DOCUMENT NO.

CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

START

SWITCH ON MAIN AND


PLC

“WELCOME TO DOSHION”
“D.M. + U.F. PLANT

PRESS MODE SELECTION


KEY

“ENTER THE”
“PASSWORD _ _ _ _”

SELECT THE SECTION

D.,M. PLANT
U.F. PLANT
3. ACID / CAUSTIC UNLOADING
4. N-PIT TANK OPERATION

4. N-PIT TANK
OPERATION

D.M PLANT POST UF ACID / CAUSTIC


UNLOADING
1.1 SERVICE MODE 2.1 SERVICE MODE
ACF SERVICE 3.1 PUMP ON / OFF
SAC SERVICE 2.2 UF B/W
SBA SERVICE
MB SERVICE
1.2 BACKWASH/REGN.
MODE
1.2.1 ACF B/W
1.2.2 SAC B/W
1.2.3 SBA B/W
1.2.4 MB B/W

Page 1 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

PLC STARTUP OPERATIONAL LOGICS FOR ACF :

SYSTEM START UP-


NORMAL ACF SERVICE
AUTO MODE

I-
1

OPERATIONAL CHECKS STEPS REMARKS


1 COPM. AIR PR > 5 Kg/cm2 LOCAL GAUGE ON AIR
COMP.

START
SYSTEM

TWO ACF 1001A /B SELECTED

A
SELECT ONE ACF 2
OR TWO ACF
FROM ACF –
1001A/B/C

AUTO OPERATION STEPS REMARKS


START : ALL AUTO VALVES ARE CLOSED CHECK ANY ONE SAC IN
SELECT ACF SERVICE CYCLE MODE SERVICE MODE, SELECT ANY
A. SERVICE WITH AIR VENT (IF ACF-1001A ONE PUMP FROM ANY THREE
SELECTED) PUMP.
A1 TIMER TA START AUTO (START + 0 SEC)
V – 1102 OPEN
AUTO (START + 0 SEC)
A2 V – 1108 OPEN  61,62
CWP – START 1,2,(3&4),12,5
1001A/B/C A
A3 AUTO (STEP A2 + 10 SECS)
ANY ONE 1
SELECTED

STEP A2
IS ELAPSED
TIME = TA ?
NO

YES
SERVICE WITH AIR VENT COMPLETE
Page 2 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

B. PRESERVICE RINSE
B1 TIMER T(B) START AUTO (TA + 0 SEC)
V – 1102 OPEN
B2 AUTO (TA + 0 SEC)
V – 1107 OPEN 61,62
B3 V – 1108 CLOSE AUTO (STEP B2 + 3 SECS)

STEP B2
IS ELAPSED
TIME = TB ? NO

YES

PRE SERVICE RINSE COMPLETE


C. SERVICE CYCLE
C1 TIMER TC START AUTO (TB + 0 SEC)
V-1102 OPEN AUTO (TB + 0 SEC)
C2
V – 1106 OPEN
C3 V – 1107 CLOSE AUTO (STEP C2 + 3 SECS)
STEP C2
IS ELAPSED
TIME = TC ?
NO

YES
IF OPERATOR WANTS TO TAKE
SERVICE CYCLE COMPLETE IN REG. THEN ABLE TO TAKE
After completion of service cycle all valves will be closed after the time (TC+3) seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any ACF first service with air – vent done and then service
cycle .
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves.”

A
NOTE
1 : 1)IF ACF 1001B OR 1001C SELECTED THEN VALVE SERIES OF 2101
… & 3101 COME
2) IF IF ACF 1001C OR 1001A SELECTED THEN VALVE SERIES OF
3101 … & 1101 COME
3) IF IF ACF 1001B OR 1001A SELECTED THEN VALVE SERIES OF
2101 … & 1101 COME
4) CHECK THE SELECTD PUMP RUN CONFIRM FEEDBACK FROM
MCC PANEL. IF NOT AVAILABLE THEN MESSAGE COME “RUN CONFIRM
MISSING CWP-1001 A/B/C” (AS PER SELECTED PUMP A/B/C) FOR EVERY
CYCLE OF ACF –SERVICE & ACF BACKWASH
Page 3 & 43
DATA
ACQUISITION &
EVENT LOGGED
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

5) IF ACF 1001B AND 1001C SELECTED THEN VALVE SERIES OF


2101 … & 3101 COME
6) IF ACF 1001C AND 1001A SELECTED THEN VALVE SERIES OF
1101 … & 3101 COME
7) MAXIMUM TIME REQUIRED FOR ANY AUTO VALVE(IN WHOLE
SYSTEM) OPEN / CLOSE FEED BACK AFTER OPEN / CLOSE COMMAND IS
7 SEC (FIXED) IF NOT RECEIVED WITHIN THE SET TIME AN OPERATOR
ALARM WILL RAISED AND SERVICE / REGNERATION / BACKWASH
CYCLE WILL PAUSE. An OVER RIDE SOFT BUTTON WILL BE PROVIDED
FOR THE OPERATOR TO RESET THE ALARM AND CONTINUE WITH THE
CYCLE IF HE WANTS
8) IN SAC SERVICE CYCLE SELECT DGT – 1001A/B
IF DGT-1001A SELECTED THEN V-5012 VALVE OPEN AND ANY
ONE SELECTED BLOWER DGB – 1001 A/B/C START
IF DGT-1001B SELECTED THEN V-5016 VALVE OPEN AND ANY
OEN SELECTED BLOWER DGB-1001 A/B/C START.
IF TWO SAC IS IN SERVICE THEN TWO DGT-1001 A/B START
AND BOTH VALVE V-5012 & V-5016 OPEN AND ANY TWO SELECTED DGB
-1001A/B/C START
9) HOLD SOFT BUTTON WILL BE PROVIDED TO PROLONG THE
CURRENT STEP FOR EVERY CYCLE OF ACF / SAC /SBA /MB AND UF
SYSTEM AT OPERATOR DISCRETION.
10) IN WHOLE SYSTEM FOR EVERY PUMP BEFORE STARTING
THE PUMP CHEK STATUS OF O/L FEED BACK. IF NOT HEALTHY THEN
ALARY COME AND OPERATOR RESET ALARM AND THEN ABLE TO
START THE PUMP.
11) IN OUR SYSTEM ALL PUMP AND DOSING PUMP IF WORKING
PUMP IS TRIP FOR ANY INTERLOCK THEN STAND BY PUMP WILL START IN
AUTO.
AUTO OPERATION STEPS REMARKS
START : ALL AUTO VALVES ARE CLOSED ANY TWO SAC IN SERVICE
SELECT ANY TWO ACF SERVICE CYCLE (ACF-1001A& MODE SELECTED
B)
A. SERVICE WITH AIR VENT FIRST SELECT ANY TWO PUMP
FROM ANY THREE PUMP
A1 TIMER TA1 START AUTO (START + 0 SEC)
V – 1102 , 2102 OPEN
AUTO (START + 0 SEC)
A2 V – 1108 , 2108 OPEN  61,62
CWP – START 1,2,(3&4),12,5
1001A/B/C
A3 AUTO (STEP A2 + 10 SECS)
ANY TWO
SELECTED

