90
0.54
3.78
1.35

1
2
1
2
1

8.45
2.70
8.52
2.70
8.97

0.10
0.10
0.10
0.10
0.10

0.85
0.54
0.85
0.54
0.90

2
1
2
1
9
1
2
1
2

2.70
8.94
2.70
37.85
1.50
8.52
2.70
8.45
2.70

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

0.54
0.89
0.54
3.79
1.35
0.85
0.54
0.85
0.54

AMJ-03
AMJ-04
AVJ L.D.-01
AMJ-05
AMJ-06
Vereda Martillo-Jardn

Jirn Sucre
AMS-01
AMS-02
AVS L.I.-01
AMS-03
AMS-04
AMS-05
AMS-06
AVS L.D.-01
AMS-02
AMS-05
Vereda Martillo-Jardn

Jirn Ramn Castilla

AVRC L.I.-01
AMRC-03
AMRC-04
AMRC-05
AMRC-06
AVRC L.D.-01
AMRC-02
AMRC-05

0.90
0.60
0.89
0.60
0.95
0.60
3.89
1.80
0.89
0.60
0.90
0.60
2.00
1.20
0.54
5.20
2.16
32.57
0.90
0.54
0.89
0.54
3.83
1.50
0.85
0.54
0.85
0.54
0.89
0.54
0.90
0.54
3.83
1.50
0.85
0.54
0.85
0.54
2.00
1.08
0.54
5.20

Vereda Martillo-Jardn

4
4

5.00
2.70

0.10
0.10

2.00
1.08

4
4
12

1.35
13.00
1.50

0.10
0.10
0.10

1
2
1
2
1
9
1
2
1
2
1
9
1
2
1
2
1
2
1
2
1
9
1
2
1
2
1
9
1
2
1
2
8
8
8
8
24

8.94
2.70
8.96
2.70
37.38
1.50
8.45
2.70
8.60
2.70
37.91
1.50
8.44
2.70
8.53
2.70
8.94
2.70
8.96
2.70
37.40
1.50
8.52
2.70
8.36
2.70
37.82
1.50
8.53
2.70
8.45
2.70
5.00
2.70
1.35
13.00
1.50

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

0.54
5.20
1.80
58.54
0.89
0.54
0.90
0.54
3.74
1.35
0.85
0.54
0.86
0.54
3.79
1.35
0.84
0.54
0.85
0.54
0.89
0.54
0.90
0.54
3.74
1.35
0.85
0.54
0.84
0.54
3.78
1.35
0.85
0.54
0.85
0.54
4.00
2.16
1.08
10.40
3.60

1
2
1
2

7.53
1.80
7.55
1.80

0.10
0.10
0.10
0.10

53.08
0.75
0.36
0.76
0.36

1
15
1
2
1
2
1
15
1

62.93
1.20
7.04
1.80
7.10
1.80
62.96
1.20
6.95

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

6.29
1.80
0.70
0.36
0.71
0.36
6.30
1.80
0.70

2
1
2
1
2

1.80
7.18
1.80
7.55
1.80

0.10
0.10
0.10
0.10
0.10

0.36
0.72
0.36
0.76
0.36

7.53

0.10

0.75

Jirn Bolivar
AMB-01
AMB-02
AVB L.I.-01
AMB-03
AMB-04
AVB L.I.-02
AMB-05
AMB-06
AMB-07
AMB-08
AVB L.D.-01
AMB-09
AMB-10
AVB L.D.-02
AMB-11
AMB-12
Vereda Martillo-Jardn

Jirn Sebastin Chipana


AMSCH-01
AMSCH-02
AVSCH L.I.-01
AMSCH-03
AMSCH-04
AVSCH L.I.-02
AMSCH-05
AMSCH-06
AMSCH-07
AMSCH-08

2
1

1.80
65.31

0.10
0.10

0.36
6.53

16
1
2
1
2
1
16
1
2

1.20
7.10
1.80
7.04
1.80
65.33
1.20
7.03
1.80

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

1.92
0.71
0.36
0.70
0.36
6.53
1.92
0.70
0.36

1
2
8
8
8

7.10
1.80
6.20
1.80
0.75

0.10
0.10
0.10
0.10
0.10

0.71
0.36
4.96
1.44
0.60

1
2
1

9.51
3.00
56.32

0.10
0.10
0.10

62.62
0.95
0.60
5.63

AMSM-03

14
1
2
1

1.80
9.38
3.00
9.47

0.10
0.10
0.10
0.10

2.52
0.94
0.60
0.95

AVSM L.I.-02

2
1

3.00
36.34

0.10
0.10

0.60
3.63

9
1
2
1

1.80
9.41
3.00
9.34

0.10
0.10
0.10
0.10

1.62
0.94
0.60
0.93

2
1
13

3.00
56.07
1.80

0.10
0.10
0.10

0.60
5.61
2.34

AMSM-06

1
2

9.45
3.00

0.10
0.10

0.95
0.60

AMSM-07

1
2
1

9.40
3.00
36.58

0.10
0.10
0.10

0.94
0.60
3.66

9
1
2
1

1.80
9.00
3.00
8.91

0.10
0.10
0.10
0.10

1.62
0.90
0.60
0.89

3.00

0.10

0.60

5.00

0.10

4.00

3.00

0.10

2.40

1.35

0.10

1.08

13.00

0.10

10.40

24

1.80

0.10

AVSCH L.D.-01
AMSCH-09
AMSCH-10
AVSCH L.D.-02
AMSCH-11
AMSCH-12
Vereda Martillo-Jardn

Calle San Martn


AMSM-01
AVSM L.I.-01
AMSM-02

AMSM-04
AMSM-05
AVSM L.D.-01

AVSM L.D.-02
AMSM-08
AMSM-09
Vereda Martillo-Jardn

Jirn Lima

4.32
30.45

AML-01
AML-02
AVL L.I.-01
AML-03
AML-04
AML-05

9.04

0.10

0.90

2.70

0.10

0.54

8.87

0.10

0.89

2.70

0.10

0.54

36.80

0.10

3.68

1.50

0.10

1.35

8.59

0.10

0.86

2.70

0.10

0.54

7.18

0.10

0.72

2.70

0.10

0.54

8.87

0.10

0.89

2.70

0.10

0.54

AML-06
AVL L.D.-01
AML-02
Vereda Martillo-Jardn

9.04

0.10

0.90

2.70

0.10

0.54

36.76

0.10

3.68

1.50

0.10

1.35

8.37

0.10

0.84

2.70

0.10

0.54

5.00

0.10

2.00

2.70

0.10

1.08

1.35

0.10

0.54

13.00

0.10

5.20

12

1.50

0.10

Jirn Huancayo

1.80
49.50

AMH-01
AMH-02
AVH L.I.-01
AMH-03
AMH-04
AVH L.I.-02
AMH-05
AMH-06
AMH-07
AVH L.D.-01
AMH-08
AMH-09
AVH L.D.-02
AMH-10
Vereda Martillo-Jardn

7.50

0.10

0.75

1.80

0.10

0.36

7.58

0.10

0.76

1.80

0.10

0.36

63.23

0.10

6.32

15

1.20

0.10

1.80

7.05

0.10

0.71

1.80

0.10

0.36

7.09

0.10

0.71

1.80

0.10

0.36

63.20

0.10

6.32

15

1.20

0.10

1.80

6.11

0.10

0.61

1.80

0.10

0.18

7.58

0.10

0.76

1.80

0.10

0.36

7.50

0.10

0.75

1.80

0.10

0.36

61.69

0.10

6.17

15

1.20

0.10

1.80

7.09

0.10

0.71

1.80

0.10

0.36

7.05

0.10

0.71

1.80

0.10

0.36

61.75

0.10

6.18

15

1.20

0.10

1.80

6.14

0.10

0.61

1.80

0.10

0.18

6.20

0.10

4.96

1.80

0.10

1.44

0.75

0.10

1
2
1
2
1
15
1
2
1
2
1
15
1
1
1
2

7.55
1.80
7.53
1.80
63.67
1.20
7.10
1.80
7.04
1.80
63.64
1.20
6.15
1.80
7.53
1.80

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

0.60
49.58
0.76
0.36
0.75
0.36
6.37
1.80
0.71
0.36
0.70
0.36
6.36
1.80
0.62
0.18
0.75
0.36

Jirn Catalina Huanca


AMCH-01
AMCH-02
AVCH L.I.-01
AMCH-03
AMCH-04
AVCH L.I.-02
AMCH-05
AMCH-06

AMCH-07
AVCH L.D.-01
AMCH-08
AMCH-09
AVCH L.D.-02
AMCH-10
Vereda Martillo-Jardn

1
2
1
15
1
2
1
2
1
15
1
1
8
8
8

7.55
1.80
61.69
1.20
7.04
1.80
7.10
1.80
61.69
1.20
6.10
1.80
6.20
1.80
0.75

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

1
2
1
2
1
15
1
2
1
2
1
15
1
1
1
2
1
2
1
15
1
2
1
2
1
15
1
1
8
8

7.55
1.80
7.53
1.80
64.11
1.20
7.10
1.80
7.04
1.80
64.08
1.20
6.15
1.80
7.53
1.80
7.55
1.80
61.69
1.20
7.04
1.80
7.10
1.80
61.69
1.20
6.10
1.80
6.20
1.80

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

0.75

0.10

Jirn Alfonso Ugarte


AMAU-01
AMAU-02
AVAU L.I.-01
AMAU-03
AMAU-04
AVAU L.I.-02
AMAU-05
AMAU-06
AMAU-07
AVAU L.D.-01
AMAU-08
AMAU-09
AVAU L.D.-02
AMAU-10
Vereda Martillo-Jardn

Jirn 27 de Mayo

0.76
0.36
6.17
1.80
0.70
0.36
0.71
0.36
6.17
1.80
0.61
0.18
4.96
1.44
0.60
49.67
0.76
0.36
0.75
0.36
6.41
1.80
0.71
0.36
0.70
0.36
6.41
1.80
0.62
0.18
0.75
0.36
0.76
0.36
6.17
1.80
0.70
0.36
0.71
0.36
6.17
1.80
0.61
0.18
4.96
1.44
0.60
49.83

AM27M-01
AM27M-02
AV27M L.I.-01
AM27M-03
AM27M-04
AV27M L.I.-02
AM27M-05

7.86

0.10

0.79

1.80

0.10

0.36

7.23

0.10

0.72

1.80

0.10

0.36

64.73

0.10

6.47

15

1.20

0.10

1.80

7.39

0.10

0.74

1.80

0.10

0.36

6.76

0.10

0.68

1.80

0.10

0.36

64.70

0.10

6.47

15

1.20

0.10

1.80

6.40

0.10

0.64

1.80

0.10

0.18

AM27M-06
AM27M-07
AV27M L.D.-01
AM27M-08
AM27M-09
AV27M L.D.-02
AM27M-10
Vereda Martillo-Jardn

7.23

0.10

0.72

1.80

0.10

0.36

7.86

0.10

0.79

1.80

0.10

0.36

61.88

0.10

6.19

15

1.20

0.10

1.80

6.76

0.10

0.68

1.80

0.10

0.36

7.39

0.10

0.74

1.80

0.10

0.36

61.88

0.10

6.19

15

1.20

0.10

1.80

5.86

0.10

0.59

1.80

0.10

0.18

6.20

0.10

4.96

1.80

0.10

1.44

0.75

0.10

Jirn Santa Cruz

0.60
47.62

AMSC-01
AVSC L.I.-01
AMSC-02
AMSC-03
AVSC L.I.-02
AMSC-04
AMSC-05
AVSC L.D.-01
AMSC-06
AMSC-07
AVSC L.D.-02
AMSC-08
Vereda Martillo-Jardn

04.03 Juntas Asflticas E=2"


Jirn Los Incas (Tramo 28 d/Julio-San Martn)
AMI-01
AVI L.I.-01
AVI L.D.-01
AVI L.I.-02
AVI L.D.-02
AVI L.I.-03
AVI L.D.-03
AVI L.I.-04
AVI L.D.-04
AVI L.I.-05
AVI L.D.-05
Vereda Martillo-Jardn

7.18

0.10

0.72

1.80

0.10

0.36

65.35

0.10

6.54

16

1.20

0.10

1.92

7.44

0.10

0.74

1.80

0.10

0.36

6.71

0.10

0.67

1.80

0.10

0.18

65.32

0.10

6.53

16

1.20

0.10

1.92

6.45

0.10

0.65

1.80

0.10

0.18

7.91

0.10

0.79

1.80

0.10

0.36

61.94

0.10

6.19

15

1.20

0.10

1.80

6.71

0.10

0.67

1.80

0.10

0.18

7.44

0.10

0.74

1.80

0.10

0.36

61.94

0.10

6.19

15

1.20

0.10

1.80

5.82

0.10

0.58

1.80

0.10

0.18

6.20

0.10

4.96

1.80

0.10

1.44

0.75

0.10

0.60
3,577.50

2
19
19
13
13
13
13
13
13
10
10
20

3.00
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
3.00

418.80
6.00
34.20
34.20
23.40
23.40
23.40
23.40
23.40
23.40
18.00
18.00
60.00

ml.

Jr. Los Incas (Tramo San Martn-Chacamarca)


AVI L.I.-06
AVI L.D.-06
AVI L.I.-07
AVI L.D.-07
AVI L.I.-08
AVI L.D.-08
AVI L.I.-09
AVI L.D.-09
AVI L.I.-10
AVI L.D.-10
AVI L.I.-11
AVI L.D.-11
AVI L.I.-11'
AVI L.I.-12
AVI L.D.-12
AMI-02
AMI-03
Vereda Martillo-Jardn
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)
AVFB L.I.-01
AVFB L.D.-01
AVFB L.I.-02
AVFB L.D.-02
AVFB L.I.-03
AVFB L.D.-03
AVFB L.I.-04
AVFB L.D.-04
AVFB L.I.-05
AVFB L.D.-05
Vereda Martillo-Jardn
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)
AVFB L.I.-06
AVFB L.D.-06
AVFB L.I.-07
AVFB L.D.-07
AVFB L.I.-08
AVFB L.D.-08
AVFB L.I.-09
AVFB L.D.-09
AVFB L.I.-10
AVFB L.D.-10
AVFB L.I.-11
AVFB L.D.-11
AMFB-01
AMFB-02
Vereda Martillo-Jardn
Jirn Los Andes (Tramo Bolivar - San Martn)
AVLA L.I.-01
AVLA L.D.-01
AVLA L.I.-02
AVLA L.D.-02
AMLA-01
AMLA-02
Vereda Martillo-Jardn

60

1.80

9
9
10
10
10
10
10
10
8
9
15
15
5
13
13
3
3
28
84

1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
3.00
3.00
3.00
1.80

19
19
13
13
13
13
13
13
10
10
20
60

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.70
1.50

9
9
10
10
10
10
10
10
15
15
13
13
3
3
24

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.70
2.70
2.70

72

1.50

13
13
10
10
3
3
8
24

1.50
1.50
1.50
1.50
2.70
2.70
2.70
1.50

3
10

3.00
1.80

Jirn 28 de Julio
AMJ-01
AVJ L.I.-01

108.00
534.00
16.20
16.20
18.00
18.00
18.00
18.00
18.00
18.00
14.40
16.20
27.00
27.00
9.00
23.40
23.40
9.00
9.00
84.00
151.20
348.00
28.50
28.50
19.50
19.50
19.50
19.50
19.50
19.50
15.00
15.00
54.00
90.00
390.00
13.50
13.50
15.00
15.00
15.00
15.00
15.00
15.00
22.50
22.50
19.50
19.50
8.10
8.10
64.80
108.00
142.80
19.50
19.50
15.00
15.00
8.10
8.10
21.60
36.00
123.60
9.00
18.00

AMJ-02
AMJ-03
AMJ-04
AVJ L.D.-01
AMJ-05
AMJ-06
Vereda Martillo-Jardn

3
3
3
10
3
3
4
12

3.00
3.00
3.00
1.80
3.00
3.00
3.00
1.80

AMS-01
AMS-02
AVS L.I.-01
AMS-03
AMS-04
AMS-05
AMS-06
AVS L.D.-01
AMS-02
AMS-05
Vereda Martillo-Jardn

3
3
10
3
3
3
3
10
3
3
4
12

2.70
2.70
1.50
2.70
2.70
2.70
2.70
1.50
2.70
2.70
2.70
1.50

3
3
9
3
3
3
3
9
3
3
4
12

2.70
2.70
1.50
2.70
2.70
2.70
2.70
1.50
2.70
2.70
2.70
1.50

3
3
9
3
3
9
3
3
3
3
9
3
3
9
3
3
8

2.70
2.70
1.50
2.70
2.70
1.50
2.70
2.70
2.70
2.70
1.50
2.70
2.70
1.50
2.70
2.70
2.70

24

1.50

Jirn Sucre

Jirn Ramn Castilla


AMRC-01
AMRC-02
AVRC L.I.-01
AMRC-03
AMRC-04
AMRC-05
AMRC-06
AVRC L.D.-01
AMRC-02
AMRC-05
Vereda Martillo-Jardn
Jirn Bolivar
AMB-01
AMB-02
AVB L.I.-01
AMB-03
AMB-04
AVB L.I.-02
AMB-05
AMB-06
AMB-07
AMB-08
AVB L.D.-01
AMB-09
AMB-10
AVB L.D.-02
AMB-11
AMB-12
Vereda Martillo-Jardn
Jirn Sebastin Chipana

9.00
9.00
9.00
18.00
9.00
9.00
12.00
21.60
123.60
8.10
8.10
15.00
8.10
8.10
8.10
8.10
15.00
8.10
8.10
10.80
18.00
120.60
8.10
8.10
13.50
8.10
8.10
8.10
8.10
13.50
8.10
8.10
10.80
18.00
208.80
8.10
8.10
13.50
8.10
8.10
13.50
8.10
8.10
8.10
8.10
13.50
8.10
8.10
13.50
8.10
8.10
21.60
36.00
153.60

AMSCH-01

1.80

AMSCH-02

1.80

5.40
5.40

AVSCH L.I.-01

15

1.20

18.00

AMSCH-03

1.80

5.40

AMSCH-04

1.80

5.40

AVSCH L.I.-02

15

1.20

18.00

AMSCH-05

1.80

5.40

AMSCH-06

1.80

5.40

AMSCH-07

1.80

5.40

AMSCH-08

1.80

5.40

AVSCH L.D.-01

16

1.20

19.20

AMSCH-09

1.80

5.40

AMSCH-10

1.80

5.40

AVSCH L.D.-02

16

1.20

19.20
5.40

AMSCH-11

1.80

AMSCH-12

1.80

5.40

Vereda Martillo-Jardn

1.80

14.40

AMSM-01

3.00

9.00

AVSM L.I.-01

14

1.80

25.20

AMSM-02

3.00

9.00

AMSM-03

3.00

9.00

AVSM L.I.-02

1.80

16.20

AMSM-04

3.00

9.00

AMSM-05

3.00

9.00

AVSM L.D.-01

13

1.80

23.40

AMSM-06

3.00

9.00

AMSM-07

3.00

9.00

AVSM L.D.-02

1.80

16.20

AMSM-08

3.00

9.00

AMSM-09

3.00

9.00

Vereda Martillo-Jardn

3.00

24.00

24

1.80

Calle San Martn

229.20

Jirn Lima

43.20
112.50

AML-01

2.70

AML-02

2.70

8.10

AVL L.I.-01

1.50

13.50

AML-03

2.70

8.10

AML-04

2.70

8.10

AML-05

2.70

8.10

AML-06

2.70

8.10

AVL L.D.-01

1.50

13.50

AML-02

2.70

8.10

Vereda Martillo-Jardn

2.70

10.80

12

1.50

Jirn Huancayo

8.10

18.00
136.80

AMH-01

1.80

AMH-02

1.80

5.40
5.40

AVH L.I.-01

15

1.20

18.00

AMH-03

1.80

5.40

AMH-04

1.80

5.40

AVH L.I.-02

15

1.20

18.00

AMH-05

1.80

3.60

AMH-06

1.80

5.40

AMH-07

1.80

5.40

AVH L.D.-01

15

1.20

18.00

AMH-08

1.80

5.40

AMH-09

1.80

5.40

AVH L.D.-02

15

1.20

18.00

AMH-10

1.80

3.60

Vereda Martillo-Jardn
Jirn Catalina Huanca
AMCH-01
AMCH-02
AVCH L.I.-01

1.80

3
3
15

1.80
1.80
1.20

14.40
136.80
5.40
5.40
18.00

AMCH-03
AMCH-04
AVCH L.I.-02
AMCH-05

3
3
15
2

1.80
1.80
1.20
1.80

5.40
5.40
18.00
3.60

AMCH-06
AMCH-07

3
3

1.80
1.80

5.40
5.40

AVCH L.D.-01
AMCH-08
AMCH-09
AVCH L.D.-02
AMCH-10
Vereda Martillo-Jardn
Jirn Alfonso Ugarte
AMAU-01
AMAU-02

15
3
3
15
2
8

1.20
1.80
1.80
1.20
1.80
1.80

3
3

1.80
1.80

18.00
5.40
5.40
18.00
3.60
14.40
136.80
5.40
5.40

AVAU L.I.-01
AMAU-03
AMAU-04
AVAU L.I.-02
AMAU-05

15
3
3
15
2

1.20
1.80
1.80
1.20
1.80

18.00
5.40
5.40
18.00
3.60

AMAU-06
AMAU-07
AVAU L.D.-01
AMAU-08

3
3
15
3

1.80
1.80
1.20
1.80

5.40
5.40
18.00
5.40

AMAU-09
AVAU L.D.-02
AMAU-10
Vereda Martillo-Jardn

3
15
2
8

1.80
1.20
1.80
1.80

5.40
18.00
3.60
14.40

AM27M-01

1.80

136.80
5.40

AM27M-02
AV27M L.I.-01
AM27M-03
AM27M-04

3
15
3
3

1.80
1.20
1.80
1.80

5.40
18.00
5.40
5.40

AV27M L.I.-02
AM27M-05
AM27M-06

15
2
3

1.20
1.80
1.80

18.00
3.60
5.40

AM27M-07
AV27M L.D.-01

3
15

1.80
1.20

5.40
18.00

AM27M-08
AM27M-09
AV27M L.D.-02

3
3
15

1.80
1.80
1.20

5.40
5.40
18.00

AM27M-10

Jirn 27 de Mayo

Vereda Martillo-Jardn
Jirn Santa Cruz
AMSC-01
AVSC L.I.-01

2
8

1.80
1.80

3
16

1.80
1.20

14.40
124.80
5.40
19.20

3.60

AMSC-02
AMSC-03
AVSC L.I.-02
AMSC-04
AMSC-05

3
2
16
2
3

1.80
1.80
1.20
1.80
1.80

5.40
3.60
19.20
3.60
5.40

AVSC L.D.-01
AMSC-06
AMSC-07
AVSC L.D.-02

15
2
3
15

1.20
1.80
1.80
1.20

18.00
3.60
5.40
18.00

AMSC-08
Vereda Martillo-Jardn

2
8

1.80
1.80

3.60
14.40

05.00 BANCAS
05.01 Concreto F'c=210 kg/cm2

70.30
Sub Total

104.00

Cimientos

1.00

0.60

0.35

0.35

0.07

2.00

0.80

0.30

0.35

0.17

2.00

0.60

0.30

0.35

0.13

1.00

0.60

0.15

0.45

0.04

Base de Banca

0.68

Losa de Banca

1.00

1.20

0.60

0.10

Muros

2.00

0.80

0.10

0.70

0.07
0.11

2.00

0.60

0.10

0.70

0.08

05.02 Acero Corrugado fy=4200kg/cm2 Grado 60


Sub Total

104.00
Cant.

Long.

