You are on page 1of 12

SBP Rebar (Design)

Wall 1

Bar Mark
V1A
V1B
V1C
V1D
V1E
V1F
V1G
V1H
V1J
V1K
V1L
V1M
V2A
V2B
V2C
V2D
V2E
V2F
V2G
V3A
H1A
H1B
H1C
H1D
H1E
H1F
H1G
H2A
H2B
Links (H)
Links (V)
5% Waste

Wall 3
V1A
V1B
V1C
V1D
V1E
V1F
V1G

Bar Size (mm) Spacing (mm)


T40
300
T32
150
T32
150
T40
300
T32
300
T32
150
T32
150
T32
300
T40
300
T40
300
T32
300
T32
300
T40
150
T32
150
T32
150
T25
300
T25
300
T25
300
T25
300
T25
150
T32
150
T25
300
T25
150
T25
150
T25
150
T32
150
T25
300
T32
150
T32
150
T13
150
300

T32
T32
T32
T32
T32
T32
T32

300
150
150
150
150
150
300

Wall Height
(mm)

20389
20389
16189
16189
16189
20389
20389
20389
20389
16189
16189

Wall Width
(mm)
26700
26700
26700
26700
24300
24300
24300
24300
26700
26700
24300
24300
26700
26700
26700
24300
24300
24300
24300
26700

24300
24300

23399
18575
23399
23399
23399
23399
23399

Bar Qty.
89
178
178
89
81
162
162
81
89
89
81
81
178
178
178
81
81
81
81
178
136
68
108
108
108
136
68
136
136
108
81

78
124
156
156
156
156
78

Bar Length
(m)
7.46
12
3.87
7.38
9.4
6
6
3.97
7.1
7.44
7.66
5.71
7.3
5.3
7.55
5.325
4.05
3.9
5.475
7.14
12
11.88
6
12
12
11.685
9.03
6.645
4.905
1.6

6.82
12
6
6
12
6
7.66

unit wt. (kg/m)


9.865
6.313
6.313
9.865
6.313
6.313
6.313
6.313
9.865
9.865
6.313
6.313
9.865
6.313
6.313
3.853
3.853
3.853
3.853
3.853
6.313
3.853
3.853
3.853
3.853
6.313
3.853
6.313
6.313
1.042

Bar wt. (kg)


6549.50
13485.30
4349.01
6479.27
4806.98
6136.57
6136.57
2030.18
6233.44
6531.94
3917.18
2919.99
12818.06
5956.01
8484.50
1662.05
1264.09
1217.28
1708.87
4897.31
10303.38
3112.90
2496.98
4993.95
4993.95
10032.91
2366.12
5705.50
4211.51
14583.94

Total Rebar wt. =

8519.26
178904.52
178.90

6.313
6.313
6.313
6.313
6.313
6.313
6.313

3358.45
9394.26
5909.29
5909.29
11818.58
5909.29
3772.10

Wall Thickness
(mm)
1400

Ratio =
ton
1200

V1H
V1J
V1K
V1L
V1M
V1N
V1O
V1P
V1Q
V1R
V1S
V2A
V2B
V2C
V2D
V2E
V3A
V3B
H1A
H1B
H1C
H1D
H1E
H1F
H1G
H1H
H1J
H1K
H2A
H2B
H2C
H2D
H2E
H3A
Links (H)
Links (V)
Links (H)
Links (V)
Links (H)
Links (V)
5% Waste

T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T40
T32
T40
T40
T40
T32
T32
T40
T40
T40
T32
T32
T40
T32
T40
T32
32
32
T40
T40
T32
T20
T16
T13

150
150
150
150
150
300
300
300
300
150
150
300
150
300
300
300
300
300
300
150
300
150
300
300
300
300
300
300
150
150
150
150
150
150
125
250
150
300
150
300

20676
26700
26700
26700
26700
26700
23399
23399
26700
4824
6025
5330
5330
26700
5330
26700
26700
26700
42476
42476
42476
44078
44078
44078
42476
42476
44078
44078
20389
29520
29520
29520
29520
20389
2987
2987
15800
15800
9131
9131

23399
23399
23399
23399
23399
23399

138
178
178
178
178
89
78
78
89
33
41
18
36
89
18
89
89
89
142
284
142
294
147
147
142
142
147
147
136
197
197
197
197
136
24
94
106
78
61
78

12
6
6
12
6
7.72
10.3
5.92
7.98
9.575
9.575
9.50
6
7.72
11.24
7.78
4.055
5.695
9.215
12
9.215
12
11.2
8.74
7.48
10.95
8.38
11.20
4.15
4.64
4.2
5.33
7.49
5.33
1.4

6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
9.865
6.313
9.865
9.865
9.865
6.313
6.313
9.865
9.865
9.865
6.313
6.313
9.865
6.313
9.865
6.313
6.313
6.313
9.865
9.865
6.313
2.466