Page 4 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

STEP A2
IS ELAPSED
TIME = TA1 ?
NO

YES
SERVICE WITH AIR VENT COMPLETE
B. PRESERVICE RINSE
B1 TIMER T(B1) START AUTO (TA1 + 0 SEC)
V – 1102 , 2102 OPEN
B2 AUTO (TA1 + 0 SEC)
V – 1107 , 2107 OPEN  61,62
B3 V – 1108 , 2108 CLOSE AUTO (STEP B2 + 3 SECS)

STEP B2
IS ELAPSED
TIME = TB1 ? NO

YES

PRE SERVICE RINSE COMPLETE


C. SERVICE CYCLE
C1 TIMER TC1 START AUTO (TB1 + 0 SEC)
V-1102 , 2102 OPEN AUTO (TB1 + 0 SEC)
C2
V – 1106 , 2106 OPEN
C3 V – 1107 , 2107 CLOSE AUTO (STEP C2 + 3 SECS)
STEP C2

IS ELAPSED NO
TIME = TC1 ?

YES
IF OPERATOR WANTS TO TAKE
SERVICE CYCLE COMPLETE IN REG. THEN ABLE TO TAKE
After completion of service cycle all valves will be closed the time (TC+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any ACF first service with air – vent done and then service
cycle .
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves.”
A2

Page 5 & 43
DATA IS ELAPSED
ACQUISITION & TIME = TC ?
EVENT LOGGED
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

ACF B/W CYCLE


AUTO MODE

I-
2
OPERATIONAL CHECKS STEPS REMARKS
1 COPM. AIR PR > 5 Kg/cm2

START
SYSTEM

SELECT ONE ACF –


1001A/B/C
FOR B/W

Starting condition for ACF B/W cycle :-


1) Either of pumps CWP – 1101 A/B/C/ in running condition.  1
2) Check Interlock 61 & 62 High level at N-pit tank.
3) Check no ANY OTHER ACF IN B/W MODE AT A TIME ONLY SINGLE ACF IN B/W
CYCLE.
4) IF ACF -1001A SELECTED THEN GO WITH VALVE SERIES –V1105,
IF ACF-1001B SELECTED THEN GO WITH VALVE SERIES V-2105,
IF ACF-1001C SELECTED THEN GO WITH VALVE SERIES V-3105.

C1

Page 6 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

C1

AUTO OPERATION STEPS REMARKS


LS-5011 &LS-5012 (61 & 62) (STARTUP SELECT ANY ONE ACF
CONDITION) FROM ACF-1001A/B/C
A. ACF BACKWASH
A1 TIMER TD START AUTO (START + 0 SEC)
A2 V-1105 OPEN AUTO (START + 0 SEC)
V-1103 OPEN  61,62
A3 CWP-1001A/B/C START 1,2,(3&4),5 AUTO (STEPA2+7 SECS)
ANY ONE

STEP A2
IS ELAPSED
TIME = TD? NO

YES
B.RINSE :
B1 TIMER TE START AUTO (TD + 0 SEC)
B2 V - 1102 OPEN AUTO (TD+ 0 SEC )
V-1107 OPEN  61,62
B3 V -1105 CLOSE AUTO (STEP B2 + 3 SEC)
V – 1103 CLOSE

STEP B2
IS ELAPSED
TIME = TE? NO

YES
SELECTED ACF BACKWASH COMPLETED
After completion of cycle all valves will be closed the time (TE+3)seconds.
All timers are settable and operator can set the time.
If backwash cycle timer stopped due to any reason service cycle timer will pause but not
reset.An over ride soft button will be provided for the Operator to reset the alarm and
continue with the cycle if he wants
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of
next cycle valves

DATA ACQUISITION AND


EVENT LOGGED

Page 7 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

SAC OPERATION :

SYSTEM START UP-


NORMAL SAC SERVICE
AUTO MODE

I-
3

OPERATIONAL CHECKS STEPS REMARKS


1 COPM. AIR PR > 5 Kg/cm2

START
SYSTEM

START UP CONDITION :
1) CLARIFIED PUMP CPW-1001A/B/C SELECTED IN AUTO MODE
2) DEGASSER STORAGE TANK LEVEL NOT BE HIGH – 12(LT-5001)
3) ANY ONE ACF TO BE IN SERVICE MODE.

TWO SAC A/B /C SLECTED

SELECT ONE SAC D


OR TWO SAC 2
FROM SAC –
1001A/B/C

ONE SAC A/B/C SLECTED

D
1

Page 8 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

AUTO OPERATION STEPS REMARKS


START : ALL AUTO VALVES ARE CLOSED
SELECT ANY ONE SAC SERVICE CYCLE CHEK ANY ONE ACF IN
SERVICE
A. SERVICE WITH AIR RELEASE (AIR VENT)
A1 TIMER TF START AUTO (START + 0 SEC)
V – 1110 OPEN
AUTO (START + 0 SEC)
A2 V – 1120 OPEN 61,62
CWP – ON 1,2,(3&4),12,5
1001A/B/C
A3 AUTO (STEP A2 + 7 SECS)
ANY ONE
SELECTED
STEP A2
IS ELAPSED
TIME= TF? NO

YES
SERVICE WITH AIR VENT COMPLETE
B. PRE SERVICE RINSE (FAST RINSE)
B1 TIMER TG START AUTO (TF + 0 SEC)
V-1110 OPEN AUTO (TF + 0 SEC)
B2
V -1119 OPEN  61,62
B3 V-1120 CLOSE AUTO (STEP B2 + 3 SEC)
STEP B2

IS ELAPSED NO
TIME= TG?

YES
PRE SERVICE RINSE COMPLETE.
C. SERVICE CYCLE SELECT DGT-1001 A/B
C1 TIMER TH START AUTO (TG + 0 SEC)
V-1110 OPEN AUTO (TG + 0 SEC)
V-1118 OPEN  D3,12
C2 V-5012 or V-5016 OPEN  D3,12
DGB-1001A/B/C (SELECT ANY DGT-1001A/B)
ON D3,12
ANY SELECTED
C3 V-1119 CLOSE AUTO (STEP C2 + 3 SEC)

STEP C2
IS ELAPSED TIME=
TH? NO

YES
MESSAGE COME REGNERATION
SERVICE CYCLE COMPLETE REQUIRE GOTO E1

Page 9 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

After completion of cycle all valves will be closed the time (TH+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any SAC first service with air – vent done and then service
cycle .
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves”.
D
1

D3

CHECK : CONDUCTIVITY
DIFFERENCE VALUE EXCEEDS THE
SET VALUE FOR MORE THAN 5
MINUTES.
CA-1104(6), CA-1103(7), CA-2104(8),
CA-2103(9), CA-3104(10), CA-
3103(11)

YES

NO
 GO TO INTERLOCK 6,7,8,9,10,11 YES
 STOP SAC SERVICE CYCLE AND PARTICULAR SAC COME IN
ISOLATION MODE – ALL CYCLE STOP
C1
 1MESSAGE COME SAC-1001A/B/C REGNERATION REQUIRE.