Kg/m

Sub Total

1.00

10.00

1.00

0.56

5.60

1.00

5.00

0.80

0.56

2.24

1.00

5.00

1.40

0.56

3.92

1.00

5.00

0.80

0.56

2.24

2.00

7.00

1.20

0.56

9.41

2.00

4.00

1.00

0.56

4.48

2.00

5.00

1.20

0.56

6.72

2.00

4.00

0.80

0.56

3.58

Alambre N 16

1.05

38.19

0.06

2.41

Sub Total

104.00

Base de Banca

1.00

0.60

0.45

0.27

1.00

0.60

0.35

0.21

0.45

0.14

Losa de Banca
Muros

05.03 Encofrado y Desencofrado Normal

Muros

0.15

1.00

1.05

0.60

2.00

1.05

0.10

0.21

4.00

0.80

0.70

2.24

4.00

0.60

0.70

1.68

Sub Total

104.00

Base de Banca

1.00

0.60

0.45

0.27

1.00

0.60

0.35

417.56

4.02
0.21

0.45

0.14

2.00

Muros

0.63

05.03 Acabado con Granito Pulido en Bancas

Losa de Banca

559.00
5.38

2.00
Losa de Banca

kg.

27.89
N veces

Base de Banca

2,900.35

0.15

1.00

1.05

0.60

2.00

1.05

0.10

0.63
0.21

4.00

0.80

0.60

1.92

4.00

0.60

0.15

0.36

2.00

0.80

0.10

0.16

2.00

0.60

0.10

0.12

06.00 SEALIZACION
06.01 Seal Elevada

54.00 und.
Jirn 28 de Julio

3.00

Jirn Sucre

4.00

Jirn Ramn Castilla

4.00

Jirn Bolivar

6.00

Jirn Sebastin Chipana

6.00

Calle San Martn

4.00

Jirn Lima

3.00

Jirn Huancayo

5.00

Jirn Catalina Huanca

5.00

Jirn Alfonso Ugarte

5.00

Jirn 27 de Mayo

5.00

Jirn Santa Cruz

4.00

07.00 VARIOS
07.01 Pintura para Sardinel en Vereda

4,496.81

Jirn Los Incas (Tramo 28 d/Julio-San Martn)


AMI-01

420.40
1

3.14

0.55

1.73

AVI L.I.-01

80.51

0.25

20.13

AVI L.D.-01

80.51

0.25

20.13

AVI L.I.-02

56.04

0.25

14.01

AVI L.D.-02

55.95

0.25

13.99

AVI L.I.-03

55.58

0.25

13.90

AVI L.D.-03

55.46

0.25

13.87

AVI L.I.-04

54.63

0.25

13.66

AVI L.D.-04

54.63

0.25

13.66
9.72

AVI L.I.-05

38.88

0.25

AVI L.D.-05

38.87

0.25

9.72

Vereda Martillo-Jardn

20

5.00

0.55

55.00

20

1.35

0.25

6.75

20

13.00

0.25

65.00

20

12.00

0.55

132.00

20

1.56

0.55

Jardineria
Jr. Los Incas (Tramo San Martn-Chacamarca)

17.16
551.37

AVI L.I.-06

36.12

0.25

9.03

AVI L.D.-06

36.28

0.25

9.07

AVI L.I.-07

39.81

0.25

9.95

AVI L.D.-07

39.64

0.25

9.91

AVI L.I.-08

38.84

0.25

9.71

AVI L.D.-08

38.92

0.25

9.73

AVI L.I.-09

39.81

0.25

9.95

AVI L.D.-09

39.81

0.25

9.95

AVI L.I.-10

33.35

0.25

8.34

AVI L.D.-10

33.79

0.25

8.45

AVI L.I.-11

62.55

0.25

15.64

AVI L.D.-11

62.63

0.25

15.66

AVI L.I.-11'

16.04

0.25

4.01

AVI L.I.-12

54.88

0.25

13.72

AVI L.D.-12

54.72

0.25

13.68

AMI-02

7.29

0.55

4.01

AMI-03

7.80

0.55

4.29

Vereda Martillo-Jardn

28

5.00

0.55

77.00

28

1.35

0.25

9.45

28

13.00

0.25

91.00

28

12.00

0.55

184.80

28

1.56

0.55

24.02

AVFB L.I.-01

80.51

0.25

20.13

AVFB L.D.-01

80.71

0.25

20.18

AVFB L.I.-02

55.06

0.25

13.77

AVFB L.D.-02

54.99

0.25

13.75

AVFB L.I.-03

55.58

0.25

13.90

AVFB L.D.-03

55.58

0.25

13.90

AVFB L.I.-04

54.63

0.25

13.66

AVFB L.D.-04

54.63

0.25

13.66

AVFB L.I.-05

38.75

0.25

9.69

AVFB L.D.-05

38.74

0.25

9.69

Vereda Martillo-Jardn

20

5.00

0.55

55.00

20

1.35

0.25

6.75

20

13.00

0.25

65.00

20

12.00

0.55

132.00

20

1.56

0.55

Jardineria
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

Jardineria

418.21

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)


AVFB L.I.-06

17.16
475.39

37.59

0.25

9.40

AVFB L.D.-06

37.43

0.25

9.36

AVFB L.I.-07

39.81

0.25

9.95

AVFB L.D.-07

39.88

0.25

9.97

AVFB L.I.-08

39.81

0.25

9.95

AVFB L.D.-08

39.81

0.25

9.95

AVFB L.I.-09

39.27

0.25

9.82

AVFB L.D.-09

39.68

0.25

9.92

AVFB L.I.-10

63.64

0.25

15.91

AVFB L.D.-10

63.71

0.25

15.93

AVFB L.I.-11

52.80

0.25

13.20

AVFB L.D.-11

52.65

0.25

13.16

AMFB-01

6.81

0.55

3.75

AMFB-02

7.34

0.55

4.04

Vereda Martillo-Jardn

24

5.00

0.55

66.00

24

1.35

0.25

8.10

24

13.00

0.25

78.00

24

12.00

0.55

158.40

24

1.56

0.55

Jardineria
Jirn Los Andes (Tramo Bolivar - San Martn)

20.59
167.58

AVLA L.I.-01

56.03

0.25

14.01

AVLA L.D.-01

56.13

0.25

14.03

AVLA L.I.-02

38.65

0.25

9.66

AVLA L.D.-02

38.64

0.25

9.66

AMLA-01

9.11

0.55

5.01

AMLA-02

8.80

0.55

4.84

Vereda Martillo-Jardn

5.00

0.55

22.00

1.35

0.25

2.70

13.00

0.25

26.00

12.00

0.55

52.80

1.56

0.55

6.86

Jardineria
Jirn 28 de Julio
AMJ-01
AVJ L.I.-01

1
1

9.38
38.83

0.55
0.25

104.67
5.16
9.71

AMJ-02
AMJ-03

1
1

8.98
8.93

0.55
0.55

4.94
4.91

AMJ-04
AVJ L.D.-01
AMJ-05

1
1
1

9.47
38.86
8.93

0.55
0.25
0.55

5.21
9.72
4.91

AMJ-06
Vereda Martillo-Jardn

1
4
4
4
4

8.98
5.00
1.35
13.00
12.00

0.55
0.55
0.25
0.25
0.55

4.94
11.00
1.35
13.00
26.40

1.56

0.55

AMS-01
AMS-02
AVS L.I.-01
AMS-03
AMS-04
AMS-05
AMS-06

1
1
1
1
1
1
1

9.00
8.91
38.27
8.51
8.46
8.91
9.01

0.55
0.55
0.25
0.55
0.55
0.55
0.55

3.43
112.69
4.95
4.90
9.57
4.68
4.65
4.90
4.96

AVS L.D.-01
AMS-02
AMS-05
Vereda Martillo-Jardn

1
1
1
4
4

38.30
8.46
8.50
5.00
1.35

0.25
0.55
0.55
0.55
0.25

9.58
4.65
4.68
11.00
1.35

4
4

13.00
12.00

0.25
0.55

13.00
26.40

1.56

0.55

Jardineria
Jirn Sucre

Jardineria
Jirn Ramn Castilla

3.43
112.47

AMRC-01

8.94

0.55

4.92

AMRC-02

8.97

0.55

4.93

AVRC L.I.-01

37.82

0.25

9.46

AMRC-03

8.45

0.55

4.65

AMRC-04

8.52

0.55

4.69

AMRC-05

8.97

0.55

4.93

AMRC-06

8.94

0.55

4.92

AVRC L.D.-01

37.85

0.25

9.46

AMRC-02

8.52

0.55

4.69

AMRC-05

8.45

0.55

4.65

Vereda Martillo-Jardn

5.00

0.55

11.00

1.35

0.25

1.35

13.00

0.25

13.00

12.00

0.55

26.40

1.56

0.55

Jardineria
Jirn Bolivar

3.43
205.02

AMB-01

8.94

0.55

4.92

AMB-02

8.96

0.55

4.93

AVB L.I.-01

37.38

0.25

9.35

AMB-03

8.45

0.55

4.65

AMB-04

8.60

0.55

4.73

AVB L.I.-02

37.91

0.25

9.48

AMB-05

8.44

0.55

4.64

AMB-06

8.53

0.55

4.69

AMB-07

8.94

0.55

4.92

AMB-08

8.96

0.55

4.93

AVB L.D.-01

37.40

0.25

9.35

AMB-09

8.52

0.55

4.69

AMB-10

8.36

0.55

4.60

AVB L.D.-02

37.82

0.25

9.46

AMB-11

8.53

0.55

4.69

AMB-12

8.45

0.55

4.65

Vereda Martillo-Jardn

5.00

0.55

22.00

1.35

0.25

2.70

13.00

0.25

26.00

12.00

0.55

52.80

1.56

0.55

Jardineria
Jirn Sebastin Chipana

6.86
281.69

AMSCH-01

7.53

0.55

AMSCH-02

7.55

0.55

4.14
4.15

AVSCH L.I.-01

62.93

0.25

15.73

AMSCH-03

7.04

0.55

3.87

AMSCH-04

7.10

0.55

3.91

AVSCH L.I.-02

62.96

0.25

15.74

AMSCH-05

6.95

0.55

3.82

AMSCH-06

7.18

0.55

3.95

AMSCH-07

7.55

0.55

4.15

AMSCH-08

7.53

0.55

4.14

AVSCH L.D.-01

65.31

0.25

16.33

AMSCH-09

7.10

0.55

3.91

AMSCH-10

7.04

0.55

3.87

AVSCH L.D.-02

65.33

0.25

16.33
3.87

AMSCH-11

7.03

0.55

AMSCH-12

7.10

0.55

3.91

Vereda Martillo-Jardn

6.20

0.55

27.28

0.75

0.25

1.50

62.93

0.55

34.61

62.96

0.55

34.63

65.31

0.55

35.92

Jardineria

65.33

0.55

Calle San Martn

35.93
202.82

AMSM-01

9.51

0.55

5.23

AVSM L.I.-01

56.32

0.25

14.08

AMSM-02

9.38

0.55

5.16

AMSM-03

9.47

0.55

5.21

AVSM L.I.-02

36.34

0.25

9.09

AMSM-04

9.41

0.55

5.18

AMSM-05

9.34

0.55

5.14

AVSM L.D.-01

56.07

0.25

14.02

AMSM-06

9.45

0.55

5.20

AMSM-07

9.40

0.55

5.17

AVSM L.D.-02

36.58

0.25

9.15

AMSM-08

9.00

0.55

4.95

AMSM-09

8.91

0.55

4.90

Vereda Martillo-Jardn

5.00

0.55

22.00

1.35

0.25

2.70

13.00

0.25

26.00

12.00

0.55

52.80

1.56

0.55

Jardineria
Jirn Lima

6.86
106.55

AML-01

9.04

0.55

4.97

AML-02

8.87

0.55

4.88

AVL L.I.-01

36.80

0.25

9.20

AML-03

8.59

0.55

4.72

AML-04

7.18

0.55

3.95

AML-05

8.87

0.55

4.88

AML-06

9.04

0.55

4.97

AVL L.D.-01

36.76

0.25

9.19

AML-02

8.37

0.55

4.60

Vereda Martillo-Jardn

5.00

0.55

11.00

1.35

0.25

1.35

13.00

0.25

13.00

12.00

0.55

26.40

1.56

0.55

Jardineria
Jirn Huancayo

3.43
267.56

AMH-01

7.50

0.55

AMH-02

7.58

0.55

4.17

AVH L.I.-01

63.23

0.25

15.81

AMH-03

7.05

0.55

3.88

AMH-04

7.09

0.55

3.90

AVH L.I.-02

63.20

0.25

15.80

AMH-05

6.11

0.55

3.36

AMH-06

7.58

0.55

4.17

AMH-07

7.50

0.55

4.13

AVH L.D.-01

61.69

0.25

15.42

AMH-08

7.09

0.55

3.90

AMH-09

7.05

0.55

3.88

AVH L.D.-02

61.75

0.25

15.44

AMH-10

6.14

0.55

3.38

Vereda Martillo-Jardn

6.20

0.55

27.28

0.75

0.25

1.50

63.23

0.55

34.78

63.20

0.55

34.76

61.69

0.55

33.93

61.75

0.55

Jardineria

Jirn Catalina Huanca

4.13

33.96
268.21

AMCH-01

7.55

0.55

4.15

AMCH-02

7.53

0.55

4.14

AVCH L.I.-01

63.67

0.25

15.92

AMCH-03

7.10

0.55

3.91

AMCH-04

7.04

0.55

3.87

AVCH L.I.-02

63.64

0.25

15.91

AMCH-05

6.15

0.55

3.38

AMCH-06

7.53

0.55

4.14

AMCH-07

7.55

0.55

4.15

AVCH L.D.-01

61.69

0.25

15.42

AMCH-08

7.04

0.55

3.87

AMCH-09

7.10

0.55

3.91

AVCH L.D.-02

61.69

0.25

15.42

AMCH-10

6.10

0.55

3.36

Vereda Martillo-Jardn

6.20

0.55

27.28

0.75

0.25

1.50

63.67

0.55

35.02

63.64

0.55

35.00

61.69

0.55

33.93

61.69

0.55

Jardineria

Jirn Alfonso Ugarte

33.93
268.92

AMAU-01

7.55

0.55

AMAU-02

7.53

0.55

4.15
4.14

AVAU L.I.-01

64.11

0.25

16.03

AMAU-03

7.10

0.55

3.91

AMAU-04

7.04

0.55

3.87

AVAU L.I.-02

64.08

0.25

16.02

AMAU-05

6.15

0.55

3.38

AMAU-06

7.53

0.55

4.14

AMAU-07

7.55

0.55

4.15

AVAU L.D.-01

61.69

0.25

15.42

AMAU-08

7.04

0.55

3.87

AMAU-09

7.10

0.55

3.91

AVAU L.D.-02

61.69

0.25

15.42

AMAU-10

6.10

0.55

3.36

Vereda Martillo-Jardn

6.20

0.55

27.28

0.75

0.25

1.50

64.11

0.55

35.26

64.08

0.55

35.24

61.69

0.55

33.93

61.69

0.55

Jardineria

Jirn 27 de Mayo

33.93
270.24

AM27M-01

7.86

0.55

4.32

AM27M-02

7.23

0.55

3.98

AV27M L.I.-01

64.73

0.25

16.18

AM27M-03

7.39

0.55

4.06

AM27M-04

6.76

0.55

3.72

AV27M L.I.-02

64.70

0.25

16.18

AM27M-05

6.40

0.55

3.52

AM27M-06

7.23

0.55

3.98

AM27M-07

7.86

0.55

4.32

AV27M L.D.-01

61.88

0.25

15.47

AM27M-08

6.76

0.55

3.72

AM27M-09

7.39

0.55

4.06

AV27M L.D.-02

61.88

0.25

15.47

AM27M-10

5.86

0.55

3.22

Vereda Martillo-Jardn

6.20

0.55

27.28

0.75

0.25

1.50

Jardineria

64.73

0.55

35.60

64.70

0.55

35.59

61.88

0.55

34.03

61.88

0.55

1
1
1
1
1
1
1
1
1
1
1
1
8
8
1
1
1
1

7.18
65.35
7.44
6.71
65.32
6.45
7.91
61.94
6.71
7.44
61.94
5.82
6.20
0.75
65.35
65.32
61.94
61.94

0.55
0.25
0.55
0.55
0.25
0.55
0.55
0.25
0.55
0.55
0.25
0.55
0.55
0.25
0.55
0.55
0.55
0.55

34.03
263.03
3.95
16.34
4.09
3.69
16.33
3.55
4.35
15.49
3.69
4.09
15.49
3.20
27.28
1.50
35.94
35.93
34.07
34.07

Jirn Santa Cruz


AMSC-01
AVSC L.I.-01
AMSC-02
AMSC-03
AVSC L.I.-02
AMSC-04
AMSC-05
AVSC L.D.-01
AMSC-06
AMSC-07
AVSC L.D.-02
AMSC-08
Vereda Martillo-Jardn
Jardineria

07.02 Reinstalacin de Puntos de Agua

370.00 und.

Jirn Los Incas (Tramo 28 d/Julio-San Martn)

55

55.00

Jr. Los Incas (Tramo San Martn-Chacamarca)

63

63.00

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

55

55.00

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

75

75.00

Jirn Los Andes (Tramo Bolivar - San Martn)

24

24.00

Jirn 28 de Julio

2.00

Jirn Sucre

6.00

Jirn Ramn Castilla

7.00

Jirn Bolivar

5.00

Jirn Sebastin Chipana

10

10.00

Calle San Martn

21

21.00

Jirn Lima

5.00

Jirn Huancayo

12

12.00

Jirn Catalina Huanca

9.00

Jirn Alfonso Ugarte

9.00

Jirn 27 de Mayo

6.00

Jirn Santa Cruz

6.00

07.03 Reinstalacin de Puntos de Desage


Jirn Los Incas (Tramo 28 d/Julio-San Martn)
Jr. Los Incas (Tramo San Martn-Chacamarca)
Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)
Jirn Los Andes (Tramo Bolivar - San Martn)
Jirn 28 de Julio

55
63
55
75
24
2

55.00
63.00
55.00
75.00
24.00
2.00

370.00 und.

Jirn Sucre

6.00

Jirn Ramn Castilla

7.00

Jirn Bolivar
Jirn Sebastin Chipana
Calle San Martn
Jirn Lima
Jirn Huancayo
Jirn Catalina Huanca

5
10
21
5
12
9

5.00
10.00
21.00
5.00
12.00
9.00

Jirn Alfonso Ugarte


Jirn 27 de Mayo

9
6

9.00
6.00

Jirn Santa Cruz

6.00

METRADOS DE OBRA
OBRA:

"MEJORAMIENTO VIAL DE LAS CALLES DEL CASCO URBANO DE LA LOCALIDAD DE QUILCAS , DISTRITO
DE QUILCAS HUANCAYO JUNN"

PPTO:

CONSTRUCCION DE CUNETAS Y BADENES

ENTIDAD: MUNICIPALIDAD DISTRITAL DE QUILCAS


FECHA:

PART.