10454.90
6742.65
6742.65
13485.30
6742.65
4337.77
5072.14
2915.25
4483.86
1994.86
2478.46
1079.58
1363.68
6777.77
1277.32
6830.45
3560.09
4999.92
8261.20
21515.88
12908.13
34802.31
16241.08
8111.26
6701.30
15331.46
7777.16
16241.08
3563.25
5770.90
5223.66
10357.93
14555.51
4576.42
7789.09

1.4

1.578

18269.56

1.4

1.042

6940.63

Total Rebar wt. =


Wall 2
V1A
V1B
V1C

T32
T32
T32

300
150
150

24300
24300
24300

81
162
162

6.64
12
6

6.313
6.313
6.313

18117.42
380465.79
380.47
3395.57
12273.14
6136.57

Ratio =
ton
1200

V1D
V1E
V1F
V1G
V1H
V1J
V1K
V1L
V1M
V2A
V2B
H1A
H1B
H1C
H1D
H1E
H1F
H1G
H1H
H1J
H1K
H1L
H2A
H2B
H2C
H2D
H2E
H2F
H2G
Links (H)
Links (V)
Trimmer Bar
5% Waste

T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T40
T32
T32
T32
T32
T40
T32
T32
T32
T32
T40
T25
T32
T32
T25
T32
T32
T13

150
150
150
300
150
150
150
150
150
150
150
150
300
300
300
300
300
300
300
300
300
300
150
150
150
300
150
150
300
150
300

24300
24300
24300
24300
24300
24300
24300
24300
24300
24300
24300
40053
40053
40053
40053
40053
40053
40053
40053
40053
40053
40053
10700
10700
6200
6200
10639
6200
6200
26889
26889

24300
24300

T32

162
162
162
81
162
162
162
162
162
162
162
268
134
134
134
134
134
134
134
134
134
134
72
72
42
21
71
42
21
180
81
8

6
12
10.26
10.12
8.52
6
6
12
12
5.5
3.925
9.215
12
9.22
12.00
9.22
10.955
8.52
10.955
10.955
8.52
10.96
5.33
4.20
9.27
12
5.33
10.96
8.52
1.4

6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
9.865
6.313
6.313
6.313
6.313
9.865
6.313
6.313
6.313
6.313
9.865
3.853
6.313
6.313
3.853
6.313
6.313
1.042

6136.57
12273.14
10493.54
5175.17
8713.93
6136.57
6136.57
12273.14
12273.14
5625.19
4014.34
15591.56
15862.28
7795.78
10151.86
7795.78
9267.80
11262.22
9267.80
9267.80
7207.82
9267.80
3785.64
1165.26
2456.71
1590.96
1458.23
2904.83
1129.58
21268.25

125.22

6.313

6324.46
13293.95
279172.96
279.17
60.94
264.61

Total Rebar wt. =


Opening Area =
WITH OPENING =
Wall A
V1A
V1B
V1C
V1D
V1E
V1F
V1G
V1H
V1J

T32
T32
T32
T32
T32
T32
T32
T32
T32

150
150
150
300
150
300
300
300
300

12375
12375
12375
10975
10975
10975
10975
10975
3600

83
83
83
37
74
37
37
37
12

6
12
10.52
6.22
12
5.71
7.96
3.97
4.5

6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313

3144.05
6288.09
5512.56
1452.95
5606.25
1333.82
1859.41
927.37
340.92

Ratio =
ton
m
ton
1200

V1K
V1L
V1M
V1N
V1O
V1P
V1Q
V1R
V1S
V1T
V1U
V1V
V1W
V1X
V1Y
V2A
V2B
V2C
H1A
H1B
H1C
H1D
H1E
H1F
H1G
H2A
H2B
U-BAR
C1A
C1B
C1C
C1D
5% Waste

T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T25
T16
T16
T32
T32
T32
T32
T32
T32
T32
T32
T32
T16
T25
T25
T25
T25

150
150
150
150
150
300
150
150
150
150
150
300
300
300
300
150
125
125
150
150
150
150
300
150
300
300
300
150

3600
3600
3600
3600
3600
3600
6000
6000
6000
6000
6000
6000
3600
3600
6000
13575
3500
3500
16189
16189
20389
20389
21264
21264
21264
20389
20389
36946

24
24
24
24
24
12
40
40
40
40
40
20
12
12
20
91
28
28
108
108
136
136
71
142
71
68
68
246
40
40
40
40

12
6
6
6
12
6.75
12
6
6
6
12
7.9
7.98
4.995
6.16
7.6
4.81
3.8
8.48
12
8.7
10.56
9.36
6.83
5.88
4.955
3.215
2.56
6
6
6
4.973

6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
3.853
1.578
1.578
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
1.578
3.853
3.853
3.853
3.853
Total Rebar wt. =
Opening Area =
WITH OPENING =