C11

E1

DATA
ACQUISITION Page 10 & 43
AND EVENT
LOGGED
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

E1 SAC REGENERATION

PRE CONDITIONS FOR SAC REGANERATION:


1)At least any one DGWTP should be running (Healthy Condition) 12
2)The other SAC should not be in regeneration mode.
3) At least one ACF- 1001A/B/C should be in service. In case if one stream in
service then both ACF-1001A/B/C should be in service.
4) Both N-Pit level should not be high. LS-5011(61), LS-5012(62)
5)Selected SAC AMT level should be high. LS-5001(63 & 64), LS-5002(65 & 66)

SELECT ONLY
ONE SAC FROM
1001 A/B/C

E2

Page 11 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

E2

REMARKS
START : ALL AUTO VALVES ARE CLOSED
SELECT SAC RGENERATION Atleast any one ACF should be in
service.
A. AIR RELEASE (AIR VENT)
A1 TIMER TI START AUTO (START + 0 SEC)
V – 1110 OPEN
AUTO (START + 0 SEC)
A2 V – 1120 OPEN 61,62
CWP – ON 1,2,(3&4),12,5
1001A/B/C
A3 AUTO (STEP A2 + 7 SECS)
ANY ONE
SELECTED
STEP A2

NO
IS ELAPSED
TIME =TI?

YES
SERVICE WITH AIR VENT COMPLETE
OPERATOR ABLE TO BYPASS THIS
B. BACKWASH (OPTIONAL) OPTION IF HE WANTS
B1 TIMER TJ START AUTO (TI + 0 SEC)
V-1116 OPEN AUTO (TI + 0 SEC)
B2
V -1111 OPEN  61,62
V-1110 CLOSE AUTO (STEP B2 + 3 SEC)
B3 V-1120 CLOSE

STEP B2

IS ELAPSED NO
TIME= TJ?

YES
BACKWASH COMPLETE
C. MIDDLE COLLECTOR FLUSH
C1 TIMER TK START AUTO (TJ + 0 SEC)
C2 V-1114 OPEN AUTO (TJ + 0 SEC)
Page 12 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

V-1111 OPEN  61,62


C3 V-1116 CLOSE AUTO (STEP C2 + 3 SEC)
STEP C2

NO
IS ELAPSED NO
TIME= TK?
YES

E3
E3

MIDDLE COLLECTOR FLUSH COMPLETE


D. ACID PRE INJECTION SELECT AMT-1001A/B FOR ACID PRE INJ.
D1 TIMER TL START AUTO (TK + 0 SEC)
V-1115 OPEN 61,62
V-5071 OR 5072 OPEN
D2 AUTO (TK + 0 SEC)
V-1117 OPEN
V-1112 OPEN
V-1114 CLOSE
D3 AUTO (STEP D2 + 3 SEC)
V-1111 CLOSE
DGWTP – 1001A/B/C
ON13,14,15,16 AUTO (STEP D2 + 7 SEC)
D4 ANY ONE SELECTED

STEP D2

NO

YES
ACID PRE INJECTION COMPLETE
E. ACID INJECTION
E1 TIMER TM START AUTO (TL + 0 SEC)
V-1115 OPEN  61,62
V-5071 OR 5072 OPEN  63,65
E2 V-1117 OPEN AUTO (TL + 0 SEC)
V-1112 OPEN
V-5075 OR 5076 OPEN  63,65
IS ELAPSED
TIME=TL?
STEP E2
IS ELAPSED TIME=TM? OR LOW NO
LEVEL IN AMT-1001A/B
63 OR 65 WHICH IS EARLIEST

YES

Page 13 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

E4

E4

ACID INJECTION COMPLETE

STEP F2
F. SLOW RINSE
F1 TIMER TN START AUTO (TM + 0 SEC)
V-1115 OPEN  61,62
V-5071 OR 5072 OPEN
F2 AUTO (TM + 0 SEC)
V-1117 OPEN
V-1112 OPEN
F3 V-5325 OR 5326 CLOSE AUTO (STEP F2 + 3 SEC)

NO
IS ELAPSED
TIME=TN?

YES

SLOW RINSE COMPLETE


FAST RINSE
G1 TIMER TO START AUTO (TN + 0 SEC)
V-1110 OPEN
G2 AUTO (TN + 0 SEC)
V-1119 OPEN  61,62
V-1115 CLOSE
V-5071 OR 5072 CLOSE AUTO (STEP G2 + 3
G3
V-1117 CLOSE SEC)
V-1112 CLOSE
G4 DGWTP – 1001A/B/C OFF AUTO (TN + 0 SEC)
HERE FACILITY WILL BE PROVIDED FOR OPERATOR TO GO FOR REPEATED FAST RINSE
CYCLES BY SELECTING EXTRA FAST RINSE BY SOFT BUTTONS.
After completion of cycle all valves will be closed time (TIMER PERTICULAR +3)seconds.
All timers are settable and operator can set the time.
If regeneration cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next cycle
valves
MESSAGE COME “ SAC -1001 A/B/C REGNERATION COMPLETED “

Page 14 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

DATA
ACQUISITION
AND EVENTAUTO OPERATION STEPS REMARKS
LOGGED START : ALL AUTO VALVES ARE CLOSED
SELECT SAC SERVICE CYCLE (FOR TWO SAC-1001A/B ANY TWO ACF IN SERVICE MODE
SELECTED) SELECTED
A. SERVICE WITH AIR RELEASE (AIR VENT)
A1 TIMER TF1 START AUTO (START + 0 SEC)
V – 1110, 2110 OPEN
AUTO (START + 0 SEC)
A2 V – 1120, 2120 OPEN  61,62
CWP – 1001A/B/C ON 1,2,(3&4),12,5
A3 ANY TWO AUTO (STEP A2 + 7 SECS)
SELECTED
STEP A2
IS ELAPSED
TIME= TF1? NO

YES
SERVICE WITH AIR VENT COMPLETE
B. PRE SERVICE RINSE (FAST RINSE)
B1 TIMER TG1 START AUTO (TF1 + 0 SEC)
V-1110, 2110 OPEN AUTO (TF1 + 0 SEC)
B2
V -1119, 2119 OPEN
B3 V-1120, 2120 CLOSE AUTO (STEP B2 + 3 SEC)
STEP B2