MARZO DEL 2014

DISTRITO:

QUILCAS

PROVINCIA:

HUANCAYO

REGIN:

JUNN

DIMENSIONES
#
VECES LARGO ANCHO
ALTO

DESCRIPCION

METRADO
PARCIAL

TOTAL

UNID

01.00 TRABAJOS PRELIMINARES


01.01 Limpieza de Terreno Manual

2,656.69

Jr. Los Incas (Tramo 28 de Julio - San Martn)

236.38

Arco

3.13

0.25

0.78

AVI L.I.-01

80.28

0.25

20.07

17.11

0.25

4.28

17.13

0.25

4.28

1.56

0.25

0.78

80.27

0.25

20.07

17.12

0.25

4.28

17.11

0.25

4.28

1.56

0.25

0.78

55.81

0.25

13.95

17.11

0.25

4.28

17.10

0.25

4.28

1.56

0.25

0.78

55.72

0.25

13.93

17.12

0.25

4.28

17.11

0.25

4.28

1.56

0.25

0.78

55.34

0.25

13.84

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

55.34

0.25

13.84

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

54.39

0.25

13.60

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

54.39

0.25

13.60

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

38.65

0.25

9.66

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

38.64

0.25

9.66

17.12

0.25

4.28

AVI L.D.-01

AVI L.I.-02

AVI L.D.-02

AVI L.I.-03

AVI L.D.-03

AVI L.I.-04

AVI L.D.-04

AVI L.I.-05

AVI L.D.-05

17.12

0.25

1.56

0.25

Jr. Los Incas (Tramo San Martn-Chacamarca)

4.28
0.78
248.18

Arco

7.66

0.25

1.92

Arco

8.21

0.25

2.05

AVI L.I.-06

35.89

0.25

8.97

17.12

0.25

8.56

1.56

0.25

0.78

36.05

0.25

9.01

17.12

0.25

8.56

1.56

0.25

0.78

39.58

0.25

9.90

17.12

0.25

8.56

1.56

0.25

0.78

39.41

0.25

9.85

17.12

0.25

8.56

1.56

0.25

0.78

38.61

0.25

9.65

17.12

0.25

8.56

1.56

0.25

0.78

38.68

0.25

9.67

17.12

0.25

4.28

1.56

0.25

0.78

39.57

0.25

9.89

17.12

0.25

4.28

1.56

0.25

0.78

39.57

0.25

9.89

17.12

0.25

4.28

1.56

0.25

0.78

33.12

0.25

8.28

17.12

0.25

4.28

1.56

0.25

0.78

33.56

0.25

8.39

17.12

0.25

4.28

1.56

0.25

0.78

62.32

0.25

15.58

17.12

0.25

4.28

1.56

0.25

0.78

62.40

0.25

15.60

17.12

0.25

4.28

1.56

0.25

0.78

54.64

0.25

13.66

17.12

0.25

4.28

1.56

0.25

0.78

54.49

0.25

13.62

17.12

0.25

4.28

1.56

0.25

AVI L.D.-06

AVI L.I.-07

AVI L.D.-07

AVI L.I.-08

AVI L.D.-08

AVI L.I.-09

AVI L.D.-09

AVI L.I.-10

AVI L.D.-10

AVI L.I.-11

AVI L.D.-11

AVI L.I.-12

AVI L.D.-12

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)


AVFB L.I.-01

AVFB L.D.-01

AVFB L.I.-02

0.78
241.23

80.28

0.25

20.07

17.42

0.25

4.36

17.40

0.25

4.35

1.56

0.25

0.78

80.28

0.25

20.07

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

54.83

0.25

13.71

17.42

0.25

4.36

17.42

0.25

4.36

AVFB L.D.-02

AVFB L.I.-03

AVFB L.D.-03

AVFB L.I.-04

AVFB L.D.-04

AVFB L.I.-05

AVFB L.D.-05

Arco Final
Arco Final
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)
Arco Inicio
AVFB L.I.-06

AVFB L.D.-06

AVFB L.I.-07

AVFB L.D.-07

AVFB L.I.-08

AVFB L.D.-08

AVFB L.I.-09

AVFB L.D.-09

AVFB L.I.-10

1.56

0.25

0.78

54.76

0.25

13.69

17.42

0.25

4.36

17.42

0.25

4.36

2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1

1.56
55.34
17.42
17.42
1.56
55.34
17.42
17.37
1.56
54.40
17.42
17.41
1.56
54.40
17.46
17.42
1.56
38.52
17.42
17.42
1.56
38.51
17.42
17.42
1.56
9.39
9.30

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1

7.88
37.36
17.42
17.42
1.56
37.20
17.42
17.42
1.56
39.57
17.42
17.42
1.56
39.64
17.42
17.42
1.56
39.57
17.42
17.42
1.56
39.57
17.42
17.42
1.56
39.03
17.42
17.41
1.56
39.44
17.42
17.41
1.56
63.41

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.78
13.84
4.36
4.36
0.78
13.84
4.36
4.34
0.78
13.60
4.36
4.35
0.78
13.60
4.37
4.36
0.78
9.63
4.36
4.36
0.78
9.63
4.36
4.36
0.78
2.35
2.33
255.37
1.97
9.34
4.36
4.36
0.78
9.30
4.36
4.36
0.78
9.89
4.36
4.36
0.78
9.91
4.36
4.36
0.78
9.89
4.36
4.36
0.78
9.89
4.36
4.36
0.78
9.76
4.36
4.35
0.78
9.86
4.36
4.35
0.78
15.85

AVFB L.D.-10

AVFB L.I.-11

AVFB L.D.-11

Arco Final
Arco Final
Jirn Los Andes (Tramo Bolivar - San Martn)
AVLA L.I.-01

AVLA L.D.-01

AVLA L.I.-02

AVLA L.D.-02

Arco Final
Arco Final

1
1
2
1
1
1

17.41
17.40
1.56
63.48
17.41
17.41

0.25
0.25
0.25
0.25
0.25
0.25

4.35
4.35
0.78
15.87
4.35
4.35

2
1
1
1
2
1
1
1
2
1
1

1.56
52.57
17.41
17.41
1.56
52.42
17.40
17.42
1.56
7.19
7.74

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1

55.79
17.42
17.42
1.56
55.90
17.42
17.42
1.56
38.41
17.42
17.41
1.56
38.40
17.41
17.42
1.56
9.51
9.19

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1

5.88
5.50
5.87
5.50
5.50
38.60
17.12
17.12
1.56
38.62
17.12
17.12
1.56
Area=
Area=
Area=

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
17.99
17.42
17.42

2
1
1
1
1
2
1
1
1
2

5.50
5.50
5.12
5.50
5.12
5.12
38.04
17.42
17.42
1.56

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.78
13.14
4.35
4.35
0.78
13.11
4.35
4.36
0.78
1.80
1.94
89.76
13.95
4.36
4.36
0.78
13.98
4.36
4.36
0.78
9.60
4.36
4.35
0.78
9.60
4.35
4.36
0.78
2.38
2.30
99.25
1.47
1.38
1.47
1.38
2.75
9.65
4.28
4.28
0.78
9.66
4.28
4.28
0.78
17.99
17.42
17.42
110.42
2.75
1.38
1.28
1.38
1.28
2.56
9.51
4.36
4.36
0.78

Jirn 28 de Julio
Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco
AVJ L.I.-01

AVJ L.D.-01

ABJ-01
ABJ-02
ABJ-03
Jirn Sucre
Arco
Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco
AVS L.I.-01

AVS L.D.-01

ABS-01
ABS-02
ABS-03

1
1
1
2
1
1
1

38.07
17.41
17.41
1.56
Area=
Area=
Area=

0.25
0.25
0.25
0.25
15.74
15.71
15.17

ABS-04

Area=

15.18

Jirn Ramn Castilla

9.52
4.35
4.35
0.78
15.74
15.71
15.17
15.18
110.24

Arco

5.50

0.25

2.75

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco

5.12

0.25

2.56

AVRC L.I.-01

37.59

0.25

9.40

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

37.62

0.25

9.41

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

ABRC-01

Area=

15.74

15.74

ABRC-02

Area=

15.74

15.74

ABRC-03

Area=

15.18

15.18

ABRC-04

Area=

15.18

AVRC L.D.-01

Jirn Bolivar

15.18
183.27

Arco

5.50

0.25

2.75

Arco Inicial

5.50

0.25

1.38

Arco Final

5.13

0.25

1.28

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco Inicial

5.12

0.25

1.28

Arco Final

5.12

0.25

1.28

Arco Inicial

5.12

0.25

1.28

Arco Final

5.12

0.25

1.28

Arco

5.12

0.25

2.56

AVB L.I.-01

37.14

0.25

9.29

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

37.17

0.25

9.29

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

37.67

0.25

9.42

17.41

0.25

4.35

17.42

0.25

4.36

1.56

0.25

0.78

37.58

0.25

9.40

17.42

0.25

4.36

17.42

0.25

4.36

AVB L.D.-01

AVB L.I.-02

AVB L.D.-02

1.56

0.25

0.78

ABB-01

Area=

15.74

15.74

ABB-02

Area=

15.74

15.74

ABB-03

Area=

15.18

15.18

ABB-04

Area=

15.19

15.19

ABB-05

Area=

15.18

15.18

ABB-06

Area=

15.15

Jirn Sebastin Chipana

15.15
169.75

Arco

4.38

0.25

2.19

Lado Izq.

75.34

0.25

18.84

Arco Inicial

4.38

0.25

1.10

Arco Final

3.97

0.25

0.99

Lado Der.

75.36

0.25

18.84

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

77.71

0.25

19.43

Arco Inicial

4.01

0.25

1.00

Arco Final

4.01

0.25

1.00

Lado Der.

77.73

0.25

19.43

Arco Inicial

4.01

0.25

1.00

Arco Final

4.01

0.25

1.00

Arco

4.01

0.25

2.01

ABSCH-01

Area=

13.83

13.83

ABSCH-02

Area=

13.83

13.83

ABSCH-03

Area=

13.29

13.29

ABSCH-04

Area=

13.29

13.29

ABSCH-05

Area=

13.46

13.46

ABSCH-06

Area=

13.12

Calle San Martn

13.12
130.22

Arco Inicial

9.91

0.25

2.48

Arco Final

5.88

0.25

1.47

Arco Inicial

9.73

0.25

2.43

Arco Final

5.88

0.25

1.47

Arco Inicial

5.80

0.25

1.45

Arco Final

9.80

0.25

2.45

Arco Inicial

5.89

0.25

1.47

AVSM L.I.-01

55.89

0.25

13.97

17.11

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

55.83

0.25

13.96

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

36.10

0.25

9.03

17.11

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

36.35

0.25

9.09

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

ABSM-01

Area=

16.81

16.81

ABSM-02

Area=

16.79

16.79

Arco

5.50

0.25

2.75

Arco Inicial

5.50

0.25

1.38

AVSM L.D.-01

AVSM L.I.-02

AVSM L.D.-02

Jirn Lima

91.98

Arco Final

5.12

0.25

1.28

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

AVL L.I.-01

36.56

0.25

9.14

17.41

0.25

4.35

17.42

0.25

4.36

1.56

0.25

0.78

36.52

0.25

9.13

17.41

0.25

4.35

17.42

0.25

4.36

1.56

0.25

0.78

ABL-01

Area=

15.74

15.74

ABL-02

Area=

15.75

15.75

ABL-03

Area=

15.18

AVL L.D.-01

Jirn Huancayo

15.18
140.75

Arco

4.38

0.25

2.19

Lado Izq.

75.63

0.25

18.91

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

75.60

0.25

18.90

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.50

0.25

1.63

Lado Der.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.53

0.25

1.63

ABH-01

Area=

13.84

13.84

ABH-02

Area=

13.83

13.83

ABH-03

Area=

13.29

13.29

ABH-04

Area=

13.29

Jirn Catalina Huanca

13.29
140.96

Arco

4.38

0.25

2.19

Lado Izq.

76.07

0.25

19.02

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

76.04

0.25

19.01

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.55

0.25

1.64

Lado Der.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.49

0.25

1.62

ABCH-01

Area=

13.83

13.83

ABCH-02

Area=

13.83

13.83

ABCH-03

Area=

13.29

13.29

ABCH-04

Area=

13.29

13.29

Arco

4.37

0.25

2.19

Lado Izq.

76.51

0.25

19.13

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

76.49

0.25

19.12

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.10

0.25

18.53

Arco Inicial

4.01

0.25

1.00

Jirn Alfonso Ugarte

141.18

Arco Final

6.55

0.25

1.64

Lado Der.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.49

0.25

1.62

ABAU-01

Area=

13.83

13.83

ABAU-02

Area=

13.83

13.83

ABAU-03

Area=

13.29

13.29

ABAU-04

Area=

13.29

13.29

Arco

4.38

0.25

2.19

Lado Izq.

77.12

0.25

19.28

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

77.09

0.25

19.27

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.27

0.25

18.57

Arco Inicial

4.01

0.25

1.00

Arco Final

6.81

0.25

1.70

Lado Der.

74.27

0.25

18.57

Arco Inicial

4.01

0.25

1.00

Arco Final

6.23

0.25

1.56

AB27M-01

Area=

13.90

13.90

AB27M-02

Area=

13.85

13.85

AB27M-03

Area=

13.37

13.37

AB27M-04

Area=

13.31

Jirn 27 de Mayo

141.77

Jirn Santa Cruz

13.31
125.99

Lado Izq.

77.74

0.25

19.44

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

77.71

0.25

19.43

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.33

0.25

18.58

Arco Inicial

4.01

0.25

1.00

Arco Final

6.86

0.25

1.72

Lado Der.

74.33

0.25

18.58

Arco Inicial

4.01

0.25

1.00

Arco Final

6.19

0.25

1.55

ABSC-01

Area=

13.86

13.86

ABSC-02

Area=

13.32

13.32

ABSC-03

Area=

13.32

13.32

01.02 Trazo, Nivelacin y Replanteo

2,656.69

Jr. Los Incas (Tramo 28 de Julio - San Martn)

236.38

Arco

3.13

0.25

0.78

AVI L.I.-01

80.28

0.25

20.07

17.11

0.25

4.28

17.13

0.25

4.28

1.56

0.25

0.78

80.27

0.25

20.07

17.12

0.25

4.28

17.11

0.25

4.28

1.56

0.25

0.78

55.81

0.25

13.95

17.11

0.25

4.28

17.10

0.25

4.28

1.56

0.25

0.78

AVI L.D.-01

AVI L.I.-02

AVI L.D.-02

55.72

0.25

13.93

17.12

0.25

4.28

17.11

0.25

4.28

1.56

0.25

0.78

55.34

0.25

13.84

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

55.34

0.25

13.84

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

54.39

0.25

13.60

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

54.39

0.25

13.60

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

38.65

0.25

9.66

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

38.64

0.25

9.66

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

Arco

7.66

0.25

1.92

Arco

8.21

0.25

2.05

AVI L.I.-06

35.89

0.25

8.97

17.12

0.25

8.56

1.56

0.25

0.78

36.05

0.25

9.01

17.12

0.25

8.56

1.56

0.25

0.78

39.58

0.25

9.90

17.12

0.25

8.56

1.56

0.25

0.78

39.41

0.25

9.85

17.12

0.25

8.56

1.56

0.25

0.78

38.61

0.25

9.65

17.12

0.25

8.56

1.56

0.25

0.78

38.68

0.25

9.67

17.12

0.25

4.28

1.56

0.25

0.78

39.57

0.25

9.89

17.12

0.25

4.28

1.56

0.25

0.78

39.57

0.25

9.89

17.12

0.25

4.28

1.56

0.25

0.78

33.12

0.25

8.28

AVI L.I.-03

AVI L.D.-03

AVI L.I.-04

AVI L.D.-04

AVI L.I.-05

AVI L.D.-05

Jr. Los Incas (Tramo San Martn-Chacamarca)

AVI L.D.-06

AVI L.I.-07

AVI L.D.-07

AVI L.I.-08

AVI L.D.-08

AVI L.I.-09

AVI L.D.-09

AVI L.I.-10

248.18

1
AVI L.D.-10

AVI L.I.-11

AVI L.D.-11

AVI L.I.-12

AVI L.D.-12

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)


AVFB L.I.-01

AVFB L.D.-01

AVFB L.I.-02

AVFB L.D.-02

AVFB L.I.-03

AVFB L.D.-03

AVFB L.I.-04

AVFB L.D.-04

AVFB L.I.-05

AVFB L.D.-05

Arco Final
Arco Final
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

17.12

0.25

4.28

1.56

0.25

0.78

33.56

0.25

8.39

17.12

0.25

4.28

1.56

0.25

0.78

62.32

0.25

15.58

17.12

0.25

4.28

1.56

0.25

0.78

62.40

0.25

15.60

17.12

0.25

4.28

1.56

0.25

0.78

54.64

0.25

13.66

17.12

0.25

4.28

1.56

0.25

0.78

54.49

0.25

13.62

17.12

0.25

4.28

1.56

0.25

1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1

80.28
17.42
17.40
1.56
80.28
17.42
17.42
1.56
54.83
17.42
17.42
1.56
54.76
17.42
17.42
1.56
55.34
17.42
17.42
1.56
55.34
17.42
17.37
1.56
54.40
17.42
17.41
1.56
54.40
17.46
17.42
1.56
38.52
17.42
17.42
1.56
38.51
17.42
17.42
1.56
9.39
9.30

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.78
241.23
20.07
4.36
4.35
0.78
20.07
4.36
4.36
0.78
13.71
4.36
4.36
0.78
13.69
4.36
4.36
0.78
13.84
4.36
4.36
0.78
13.84
4.36
4.34
0.78
13.60
4.36
4.35
0.78
13.60
4.37
4.36
0.78
9.63
4.36
4.36
0.78
9.63
4.36
4.36
0.78
2.35
2.33
255.37

Arco Inicio
AVFB L.I.-06

AVFB L.D.-06

AVFB L.I.-07

AVFB L.D.-07

AVFB L.I.-08

AVFB L.D.-08

AVFB L.I.-09

AVFB L.D.-09

AVFB L.I.-10

AVFB L.D.-10

AVFB L.I.-11

AVFB L.D.-11

Arco Final
Arco Final
Jirn Los Andes (Tramo Bolivar - San Martn)
AVLA L.I.-01

AVLA L.D.-01

AVLA L.I.-02

1
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1

7.88
37.36
17.42
17.42
1.56
37.20
17.42
17.42
1.56
39.57
17.42
17.42
1.56
39.64
17.42
17.42
1.56
39.57
17.42
17.42

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1.97
9.34
4.36
4.36
0.78
9.30
4.36
4.36
0.78
9.89
4.36
4.36
0.78
9.91
4.36
4.36
0.78
9.89
4.36
4.36

2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1

1.56
39.57
17.42
17.42
1.56
39.03
17.42
17.41
1.56
39.44
17.42
17.41
1.56
63.41
17.41
17.40
1.56
63.48
17.41
17.41
1.56
52.57
17.41
17.41
1.56
52.42
17.40
17.42
1.56
7.19
7.74

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1
1
1
2
1
1
1
2
1
1
1
2

55.79
17.42
17.42
1.56
55.90
17.42
17.42
1.56
38.41
17.42
17.41
1.56

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.78
9.89
4.36
4.36
0.78
9.76
4.36
4.35
0.78
9.86
4.36
4.35
0.78
15.85
4.35
4.35
0.78
15.87
4.35
4.35
0.78
13.14
4.35
4.35
0.78
13.11
4.35
4.36
0.78
1.80
1.94
89.76
13.95
4.36
4.36
0.78
13.98
4.36
4.36
0.78
9.60
4.36
4.35
0.78

AVLA L.D.-02

1
1
1
2
1
1

38.40
17.41
17.42
1.56
9.51
9.19

0.25
0.25
0.25
0.25
0.25
0.25

ABJ-01
ABJ-02

1
1
1
1
2
1
1
1
2
1
1
1
2
1
1

5.88
5.50
5.87
5.50
5.50
38.60
17.12
17.12
1.56
38.62
17.12
17.12
1.56
Area=
Area=

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
17.99
17.42

ABJ-03

Area=

17.42

Arco Final
Arco Final
Jirn 28 de Julio
Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco
AVJ L.I.-01

AVJ L.D.-01

Jirn Sucre

9.60
4.35
4.36
0.78
2.38
2.30
99.25
1.47
1.38
1.47
1.38
2.75
9.65
4.28
4.28
0.78
9.66
4.28
4.28
0.78
17.99
17.42
17.42
110.42

Arco

5.50

0.25

2.75

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco

5.12

0.25

2.56

AVS L.I.-01

38.04

0.25

9.51

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

38.07

0.25

9.52

17.41

0.25

4.35

17.41

0.25

4.35

1.56

0.25

0.78

ABS-01

Area=

15.74

15.74

ABS-02

Area=

15.71

15.71

ABS-03

Area=

15.17

15.17

ABS-04

Area=

15.18

AVS L.D.-01

Jirn Ramn Castilla

15.18
110.24

Arco

5.50

0.25

2.75

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco

5.12

0.25

2.56

AVRC L.I.-01

37.59

0.25

9.40

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

37.62

0.25

9.41

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

ABRC-01

Area=

15.74

15.74

ABRC-02

Area=

15.74

15.74

ABRC-03

Area=

15.18

15.18

ABRC-04

Area=

15.18

15.18

AVRC L.D.-01

Jirn Bolivar

183.27
Arco

5.50

0.25

2.75

Arco Inicial

5.50

0.25

1.38

Arco Final

5.13

0.25

1.28

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco Inicial

5.12

0.25

1.28

Arco Final

5.12

0.25

1.28

Arco Inicial

5.12

0.25

1.28

Arco Final

5.12

0.25

1.28

Arco

5.12

0.25

2.56

AVB L.I.-01

37.14

0.25

9.29

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

37.17

0.25

9.29

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

37.67

0.25

9.42

17.41

0.25

4.35

17.42

0.25

4.36

1.56

0.25

0.78

37.58

0.25

9.40

17.42

0.25

4.36

17.42

0.25

4.36

1.56

0.25

0.78

ABB-01

Area=

15.74

15.74

ABB-02

Area=

15.74

15.74

ABB-03

Area=

15.18

15.18

ABB-04

Area=

15.19

15.19

ABB-05

Area=

15.18

15.18

ABB-06

Area=

15.15

AVB L.D.-01

AVB L.I.-02

AVB L.D.-02

Jirn Sebastin Chipana

15.15
169.75

Arco

4.38

0.25

2.19

Lado Izq.