Wall D
V1A
V1B
V1C
V1D
V1E
V1F
V1G
V1H
V1J

T32
T32
T32
T32
T32
T32
T32
T32
T32

150
150
150
300
150
300
300
300
300

12375
12375
12375
10975
10975
10975
10975
10975
3600

83
83
83
37
74
37
37
37
12

6
12
10.52
6.22
12
5.71
7.96
3.97
6.925

6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313

1818.24
909.12
909.12
909.12
1818.24
511.38
3030.41
1515.20
1515.20
1515.20
3030.41
997.51
604.57
378.42
777.80
2664.98
212.57
167.93
5782.01
8182.09
7469.95
9066.97
4195.60
6123.06
2635.70
2127.22
1380.22
993.97
924.81
924.81
924.81
766.51
5062.43
106311.01
106.31
52.84
94.56
3144.05
6288.09
5512.56
1452.95
5606.25
1333.82
1859.41
927.37
524.64

Ratio =
ton
m
ton
1200

V1K
V1L
V1M
V1N
V1O
V1P
V1Q
V1R
V1S
V1T
V1U
V1V
V1W
V1X
V1Y
V2A
V2B
V2C
H1A
H1B
H1C
H1D
H1E
H1F
H1G
H2A
H2B
U-BAR
C1A
C1B
C1C
C1D
5% Waste

T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T32
T16
T16
T32
T32
T32
T32
T32
T32
T32
T32
T32
T16
T25
T25
T25
T25

150
150
150
150
150
300
150
150
150
150
150
300
300
300
300
150
125
125
150
150
150
150
300
150
300
300
300
150

3600
3600
3600
3600
3600
3600
6000
6000
6000
6000
6000
6000
3600
3600
6000
13575
3500
3500
16189
16189
20389
20389
23689
23689
23689
20389
20389
36946

24
24
24
24
24
12
40
40
40
40
40
20
12
12
20
91
28
28
108
108
136
136
79
158
79
68
68
246
40
40
40
40

12
6
6
6
12
6.75
12
6
6
6
12
7.9
10.405
4.995
6.16
7.6
4.81
3.8
8.48
12
8.7
10.56
9.36
6.83
5.88
4.955
3.215
2.56
6
6
6
4.973

6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
1.578
1.578
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
6.313
1.578
3.853
3.853
3.853
3.853
Total Rebar wt. =
Opening Area =
WITH OPENING =

Wall B & C
V1A
V1B
V1C
V1D
V1E
V1F
V1G
V1H
V1J

T25
T25
T25
T25
T25
T25
T25
T25
T25

300
150
150
150
150
150
150
150
150

3600
3600
3600
3600
3600
3600
3600
6000
6000

12
24
24
24
24
24
24
40
40

6.725
12
6
6
6
12
6
12
6

3.853
3.853
3.853
3.853
3.853
3.853
3.853
3.853
3.853

1818.24
909.12
909.12
909.12
1818.24
511.38
3030.41
1515.20
1515.20
1515.20
3030.41
997.51
788.28
378.42
777.80
4366.31
212.57
167.93
5782.01
8182.09
7469.95
9066.97
4668.34
6812.98
2932.67
2127.22
1380.22
993.97
924.81
924.81
924.81
766.51
5238.85
110015.84
110.02
52.84
98.20
310.97
1109.77
554.88
554.88
554.88
1109.77
554.88
1849.61
924.81

Ratio =
ton
m
ton
1200

V1K
V1L
V1M
V1N
V1O
V1P
V1Q
H1A
H1B
H1C
5% Waste

T25
T25
T25
T25
T25
T25
T25
T32
T32
T32

150
150
150
150
300
300
300
300
150
300

6000
6000
6000
6000
3600
3600
6000
44078
42478
44078

40
40
40
40
12
12
20
147
284
147

6
6
12
6
9.575
4.575
4.575
9.36
6.83
5.88

3.853
3.853
3.853
3.853
3.853
3.853
3.853
6.313
6.313
6.313
Total Rebar wt. =

CONC. VOLUME =
TOTAL REBAR WT. =
OVERALL RATIO =

924.81
924.81
1849.61
924.81
442.75
211.55
352.58
8686.66
12246.12
5457.00
1977.26
41522.41
41.52

ton

4384
1100
250.84

m
ton
kg/m

Ratio =

Concrete
Volume (m)
702

254.73

1343

1D
1H
2C
2E
1K
1M
2G

6479.27
2030.18
8484.50
1264.09
6531.94
2919.99
1708.87
29.42

1G
1N
2c
3a
1p
2e
1q

3772.10
4337.77
6777.77
3560.09
2915.25
6830.45
4483.86

kg/m

283.21

1168

3b

4999.92
37.68

1k
2b
1f

6136.57
4014.34
10493.54

kg/m

239.03

478

1m

12273.14
32.917589327

1c
1f
2c
1h
1p
1v
1x
1y

5512.56
1333.82
167.93
927.37
511.38
997.51
378.42
777.80
10.606797723

kg/m

Total

222.34

492

kg/m

1c
1f
2c
1h
1p
1v
1x
1y

121.2272385

223.55

184

kg/m

1g
1n
1p
1q

226.27

kg/m

You might also like