IS ELAPSED
TIME= TG1? NO

YES
PRE SERVICE RINSE COMPLETE.
C. SERVICE CYCLE SELECT BOTH DGT-1001A &B
C1 TIMER TH1 START AUTO (TG1 + 0 SEC)
V-1110,2110 OPEN
V-1118,2118 OPEN D3,12
V-5016 OPEND3,12 AUTO (TG1 + 0 SEC)
C2 V-5012 OPEN  D3,12
DGB – 1001A/B/C
ANY TWO ON  D3,12
SELECTED
C3 V-1119,2119 CLOSE AUTO (STEP C2 + 3 SEC)
STEP C2

IS ELAPSED
TIME= TC? NO

YES

Page 15 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

SERVICE CYCLE COMPLETE. MESSAGE COME “REGNERATION REQUIRE GO TO


E1”
After completion of cycle all valves will be closed the time (TH1+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any SAC first service with air – vent done and then service
cycle .
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves
D
2

C1
1

DATA
ACQUISITION Page 16 & 43
AND EVENT
LOGGED
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

SBA OPERATION

SYSTEM START UP-


NORMAL SBA SERVICE
AUTO MODE

I-
4

OPERATIONAL CHECKS STEPS REMARKS


1 COPM. AIR PR > 5 Kg/cm2

START
SYSTEM

START UP CONDITION :
1) SELECTED DGWTP-1001A/B/C SHOULD BE IN AUTO MODE
2) DEGASSER STORAGE TANK DGWST-1001 LEVEL NOT BE LOW – 12(LT-5001)
3) ANY ONE MB-1001A/B/C TO BE IN SERVICE MODE.
4) SELECTED DGWTP-1001A/B/C IN AUTO MODE

TWO SBA 1001- A/B/C SLECTED

SELECT ONE SBA F


OR TWO SBA 2
FROM SAC –
1001A/B/C

ONE SBA-1001 A/B/C


SLECTED

Page 17 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

F
1

AUTO OPERATION STEPS REMARKS


START : ALL AUTO VALVES ARE CLOSED
SELECT SBA SERVICE CYCLE ANY ONE MB SHOULD BE
SELECTED (I5)
A. SERVICE WITH AIR RELEASE (AIR VENT)
A1 TIMER TP START AUTO (START + 0 SEC)
V – 1122 OPEN
AUTO (START + 0 SEC)
A2 V – 1132 OPEN
DGWTP – ON 13,(14&15),12,16,34
1101A/B/C
A3 AUTO (STEP A2 + 7 SECS)
ANY ONE
SELECTED
STEP A2

IS ELAPSED NO
TIME= TP?

YES
SERVICE WITH AIR VENT COMPLETE
B. PRE SERVICE RINSE (FAST RINSE)
B1 TIMER TQ START AUTO (TP + 0 SEC)
V-1122 OPEN AUTO (TP + 0 SEC)
B2
V -1131 OPEN 61,62
B3 V-1132 CLOSE AUTO (STEP B2 + 3 SEC)
STEP B2

IS ELAPSED NO
TIME= TQ?

YES
PRE SERVICE RINSE COMPLETE.
C. SERVICE CYCLE
C1 TIMER TR START AUTO (TQ + 0 SEC)
V-1122 OPEN AUTO (TQ + 0 SEC)
C2
V-1130 OPEN  F3
C3 V-1131 CLOSE AUTO (STEP C2 + 3 SEC)

Page 18 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

STEP C2

IS ELAPSED NO
TIME= TR?

YES
MESSAGE COME
SERVICE CYCLE COMPLETE REGNERATION REQUIRE SBA-
1001A/B/C GO TO F3
After completion of cycle all valves will be closed the time (TR+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any SBA first service with air – vent done and then service
cycle .
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves
F
1

F3

CHECK : (1)SBA CONDUCTIVITY


EXCEEDS THE SET VALUE
CT-1101(17), CT-2101(18), CT-
3101(19),
CHECK (2) SBA SILICA EXCEEDS
THE SET VALUE SIA-1101(20), SIA- NO
2101(21), SIA-3101(22)

YES

 G1
GO TO INTRLOCK : - 17,18,19,20,21,22 G11
DATA 1
 STOP SERVICE SYSLE AND PARTICULAR SBA
Page 19 &COME
43 IN ISOLATION
ACQUISITION
– ALL CYCLE OPERATION STOPE.
AND EVENT
 MESSAGE COME SAC-1001A/B/C REGNERATION REQUIRE.
LOGGED
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

G1

G SBA REGENERATION
1

PRE CONDITIONS FOR SBA REGANERATION:


1)Selected DGWTP-1001A/B/C should be in Auto mode.
2)The other SBA should not be in regeneration mode.
3) Both N-Pit level should not be high. LS-5011(61), LS-5012(62)
4)Selected SBA CDT-1001A/B level should be high. LS-5007(72), LS-5008(74)
5)Only One SBA should be in Regeneration.
6)Regeneration Pump RWP – 1001A/B should be in Auto mode.
7)Another SBA-1001 and not any MB – 1001A/B/C should be in regeneration.
Page 20 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

SELECT ONLY
ONE SBA FROM
SBA-1001 A/B/C

G
2

G
2
REMARKS

START : ALL AUTO VALVES ARE CLOSED


SELECT SBA REGENERATION
A. AIR RELEASE (AIR VENT)
A1 TIMER TS START AUTO (START + 0 SEC)
V – 1122 OPEN
AUTO (START + 0 SEC)
A2 V – 1132 OPEN  61,62
DGWTPP – ON  13,(14&15),12,16,34
1101A/B/C
A3 AUTO (STEP A2 + 7 SECS)
ANY ONE
SELECTED
STEP A2

NO
IS ELAPSED
TIME =TS?

YES
SERVICE WITH AIR VENT COMPLETE
OPERATOR ABLE TO BYPASS THIS
B. BACKWASH (OPTIONAL) OPTION IF HE WANTS
B1 TIMER TT START AUTO (TS + 0 SEC)
B2 V-1128 OPEN AUTO (TS + 0 SEC)

Page 21 & 43

G
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

V -1123 OPEN  61,62


V-1122 CLOSE AUTO (STEP B2 + 3 SEC)
B3 V-1132 CLOSE

STEP B2

IS ELAPSED NO
TIME= TT?