75.34

0.25

18.84

Arco Inicial

4.38

0.25

1.10

Arco Final

3.97

0.25

0.99

Lado Der.

75.36

0.25

18.84

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

77.71

0.25

19.43

Arco Inicial

4.01

0.25

1.00

Arco Final

4.01

0.25

1.00

Lado Der.

77.73

0.25

19.43

Arco Inicial

4.01

0.25

1.00

Arco Final

4.01

0.25

1.00

Arco

4.01

0.25

2.01

ABSCH-01

Area=

13.83

13.83

ABSCH-02

Area=

13.83

13.83

ABSCH-03

Area=

13.29

13.29

ABSCH-04

Area=

13.29

13.29

ABSCH-05

Area=

13.46

13.46

ABSCH-06

Area=

13.12

Calle San Martn

13.12
130.22

Arco Inicial

9.91

0.25

2.48

Arco Final

5.88

0.25

1.47

Arco Inicial

9.73

0.25

2.43

Arco Final

5.88

0.25

1.47

Arco Inicial

5.80

0.25

1.45

Arco Final

9.80

0.25

2.45

Arco Inicial

5.89

0.25

1.47

AVSM L.I.-01

55.89

0.25

13.97

17.11

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

55.83

0.25

13.96

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

36.10

0.25

9.03

17.11

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

36.35

0.25

9.09

17.12

0.25

4.28

17.12

0.25

4.28

1.56

0.25

0.78

ABSM-01

Area=

16.81

16.81

ABSM-02

Area=

16.79

16.79

AVSM L.D.-01

AVSM L.I.-02

AVSM L.D.-02

Jirn Lima

91.98
Arco

5.50

0.25

2.75

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

Arco Inicial

5.50

0.25

1.38

Arco Final

5.12

0.25

1.28

AVL L.I.-01

36.56

0.25

9.14

17.41

0.25

4.35

17.42

0.25

4.36

1.56

0.25

0.78

36.52

0.25

9.13

17.41

0.25

4.35

17.42

0.25

4.36

AVL L.D.-01

1.56

0.25

0.78

ABL-01

Area=

15.74

15.74

ABL-02

Area=

15.75

15.75

ABL-03

Area=

15.18

Jirn Huancayo

15.18
140.75

Arco

4.38

0.25

2.19

Lado Izq.

75.63

0.25

18.91

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

75.60

0.25

18.90

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.50

0.25

1.63

Lado Der.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.53

0.25

1.63

ABH-01

Area=

13.84

13.84

ABH-02

Area=

13.83

13.83

ABH-03

Area=

13.29

13.29

ABH-04

Area=

13.29

Jirn Catalina Huanca

13.29
140.96

Arco

4.38

0.25

2.19

Lado Izq.

76.07

0.25

19.02

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

76.04

0.25

19.01

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.55

0.25

1.64

Lado Der.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.49

0.25

1.62

ABCH-01

Area=

13.83

13.83

ABCH-02

Area=

13.83

13.83

ABCH-03

Area=

13.29

13.29

ABCH-04

Area=

13.29

Jirn Alfonso Ugarte

13.29
141.18

Arco

4.37

0.25

2.19

Lado Izq.

76.51

0.25

19.13

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

76.49

0.25

19.12

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.10

0.25

18.53

Arco Inicial

4.01

0.25

1.00

Arco Final

6.55

0.25

1.64

Lado Der.

74.09

0.25

18.52

Arco Inicial

4.01

0.25

1.00

Arco Final

6.49

0.25

1.62

ABAU-01

Area=

13.83

13.83

ABAU-02

Area=

13.83

13.83

ABAU-03

Area=

13.29

13.29

ABAU-04

Area=

13.29

Jirn 27 de Mayo

13.29
141.77

Arco

4.38

0.25

2.19

Lado Izq.

77.12

0.25

19.28

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

77.09

0.25

19.27

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.27

0.25

18.57

Arco Inicial

4.01

0.25

1.00

Arco Final

6.81

0.25

1.70

Lado Der.

74.27

0.25

18.57

Arco Inicial

4.01

0.25

1.00

Arco Final

6.23

0.25

1.56

AB27M-01

Area=

13.90

13.90

AB27M-02

Area=

13.85

13.85

AB27M-03

Area=

13.37

13.37

AB27M-04

Area=

13.31

13.31

Jirn Santa Cruz

125.99
Lado Izq.

77.74

0.25

19.44

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Der.

77.71

0.25

19.43

Arco Inicial

4.38

0.25

1.10

Arco Final

4.01

0.25

1.00

Lado Izq.

74.33

0.25

18.58

Arco Inicial

4.01

0.25

1.00

Arco Final

6.86

0.25

1.72

Lado Der.

74.33

0.25

18.58

Arco Inicial

4.01

0.25

1.00

Arco Final

6.19

0.25

1.55

ABSC-01

Area=

13.86

13.86

ABSC-02

Area=

13.32

13.32

ABSC-03

Area=

13.32

13.32

02.00 MOVIMIENTO DE TIERRAS


02.01 Excavacin de Zanja para Cunetas

393.86

Jr. Los Incas (Tramo 28 de Julio - San Martn)

47.28

Arco

3.13

0.25

0.20

0.16

AVI L.I.-01

80.28

0.25

0.20

4.01

17.11

0.25

0.20

0.86

17.13

0.25

0.20

0.86

1.56

0.25

0.20

0.16

80.27

0.25

0.20

4.01

17.12

0.25

0.20

0.86

17.11

0.25

0.20

0.86

1.56

0.25

0.20

0.16

55.81

0.25

0.20

2.79

17.11

0.25

0.20

0.86

17.10

0.25

0.20

0.86

1.56

0.25

0.20

0.16

55.72

0.25

0.20

2.79

17.12

0.25

0.20

0.86

17.11

0.25

0.20

0.86

1.56

0.25

0.20

0.16

55.34

0.25

0.20

2.77

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

55.34

0.25

0.20

2.77

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

54.39

0.25

0.20

2.72

17.12

0.25

0.20

0.86

AVI L.D.-01

AVI L.I.-02

AVI L.D.-02

AVI L.I.-03

AVI L.D.-03

AVI L.I.-04

AVI L.D.-04

AVI L.I.-05

AVI L.D.-05

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

54.39

0.25

0.20

2.72

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

38.65

0.25

0.20

1.93

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

38.64

0.25

0.20

1.93

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

Jr. Los Incas (Tramo San Martn-Chacamarca)

0.16
49.64

Arco

7.66

0.25

0.20

0.38

Arco

8.21

0.25

0.20

0.41

AVI L.I.-06

35.89

0.25

0.20

1.79

17.12

0.25

0.20

1.71

1.56

0.25

0.20

0.16

36.05

0.25

0.20

1.80

17.12

0.25

0.20

1.71

1.56

0.25

0.20

0.16

39.58

0.25

0.20

1.98

17.12

0.25

0.20

1.71

1.56

0.25

0.20

0.16

39.41

0.25

0.20

1.97

17.12

0.25

0.20

1.71

1.56

0.25

0.20

0.16

38.61

0.25

0.20

1.93

17.12

0.25

0.20

1.71

1.56

0.25

0.20

0.16

1
1

38.68
17.12

0.25
0.25

0.20
0.20

1.93
0.86

2
1
1
2

1.56
39.57
17.12
1.56

0.25
0.25
0.25
0.25

0.20
0.20
0.20
0.20

0.16
1.98
0.86
0.16

1
1
2
1
1
2
1
1
2

39.57
17.12
1.56
33.12
17.12
1.56
33.56
17.12
1.56

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.98
0.86
0.16
1.66
0.86
0.16
1.68
0.86
0.16

1
1
2
1
1

62.32
17.12
1.56
62.40
17.12

0.25
0.25
0.25
0.25
0.25

0.20
0.20
0.20
0.20
0.20

3.12
0.86
0.16
3.12
0.86

2
1
1
2

1.56
54.64
17.12
1.56

0.25
0.25
0.25
0.25

0.20
0.20
0.20
0.20

0.16
2.73
0.86
0.16

1
1
2

54.49
17.12
1.56

0.25
0.25
0.25

0.20
0.20
0.20

2.72
0.86
0.16

AVI L.D.-06

AVI L.I.-07

AVI L.D.-07

AVI L.I.-08

AVI L.D.-08

AVI L.I.-09

AVI L.D.-09

AVI L.I.-10

AVI L.D.-10

AVI L.I.-11

AVI L.D.-11

AVI L.I.-12

AVI L.D.-12

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)


AVFB L.I.-01

48.25
1

80.28

0.25

0.20

4.01

17.42

0.25

0.20

0.87

17.40

0.25

0.20

0.87

1.56

0.25

0.20

0.16

80.28

0.25

0.20

4.01

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

54.83

0.25

0.20

2.74

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

54.76

0.25

0.20

2.74

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

55.34

0.25

0.20

2.77

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

55.34

0.25

0.20

2.77

17.42

0.25

0.20

0.87

17.37

0.25

0.20

0.87

1.56

0.25

0.20

0.16

54.40

0.25

0.20

2.72

17.42

0.25

0.20

0.87

17.41

0.25

0.20

0.87

1.56

0.25

0.20

0.16

54.40

0.25

0.20

2.72

17.46

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

38.52

0.25

0.20

1.93

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

38.51

0.25

0.20

1.93

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

Arco Final

9.39

0.25

0.20

0.47

Arco Final

9.30

0.25

0.20

AVFB L.D.-01

AVFB L.I.-02

AVFB L.D.-02

AVFB L.I.-03

AVFB L.D.-03

AVFB L.I.-04

AVFB L.D.-04

AVFB L.I.-05

AVFB L.D.-05

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

0.47
51.07

Arco Inicio

7.88

0.25

0.20

0.39

AVFB L.I.-06

37.36

0.25

0.20

1.87

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

37.20

0.25

0.20

1.86

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

39.57

0.25

0.20

1.98

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

39.64

0.25

0.20

1.98

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

AVFB L.D.-06

AVFB L.I.-07

AVFB L.D.-07

1.56

0.25

0.20

0.16

39.57

0.25

0.20

1.98

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

39.57

0.25

0.20

1.98

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

39.03

0.25

0.20

1.95

17.42

0.25

0.20

0.87

17.41

0.25

0.20

0.87

1.56

0.25

0.20

0.16

39.44

0.25

0.20

1.97

17.42

0.25

0.20

0.87

17.41

0.25

0.20

0.87

1.56

0.25

0.20

0.16

63.41

0.25

0.20

3.17

17.41

0.25

0.20

0.87

17.40

0.25

0.20

0.87

1.56

0.25

0.20

0.16

63.48

0.25

0.20

3.17

17.41

0.25

0.20

0.87

17.41

0.25

0.20

0.87

1.56

0.25

0.20

0.16

52.57

0.25

0.20

2.63

17.41

0.25

0.20

0.87

17.41

0.25

0.20

0.87

1.56

0.25

0.20

0.16

52.42

0.25

0.20

2.62

17.40

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

Arco Final

7.19

0.25

0.20

0.36

Arco Final

7.74

0.25

0.20

AVFB L.I.-08

AVFB L.D.-08

AVFB L.I.-09

AVFB L.D.-09

AVFB L.I.-10

AVFB L.D.-10

AVFB L.I.-11

AVFB L.D.-11

Jirn Los Andes (Tramo Bolivar - San Martn)


AVLA L.I.-01

0.39
17.95

55.79

0.25

0.20

2.79

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

55.90

0.25

0.20

2.80

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

38.41

0.25

0.20

1.92

17.42

0.25

0.20

0.87

17.41

0.25

0.20

0.87

1.56

0.25

0.20

0.16

38.40

0.25

0.20

1.92

17.41

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

Arco Final

9.51

0.25

0.20

0.48

Arco Final

9.19

0.25

0.20

0.46

Arco Inicial

5.88

0.25

0.20

0.29

Arco Final

5.50

0.25

0.20

0.28

Arco Inicial

5.87

0.25

0.20

0.29

Arco Final

5.50

0.25

0.20

0.28

Arco

5.50

0.25

0.20

0.55

AVJ L.I.-01

38.60

0.25

0.20

1.93

AVLA L.D.-01

AVLA L.I.-02

AVLA L.D.-02

Jirn 28 de Julio

9.28

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

38.62

0.25

0.20

1.93

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

Arco

5.50

0.25

0.20

0.55

Arco Inicial

5.50

0.25

0.20

0.28

Arco Final

5.12

0.25

0.20

0.26

Arco Inicial

5.50

0.25

0.20

0.28

Arco Final

5.12

0.25

0.20

0.26

Arco

5.12

0.25

0.20

0.51

AVS L.I.-01

38.04

0.25

0.20

1.90

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

38.07

0.25

0.20

1.90

17.41

0.25

0.20

0.87

17.41

0.25

0.20

0.87

1.56

0.25

0.20

0.16

Arco

5.50

0.25

0.20

0.55

Arco Inicial

5.50

0.25

0.20

0.28

Arco Final

5.12

0.25

0.20

0.26

Arco Inicial

5.50

0.25

0.20

0.28

Arco Final

5.12

0.25

0.20

0.26

Arco

5.12

0.25

0.20

0.51

AVRC L.I.-01

37.59

0.25

0.20

1.88

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

37.62

0.25

0.20

1.88

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

Arco

5.50

0.25

0.20

0.55

Arco Inicial

5.50

0.25

0.20

0.28

AVJ L.D.-01

Jirn Sucre

9.72

AVS L.D.-01

Jirn Ramn Castilla

9.68

AVRC L.D.-01

Jirn Bolivar

18.22

Arco Final

5.13

0.25

0.20

0.26

Arco Inicial

5.50

0.25

0.20

0.28

Arco Final

5.12

0.25

0.20

0.26

Arco Inicial

5.12

0.25

0.20

0.26

Arco Final

5.12

0.25

0.20

0.26

Arco Inicial

5.12

0.25

0.20

0.26

Arco Final

5.12

0.25

0.20

0.26

Arco

5.12

0.25

0.20

0.51

AVB L.I.-01

37.14

0.25

0.20

1.86

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

37.17

0.25

0.20

1.86

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

37.67

0.25

0.20

1.88

17.41

0.25

0.20

0.87

AVB L.D.-01

AVB L.I.-02

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

37.58

0.25

0.20

1.88

17.42

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

Arco

4.38

0.25

0.20

0.44

AVB L.D.-02

Jirn Sebastin Chipana

17.79
Lado Izq.

75.34

0.25

0.20

3.77

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

3.97

0.25

0.20

0.20

Lado Der.

75.36

0.25

0.20

3.77

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Izq.

77.71

0.25

0.20

3.89

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

4.01

0.25

0.20

0.20

Lado Der.

77.73

0.25

0.20

3.89

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

4.01

0.25

0.20

0.20

Arco

4.01

0.25

0.20

Calle San Martn

0.40
19.32

Arco Inicial

9.91

0.25

0.20

0.50

Arco Final

5.88

0.25

0.20

0.29

Arco Inicial

9.73

0.25

0.20

0.49

Arco Final

5.88

0.25

0.20

0.29

Arco Inicial

5.80

0.25

0.20

0.29

Arco Final

9.80

0.25

0.20

0.49

Arco Inicial

5.89

0.25

0.20

0.29

AVSM L.I.-01

55.89

0.25

0.20

2.79

17.11

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

55.83

0.25

0.20

2.79

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

36.10

0.25

0.20

1.81

17.11

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

36.35

0.25

0.20

1.82

17.12

0.25

0.20

0.86

17.12

0.25

0.20

0.86

1.56

0.25

0.20

0.16

AVSM L.D.-01

AVSM L.I.-02

AVSM L.D.-02

Jirn Lima

9.06
Arco

5.50

0.25

0.20

0.55

Arco Inicial

5.50

0.25

0.20

0.28

Arco Final

5.12

0.25

0.20

0.26

Arco Inicial

5.50

0.25

0.20

0.28

Arco Final

5.12

0.25

0.20

0.26

AVL L.I.-01

36.56

0.25

0.20

1.83

AVL L.D.-01

17.41

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

0.16

36.52

0.25

0.20

1.83

17.41

0.25

0.20

0.87

17.42

0.25

0.20

0.87

1.56

0.25

0.20

Jirn Huancayo

0.16
17.30

Arco

4.38

0.25

0.20

0.44

Lado Izq.

75.63

0.25

0.20

3.78

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Der.

75.60

0.25

0.20

3.78

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Izq.

74.09

0.25

0.20

3.70

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.50

0.25

0.20

0.33

Lado Der.

74.09

0.25

0.20

3.70

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.53

0.25

0.20

Jirn Catalina Huanca

0.33
17.34

Arco

4.38

0.25

0.20

0.44

Lado Izq.

76.07

0.25

0.20

3.80

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Der.

76.04

0.25

0.20

3.80

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Izq.

74.09

0.25

0.20

3.70

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.55

0.25

0.20

0.33

Lado Der.

74.09

0.25

0.20

3.70

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.49

0.25

0.20

0.32

Arco

4.37

0.25

0.20

0.44

Lado Izq.

76.51

0.25

0.20

3.83

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Jirn Alfonso Ugarte

17.39

Lado Der.

76.49

0.25

0.20

3.82

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Izq.

74.10

0.25

0.20

3.71

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.55

0.25

0.20

0.33

Lado Der.

74.09

0.25

0.20

3.70

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.49

0.25

0.20

Jirn 27 de Mayo

0.32
17.47

Arco

4.38

0.25

0.20

0.44

Lado Izq.

77.12

0.25

0.20

3.86

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Der.

77.09

0.25

0.20

3.85

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Izq.

74.27

0.25

0.20

3.71

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.81

0.25

0.20

0.34

Lado Der.

74.27

0.25

0.20

3.71

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.23

0.25

0.20

Jirn Santa Cruz

0.31
17.10

Lado Izq.

77.74

0.25

0.20

3.89

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Der.

77.71

0.25

0.20

3.89

Arco Inicial

4.38

0.25

0.20

0.22

Arco Final

4.01

0.25

0.20

0.20

Lado Izq.

74.33

0.25

0.20

3.72

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.86

0.25

0.20

0.34

Lado Der.