YES
BACKWASH COMPLETE
C. MIDDLE COLLECTOR FLUSH
C1 TIMER TU START AUTO (TT + 0 SEC)
V-1126 OPEN AUTO (TT + 0 SEC)
C2
V-1123 OPEN  61,62
C3 V-1128 CLOSE AUTO (STEP C2 + 3 SEC)
STEP C2

NO NO
IS ELAPSED
TIME= TU?
YES

G
3

MIDDLE COLLECTOR FLUSH COMPLETE


SELECT CDT-1001A/B FOR
D. CAUSTIC PRE INJECTION CAUSTIC PRE INJ.
D1 TIMER TV START AUTO (TU + 0 SEC)
V-1127 OPEN  61,62
V-5070 OR 5071 OPEN
D2 AUTO (TU + 0 SEC)
V-1129 OPEN
V-1125 OPEN
V-1126 CLOSE
D3 AUTO (STEP D2 + 3 SEC)
V-1123 CLOSE
RWP – 1001A/B ANY ONE
ON56,57,58 AUTO (STEP D2 + 7 SEC)
D4 SELECTED

STEPD2
NO

YES

YES
CAUSTIC PRE INJECTION COMPLETE

Page 22 & 43

IS ELAPSED
TIME=TV?
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

E. CAUSTIC INJECTION
E1 TIMER TW START AUTO (TV + 0 SEC)
V-1127 OPEN  61,62
V-5070 OR 5071 OPEN 71,73
E2 V-1129 OPEN AUTO (TV + 0 SEC)
V-1125 OPEN
V-5150 OR 5155 OPEN  71,73

STEP E2
IS ELAPSED TIME=TW? OR NO
LOE LEVEL IN CDT-1001A/B
71,73 WHICH IS EARLIER

YES

G
4

G
4
CAUSTIC INJECTION COMPLETE
STEP F2
F. SLOW RINSE
F1 TIMER TX START AUTO (TW + 0 SEC)
V-1127 OPEN  61,62
V-5070 OR 5071 OPEN
F2 AUTO (TW + 0 SEC)
V-1129 OPEN
V-1125 OPEN
F3 V-5150 OR 5155 CLOSE AUTO (STEP F2 + 3 SEC)

NO
IS ELAPSED
TIME=TX?

YES
STEPG2
SLOW RINSE COMPLETE
G. FAST RINSE
G1 TIMER TY START AUTO (TX + 0 SEC)
V-1122 OPEN
G2 AUTO (TX + 0 SEC)
V-1131  61,62 OPEN
G3 V-1127 CLOSE AUTO (STEP G2 + 3

Page 23 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

V-5070 OR 5071 CLOSE


V-1129 CLOSE SEC)
V-1125 CLOSE
G4 RWP – 1001A/B/C OFF AUTO (TX + 0 SEC)

IS ELAPSED
TIME=TY? NO

YES

FAST RINSE COMPLETE


After completion of cycle all valves will be closed the time (TY+3)seconds.
All timers are settable and operator can set the time.
If regeneration cycle timer stopped due to any reason reganeration cycle timer will pause but not
reset.Operator has to reset Manually.
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next cycle
valves
DATA
AUTO OPERATION STEPS REMARKS
ACQUISITION
START : ALL AUTO VALVES ARE CLOSED
AND EVENT
SELECT SBA SERVICE CYCLE (FOR TWO SBA
LOGGED
SELECTED)
A. SERVICE WITH AIR RELEASE (AIR VENT)
A1 TIMER TA2 START AUTO (START + 0 SEC)
V – 1122, 2122 OPEN
AUTO (START + 0 SEC)
A2 V – 1132, 2132 OPEN
DGWTP – ON 13,(14&15),12,16,34
1101A/B/C
A3 AUTO (STEP A2 + 7 SECS)
ANY TWO
SELECTED
STEP A2
IS ELAPSED
TIME= TA2? NO

YES
SERVICE WITH AIR VENT COMPLETE
B. PRE SERVICE RINSE (FAST RINSE)
B1 TIMER TB2 START AUTO (TA2 + 0 SEC)
V-1122, 2122 OPEN AUTO (TA2 + 0 SEC)
B2
V -1131, 2131 OPEN  61,62
B3 V-1132, 2132 CLOSE AUTO (STEP B2 + 3 SEC)
STEP B2
IS ELAPSED
TIME= TB2? NO

YES
PRE SERVICE RINSE COMPLETE.

Page 24 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

C. SERVICE CYCLE
C1 TIMER TC2 START AUTO (TB2 + 0 SEC)
V-1122, 2122 OPEN AUTO (TB2 + 0 SEC)
C2
V-1130, 2130 OPEN
C3 V-1132, 2132 CLOSE AUTO (STEP C2 + 3 SEC)
STEP C2

IS ELAPSED
TIME= TC2? NO

YES
MESSAGE COME “ SBA
SERVICE CYCLE COMPLETE
REGNERATION REQUIRE”
After completion of cycle all valves will be closed the time (TC2+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any SBA first service with air – vent done and then service
cycle .
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves

F
2MB OPERATION

SYSTEM START UP-


NORMAL MB SERVICE
AUTO MODE

I-
5

OPERATIONAL CHECKS STEPS REMARKS


1 COPM. AIR PR > 5 Kg/cm2 LOCAL GAUGE

START
SYSTEM

START UP CONDITION :
1) SELECTED DGWTP-1001A/B/C SHOULD BE IN AUTO MODE
2) DEGASSER STORAGE TANK DGWST-1001 LEVEL NOT BE LOW – 12(LT-
DATA 5001)
ACQUISITIONANY ONE SBA-1001A/B/C TO BEPage
3) IN SERVICE MODE.
25 & 43
4) IDMWST TANK, SELECTED IN FILLING MODE, LEVEL NOT HIGH
G11
AND EVENT
LOGGED
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

TWO MB -1001A/B/C SLECTED

SELECT ONE MB H
OR TWO MB FROM 2
MB – 1001A/B/C

ONE MB A/B/C SLECTED FOR


OPERATION

H
1

AUTO OPERATION STEPS REMARKS


START : ALL AUTO VALVES ARE CLOSED
SELECT MB SERVICE CYCLE ANY ONE SBA-1001A/B/C SHOULD
BE SELECTED INSERVICE CYCLE
A. SERVICE WITH AIR RELEASE (AIR VENT)
A1 TIMER TA START AUTO (START + 0 SEC)
V – 1134 OPEN
AUTO (START + 0 SEC)
A2 V – 1145 OPEN
DGWTP – ON  13,(14&15),12,16,34
A3 1101A/B/C ANY AUTO (STEP A2 + 7 SECS)
ONE SELECTED
STEP A2
IS ELAPSED NO
TIME= TA?

YES
SERVICE WITH AIR VENT COMPLETE
B. PRE SERVICE RINSE (FAST RINSE)
B1 TIMER TB START AUTO (TA + 0 SEC)
V-1134 OPEN AUTO (TA + 0 SEC)
B2
V -1144 OPEN  61,62
B3 V-1145 CLOSE AUTO (STEP B2 + 3 SEC)
STEP B2

IS ELAPSED NO
TIME= TB?

YES

Page 26 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

PRE SERVICE RINSE COMPLETE.


C. SERVICE CYCLE
C1 TIMER TC START AUTO (TB + 0 SEC)
V-1134 OPEN
V-1143 OPEN  H3
V-5197 OPEN  35 AUTO (TB + 0 SEC)
C2
V-5243 /5244/5245
(SELECT DMWST- OPEN  35,56,57,58
1001A/B/C TANK)
C3 V-1144 CLOSE AUTO (STEP C2 + 3 SEC)
STEP C2

IS ELAPSED NO
TIME= TB?