74.33

0.25

0.20

3.72

Arco Inicial

4.01

0.25

0.20

0.20

Arco Final

6.19

0.25

0.20

0.31

02.02 Excavacin de Zanja para Badenes

206.22

Jirn 28 de Julio

15.85
ABJ-01

Area=

17.99

0.30

5.40

ABJ-02

Area=

17.42

0.30

5.23

ABJ-03

Area=

17.42

0.30

Jirn Sucre

5.23
18.54

ABS-01

Area=

15.74

0.30

4.72

ABS-02

Area=

15.71

0.30

4.71

ABS-03

Area=

15.17

0.30

4.55

ABS-04

Area=

15.18

0.30

Jirn Ramn Castilla

4.55
18.55

ABRC-01

Area=

15.74

0.30

4.72

ABRC-02

Area=

15.74

0.30

4.72

ABRC-03

Area=

15.18

0.30

4.55

ABRC-04

Area=

15.18

0.30

Jirn Bolivar

4.55
27.65

ABB-01

Area=

15.74

0.30

4.72

ABB-02

Area=

15.74

0.30

4.72

ABB-03

Area=

15.18

0.30

4.55

ABB-04

Area=

15.19

0.30

4.56

ABB-05

Area=

15.18

0.30

4.55

ABB-06

Area=

15.15

0.30

Jirn Sebastin Chipana

4.55
24.25

ABSCH-01

Area=

13.83

0.30

4.15

ABSCH-02

Area=

13.83

0.30

4.15

ABSCH-03

Area=

13.29

0.30

3.99

ABSCH-04

Area=

13.29

0.30

3.99

ABSCH-05

Area=

13.46

0.30

4.04

ABSCH-06

Area=

13.12

0.30

Calle San Martn

3.94
10.08

ABSM-01

Area=

16.81

0.30

5.04

ABSM-02

Area=

16.79

0.30

ABL-01

Area=

15.74

0.30

4.72

ABL-02

Area=

15.75

0.30

4.73

ABL-03

Area=

15.18

0.30

4.55

ABH-01

Area=

13.84

0.30

4.15

ABH-02

Area=

13.83

0.30

4.15

ABH-03

Area=

13.29

0.30

3.99

ABH-04

Area=

13.29

0.30

Jirn Lima

5.04
14.00

Jirn Huancayo

16.28

Jirn Catalina Huanca

3.99
16.27

ABCH-01

Area=

13.83

0.30

4.15

ABCH-02

Area=

13.83

0.30

4.15

ABCH-03

Area=

13.29

0.30

3.99

ABCH-04

Area=

13.29

0.30

Jirn Alfonso Ugarte

3.99
16.27

ABAU-01

Area=

13.83

0.30

4.15

ABAU-02

Area=

13.83

0.30

4.15

ABAU-03

Area=

13.29

0.30

3.99

ABAU-04

Area=

13.29

0.30

Jirn 27 de Mayo

3.99
16.33

AB27M-01

Area=

13.90

0.30

4.17

AB27M-02

Area=

13.85

0.30

4.16

AB27M-03

Area=

13.37

0.30

4.01

AB27M-04

Area=

13.31

0.30

3.99

ABSC-01

Area=

13.86

0.30

4.16

ABSC-02

Area=

13.32

0.30

4.00

ABSC-03

Area=

13.32

0.30

4.00

Jirn Santa Cruz

12.15

02.03 Base Granular Compactado E=0.10 m.

687.40

Jirn 28 de Julio

52.83
ABJ-01

Area=

17.99

17.99

ABJ-02

Area=

17.42

17.42

ABJ-03

Area=

17.42

17.42

ABS-01

Area=

15.74

15.74

ABS-02

Area=

15.71

15.71

ABS-03

Area=

15.17

15.17

ABS-04

Area=

15.18

15.18

Jirn Sucre

61.80

Jirn Ramn Castilla

61.84
ABRC-01

Area=

15.74

15.74

ABRC-02

Area=

15.74

15.74

ABRC-03

Area=

15.18

15.18

ABRC-04

Area=

15.18

15.18

ABB-01

Area=

15.74

15.74

ABB-02

Area=

15.74

15.74

ABB-03

Area=

15.18

15.18

ABB-04

Area=

15.19

15.19

ABB-05

Area=

15.18

15.18

ABB-06

Area=

15.15

15.15

Jirn Bolivar

92.18

Jirn Sebastin Chipana

80.82
ABSCH-01

Area=

13.83

13.83

ABSCH-02

Area=

13.83

13.83

ABSCH-03

Area=

13.29

13.29

ABSCH-04

Area=

13.29

13.29

ABSCH-05

Area=

13.46

13.46

ABSCH-06

Area=

13.12

13.12

ABSM-01

Area=

16.81

16.81

ABSM-02

Area=

16.79

16.79

Calle San Martn

33.60

Jirn Lima

46.67
ABL-01

Area=

15.74

15.74

ABL-02

Area=

15.75

15.75

ABL-03

Area=

15.18

15.18

Jirn Huancayo

54.25
ABH-01

Area=

13.84

13.84

ABH-02

Area=

13.83

13.83

ABH-03

Area=

13.29

13.29

ABH-04

Area=

13.29

13.29

ABCH-01

Area=

13.83

13.83

ABCH-02

Area=

13.83

13.83

ABCH-03

Area=

13.29

13.29

ABCH-04

Area=

13.29

13.29

ABAU-01

Area=

13.83

13.83

ABAU-02

Area=

13.83

13.83

ABAU-03

Area=

13.29

13.29

ABAU-04

Area=

13.29

13.29

AB27M-01

Area=

13.90

13.90

AB27M-02

Area=

13.85

13.85

AB27M-03

Area=

13.37

13.37

AB27M-04

Area=

13.31

13.31

Jirn Catalina Huanca

54.24

Jirn Alfonso Ugarte

54.24

Jirn 27 de Mayo

54.43

Jirn Santa Cruz

40.50
ABSC-01

Area=

13.86

13.86

ABSC-02

Area=

13.32

13.32

ABSC-03

Area=

13.32

13.32

02.04 Eliminacin de Material Excedente (Maquinaria)

F(e)

Total excavacin

20%

600.08

Excavacion de Zanja para Cunetas

393.86

Excavacin de Zanja para Badenes

206.22

120.02

720.09

315.09

720.09

03.00 CUNETAS
03.01 Concreto f'c=175 kg/cm2 para Cunetas
Jr. Los Incas (Tramo 28 de Julio - San Martn)

37.82

Arco

3.13

Area=

0.04

0.13

AVI L.I.-01

80.28

Area=

0.04

3.21

17.11

Area=

0.04

0.68

17.13

Area=

0.04

0.69

1.56

Area=

0.04

0.12

80.27

Area=

0.04

3.21

17.12

Area=

0.04

0.68

17.11

Area=

0.04

0.68

1.56

Area=

0.04

0.12

55.81

Area=

0.04

2.23

AVI L.D.-01

AVI L.I.-02

AVI L.D.-02

AVI L.I.-03

AVI L.D.-03

AVI L.I.-04

AVI L.D.-04

AVI L.I.-05

AVI L.D.-05

17.11

Area=

0.04

0.68

17.10

Area=

0.04

0.68

1.56

Area=

0.04

0.12

55.72

Area=

0.04

2.23

17.12

Area=

0.04

0.68

17.11

Area=

0.04

0.68

1.56

Area=

0.04

0.12

55.34

Area=

0.04

2.21

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

55.34

Area=

0.04

2.21

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

54.39

Area=

0.04

2.18

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

54.39

Area=

0.04

2.18

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

38.65

Area=

0.04

1.55

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

38.64

Area=

0.04

1.55

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

Jr. Los Incas (Tramo San Martn-Chacamarca)

0.12
39.71

Arco

7.66

Area=

0.04

0.31

Arco

8.21

Area=

0.04

0.33

AVI L.I.-06

35.89

Area=

0.04

1.44

17.12

Area=

0.04

1.37

1.56

Area=

0.04

0.12

36.05

Area=

0.04

1.44

17.12

Area=

0.04

1.37

1.56

Area=

0.04

0.12

39.58

Area=

0.04

1.58

17.12

Area=

0.04

1.37

1.56

Area=

0.04

0.12

39.41

Area=

0.04

1.58

17.12

Area=

0.04

1.37

1.56

Area=

0.04

0.12

38.61

Area=

0.04

1.54

17.12

Area=

0.04

1.37

1.56

Area=

0.04

0.12

38.68

Area=

0.04

1.55

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

39.57

Area=

0.04

1.58

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

39.57

Area=

0.04

1.58

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

33.12

Area=

0.04

1.32

17.12

Area=

0.04

0.68

AVI L.D.-06

AVI L.I.-07

AVI L.D.-07

AVI L.I.-08

AVI L.D.-08

AVI L.I.-09

AVI L.D.-09

AVI L.I.-10

AVI L.D.-10

AVI L.I.-11

AVI L.D.-11

AVI L.I.-12

AVI L.D.-12

1.56

Area=

0.04

0.12

33.56

Area=

0.04

1.34

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

62.32

Area=

0.04

2.49

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

62.40

Area=

0.04

2.50

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

54.64

Area=

0.04

2.19

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

54.49

Area=

0.04

2.18

17.12

Area=

0.04

0.68

1.56

Area=

0.04

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)


AVFB L.I.-01

0.12
38.60

80.28

Area=

0.04

3.21

17.42

Area=

0.04

0.70

17.40

Area=

0.04

0.70

1.56

Area=

0.04

0.12

80.28

Area=

0.04

3.21

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

54.83

Area=

0.04

2.19

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

54.76

Area=

0.04

2.19

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

55.34

Area=

0.04

2.21

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

55.34

Area=

0.04

2.21

17.42

Area=

0.04

0.70

17.37

Area=

0.04

0.69

1.56

Area=

0.04

0.12

54.40

Area=

0.04

2.18

17.42

Area=

0.04

0.70

17.41

Area=

0.04

0.70

1.56

Area=

0.04

0.12

54.40

Area=

0.04

2.18

17.46

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

38.52

Area=

0.04

1.54

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

38.51

Area=

0.04

1.54

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

Arco Final

9.39

Area=

0.04

0.38

Arco Final

9.30

Area=

0.04

0.37

AVFB L.D.-01

AVFB L.I.-02

AVFB L.D.-02

AVFB L.I.-03

AVFB L.D.-03

AVFB L.I.-04

AVFB L.D.-04

AVFB L.I.-05

AVFB L.D.-05

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

40.86

Arco Inicio

7.88

Area=

0.04

0.32

AVFB L.I.-06

37.36

Area=

0.04

1.49

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

37.20

Area=

0.04

1.49

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

39.57

Area=

0.04

1.58

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

39.64

Area=

0.04

1.59

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

39.57

Area=

0.04

1.58

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

39.57

Area=

0.04

1.58

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

39.03

Area=

0.04

1.56

17.42

Area=

0.04

0.70

17.41

Area=

0.04

0.70

1.56

Area=

0.04

0.12

39.44

Area=

0.04

1.58

17.42

Area=

0.04

0.70

17.41

Area=

0.04

0.70

1.56

Area=

0.04

0.12

63.41

Area=

0.04

2.54

17.41

Area=

0.04

0.70

17.40

Area=

0.04

0.70

1.56

Area=

0.04

0.12

63.48

Area=

0.04

2.54

17.41

Area=

0.04

0.70

17.41

Area=

0.04

0.70

1.56

Area=

0.04

0.12

52.57

Area=

0.04

2.10

17.41

Area=

0.04

0.70

17.41

Area=

0.04

0.70

1.56

Area=

0.04

0.12

52.42

Area=

0.04

2.10

17.40

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

Arco Final

7.19

Area=

0.04

0.29

Arco Final

7.74

Area=

0.04

AVFB L.D.-06

AVFB L.I.-07

AVFB L.D.-07

AVFB L.I.-08

AVFB L.D.-08

AVFB L.I.-09

AVFB L.D.-09

AVFB L.I.-10

AVFB L.D.-10

AVFB L.I.-11

AVFB L.D.-11

Jirn Los Andes (Tramo Bolivar - San Martn)


AVLA L.I.-01

AVLA L.D.-01

0.31
14.36

55.79

Area=

0.04

2.23

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

55.90

Area=

0.04

2.24

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

38.41

Area=

0.04

1.54

17.42

Area=

0.04

0.70

17.41

Area=

0.04

0.70

1.56

Area=

0.04

0.12

38.40

Area=

0.04

1.54

17.41

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

Arco Final

9.51

Area=

0.04

0.38

Arco Final

9.19

Area=

0.04

0.37

Arco Inicial

5.88

Area=

0.04

0.24

Arco Final

5.50

Area=

0.04

0.22

Arco Inicial

5.87

Area=

0.04

0.23

Arco Final

5.50

Area=

0.04

0.22

Arco

5.50

Area=

0.04

0.44

AVJ L.I.-01

38.60

Area=

0.04

1.54

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

38.62

Area=

0.04

1.54

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

Arco

5.50

Area=

0.04

0.44

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.12

Area=

0.04

0.20

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.12

Area=

0.04

0.20

Arco

5.12

Area=

0.04

0.41

AVS L.I.-01

38.04

Area=

0.04

1.52

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

38.07

Area=

0.04

1.52

17.41

Area=

0.04

0.70

17.41

Area=

0.04

0.70

1.56

Area=

0.04

0.12

Arco

5.50

Area=

0.04

0.44

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.12

Area=

0.04

0.20

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.12

Area=

0.04

0.20

Arco

5.12

Area=

0.04

0.41

AVRC L.I.-01

37.59

Area=

0.04

1.50

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

37.62

Area=

0.04

1.50

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

AVLA L.I.-02

AVLA L.D.-02

Jirn 28 de Julio

7.43

AVJ L.D.-01

Jirn Sucre

7.78

AVS L.D.-01

Jirn Ramn Castilla

7.74

AVRC L.D.-01

Jirn Bolivar

0.12
14.57

Arco

5.50

Area=

0.04

0.44

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.13

Area=

0.04

0.21

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.12

Area=

0.04

0.20

Arco Inicial

5.12

Area=

0.04

0.20

Arco Final

5.12

Area=

0.04

0.20

Arco Inicial

5.12

Area=

0.04

0.20

Arco Final

5.12

Area=

0.04

0.20

Arco

5.12

Area=

0.04

0.41

AVB L.I.-01

37.14

Area=

0.04

1.49

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

37.17

Area=

0.04

1.49

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

37.67

Area=

0.04

1.51

17.41

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

37.58

Area=

0.04

1.50

17.42

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

AVB L.D.-01

AVB L.I.-02

AVB L.D.-02

Jirn Sebastin Chipana

0.12
14.23

Arco

4.38

Area=

0.04

0.35

Lado Izq.

75.34

Area=

0.04

3.01

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

3.97

Area=

0.04

0.16

Lado Der.

75.36

Area=

0.04

3.01

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Izq.

77.71

Area=

0.04

3.11

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

4.01

Area=

0.04

0.16

Lado Der.

77.73

Area=

0.04

3.11

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

4.01

Area=

0.04

0.16

Arco

4.01

Area=

0.04

Calle San Martn

0.32
15.46

Arco Inicial

9.91

Area=

0.04

0.40

Arco Final

5.88

Area=

0.04

0.24

Arco Inicial

9.73

Area=

0.04

0.39

Arco Final

5.88

Area=

0.04

0.24

Arco Inicial

5.80

Area=

0.04

0.23

Arco Final

9.80

Area=

0.04

0.39

Arco Inicial

5.89

Area=

0.04

0.24

AVSM L.I.-01

55.89

Area=

0.04

2.24

17.11

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

55.83

Area=

0.04

2.23

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

36.10

Area=

0.04

1.44

17.11

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

36.35

Area=

0.04

1.45

17.12

Area=

0.04

0.68

17.12

Area=

0.04

0.68

1.56

Area=

0.04

0.12

AVSM L.D.-01

AVSM L.I.-02

AVSM L.D.-02

Jirn Lima

7.25
Arco

5.50

Area=

0.04

0.44

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.12

Area=

0.04

0.20

Arco Inicial

5.50

Area=

0.04

0.22

Arco Final

5.12

Area=

0.04

0.20

AVL L.I.-01

36.56

Area=

0.04

1.46

17.41

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

0.12

36.52

Area=

0.04

1.46

17.41

Area=

0.04

0.70

17.42

Area=

0.04

0.70

1.56

Area=

0.04

AVL L.D.-01

Jirn Huancayo

0.12
13.84

Arco

4.38

Area=

0.04

0.35

Lado Izq.

75.63

Area=

0.04

3.03

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Der.

75.60

Area=

0.04

3.02

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Izq.

74.09

Area=

0.04

2.96

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.50

Area=

0.04

0.26

Lado Der.

74.09

Area=

0.04

2.96

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.53

Area=

0.04

Jirn Catalina Huanca

0.26
13.88

Arco

4.38

Area=

0.04

0.35

Lado Izq.

76.07

Area=

0.04

3.04

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Der.

76.04

Area=

0.04

3.04

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Izq.

74.09

Area=

0.04

2.96

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.55

Area=

0.04

0.26

Lado Der.

74.09

Area=

0.04

2.96

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.49

Area=

0.04

Jirn Alfonso Ugarte

0.26
13.91

Arco

4.37

Area=

0.04

0.35

Lado Izq.

76.51

Area=

0.04

3.06

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Der.

76.49

Area=

0.04

3.06

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Izq.

74.10

Area=

0.04

2.96

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.55

Area=

0.04

0.26

Lado Der.

74.09

Area=

0.04

2.96

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.49

Area=

0.04

0.26

Arco

4.38

Area=

0.04

Jirn 27 de Mayo

13.97
0.35

Lado Izq.

77.12

Area=

0.04

3.08

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Der.

77.09

Area=

0.04

3.08

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Izq.

74.27

Area=

0.04

2.97

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.81

Area=

0.04

0.27

Lado Der.

74.27

Area=

0.04

2.97

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.23

Area=

0.04

Jirn Santa Cruz

0.25
13.68

Lado Izq.

77.74

Area=

0.04

3.11

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Der.

77.71

Area=

0.04

3.11

Arco Inicial

4.38

Area=

0.04

0.18

Arco Final

4.01

Area=

0.04

0.16

Lado Izq.

74.33

Area=

0.04

2.97

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.86

Area=

0.04

0.27

Lado Der.

74.33

Area=

0.04

2.97

Arco Inicial

4.01

Area=

0.04

0.16

Arco Final

6.19

Area=

0.04

0.25

03.02 Encofrado y Desencofrado Normal en Cunetas

70.48

Jr. Los Incas (Tramo 28 de Julio - San Martn)

8.68

Arco

Area=

0.04

0.04

AVI L.I.-01

27

Area=

0.04

1.08

AVI L.D.-01

27

Area=

0.04

1.08

AVI L.I.-02

21

Area=

0.04

0.84

AVI L.D.-02

21

Area=

0.04

0.84

AVI L.I.-03

21

Area=

0.04

0.84

AVI L.D.-03

21

Area=

0.04

0.84

AVI L.I.-04

21

Area=

0.04

0.84

AVI L.D.-04

21

Area=

0.04

0.84

AVI L.I.-05

18

Area=

0.04

0.72

AVI L.D.-05

18

Area=

0.04

0.72

Arco

Area=

0.04

0.08

Arco

Area=

0.04

0.08

AVI L.I.-06

13

Area=

0.04

0.52

AVI L.D.-06

13

Area=

0.04

0.52

Jr. Los Incas (Tramo San Martn-Chacamarca)

8.48

AVI L.I.-07

14

Area=

0.04

0.56

AVI L.D.-07

14

Area=

0.04

0.56

AVI L.I.-08

14

Area=

0.04

0.56

AVI L.D.-08

14

Area=

0.04

0.56

AVI L.I.-09

14

Area=

0.04

0.56

AVI L.D.-09

14

Area=

0.04

0.56

AVI L.I.-10

13

Area=

0.04

0.52

AVI L.D.-10

13

Area=

0.04

0.52

AVI L.I.-11

19

Area=

0.04

0.76

AVI L.D.-11

19

Area=

0.04

0.76

AVI L.I.-12

17

Area=

0.04

0.68

AVI L.D.-12

17

Area=

0.04

0.68

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

8.80

AVFB L.I.-01

27

Area=

0.04

1.08

AVFB L.D.-01

27

Area=

0.04

1.08

AVFB L.I.-02

21

Area=

0.04

0.84

AVFB L.D.-02

21

Area=

0.04

0.84

AVFB L.I.-03

21

Area=

0.04

0.84

AVFB L.D.-03

21

Area=

0.04

0.84

AVFB L.I.-04

21

Area=

0.04

0.84

AVFB L.D.-04

21

Area=

0.04

0.84

AVFB L.I.-05

18

Area=

0.04

0.72

AVFB L.D.-05

18

Area=

0.04

0.72

Arco Final

Area=

0.04

0.08

Arco Final

Area=

0.04

0.08

Arco Inicio

Area=

0.04

0.08

AVFB L.I.-06

17

Area=

0.04

0.68

AVFB L.D.-06

17

Area=

0.04

0.68

AVFB L.I.-07

18

Area=

0.04

0.72

AVFB L.D.-07

18

Area=

0.04

0.72

AVFB L.I.-08

18

Area=

0.04

0.72

AVFB L.D.-08

18

Area=

0.04

0.72

AVFB L.I.-09

18

Area=

0.04

0.72

AVFB L.D.-09

18

Area=

0.04

0.72

AVFB L.I.-10

23

Area=

0.04

0.92

AVFB L.D.-10

23

Area=

0.04

0.92

AVFB L.I.-11

21

Area=

0.04

0.84

AVFB L.D.-11

21

Area=

0.04

0.84

Arco Final

Area=

0.04

0.08

Arco Final

Area=

0.04

0.08

AVLA L.I.-01

21

Area=

0.04

0.84

AVLA L.D.-01

22

Area=

0.04

0.88

AVLA L.I.-02

18

Area=

0.04

0.72

AVLA L.D.-02

18

Area=

0.04

0.72

Arco Final

Area=

0.04

0.08

Arco Final

Area=

0.04

0.08

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco

Area=

0.04

0.04

AVJ L.I.-01

18

Area=

0.04

0.72

AVJ L.D.-01

18

Area=

0.04

0.72

Arco

Area=

0.04

0.04

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco

Area=

0.04

0.04

AVS L.I.-01

17

Area=

0.04

0.68

AVS L.D.-01

17

Area=

0.04

0.68

Arco

Area=

0.04

0.04

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco

Area=

0.04

0.04

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

9.44

Jirn Los Andes (Tramo Bolivar - San Martn)

3.32

Jirn 28 de Julio

1.64

Jirn Sucre

1.60

Jirn Ramn Castilla

1.52

AVRC L.I.-01

16

Area=

0.04

0.64

AVRC L.D.-01

16

Area=

0.04

0.64
2.96

Arco
Arco Inicial
Arco Final
Arco Inicial
Arco Final

1
1
1
1
1

Area=
Area=
Area=
Area=
Area=

0.04
0.04
0.04
0.04
0.04

0.04
0.04
0.04
0.04
0.04

Arco Inicial
Arco Final
Arco Inicial
Arco Final

1
1
1
1

Area=
Area=
Area=
Area=

0.04
0.04
0.04
0.04

0.04
0.04
0.04
0.04

Arco
AVB L.I.-01
AVB L.D.-01
AVB L.I.-02
AVB L.D.-02

1
16
16
16
16

Area=
Area=
Area=
Area=
Area=

0.04
0.04
0.04
0.04
0.04

Arco
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final
Arco

1
18
1
1
18
1
1
18
1
1
18
1
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04

Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco Inicial
AESM-01
AESM-02
AESM-03
AESM-04

2
1
2
1
1
2
1
20
20
16
16

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04

Arco
Arco Inicial
Arco Final
Arco Inicial
Arco Final
AEL-01
AEL-02

1
1
1
1
1
16
16

Area=
Area=
Area=
Area=
Area=
Area=
Area=

0.04
0.04
0.04
0.04
0.04
0.04
0.04

Arco
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final
Lado Izq.
Arco Inicial
Arco Final

1
18
1
1
18
1
1
17
1
1

Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=
Area=

0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04

0.04
0.64
0.64
0.64
0.64
3.28
0.04
0.72
0.04
0.04
0.72
0.04
0.04
0.72
0.04
0.04
0.72
0.04
0.04
0.04
3.28
0.08
0.04
0.08
0.04
0.04
0.08
0.04
0.80
0.80
0.64
0.64
1.48
0.04
0.04
0.04
0.04
0.04
0.64
0.64
3.16
0.04
0.72
0.04
0.04
0.72
0.04
0.04
0.68
0.04
0.04

Jirn Bolivar

Jirn Sebastin Chipana

Calle San Martn

Jirn Lima

Jirn Huancayo

Lado Der.
Arco Inicial

17
1

Area=
Area=

0.04
0.04

0.68
0.04

Arco Final

Area=

0.04

0.04

Arco

Area=

0.04

0.04

Jirn Catalina Huanca

3.16
Lado Izq.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Der.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Izq.