YES
SERVICE CYCLE COMPLETE
After completion of cycle all valves will be closed the time (TC+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any MB first service with air – vent done and then service
cycle . In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of
next cycle valves”
H
1

H3

DATA
ACQUISITION
J1
Page 27 & 43
AND EVENT
1

LOGGED
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

CHECK : (1)TOTALISED FLOW


THRU MB EXCEEDS THE PRESET
VALUE. FT-1101(23), FT-2101(24), FT-
3101(25)
(2)MB OUTLET SILICA EXCEEDS
THE PRESET LIMIT. SIA-1101-1(32),
SIA-1101-1(33), SIA-1101-1(34)
(2)MB OUTLET CONDUCTIVITY
EXCEEDS THE PRESET LIMIT. CA-
1102(29), CA-2102(30), CA-3102(31)

NO

 GO TO INTERLOCK 23,24,25,32,33,34,29,30,31
 STOP MB-1001A/B/C SERVICE CYCLE AND PARTICULAR MB-
1001A/B/C COME IN ISOLATION MODE – ALL CYCLE OPERATION J11
STOP.
 MESSAGE COME MB-1001A/B/C REGNERATION REQUIRE.

J1

Page 28 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

J1 MB REGENERATION

PRE CONDITIONS FOR MB REGANERATION:


1)Degasser water storage tank level should not be low. LT-5001 (12)
2)Degasser water pumps should be in auto.
3)Regeneration pumps should be in auto
4) Both N-Pit level should not be high.  LS-5011(61), LS-5012(62)
5)Selected MB-1001A/B/C CDT – 2001A/B level should be high  LS-5009 (76) , LS-
5010 (78)
6)Selected MB AMT -2001A/B level should be high  LS-5003 (68) , LS-5004 (70)
5) One SBA -1001A/B/C should be in service. Incase one stream is in operation then
both SBAs should be in service.
7)Another MB shold not be in regeneration.

SELECT ONLY
ONE MB FROM
1001 A/B/C

J2

REMARKS

START : ALL AUTO VALVES ARE CLOSED


SELECT MB REGENERATION
A. AIR RELEASE (AIR VENT)
A1 TIMER TA START AUTO (START + 0 SEC)
V – 1134 OPEN AUTO (START + 0 SEC)
Page 29 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

A2 V – 1145 OPEN  61,62


DGWTPP – ON 13,(14&15),12,16,34
1101A/B/C
A3 AUTO (STEP A2 + 7 SECS)
ANY ONE
SELECTED
STEP A2

NO
IS ELAPSED
TIME =TA?

YES
SERVICE WITH AIR VENT COMPLETE
B. BACKWASH
B1 TIMER TB START AUTO (TA + 0 SEC)
V-1141 OPEN AUTO (TA + 0 SEC)
B2
V -1135 OPEN  61,62
V-1134 CLOSE AUTO (STEP B2 + 3 SEC)
B3 V-1145 CLOSE

STEP B2

IS ELAPSED NO
TIME= TB?

YES
BACKWASH COMPLETE
C. MIDDLE COLLECTOR FLUSH
C1 TIMER TC START AUTO (TB + 0 SEC)
V-1135 OPEN 61,62 AUTO (TB + 0 SEC)
C2
V-1138 OPEN
C3 V-1141 CLOSE AUTO (STEP C2 + 3 SEC)
STEP C2

NO NO
IS ELAPSED
TIME= TC?
YES

STEP E2

MIDDLE COLLECTOR FLUSH COMPLETE


J2 D. ACID PRE INJECTION
D1 TIMER TD START AUTO (TC + 0 SEC)
V-1144 OPEN  61,62
V-5073 OR 5074 OPEN (SELECTED AMT TANK2001A/B)
D2 AUTO (TC + 0 SEC)
V-1137 OPEN
V-1136 OPEN
V-1135 CLOSE AUTO (STEP D2 + 3
D3
V-1138 CLOSE SEC)
Page 30 & 43

J3
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

RWP – 1001A/B ANY AUTO (STEP D2 + 7


ON56,57,58
D4 ONE SELECTED SEC)
STEP D2
IS ELAPSED
TIME=TD?
NO

YES

ACID PRE INJECTION COMPLETE


E. ACID INJECTION
E1 TIMER TE START AUTO (TD + 0 SEC)
V-1144 OPEN  61,62
V-5073 OR 5074 OPEN 67,69(SEL. AMT-2001A/B)
E2 V-1137 OPEN AUTO (TD + 0 SEC)
V-1136 OPEN
V-5377 OR 5078 OPEN 67,69
J3 STEP E2

NO

IS ELAPSED TIME=TE?
OR LS5003 OR 5004
WHICH IS SELECTED 67
OR 69
WHICH IS EARLIER
YES

YES

J4

F. ACID SLOW RINSE (PRE INJECTION)


ACID INJECTION
F1 COMPLETE
TIMER TF START AUTO (TE +J4
0 SEC)
V-1144 OPEN  61,62
V-5073 OR 5074 OPEN
F2 AUTO (TE + 0 SEC)
V-1137 OPEN
V-1136 OPEN
V-1135 CLOSE
F3 AUTO (STEP F2 + 3 SEC)
V-1138 CLOSE
RWP – 1001A/B
ANY ONE ON56,57,58 AUTO (STEP F2 + 7 SEC)
F4
SELECTED
Page 31 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

STEP F2
IS ELAPSED NO
IS ELAPSED
TIME=TF?
TIME=TF?

YES

STEP G2
SLOW RINSE COMPLETE
CAUSTIC PRE INJECTION
G1 TIMER TG START AUTO (TF + 0 SEC)
V-5172 OR 5173 OPEN
V-1146 OPEN
G2 AUTO (TF + 0 SEC)
V-1140 OPEN
V-1139 OPEN  61,62
V-1144 CLOSE
V-5073 OR 5074 CLOSE AUTO (STEP G2 + 3
G3
V-1137 CLOSE SEC)
V-1136 CLOSE
IS ELAPSED
TIME=TG? NO

YES

J5

J5

STEP H2
CAUSTIC PRE INJECTION COMPLETE
H.CAUSTIC INJECTION
H1 TIMER TH START AUTO (TG + 0 SEC)
V-5172 OR 5173 OPEN  71,73
V-1146 OPEN
H2 V-5160 OR 5165 OPEN  71,73 AUTO (TG + 0 SEC)
V-1140 OPEN
V-1139 OPEN  61,62

Page
IS ELAPSED 32 & 43
TIME=TH?
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

NO

YES
STEP I2
CAUSTIC INJECTION COMPLETE
I .CAUSTIC SLOW RINSE
I1 TIMER TI START AUTO (TH + 0 SEC)
V-5172 OR 5173 OPEN
V-1146 OPEN
I2 AUTO (TH + 0 SEC)
V-1140 OPEN
V-1139 OPEN  61,62
V-1144 CLOSE
V-5073 OR 5074 CLOSE AUTO (STEP H2 + 3
I3
V-1137 CLOSE SEC)
V-1136 CLOSE

IS ELAPSED
TIME=TI? NO

YES

CAUSTIC SLOW RINSE COMPLETE


J . DRAIN DOWN MINUTES
J1 TIMER TJ START AUTO (TI + 0 SEC)
V-1135 OPEN  61,62
J2 V-1144 OPEN  61,62 AUTO (TI + 0 SEC)
V-1145 OPEN  61,62
V-1146 CLOSE
AUTO (STEP J2 + 3
J3 V-5172 OR 5173 CLOSE
SEC)
V-1139 CLOSE
J4 DGWTP-1001-A/B/C OFF AUTO (TI + 0 SEC)
J5 RWP-1001-A/B OFF AUTO (TI + 0 SEC)

J5
J5

STEP J2

NO
IS ELAPSED
TIME=TJ?