17

Area=

0.04

0.68

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Der.

17

Area=

0.04

0.68

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco

Area=

0.04

0.04

Lado Izq.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Der.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Jirn Alfonso Ugarte

3.16

Lado Izq.

17

Area=

0.04

0.68

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Der.

17

Area=

0.04

0.68

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Arco

Area=

0.04

0.04

Jirn 27 de Mayo

3.28
Lado Izq.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Der.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Izq.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.08

Lado Der.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Izq.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Der.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

Lado Izq.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Jirn Santa Cruz

3.24

Arco Final

Area=

0.04

0.08

Lado Der.

18

Area=

0.04

0.72

Arco Inicial

Area=

0.04

0.04

Arco Final

Area=

0.04

0.04

03.03 Tarrajeo en Cunetas (Mezcla 1:3)


Jr. Los Incas (Tramo 28 de Julio - San Martn)
Arco
AVI L.I.-01

AVI L.D.-01

AVI L.I.-02

AVI L.D.-02

AVI L.I.-03

AVI L.D.-03

AVI L.I.-04

AVI L.D.-04

AVI L.I.-05

AVI L.D.-05

Jr. Los Incas (Tramo San Martn-Chacamarca)


Arco
Arco
AVI L.I.-06

AVI L.D.-06

AVI L.I.-07

AVI L.D.-07

3,702.27
1
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2

3.13
80.28
17.11
17.13
1.56
80.27
17.12
17.11
1.56
55.81
17.11
17.10
1.56
55.72
17.12
17.11
1.56
55.34
17.12
17.12
1.56
55.34
17.12
17.12
1.56
54.39
17.12
17.12
1.56
54.39
17.12
17.12
1.56
38.65
17.12
17.12
1.56
38.64
17.12
17.12
1.56

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47

1
1
1
2
2
1
2
2
1
2
2
1
2

7.66
8.21
35.89
17.12
1.56
36.05
17.12
1.56
39.58
17.12
1.56
39.41
17.12

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47

444.39
1.47
37.73
8.04
8.05
1.47
37.73
8.05
8.04
1.47
26.23
8.04
8.04
1.47
26.19
8.05
8.04
1.47
26.01
8.05
8.05
1.47
26.01
8.05
8.05
1.47
25.56
8.05
8.05
1.47
25.56
8.05
8.05
1.47
18.17
8.05
8.05
1.47
18.16
8.05
8.05
1.47
466.58
3.60
3.86
16.87
16.09
1.47
16.94
16.09
1.47
18.60
16.09
1.47
18.52
16.09

AVI L.I.-08

AVI L.D.-08

AVI L.I.-09

AVI L.D.-09

AVI L.I.-10

AVI L.D.-10

AVI L.I.-11

AVI L.D.-11

AVI L.I.-12

AVI L.D.-12

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)


AVFB L.I.-01

AVFB L.D.-01

AVFB L.I.-02

AVFB L.D.-02

AVFB L.I.-03

AVFB L.D.-03

AVFB L.I.-04

AVFB L.D.-04

AVFB L.I.-05

2
1
2
2
1
1

1.56
38.61
17.12
1.56
38.68
17.12

0.47
0.47
0.47
0.47
0.47
0.47

1.47
18.15
16.09
1.47
18.18
8.05

2
1
1
2
1
1
2
1
1
2
1
1
2
1
1
2
1
1
2
1
1
2
1
1
2

1.56
39.57
17.12
1.56
39.57
17.12
1.56
33.12
17.12
1.56
33.56
17.12
1.56
62.32
17.12
1.56
62.40
17.12
1.56
54.64
17.12
1.56
54.49
17.12
1.56

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47

1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
1
1

80.28
17.42
17.40
1.56
80.28
17.42
17.42
1.56
54.83
17.42
17.42
1.56
54.76
17.42
17.42
1.56
55.34
17.42
17.42
1.56
55.34
17.42
17.37
1.56
54.40
17.42
17.41
1.56
54.40
17.46
17.42
1.56
38.52
17.42

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47

1.47
18.60
8.05
1.47
18.60
8.05
1.47
15.57
8.05
1.47
15.77
8.05
1.47
29.29
8.05
1.47
29.33
8.05
1.47
25.68
8.05
1.47
25.61
8.05
1.47
453.51
37.73
8.19
8.18
1.47
37.73
8.19
8.19
1.47
25.77
8.19
8.19
1.47
25.74
8.19
8.19
1.47
26.01
8.19
8.19
1.47
26.01
8.19
8.16
1.47
25.57
8.19
8.18
1.47
25.57
8.21
8.19
1.47
18.10
8.19

Arco Final

1
2
1
1
1
2
1

17.42
1.56
38.51
17.42
17.42
1.56
9.39

0.47
0.47
0.47
0.47
0.47
0.47
0.47

Arco Final

9.30

0.47

AVFB L.D.-05

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

8.19
1.47
18.10
8.19
8.19
1.47
4.41
4.37
480.10

Arco Inicio

7.88

0.47

3.70

AVFB L.I.-06

37.36

0.47

17.56

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

37.20

0.47

17.48

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

39.57

0.47

18.60

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

39.64

0.47

18.63

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

39.57

0.47

18.60

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

39.57

0.47

18.60

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

39.03

0.47

18.34

17.42

0.47

8.19

17.41

0.47

8.18

1.56

0.47

1.47

39.44

0.47

18.54

17.42

0.47

8.19

17.41

0.47

8.18

1.56

0.47

1.47

63.41

0.47

29.80

17.41

0.47

8.18

17.40

0.47

8.18

1.56

0.47

1.47

63.48

0.47

29.84

17.41

0.47

8.18

17.41

0.47

8.18

1.56

0.47

1.47

52.57

0.47

24.71

17.41

0.47

8.18

17.41

0.47

8.18

1.56

0.47

1.47

52.42

0.47

24.64

17.40

0.47

8.18

17.42

0.47

8.19

1.56

0.47

1.47

Arco Final

7.19

0.47

3.38

Arco Final

7.74

0.47

3.64

AVFB L.D.-06

AVFB L.I.-07

AVFB L.D.-07

AVFB L.I.-08

AVFB L.D.-08

AVFB L.I.-09

AVFB L.D.-09

AVFB L.I.-10

AVFB L.D.-10

AVFB L.I.-11

AVFB L.D.-11

Jirn Los Andes (Tramo Bolivar - San Martn)


AVLA L.I.-01

168.74
1

55.79

0.47

26.22

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

55.90

0.47

26.27

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

38.41

0.47

18.05

17.42

0.47

8.19

17.41

0.47

8.18

1.56

0.47

1.47

38.40

0.47

18.05

17.41

0.47

8.18

17.42

0.47

8.19

1.56

0.47

1.47

Arco Final

9.51

0.47

4.47

Arco Final

9.19

0.47

AVLA L.D.-01

AVLA L.I.-02

AVLA L.D.-02

Jirn 28 de Julio

4.32
87.27

Arco Inicial

5.88

0.47

2.76

Arco Final

5.50

0.47

2.59

Arco Inicial

5.87

0.47

2.76

Arco Final

5.50

0.47

2.59

Arco

5.50

0.47

5.17

AVJ L.I.-01

38.60

0.47

18.14

17.12

0.47

8.05

17.12

0.47

8.05

1.56

0.47

1.47

38.62

0.47

18.15

17.12

0.47

8.05

17.12

0.47

8.05

1.56

0.47

AVJ L.D.-01

Jirn Sucre

1.47
91.41

Arco

5.50

0.47

5.17

Arco Inicial

5.50

0.47

2.59

Arco Final

5.12

0.47

2.41

Arco Inicial

5.50

0.47

2.59

Arco Final

5.12

0.47

2.41

Arco

5.12

0.47

4.81

AVS L.I.-01

38.04

0.47

17.88

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

38.07

0.47

17.89

17.41

0.47

8.18

17.41

0.47

8.18

1.56

0.47

AVS L.D.-01

Jirn Ramn Castilla

1.47
91.00

Arco

5.50

0.47

5.17

Arco Inicial

5.50

0.47

2.59

Arco Final

5.12

0.47

2.41

Arco Inicial

5.50

0.47

2.59

Arco Final

5.12

0.47

2.41

Arco

5.12

0.47

4.81

AVRC L.I.-01

37.59

0.47

17.67

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

37.62

0.47

17.68

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

Arco

5.50

0.47

5.17

Arco Inicial

5.50

0.47

2.59

Arco Final

5.13

0.47

2.41

Arco Inicial

5.50

0.47

2.59

Arco Final

5.12

0.47

2.41

Arco Inicial

5.12

0.47

2.41

Arco Final

5.12

0.47

2.41

Arco Inicial

5.12

0.47

2.41

Arco Final

5.12

0.47

2.41

Arco

5.12

0.47

4.81

AVB L.I.-01

37.14

0.47

17.46

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

37.17

0.47

17.47

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

1.47

37.67

0.47

17.70

17.41

0.47

8.18

17.42

0.47

8.19

1.56

0.47

1.47

37.58

0.47

17.66

17.42

0.47

8.19

17.42

0.47

8.19

1.56

0.47

AVRC L.D.-01

Jirn Bolivar

171.25

AVB L.D.-01

AVB L.I.-02

AVB L.D.-02

Jirn Sebastin Chipana

1.47
167.18

Arco

4.38

0.47

4.12

Lado Izq.

75.34

0.47

35.41

Arco Inicial

4.38

0.47

2.06

Arco Final

3.97

0.47

1.87

Lado Der.

75.36

0.47

35.42

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Izq.

77.71

0.47

36.52

Arco Inicial

4.01

0.47

1.88

Arco Final

4.01

0.47

1.88

Lado Der.

77.73

0.47

36.53

Arco Inicial

4.01

0.47

1.88

Arco Final

4.01

0.47

1.88

Arco

4.01

0.47

Calle San Martn

3.77
181.65

Arco Inicial

9.91

0.47

4.66

Arco Final

5.88

0.47

2.76

Arco Inicial

9.73

0.47

4.57

Arco Final

5.88

0.47

2.76

Arco Inicial

5.80

0.47

2.73

Arco Final

9.80

0.47

4.61

Arco Inicial

5.89

0.47

2.77

AVSM L.I.-01

55.89

0.47

26.27

17.11

0.47

8.04

17.12

0.47

8.05

AVSM L.D.-01

AVSM L.I.-02

AVSM L.D.-02

1.56

0.47

1.47

55.83

0.47

26.24

17.12

0.47

8.05

17.12

0.47

8.05

1.56

0.47

1.47

36.10

0.47

16.97

17.11

0.47

8.04

17.12

0.47

8.05

1.56

0.47

1.47

36.35

0.47

17.08

17.12

0.47

8.05

17.12

0.47

8.05

1.56

0.47

Jirn Lima

1.47
85.17

Arco

5.50

0.47

5.17

Arco Inicial

5.50

0.47

2.59

Arco Final

5.12

0.47

2.41

Arco Inicial

5.50

0.47

2.59

Arco Final

5.12

0.47

2.41

AVL L.I.-01

36.56

0.47

17.18

17.41

0.47

8.18

17.42

0.47

8.19

1.56

0.47

1.47

36.52

0.47

17.16

17.41

0.47

8.18

17.42

0.47

8.19

1.56

0.47

AVL L.D.-01

Jirn Huancayo

1.47
162.62

Arco

4.38

0.47

4.12

Lado Izq.

75.63

0.47

35.55

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Der.

75.60

0.47

35.53

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Izq.

74.09

0.47

34.82

Arco Inicial

4.01

0.47

1.88

Arco Final

6.50

0.47

3.06

Lado Der.

74.09

0.47

34.82

Arco Inicial

4.01

0.47

1.88

Arco Final

6.53

0.47

Jirn Catalina Huanca

3.07
163.04

Arco

4.38

0.47

4.12

Lado Izq.

76.07

0.47

35.75

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Der.

76.04

0.47

35.74

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Izq.

74.09

0.47

34.82

Arco Inicial

4.01

0.47

1.88

Arco Final

6.55

0.47

3.08

Lado Der.

74.09

0.47

34.82

Arco Inicial

4.01

0.47

1.88

Arco Final

6.49

0.47

3.05

Jirn Alfonso Ugarte

163.45
Arco

4.37

0.47

4.11

Lado Izq.

76.51

0.47

35.96

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Der.

76.49

0.47

35.95

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Izq.

74.10

0.47

34.83

Arco Inicial

4.01

0.47

1.88

Arco Final

6.55

0.47

3.08

Lado Der.

74.09

0.47

34.82

Arco Inicial

4.01

0.47

1.88

Arco Final

6.49

0.47

Jirn 27 de Mayo

3.05
164.19

Arco

4.38

0.47

4.12

Lado Izq.

77.12

0.47

36.25

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Der.

77.09

0.47

36.23

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Izq.

74.27

0.47

34.91

Arco Inicial

4.01

0.47

1.88

Arco Final

6.81

0.47

3.20

Lado Der.

74.27

0.47

34.91

Arco Inicial

4.01

0.47

1.88

Arco Final

6.23

0.47

Jirn Santa Cruz

2.93
160.72

Lado Izq.

77.74

0.47

36.54

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Der.

77.71

0.47

36.52

Arco Inicial

4.38

0.47

2.06

Arco Final

4.01

0.47

1.88

Lado Izq.

74.33

0.47

34.94

Arco Inicial

4.01

0.47

1.88

Arco Final

6.86

0.47

3.22

Lado Der.

74.33

0.47

34.94

Arco Inicial

4.01

0.47

1.88

Arco Final

6.19

0.47

2.91

03.04 Juntas Asflticas E=1"

828.14

Jr. Los Incas (Tramo 28 de Julio - San Martn)

101.99

Arco

0.47

0.47

AVI L.I.-01

27

0.47

12.69

AVI L.D.-01

27

0.47

12.69

AVI L.I.-02

21

0.47

9.87

AVI L.D.-02

21

0.47

9.87

AVI L.I.-03

21

0.47

9.87

AVI L.D.-03

21

0.47

9.87

AVI L.I.-04

21

0.47

9.87

AVI L.D.-04

21

0.47

9.87

AVI L.I.-05

18

0.47

8.46

AVI L.D.-05

18

0.47

8.46

ml.

Jr. Los Incas (Tramo San Martn-Chacamarca)


Arco

99.64
2

0.47

0.94

Arco

0.47

0.94

AVI L.I.-06

13

0.47

6.11

AVI L.D.-06

13

0.47

6.11

AVI L.I.-07

14

0.47

6.58

AVI L.D.-07

14

0.47

6.58

AVI L.I.-08

14

0.47

6.58

AVI L.D.-08

14

0.47

6.58

AVI L.I.-09

14

0.47

6.58

AVI L.D.-09

14

0.47

6.58

AVI L.I.-10

13

0.47

6.11

AVI L.D.-10

13

0.47

6.11

AVI L.I.-11

19

0.47

8.93

AVI L.D.-11

19

0.47

8.93

AVI L.I.-12

17

0.47

7.99

AVI L.D.-12

17

0.47

Jr. Fco. Bolognesi (Tramo 28 d/Julio-S. Martn)

7.99
103.40

AVFB L.I.-01

27

0.47

12.69

AVFB L.D.-01

27

0.47

12.69

AVFB L.I.-02

21

0.47

9.87

AVFB L.D.-02

21

0.47

9.87

AVFB L.I.-03

21

0.47

9.87

AVFB L.D.-03

21

0.47

9.87

AVFB L.I.-04

21

0.47

9.87

AVFB L.D.-04

21

0.47

9.87

AVFB L.I.-05

18

0.47

8.46

AVFB L.D.-05

18

0.47

8.46

Arco Final

0.47

0.94

Arco Final

0.47

Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

0.94
110.92

Arco Inicio

0.47

0.94

AVFB L.I.-06

17

0.47

7.99

AVFB L.D.-06

17

0.47

7.99

AVFB L.I.-07

18

0.47

8.46

AVFB L.D.-07

18

0.47

8.46

AVFB L.I.-08

18

0.47

8.46

AVFB L.D.-08

18

0.47

8.46

AVFB L.I.-09

18

0.47

8.46

AVFB L.D.-09

18

0.47

8.46

AVFB L.I.-10

23

0.47

10.81

AVFB L.D.-10

23

0.47

10.81

AVFB L.I.-11

21

0.47

9.87

AVFB L.D.-11

21

0.47

9.87

Arco Final

0.47

0.94

Arco Final

0.47

Jirn Los Andes (Tramo Bolivar - San Martn)

0.94
39.01

AVLA L.I.-01

21

0.47

9.87

AVLA L.D.-01

22

0.47

10.34

AVLA L.I.-02

18

0.47

8.46

AVLA L.D.-02

18

0.47

8.46

Arco Final

0.47

0.94

Arco Final

0.47

Jirn 28 de Julio

0.94
19.27

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Arco

0.47

0.47

AVJ L.I.-01

18

0.47

8.46

AVJ L.D.-01

18

0.47

Jirn Sucre

8.46
18.80

Arco

0.47

0.47

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Arco

0.47

0.47

AVS L.I.-01

17

0.47

7.99

AVS L.D.-01

17

0.47

Jirn Ramn Castilla

7.99
17.86

Arco

0.47

0.47

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Arco

0.47

0.47

AVRC L.I.-01

16

0.47

7.52

AVRC L.D.-01

16

0.47

Arco
Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco Inicial
Arco Final
Arco
AVB L.I.-01
AVB L.D.-01
AVB L.I.-02
AVB L.D.-02

1
1
1
1
1
1
1
1
1
1
16
16
16
16

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47

7.52
34.78
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
7.52
7.52
7.52
7.52

Arco
Lado Izq.

1
18

0.47
0.47

38.54
0.47
8.46

Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final

1
1
18
1
1

0.47
0.47
0.47
0.47
0.47

0.47
0.47
8.46
0.47
0.47

Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final
Arco

18
1
1
18
1
1
1

0.47
0.47
0.47
0.47
0.47
0.47
0.47

Arco Inicial

0.47

8.46
0.47
0.47
8.46
0.47
0.47
0.47
38.54
0.94

Arco Final
Arco Inicial
Arco Final
Arco Inicial
Arco Final

1
2
1
1
2

0.47
0.47
0.47
0.47
0.47

0.47
0.94
0.47
0.47
0.94

Arco Inicial
AESM-01
AESM-02
AESM-03

1
20
20
16

0.47
0.47
0.47
0.47

0.47
9.40
9.40
7.52

Jirn Bolivar

Jirn Sebastin Chipana

Calle San Martn

AESM-04

16

0.47

Arco
Arco Inicial
Arco Final
Arco Inicial
Arco Final
AEL-01
AEL-02

1
1
1
1
1
16
16

0.47
0.47
0.47
0.47
0.47
0.47
0.47

Arco
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial
Arco Final
Lado Izq.
Arco Inicial
Arco Final
Lado Der.
Arco Inicial

1
18
1
1
18
1
1
17
1
1
17
1

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47

Arco Final

0.47

Jirn Lima

Jirn Huancayo

Jirn Catalina Huanca

7.52
17.39
0.47
0.47
0.47
0.47
0.47
7.52
7.52
37.13
0.47
8.46
0.47
0.47
8.46
0.47
0.47
7.99
0.47
0.47
7.99
0.47
0.47
37.13

Arco

0.47

0.47

Lado Izq.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Der.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Izq.