YES

STEP K2
Page 33 & 43

IS ELAPSED
TIME=TG?
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

DRAIN DOWN MINUTES COMPLETE


K . AIR MIXING
K1 TIMER TK START AUTO (TJ + 0 SEC)
V-1135 OPEN  61,62
K2 V-1142 OPEN AUTO (TJI + 0 SEC)
V-1145 OPEN  61,62
AUTO (STEP K2 + 3
K3 V-1144 CLOSE
SEC)
MBB-A/B ON
K4 AUTO (TK + 0 SEC)
SELECTED ONE
NO
IS ELAPSED
TIME=TK?

YES
STEP L2
AIR MIXING COMPLETE
L . FINAL RINSE (FACILITY PROVIDED FOR OPERATOR TO GO FOR
REPEATED RINSE CYCLE BY SELECTING EXTRA RINSE CYCLE BY
SELECTING EXTRA RINSE SOFT PB.)
L1 TIMER TL START AUTO (TK+ 0 SEC)
V-1134 OPEN
L2 AUTO (TK + 0 SEC)
V-1144 OPEN  61,62
V-1135 CLOSE AUTO (STEP L2 + 3
L3
V-1145 CLOSE SEC)
L4 MBB-A/B OFF AUTO (TK + 0 SEC)
IS ELAPSED
NO
TIME=TL?

YES

J6

J6

FINAL RINSE COMPLETE

After completion of cycle all valves will be closed the time (TL+3)seconds.
All timers are settable and operator can set the time.
If regeneration cycle timer stopped due to any reason reganeration cycle timer will pause but not
reset.Operator has to reset Manually.
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next cycle
valves”

Page 34 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

DATA
ACQUISITIONAUTO OPERATION STEPS REMARKS
AND EVENT START : ALL AUTO VALVES ARE CLOSED
SELECT MB SERVICE CYCLE (FOR TWO MB 1001 ANY TWO SBA -1001A/B /C
LOGGED A/B /C SELECTED) SHOULD BE IN SERVICE
A. SERVICE WITH AIR RELEASE (AIR VENT)
A1 TIMER TA START AUTO (START + 0 SEC)
V – 1134, 2134 OPEN
AUTO (START + 0 SEC)
A2 V – 1145, 2145 OPEN  61,62
DGWTP – ON  13,(14&15),12,16,34
1101A/B/C
A3 AUTO (STEP A2 + 7 SECS)
ANY TWO
SELECTED
STEP A2
IS ELAPSED
TIME= TA? NO

YES
SERVICE WITH AIR VENT COMPLETE
B. PRE SERVICE RINSE (FAST RINSE)
B1 TIMER TB START AUTO (TA + 0 SEC)
V-1134, 2134 OPEN AUTO (TA + 0 SEC)
B2
V -1144, 2144 OPEN  61,62
B3 V-1145, 2145 CLOSE AUTO (STEP B2 + 3 SEC)
STEP B2
IS ELAPSED
TIME= TB? NO

YES
PRE SERVICE RINSE COMPLETE.
C. SERVICE CYCLE
C1 TIMER TC START AUTO (TB + 0 SEC)
V-1134, 2134 OPEN
V-1143, 2143 OPEN  H3
V-5197 OPEN  35 AUTO (TB + 0 SEC)
C2 V-5243 / 5244/
5245 (SELECTED OPEN  35,56,57,58
DMWST –
1001A/B/C TANK)
C3 V-1144, 2144 CLOSE AUTO (STEP C2 + 3 SEC)
STEP C2
IS ELAPSED
NO
TIME= TC?

YES
Page 35 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

SERVICE CYCLE COMPLETE


After completion of cycle all valves will be closed the time (TC+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.If after tripping any MB first service with air – vent done and then service
cycle .
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves

H
2

J11

Page 36 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

DATA
ACQUISITION
AND EVENT
ACID AND CAUSTIC HANDLING AREA:
LOGGED
DATA
ACQUISITION ACID / CAUSTIC
AND EVENT HANDLING
LOGGED

AUTO MODE MANUAL MODE

CHECK LOW LEVEL IN BCST-1001A/B  52,54,48,50 START BY SOFT


BUTTON
START MANUALLY FROM DCS AUP/CUP – 1001A/B  53,55,49,51 AUP-1001A/B OR
CUP-1001A/B
(53,

CHECK THE LEVEL IN BCST-


1001A/B AND BAST-1001A/B
LT-5008 (48,49), LT-5009
(50.51),
LT-5006 (52,53), LT-5007
(54,55),

LEVEL LEVEL
LOW? HIGH?
48,50,52,54 49,51,53,55

MSG WILL COME ON


DISPLAY FOR STARTING THE
AUP/CUP PUMPS DON’T START THE PUMP FROM
Page 37 & 43 AUP-1001A/B OR
CUP-1001A/B
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

START THE PUMP FROM


AUP-1001A/B OR
CUP-1001A/B

FILLING OPERATION OF AMT-FOR SAC AND MB :


DATA
AUTO MODE FOR AMT 1001 1/ ACQUISITION
& AMT-2001A/B AND EVENT
LOGGED

CHECK THE LEVEL IN AMT


FOR SAC/ MB
AMT FOR SAC-1001A/B
(63,64,65,66)
AMT FOR MB-2001A/B
(67,68,69,70) LEVEL STATUS WILL
COME ON DISPLAY

LEVEL LEVEL
LOW? HIGH?
(63,65,67,69) (64,66,68,70)

ABLE TO START ACID STOP ACID INJECTION


INJECTION CYCLE FOR CYCLE FOR PARTICULAR
PARTICULAR VESSEL BY VESSEL BY CLOSING THE
OPENING THE ACID INLET ACID INLET VALVE
VALVE

Page 38 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

FILLING OPERATION OF CDT-SBA AND MB :