17

0.47

7.99

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Der.

17

0.47

7.99

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Arco

0.47

0.47

Lado Izq.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Der.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Jirn Alfonso Ugarte

37.13

Lado Izq.

17

0.47

7.99

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Der.

17

0.47

7.99

Arco Inicial

0.47

0.47

Arco Final

0.47

Jirn 27 de Mayo

0.47
38.54

Arco

0.47

0.47

Lado Izq.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Der.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Izq.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.94

Lado Der.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Jirn Santa Cruz

38.07
Lado Izq.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Der.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

Lado Izq.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.94

Lado Der.

18

0.47

8.46

Arco Inicial

0.47

0.47

Arco Final

0.47

0.47

04.00 BADENES
04.01 Concreto F'c=175 kg(cm2 para Badenes

201.52

Jirn 28 de Julio

15.85
ABJ-01

Area=

17.99

0.30

5.40

ABJ-02

Area=

17.42

0.30

5.23

ABJ-03

Area=

17.42

0.30

Jirn Sucre

5.23
18.54

ABS-01

Area=

15.74

0.30

4.72

ABS-02

Area=

15.71

0.30

4.71

ABS-03

Area=

15.17

0.30

4.55

ABS-04

Area=

15.18

0.30

Jirn Ramn Castilla

4.55
18.55

ABRC-01

Area=

15.74

0.30

4.72

ABRC-02

Area=

15.74

0.30

4.72

ABRC-03

Area=

15.18

0.30

4.55

ABRC-04

Area=

15.18

0.30

Jirn Bolivar

4.55
27.65

ABB-01

Area=

15.74

0.30

4.72

ABB-02

Area=

15.74

0.30

4.72

ABB-03

Area=

15.18

0.30

4.55

ABB-04

Area=

15.19

0.30

4.56

ABB-05

Area=

15.18

0.30

4.55

ABB-06

Area=

15.15

0.30

Jirn Sebastin Chipana

4.55
24.25

ABSCH-01

Area=

13.83

0.30

4.15

ABSCH-02

Area=

13.83

0.30

4.15

ABSCH-03

Area=

13.29

0.30

3.99

ABSCH-04

Area=

13.29

0.30

3.99

ABSCH-05

Area=

13.46

0.30

4.04

ABSCH-06

Area=

13.12

0.30

Calle San Martn

3.94
10.08

ABSM-01

Area=

16.81

0.30

ABSM-02

Area=

16.79

0.30

Jirn Lima

5.04
5.04
14.00

ABL-01

Area=

15.74

0.30

4.72

ABL-02

Area=

15.75

0.30

4.73

ABL-03

Area=

15.18

0.30

4.55

Jirn Huancayo

16.28
ABH-01

Area=

13.84

0.30

4.15

ABH-02

Area=

13.83

0.30

4.15

ABH-03

Area=

13.29

0.30

3.99

ABH-04

Area=

13.29

0.30

Jirn Catalina Huanca

3.99
16.27

ABCH-01

Area=

13.83

0.30

4.15

ABCH-02

Area=

13.83

0.30

4.15

ABCH-03

Area=

13.29

0.30

3.99

ABCH-04

Area=

13.29

0.30

Jirn Alfonso Ugarte

3.99
16.27

ABAU-01

Area=

13.83

0.30

4.15

ABAU-02

Area=

13.83

0.30

4.15

ABAU-03

Area=

13.29

0.30

3.99

ABAU-04

Area=

13.29

0.30

Jirn 27 de Mayo

3.99
16.33

AB27M-01

Area=

13.90

0.30

4.17

AB27M-02

Area=

13.85

0.30

4.16

AB27M-03

Area=

13.37

0.30

4.01

AB27M-04

Area=

13.31

0.30

Jirn Santa Cruz

3.99
12.15

ABSC-01

Area=

13.86

0.30

4.16

ABSC-02

Area=

13.32

0.30

4.00

ABSC-03

Area=

13.32

0.30

-47

Area=

0.10

Descuento (Depresin de Baden)

4.00
-4.70

04.02 Encofrado y Desencofrado (Baden)


Jirn 28 de Julio

446.47
ABJ-01
ABJ-02
ABJ-03

1
1
1
1
1
1

20.00
12.64
19.40
12.23
19.40
12.23

0.30
0.30
0.30
0.30
0.30
0.30

1
1
1
1
1
1
1
1

18.00
10.83
18.00
10.82
17.41
10.43
17.40
10.44

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

1
1
1
1
1
1
1
1

18.00
10.83
18.01
10.83
17.40
10.44
17.40
10.44

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

1
1
1
1
1
1
1
1
1

18.00
10.84
18.00
10.83
17.40
10.41
17.40
10.44
17.40

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

Jirn Sucre
ABS-01
ABS-02
ABS-03
ABS-04
Jirn Ramn Castilla
ABRC-01
ABRC-02
ABRC-03
ABRC-04
Jirn Bolivar
ABB-01
ABB-02
ABB-03
ABB-04
ABB-05

28.77
6.00
3.79
5.82
3.67
5.82
3.67
34.00
5.40
3.25
5.40
3.25
5.22
3.13
5.22
3.13
34.01
5.40
3.25
5.40
3.25
5.22
3.13
5.22
3.13
50.69
5.40
3.25
5.40
3.25
5.22
3.12
5.22
3.13
5.22

1
1
1

10.44
17.40
10.41

0.30
0.30
0.30

1
1
1
1
1
1
1
1
1
1
1
1

16.00
9.39
16.00
9.44
15.40
9.09
15.40
9.09
15.40
9.21
15.41
8.98

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

ABSM-01

ABSM-02

19.00
11.66
19.00
11.64

0.30
0.30
0.30
0.30

ABL-01

ABL-02

ABL-03

18.00
10.84
18.00
10.84
17.40
10.44

0.30
0.30
0.30
0.30
0.30
0.30

ABH-01

16.00

0.30

4.80

9.47

0.30

2.84

16.00

0.30

4.80

9.47

0.30

2.84

15.40

0.30

4.62

9.09

0.30

2.73

15.40

0.30

4.62

9.09

0.30

ABB-06
Jirn Sebastin Chipana
ABSCH-01
ABSCH-02
ABSCH-03
ABSCH-04
ABSCH-05
ABSCH-06
Calle San Martn

Jirn Lima

Jirn Huancayo

3.13
5.22
3.12
44.64
4.80
2.82
4.80
2.83
4.62
2.73
4.62
2.73
4.62
2.76
4.62
2.69
18.39
5.70
3.50
5.70
3.49
25.66
5.40
3.25
5.40
3.25
5.22
3.13
29.98

ABH-02
ABH-03
ABH-04

1
1
1

Jirn Catalina Huanca

2.73
29.97

ABCH-01
ABCH-02
ABCH-03
ABCH-04

1
1
1
1

16.00

0.30

4.80

9.46

0.30

2.84

16.00

0.30

4.80

9.46

0.30

2.84

15.40

0.30

4.62

9.09

0.30

2.73

15.40

0.30

4.62

9.09

0.30

Jirn Alfonso Ugarte

2.73
30.21

ABAU-01
ABAU-02
ABAU-03
ABAU-04

1
1
1
1

16.00

0.30

4.80

9.44

0.30

2.83

16.01

0.30

4.80

9.46

0.30

2.84

15.40

0.30

4.62

9.90

0.30

2.97

15.40

0.30

4.62

9.09

0.30

Jirn 27 de Mayo

2.73
30.06

AB27M-01
AB27M-02
AB27M-03

1
1
1

16.03

0.30

4.81

9.50

0.30

2.85

16.03

0.30

4.81

9.50

0.30

2.85

15.44

0.30

4.63

AB27M-04

9.13

0.30

2.74

15.44

0.30

4.63

9.13

0.30

Jirn Santa Cruz

2.74
22.42

ABSC-01
ABSC-02
ABSC-03
Transversales de 47 Badenes

1
1
1
188

16.05

0.30

4.82

9.51

0.30

2.85

15.45

0.30

4.64

9.14

0.30

2.74

15.45

0.30

4.64

9.14

0.30

2.74

1.20

0.30

67.68

04.03 Acabado Pulido de Baden

687.40

Jirn 28 de Julio

52.83
ABJ-01

Area=

17.99

17.99

ABJ-02

Area=

17.42

17.42

ABJ-03

Area=

17.42

17.42

ABS-01

Area=

15.74

15.74

ABS-02

Area=

15.71

15.71

ABS-03

Area=

15.17

15.17

ABS-04

Area=

15.18

15.18

ABRC-01

Area=

15.74

15.74

ABRC-02

Area=

15.74

15.74

ABRC-03

Area=

15.18

15.18

ABRC-04

Area=

15.18

15.18

ABB-01

Area=

15.74

15.74

ABB-02

Area=

15.74

15.74

ABB-03

Area=

15.18

15.18

ABB-04

Area=

15.19

15.19

ABB-05

Area=

15.18

15.18

ABB-06

Area=

15.15

15.15

ABSCH-01

Area=

13.83

13.83

ABSCH-02

Area=

13.83

13.83

ABSCH-03

Area=

13.29

13.29

ABSCH-04

Area=

13.29

13.29

ABSCH-05

Area=

13.46

13.46

ABSCH-06

Area=

13.12

13.12

ABSM-01

Area=

16.81

16.81

ABSM-02

Area=

16.79

16.79

ABL-01

Area=

15.74

15.74

ABL-02

Area=

15.75

15.75

ABL-03

Area=

15.18

15.18

ABH-01

Area=

13.84

13.84

ABH-02

Area=

13.83

13.83

ABH-03

Area=

13.29

13.29

ABH-04

Area=

13.29

13.29

ABCH-01

Area=

13.83

13.83

ABCH-02

Area=

13.83

13.83

ABCH-03

Area=

13.29

13.29

ABCH-04

Area=

13.29

13.29

ABAU-01

Area=

13.83

Jirn Sucre

61.80

Jirn Ramn Castilla

61.84

Jirn Bolivar

92.18

Jirn Sebastin Chipana

80.82

Calle San Martn

33.60

Jirn Lima

46.67

Jirn Huancayo

54.25

Jirn Catalina Huanca

54.24

Jirn Alfonso Ugarte

54.24
13.83

ABAU-02

Area=

13.83

13.83

ABAU-03

Area=

13.29

13.29

ABAU-04

Area=

13.29

13.29

AB27M-01

Area=

13.90

13.90

AB27M-02

Area=

13.85

13.85

AB27M-03

Area=

13.37

13.37

AB27M-04

Area=

13.31

13.31

ABSC-01

Area=

13.86

13.86

ABSC-02

Area=

13.32

13.32

ABSC-03

Area=

13.32

13.32

Jirn 27 de Mayo

54.43

Jirn Santa Cruz

40.50

04.04 Juntas Asflticas E=1"

1,488.24

Jirn 28 de Julio

95.90
ABJ-01
ABJ-02
ABJ-03

20.00

20.00

12.64

12.64

19.40

19.40

12.23

12.23

19.40

19.40

12.23

Jirn Sucre

12.23
113.33

ABS-01
ABS-02
ABS-03
ABS-04

18.00

18.00

10.83

10.83

18.00

18.00

10.82

10.82

17.41

17.41

10.43

10.43

17.40

17.40

10.44

1
1
1
1
1
1
1
1

18.00
10.83
18.01
10.83
17.40
10.44
17.40
10.44

1
1
1
1
1
1
1
1
1
1
1
1

18.00
10.84
18.00
10.83
17.40
10.41
17.40
10.44
17.40
10.44
17.40
10.41

1
1
1
1
1
1
1
1
1

16.00
9.39
16.00
9.44
15.40
9.09
15.40
9.09
15.40

10.44
113.35
18.00
10.83
18.01
10.83
17.40
10.44
17.40
10.44
168.97
18.00
10.84
18.00
10.83
17.40
10.41
17.40
10.44
17.40
10.44
17.40
10.41
148.81
16.00
9.39
16.00
9.44
15.40
9.09
15.40
9.09
15.40

Jirn Ramn Castilla


ABRC-01
ABRC-02
ABRC-03
ABRC-04
Jirn Bolivar
ABB-01
ABB-02
ABB-03
ABB-04
ABB-05
ABB-06
Jirn Sebastin Chipana
ABSCH-01
ABSCH-02
ABSCH-03
ABSCH-04
ABSCH-05

ml.

ABSCH-06

1
1
1

9.21
15.41
8.98

ABSM-01

ABSM-02

19.00
11.66
19.00
11.64

ABL-01

ABL-02

ABL-03

ABH-01

ABH-02

ABH-03

ABH-04

ABCH-01

ABCH-02

ABCH-03

ABCH-04

ABAU-01

Calle San Martn

Jirn Lima
18.00
10.84
18.00
10.84
17.40
10.44

Jirn Huancayo
16.00
9.47
16.00
9.47
15.40
9.09
15.40
9.09

Jirn Catalina Huanca


16.00
9.46
16.00
9.46
15.40
9.09
15.40
9.09

Jirn Alfonso Ugarte

100.70
16.00

9.44
16.01

ABAU-02

16.01
9.46

9.46

ABAU-03

15.40

15.40

9.90

9.90

ABAU-04

15.40

15.40

9.09

9.09
100.20

AB27M-01

16.03

16.03

9.50

9.50
16.03

AB27M-02

16.03
9.50

9.50

AB27M-03

15.44

15.44

9.13

9.13

AB27M-04

15.44

15.44

9.13
Jirn Santa Cruz

9.13
74.74

ABSC-01

05.00 SUMIDEROS

16.00

9.44

Jirn 27 de Mayo

Transversales de 47 Badenes

9.21
15.41
8.98
61.30
19.00
11.66
19.00
11.64
85.52
18.00
10.84
18.00
10.84
17.40
10.44
99.92
16.00
9.47
16.00
9.47
15.40
9.09
15.40
9.09
99.90
16.00
9.46
16.00
9.46
15.40
9.09
15.40
9.09

16.05

16.05

9.51

9.51
15.45

ABSC-02

15.45
9.14

9.14

ABSC-03

15.45

15.45

188

9.14

9.14

1.20

225.60

05.01 Excavacin Manual


Sumideros

496.83

8.39

63.56

17.01
Jr. 28 de Julio

1.00

0.90

1.35

4.86

Jr. Sebastian Chipana

1.00

0.90

1.35

7.29

Jr. Alfonso Ugarte

1.00

0.90

1.35

Zanjas

4.86
479.82

Jr. 28 de Julio

Jr. Sebastian Chipana

Jr. Alfonso Ugarte

120.00

0.60

1.40

100.80

4.73

0.60

1.00

2.84

4.23

0.60

1.00

2.54

4.54

0.60

1.00

2.72

3.93

0.60

1.00

2.36

220.00

0.60

1.40

184.80

3.20

0.60

1.00

1.92

3.04

0.60

1.00

1.82

3.18

0.60

1.00

1.91

2.65

0.60

1.00

1.59

3.27

0.60

1.00

1.96

2.72

0.60

1.00

1.63

195.00

0.60

1.40

163.80

3.32

0.60

1.00

1.99

3.02

0.60

1.40

2.54

2.98

0.60

1.00

1.79

2.72

0.60

1.00

1.63

1.97

0.60

1.00

1.18

05.02 Concreto F'c=175 kg/cm2 en Losa Maciza


Sumideros

14

0.60

Base

1.00

0.90

0.15

0.14

Muros

1.00

0.10

1.20

0.24

0.70

0.10

1.20

0.17

0.80

0.70

0.10

0.06

Tapa
05.03 Encofrado y Desencofrado Normal
Sumideros

14
Muros
Tapa

4.54

0.80

1.20

1.92

0.70

1.20

1.68

0.80

1.00

0.10

0.20

0.90

0.10

0.18

0.70

0.56

05.04 Rejilla de Sumidero de 0.60 x 0.30 m.

14.00 und.
Jr. 28 de Julio

4.00

Jr. Sebastian Chipana

6.00

Jr. Alfonso Ugarte

4.00

05.05 Tendido y Colocado d/Tub. UPVC UF S-25 D=12"


Jr. 28 de Julio

Jr. Sebastian Chipana

Jr. Alfonso Ugarte

584.50
1

120.00

120.00

4.73

4.73

4.23

4.23

4.54

4.54

3.93

3.93

220.00

220.00

3.20

3.20

3.04

3.04

3.18

3.18

2.65

2.65

3.27

3.27

2.72

2.72

195.00

195.00

ml.

3.32

3.32

3.02

3.02

2.98

2.98

2.72

2.72

1.97

1.97

120.00

0.60

1.40

100.80

4.73

0.60

1.00

2.84

4.23

0.60

1.00

2.54

4.54

0.60

1.00

2.72

3.93

0.60

1.00

2.36

220.00

0.60

1.40

184.80

3.20

0.60

1.00

1.92

3.04

0.60

1.00

1.82

3.18

0.60

1.00

1.91

2.65

0.60

1.00

1.59

3.27

0.60

1.00

1.96

2.72

0.60

1.00

1.63

195.00

0.60

1.40

163.80

3.32

0.60

1.00

1.99

3.02

0.60

1.40

2.54

2.98

0.60

1.00

1.79

2.72

0.60

1.00

1.63

1.97

0.60

1.00

1.18

05.06 Relleno con Material Propio y Compactado


Jr. 28 de Julio

Jr. Sebastian Chipana

Jr. Alfonso Ugarte

479.82

METRADOS DE AMPLIACION DE PLAZO N 06


OBRA:

"MEJORAMIENTO VIAL DE LAS CALLES DEL CASCO URBANO DE LA LOCALIDAD DE QUILCAS , DISTRITO DE
QUILCAS HUANCAYO JUNN"
RED DE AGUA POTABLE

PPTO:
FECHA:

PROVINCIA:

OCTUBRE DEL 2015

PART.

QUILCAS
HUANCAYO
JUNN

DISTRITO:

ENTIDAD: MUNICIPALIDAD DISTRITAL DE QUILCAS

REGIN:

DIMENSIONES
#
VECES LARGO ANCHO
ALTO

DESCRIPCION

METRADO
PARCIAL

TOTAL

UNID

01 OBRAS PROVICIONALES
01.01 OBRAS PRELIMINARES
01.01.01 Trazo, Nivelacin y Replanteo
Jr. San Martin (Tramo Bolognesi- Los Andes)
BOLOGNESI - LOS ANDES

36.96

44.35

36.96

36.96

92.40

5.54

35.11

11.55

92.40

36.96
1

92.40

0.40

36.96

01.02 MOVIMIENTO DE TIERRAS


01.02.01 Excavacion de Zanja con Equipo
Jr. San Martin (Tramo Bolognesi- Los Andes)
BOLOGNESI - LOS ANDES

44.35
1

92.40

0.40

1.20

44.35

01.02.02 Refine y Perfilado de Zanja


Jr. San Martin (Tramo Bolognesi- Los Andes)
BOLOGNESI - LOS ANDES

36.96
1

92.40

0.40

36.96

01.02.03 Nivelacion y Compactacion Manual de Zanajas


Jr. San Martin (Tramo Bolognesi- Los Andes)
BOLOGNESI - LOS ANDES

36.96
1

92.40

0.40

36.96

01.02.04 Cama de Apoyo Para Tuberias Con Material Zarandeado, E=10cm


Jr. San Martin (Tramo Bolognesi- Los Andes)
BOLOGNESI - LOS ANDES

92.40
1

92.40

92.40

01.02.05 Relleno y Compactado de Zanajas Con Material Zarandeado, E=15cm


Jr. San Martin (Tramo Bolognesi- Los Andes)
BOLOGNESI - LOS ANDES

5.54
1

92.40

0.40

0.15

5.54

01.02.06 Relleno y Compactado Con Material Propio


Jr. San Martin (Tramo Bolognesi- Los Andes)
BOLOGNESI - LOS ANDES

35.11
1

92.40

0.40

0.95

35.11

01.02.07 Eliminacion de Material Excedente


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

11.55
1.25

92.40

0.40

0.25

11.55

02. RED MATRIZ DE AGUA POTABLE


02.01 SUMINISTRO E INSTALACION DE TUBERIAS
02.01.01 Tuberia PVC-SAP De 2" C-10
Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

92.40
1

92.40

92.40

02.02 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC


02.02.01 Cruz de PVC-UF-DN 90MM-PN10 Cuerpo Inyectado c/anillo

15.00 Und

General

15.00
Accesorios en Total

15.00

15.00

02.02.02 Tee de PVC-UF-DN 90MM-PN10 Cuerpo Inyectado c/anillo

6.00 Und

General

6.00
Accesorios en Total

6.00

6.00

02.02.03 Reduccion de PVC-UF-DN 90MM a 64 MM-PN10 Cuerpo Inyectado c/anillo

20.00 Und

General

20.00
Accesorios en Total

20.00

20.00

02.02.04 Valvula de FF de 90 mm ISO c/anillo

15.00 Und

General

15.00
Accesorios en Total

15.00

15.00

02.02.05 Union de PVC-UF-DN 90MM -PN10

20.00 Und

General

20.00
Accesorios en Total

20.00

20.00

02.02.06 Codo de PVC-UF-DN 90MM -PN10 - 90

2.00 Und

General

2.00
Accesorios en Total

2.00

2.00

02.02.07 Tapones de PVC-UF-DN 90MM -PN10

2.00 Und

General

2.00
Accesorios en Total

2.00

2.00

02.02.08 Tapones de PVC-UF-DN 64MM -PN10

2.00 Und

General

2.00
Accesorios en Total

2.00

2.00

02.03 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS


02.03.01 Prueba Hidraulica + Desinfeccion de Tuberias
Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

560.00

200.00

200.00

110.00

110.00

465.97

110.00
110.00
110.00
110.00
100.00
1

100.00

206.00

100.00

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

200.00

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

72.96

200.00

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

200.00

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

10.94

200.00

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

560.00

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

1,486.00
560.00

206.00
206.00

02.04 CONCRETO SIMPLE


02.04.01 Concreto f'c=140 kg/cm2, P/Cajas de Valvula
General

10.94
Cajas en Total

19

area

0.48

1.20

10.94

02.04.02 Encofrado y Desencofrado Para Cajas De Valvulas


General

72.96
Cajas en Total

38

0.80

1.20

36.48

76

0.40

1.20

36.48

03 CONEXIONES DOMICILIARIAS
03.01 OBRAS PRELIMINARES
03.01.01 Trazo, Nivelacin y Replanteo
Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

217.80
90

6.05

0.40

25

4.63

0.40

25

5.55

0.40

15

5.95

0.40

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

46.25

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

46.25
55.50

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

217.80

55.50
35.70
35.70

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

26.52
12

5.53

0.40

10

6.30

0.40

25

5.90

0.40

26.52

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

25.20
25.20

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

59.00
59.00

03.02 MOVIMIENTO DE TIERRAS


03.02.01 Excavacion de Zanja con Equipo
Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

90

6.05

0.40

1.20

25

4.63

0.40

1.20

25

5.55

0.40

1.20

15

5.95

0.40

1.20

12

5.53

0.40

1.20

10

6.30

0.40

1.20

25

5.90

0.40

1.20

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

90

6.05

0.40

25

4.63

0.40

25

5.55

0.40

15

5.95

0.40

12

5.53

0.40

10

6.30

0.40

25

5.90

0.40

25.20
59.00
59.00

03.02.03 Nivelacion y Compactacion Manual de Zanajas


Jr. Bolognesi (Tramo San Martin - 28 de Julio)

217.80
90

6.05

0.40

25

4.63

0.40

25

5.55

0.40

15

5.95

0.40

12

5.53

0.40

10

6.30

0.40

25

5.90

0.40

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

26.52
25.20

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

35.70
26.52

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

55.50
35.70

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

46.25
55.50

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

217.80
46.25

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

25.20
59.00
59.00

03.02.04 Cama de Apoyo Para Tuberias Con Material Zarandeado, E=10cm


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

544.50
90

6.05

25

4.63

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

544.50
115.63

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

26.52
25.20

Jr. Los Andes (Tramo San Martin - Bolivar)

SAN MARTIN - 28 DE JULIO

1,164.93

35.70
26.52

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)

SAN MARTIN - BOLIVAR

55.50
35.70

Jr. Sucre (Tramo Los Incas - Bolognesi)

LOS INCAS - BOLOGNESI

46.25
55.50

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)

LOS INCAS - BOLOGNESI

217.80
46.25

Jr. Bolivar (Tramo Los Incas - Los Andes)

LOS INCAS - BOLOGNESI

70.80

217.80

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)

LOS INCAS - LOS ANDES

465.97

30.24
70.80

Jr. Bolognesi (Tramo San Martin - 28 de Julio)

LOS INCAS - LOS ANDES

31.82

03.02.02 Refine y Perfilado de Zanja


SAN MARTIN - 28 DE JULIO

465.97

42.84

30.24

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

66.60

31.82

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

55.50

42.84

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

261.36

66.60

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

55.50

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

559.16
261.36

115.63
138.75

25

5.55

138.75

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

89.25
15

5.95

12

5.53

10

6.30

89.25

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

66.30
66.30

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

63.00
63.00

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

147.50
25

5.90

147.50

03.02.05 Relleno y Compactado de Zanajas Con Material Zarandeado, E=15cm


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

90

6.05

0.40

0.15

25

4.63

0.40

0.15

25

5.55

0.40

0.15

15

5.95

0.40

0.15

12

5.53

0.40

0.15

10

6.30

0.40

0.15

25

5.90

0.40

0.15

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

90

6.05

0.40

0.95

25

4.63

0.40

0.95

25

5.55

0.40

0.95

15

5.95

0.40

0.95

12

5.53

0.40

0.95

10

6.30

0.40

0.95

25

5.90

0.40

0.95

33.92
25.19

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)

25.19
23.94

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

52.73
33.92

Jr. Sucre (Tramo Los Incas - Bolognesi)

LOS INCAS - BOLOGNESI

43.94
52.73

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)

LOS INCAS - BOLOGNESI

206.91
43.94

Jr. Bolivar (Tramo Los Incas - Los Andes)

LOS INCAS - BOLOGNESI

23.94
56.05
56.05

03.02.07 Eliminacion de Material Excedente


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

54.45
90

6.05

0.40

0.25

25

4.63

0.40

0.25

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

25

5.55

0.40

0.25

15

5.95

0.40

0.25

12

5.53

0.40

0.25

10

6.30

0.40

0.25

8.93
6.63
6.30

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

13.88

6.63

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

11.56

8.93

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

54.45

13.88

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

1.25

11.56

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

8.85

206.91

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)

LOS INCAS - LOS ANDES

145.62

3.78
8.85

Jr. Bolognesi (Tramo San Martin - 28 de Julio)

LOS INCAS - LOS ANDES

3.98

03.02.06 Relleno y Compactado Con Material Propio


SAN MARTIN - 28 DE JULIO

442.67

5.36

3.78

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

8.33

3.98

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

6.94

5.36

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

32.67

8.33

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

6.94

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

69.90
32.67

6.30
14.75

25

5.90

0.40

0.25

14.75

03.03 SUMINISTRO E INSTALACION DE TUBERIAS


03.03.01 Tuberia PVC-SAP De 1/2" C-10

1,164.93

Jr. Bolognesi (Tramo San Martin - 28 de Julio)


SAN MARTIN - 28 DE JULIO

544.50
90

6.05

25

4.63

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

544.50
115.63
115.63

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

138.75
25

5.55

15

5.95

12

5.53

10

6.30

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

89.25

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

66.30
63.00

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

89.25
66.30

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

138.75

63.00
147.50

25

5.90

147.50

METRADOS DE AMPLIACION DE PLAZO N 05


OBRA:
PPTO:

"MEJORAMIENTO VIAL DE LAS CALLES DEL CASCO URBANO DE LA LOCALIDAD DE QUILCAS , DISTRITO DE QUILCAS
HUANCAYO JUNN"
RED DE ALCANTARILLADO SANITARIO

FECHA:

PROVINCIA:

SETIEMBRE DEL 2015

PART.

QUILCAS
HUANCAYO
JUNN

DISTRITO:

ENTIDAD: MUNICIPALIDAD DISTRITAL DE QUILCAS

REGIN:

DESCRIPCION

# VECES

DIMENSIONES
LARGO

ANCHO

METRADO
ALTO

PARCIAL

TOTAL

UNID

01.00 CONEXIONES DOMICILIARIAS


01.01 OBRAS PRELIMINARES
01.01.01 Trazo, Nivelacin y Replanteo
Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

90

7.65

0.40

25

6.45

0.40

25

7.50

0.40

15

8.15

0.40

12

7.53

0.40

10

8.78

0.40

25

7.25

0.40

607.52

48.90
48.90
36.12
36.12
35.10
35.10

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

75.00

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

607.52

75.00

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

64.50

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

911.28

64.50

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

275.40

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

607.52
275.40

72.50
72.50

01.02 MOVIMIENTO DE TIERRAS


01.02.01 Excavacion de Zanja con Equipo
Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

413.10
90

7.65

0.40

1.50

25

6.45

0.40

1.50

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

96.75

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

25

7.50

0.40

1.50

15

8.15

0.40

1.50

12

7.53

0.40

1.50

10

8.78

0.40

1.50

54.18
52.65

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

73.35
54.18

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

112.50
73.35

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

96.75
112.50

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

413.10

52.65
108.75

25

7.25

0.40

1.50

108.75

01.02.02 Refine y Perfilado de Zanja


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

275.40
90

7.65

0.40

25

6.45

0.40

25

7.50

0.40

15

8.15

0.40

12

7.53

0.40

10

8.78

0.40

25

7.25

0.40

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

64.50

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

36.12
35.10

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

48.90
36.12

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

75.00
48.90

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

64.50
75.00

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

275.40

35.10
72.50
72.50

01.02.03 Nivelacion y Apisonado De Zanjas Para Desague


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

275.40
90

7.65

0.40

25

6.45

0.40

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

275.40
64.50
64.50

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

75.00
25

7.50

0.40

15

8.15

0.40

12

7.53

0.40

10

8.78

0.40

25

7.25

0.40

75.00

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

48.90
48.90

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

36.12
36.12

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

35.10
35.10

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

72.50
72.50

01.02.04 Cama de Apoyo Para Tuberias De Desague


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

90

7.65

25

6.45

25

7.50

15

8.15

12

7.53

10

8.78

122.25
122.25
90.30
90.30
87.75
87.75

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

181.25
25

7.25

181.25

01.02.05 Relleno y Compactado de Zanajas Para Tuberias D=160mm, Con Material Seleccionado
Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

96.39
90

7.65

0.40

0.35

25

6.45

0.40

0.35

25

7.50

0.40

0.35

15

8.15

0.40

0.35

12

7.53

0.40

0.35

10

8.78

0.40

0.35

25

7.25

0.40

0.35

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

12.64
12.29

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

17.12
12.64

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

26.25
17.12

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

22.58
26.25

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

96.39
22.58

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

12.29
25.38
25.38

01.02.06 Eliminacion de Material Excedente Con Equipo


Jr. Bolognesi (Tramo San Martin - 28 de Julio)
SAN MARTIN - 28 DE JULIO

96.39
90

7.65

0.40

0.35

25

6.45

0.40

0.35

25

7.50

0.40

0.35

15

8.15

0.40

0.35

12

7.53

0.40

0.35

10

8.78

0.40

0.35

25

7.25

0.40

0.35

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

17.12
12.64
12.29

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

26.25

12.64

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

22.58

17.12

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

96.39

26.25

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

1.25

22.58

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

187.50

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

265.79

187.50

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

161.25

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

212.63

161.25

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

688.50

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

1,518.80
688.50

12.29
25.38
25.38

01.03 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS


01.03.01 Doble Prueba Hidraulica Tuberia PVC DN=160mm - Alcantarillado

1,518.80

Jr. Bolognesi (Tramo San Martin - 28 de Julio)


SAN MARTIN - 28 DE JULIO

688.50
90

7.65

25

6.45

25

7.50

15

8.15

Jr. Sebastian Chipana (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

161.25

Jr. Bolivar (Tramo Los Incas - Los Andes)


LOS INCAS - LOS ANDES

161.25
187.50

Jr. Ramon Castilla (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

688.50

187.50
122.25
122.25

Jr. Sucre (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

90.30
12

7.53

10

8.78

Jr. 28 de Julio (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI

87.75

Jr. Los Andes (Tramo San Martin - Bolivar)


SAN MARTIN - BOLIVAR

90.30
87.75
181.25

25

7.25

181.25

METRADOS DE OBRA
OBRA:

"MEJORAMIENTO VIAL DE LAS CALLES DEL CASCO URBANO DE LA LOCALIDAD DE QUILCAS , DISTRITO DE QUILC
HUANCAYO JUNN"

PPTO:

CONSTRUCCION DE VEREDAS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE QUILCAS


FECHA:

ENERO DEL 2015

PART.

DESCRIPCION

# VECES

DISTRITO:

QUILCAS

PROVINCIA:

HUANCAYO

REGIN:

JUNN
DIMENSIONES

LARGO

ANCHO

ALTO

05.00 ALCANTARILLADO PLUVIAL


05.01 BUZONES
05.01.01 OBRAS PRELIMINARES
05.01.01.01 Limpieza de Terreno Manual
Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)
BZ-PL 01

area

2.55

BZ-PL 02

area

2.55

BZ-PL 03

area

2.55

BZ-PL 01

area

2.55

BZ-PL 02

area

2.55

BZ-PL 03

area

2.55

BZ-PL 01

area

2.55

0.80

BZ-PL 02

area

2.55

1.90

BZ-PL 03

area

2.55

0.65

BZ-PL 01

1.25

area

2.55

0.80

BZ-PL 02

1.25

area

2.55

1.90

BZ-PL 03

1.25

area

2.55

0.65

BZ-PL 01

5.66

0.10

BZ-PL 02

5.66

0.10

BZ-PL 03

5.66

0.10

BZ-PL 01

area

0.22

0.30

BZ-PL 02

area

0.22

0.30

BZ-PL 03

area

0.22

0.30

BZ-PL 01

0.40

0.40

0.40

BZ-PL 02

0.40

0.40

0.40

BZ-PL 03

0.40

0.40

0.40

03.01.02 Trazo, Nivelacin y Replanteo


Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)

03.02 MOVIMIENTO DE TIERRAS


03.02.01 Excavacion De Buzon En Terreno Normal
Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)

03.02.02 Eliminacion Material Excedente Con Equipo


Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)

03.03 CONCRETO SIMPLE


03.03.01 Solado Para Buzon E=10cm Mezcla 1:12 (Cemento - Hormigon)
Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)

03.03.02 Concreto f'c=140 kg/cm2, P/Canaleta De Buzon


Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)

Dados De Concreto - Alfonso Ugarte (Tramo Los Incas - Los Andes)

03.04 CONCRETO ARMADO (techo de buzon)


03.04.01 Concreto f'c=210 kg/cm2, Para Buzones
Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)
BZ-PL 01

area

1.01

0.60

(base de buzon)

area

2.55

0.20

(techo de buzon)

area

2.55

0.20

BZ-PL 02

area

1.01

1.70

(base de buzon)

area

2.55

0.20

(techo de buzon)

area

2.55

0.20

BZ-PL 03

area

1.01

0.45

(base de buzon)

area

2.55

0.20

(techo de buzon)

area

2.55

0.20

long.

5.66

0.80

long.

4.40

0.80

(techo de buzon)

long.

5.66

0.20

BZ-PL 02

long.

5.66

1.90

long.

4.40

1.90

(techo de buzon)

long.

5.66

0.20

BZ-PL 03

long.

5.66

0.65

long.

4.40

0.65

long.

5.66

0.20

03.04.02 Encofrado y Desencofrado Para Buzones


Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)
BZ-PL 01

(techo de buzon)
03.04.03 Acero de Refuerzo fy= 4200 kg/cm2
Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)
BZ-PL 01

1/2"

N VECES

CANTIDAD

LONGITUD

PESO (KG/M)

7.00

1.68

0.99

3.00

1.60

0.99

3.00

1.49

0.99

3.00

1.36

0.99

3.00

1.18

0.99

3.00

0.93

0.99

4.00

1.59

0.99

BZ-PL 02

N VECES

1/2"

7.00

1.68

0.99

3.00

1.60

0.99

3.00

1.49

0.99

3.00

1.36

0.99

3.00

1.18

0.99

3.00

0.93

0.99

4.00

1.59

CANTIDAD

LONGITUD

PESO (KG/M)

0.99

BZ-PL 03

N VECES

1/2"

7.00

1.68

0.99

3.00

1.60

0.99

3.00

1.49

0.99

3.00

1.36

0.99

3.00

1.18

0.99

3.00

0.93

0.99

4.00

1.59

0.99

CANTIDAD

LONGITUD

PESO (KG/M)

QUILCAS , DISTRITO DE QUILCAS

QUILCAS
HUANCAYO
JUNN
METRADO
PARCIAL

TOTAL

UNID

7.65

7.65

8.54

10.68

1.70

0.58

5.84

7.65
2.55
2.55
2.55
7.65
2.55
2.55
2.55

8.54
2.04
4.85
1.66
10.68
2.55
6.06
2.07

1.70
0.57
0.57
0.57
0.20
0.07
0.07
0.07
0.38
0.13
0.13
0.13

5.84
0.61
0.51
0.51
1.72

0.51
0.51
0.45
0.51
0.51
37.10

112.27

kg

37.10
4.53
3.52
1.13
10.75
8.36
1.13
3.68
2.86
1.13

37.42
11.64
4.75
4.43
4.04
3.50
2.76
6.30
37.42
11.64
4.75
4.43
4.04
3.50
2.76
6.30
37.42
11.64
4.75
4.43
4.04
3.50
2.76
6.30

METRADOS DE OBRA
OBRA:

"MEJORAMIENTO VIAL DE LAS CALLES DEL CASCO URBANO DE LA LOCALIDAD DE QUILCAS , DISTRITO DE QUILC
HUANCAYO JUNN"

PPTO:

CONSTRUCCION DE VEREDAS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE QUILCAS


FECHA:

ENERO DEL 2015

PART.

DESCRIPCION

# VECES

DISTRITO:

QUILCAS

PROVINCIA:

HUANCAYO

REGIN:

JUNN
DIMENSIONES

LARGO

ANCHO

ALTO

03.00 PAVIMENTO
03.01.00 MEJORAMIENTO A NIVEL DE SUB - RASANTE
03.01.01 Corte a nivel de Mejoramiento de sub Rasante con Maquinaria E=10cm
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

580.00

9.50

0.10

Jirn Santa Cruz (Tramo Los Incas - Los Andes)

177.00

6.40

0.10

Jirn 27 De Mayo (Tramo Los Incas - Los Andes)

176.00

6.40

0.10

Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)


LOS INCAS - BOLOGNESI

86.11

6.40

0.10

BOLOGNESI - LOS ANDES

85.30

6.40

0.10

LOS INCAS - BOLOGNESI

85.82

6.40

0.10

BOLOGNESI - LOS ANDES

85.30

6.40

0.10

LOS INCAS - BOLOGNESI

86.15

6.40

0.10

BOLOGNESI - LOS ANDES

85.70

6.40

0.10

85.60

9.00

0.10

Jirn Catalina Huanca (Tramo Los Incas - Los Andes)

Jirn Huancayo (Tramo Los Incas - Los Andes)

Jirn Lima (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI
03.01.03 Perfilado y Compactado a nivel de Mejoramiento De S-R
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

580.00

9.50

Jirn Santa Cruz (Tramo Los Incas - Los Andes)

177.00

6.40

Jirn 27 De Mayo (Tramo Los Incas - Los Andes)

176.00

6.40

Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)


LOS INCAS - BOLOGNESI

86.11

6.40

BOLOGNESI - LOS ANDES

85.30

6.40

LOS INCAS - BOLOGNESI

85.82

6.40

BOLOGNESI - LOS ANDES

85.30

6.40

LOS INCAS - BOLOGNESI

86.15

6.40

BOLOGNESI - LOS ANDES

85.70

6.40

85.60

9.00

Jirn Catalina Huanca (Tramo Los Incas - Los Andes)

Jirn Huancayo (Tramo Los Incas - Los Andes)

Jirn Lima (Tramo Los Incas - Bolognesi)


LOS INCAS - BOLOGNESI
03.01.04 Relleno con Material De Sub - Rasante E=10cm
Jr. Fco. Bolognesi (Tramo Lima - Chacamarca)

580.00

9.50

0.10

Jirn Santa Cruz (Tramo Los Incas - Los Andes)

177.00

6.40

0.10

Jirn 27 De Mayo (Tramo Los Incas - Los Andes)

176.00

6.40

0.10

Jirn Alfonso Ugarte (Tramo Los Incas - Los Andes)


LOS INCAS - BOLOGNESI

86.11

6.40

0.10

BOLOGNESI - LOS ANDES

85.30

6.40

0.10

LOS INCAS - BOLOGNESI

85.82

6.40

0.10

BOLOGNESI - LOS ANDES

85.30

6.40

0.10

LOS INCAS - BOLOGNESI

86.15

6.40

0.10

BOLOGNESI - LOS ANDES

85.70

6.40

0.10

Jirn Catalina Huanca (Tramo Los Incas - Los Andes)

Jirn Huancayo (Tramo Los Incas - Los Andes)

Jirn Lima (Tramo Los Incas - Bolognesi)

LOS INCAS - BOLOGNESI


03.01.05 Eliminacin de Material Excedente (Maquinaria)

85.60

9.00

0.10

1,183

237

F(e)
Total excavacin
Corte

20%
1,183

QUILCAS , DISTRITO DE QUILCAS

QUILCAS
HUANCAYO
JUNN
METRADO
PARCIAL

TOTAL

UNID

1,183.16

11,831.63

1,183.16

551.00
113.28
112.64
55.11
54.59
54.92
54.59
55.14
54.85
77.04
5510.00
1132.80
1126.40
551.10
545.92
549.25
545.92
551.36
548.48
770.40
551.00
113.28
112.64
55.11
54.59
54.92
54.59
55.14
54.85

77.04
1,419.80
1419.80