AUTO MODE CDT-1001A/B & CDT- DATA


2001A/B ACQUISITION
AND EVENT
LOGGED

CHECK THE LEVEL IN CDT


FOR SBA/ MB
CDT FOR SBA-1001A/B
(71,72,73,74)
CDT FOR MB-2001A/B
(75,76,77,78) LEVEL STATUS WILL
COME ON DISPLAY

LEVEL
LOW? LEVEL
(71,73,75,77) HIGH?
(72,74,76,78)

START AGITATOR STOP FILLING FOR PARTICULAR


START FILLING FOR PARTICULAR AND RUN IT FOR VESSEL BY CLOSING THE
VESSEL BY OPENING THE 15 MINUTES AND PARTICULAR WATER INLET AND
PARTICULAR WATER INLET AND AFTER STOP IT. CAUSTIC INLET VALVE
CAUSTIC INLET VALVE ALSO CHECK
(71,73,75,77)

Page 39 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

UF OPERATION :

START UF NORMAL MODE

AUTO – U1

Starting Condition : 1) Overload feed back available for UFFP :-1001A/B


2) Intermediate DM water storage tank level should not be low ( LT-5002)(35)
3) Selected DM water storage tank level should not be high ( LT-5003 – 56,LT-5004 – 57,LT-5005 – 58)
4) Select UFFP-1001 A/B IN Manual or Auto mode and select any one pump and any one UF
5) Select any one UF-1001A/B FOR OPERATION
6) Select any one BST-1001 A/B for operation
STEP A2
SELECT ANY ONE FROM UF-2101A/B FOR SERVICE CYCLE IF UF-2101A
ALL VALVE ARE CLOSED SELECTED
A. INITIAL FAST FLUSH
A1 TIMER TA START AUTO (START+ 0 SEC)
V-5218 OPEN 92
V-5216 OPEN  37 (IF V-5217  38)
A2 AUTO (START + 0 SEC)
V-5199 OPEN
V-5220 OPEN
AUTO (STEP A2 + 7
A3 UFFP-1001A/B START  36,35,56,57,58,37,38
SEC)

IS ELAPSED
TIME=TA? NO

YES

U2

Page 40 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

U2

STEP B2
INITIAL FAST FLUSH COMPLETE
SELECT DM WATER
B. SERVICE CYCLE : SELECT ANY ONE UF -2101A/B FOR
STORAGE TANK DMWST-
SERVICE CYCLE 1001A/B/C
B1 TIMER TB START AUTO (TA+ 0 SEC)
V-5218 OPEN  92
V-5221 OPEN  56,57,58,39(40)
B2 AUTO (TA + 0 SEC)
OPEN  56 (if V-5244  57,IF V-
V-5243
5245)
AUTO (STEP B2 + 3
B3 V-5220 CLOSE
SEC)

DATA
IS ELAPSED
ACQUISITION TIME=TB?
NO
AND EVENT
LOGGED
YES
STEP C2
IF FLOW IS = TOTAL FLOW
SERVICE COMPLETE , GO TO UF BACKWASH CYCLE. THEN ALSO BACK WASH
CYCLE REQUIRE
C. BACKWASH :
TIMER TC (UF B/W FIRST
C1 START AUTO (TB+0SEC)
HALF CYCLE)
V-5220 OPEN
C2 AUTO (TB+ 0 SEC)
V-5219 OPEN
V-5218 CLOSE
C3 AUTO (STEP C2 + 3 SEC)
V-5221 CLOSE
C4 UFFP-1001A/B OFF AUTO (TB + 0 SEC)
C5 UFBP-1001A/B ON  56,57,58,41 AUTO (STEP C2 + 7 SEC)
B/W FIRST HALF COMPLETED
NO
IS ELAPSED
TIME=TC?

Page 41 & 43

IS ELAPSED
TIME=TA?
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

YES

U3

U3

STEP C6
B/W FIRST HALF COMPLETED
TIMER H1 (UF B/W
H1 START AUTO (TC+ 0 SEC)
SECOND HALF CYCLE)
C6 DP-1001A/B (SELECTED) ON  43 AUTO ( TC + 0 SEC)
C7 DP-1001C/D (SELECTED) ON  44 AUTO (TC + 0 SEC)
C8 DP-1001E/F (SELECTED) ON  45 AUTO (TC + 0 SEC)
NO
IS ELAPSED
TIME=TH1?

YES
STEP D1

D. FAST FLUSH
D1 TIMER TD START AUTO (TH1+ 0 SEC)
V-5218 OPEN 92
V-5199 OPEN
D2 OPEN  37 (IF V-5217 AUTO (START + 0 SEC)
V- 5216
 38)
V-5220 OPEN
V-5220 CLOSE
V-5219 CLOSE
DP-1001A/B (SELECTED) STOPE
D3 AUTO (D2+ 3 SEC)
DP-1001C/D (SELECTED) STOPE
DP-1001E/F (SELECTED) STOPE
UFBP-1001A/B STOPE
START  AUTO (STEP D2 + 7
D4 UFFP-1001A/B
36,35,56,57,58,37,38, SEC)
NO

IS ELAPSED
TIME=TD?

YES
FAST FLUSH COMPLETE UF B/W CYCLE COMPLETE

Page 42 & 43
DOCUMENT NO.
CONTROL PHILOSOPHY
FOR DM+UF PLANT
RAJ WEST POWER LTD. ISSUE.DT 23.03.2008
REV.NO R0

After completion of cycle all valves will be closed the time (TD+3)seconds.
All timers are settable and operator can set the time.
If service cycle timer stopped due to any reason service cycle timer will pause but not reset.Operator
has to reset Manually.
In every cycle the valves are closed as per sequence only after 3 seconds of the “opening of next
cycle valves

NOTE :
1)IN DMWST-1001A/B/C TANK FOR LOW LEVEL IN SELECTED TANK
,MESSAGE WILL COME ON DISPLAY OF SCADA FOR SELECTION CHANGE OVER TO
OTHER TANK,IF CHANGE OVER SHALL BE NOT DONE WITHIN 10 MIN THEN
SELECTED PUMP DGWTP-1001A/B/C(IF IMST-1001 IS HIGH) AND UFFP-1001A/B TRIP.
THIS CHANGE OVER IS MADE AUTOMATICALLY WITHIN 10 MIN.
2) AT EVERY STEP CONTROL SYSTEM WILL CHECK FOR THE
REQUIRED DRIVE / VALVE FEEDBACKS. IN CASE ANY OF THE FEED BACK
IS NOT RECEIVED WITHIN THE SET TIME, AN OPERATOR ALARM WILL BE
RAISED AND THE SERVICE / BACKWASH / FAST FLUSH CYCLE WILL PAUSE.
AN OVER RIDE SOFT BUTTON WILL BE PROVIDED FOR THE OPERATOR TO
RESET THE ALARM AND CONTINUE WITH THE CYCLE.
3) IF SYSTEM TRIP DURING SERVICE CYCLE THEN SERVICE CYCLE
TIMER CYCLE TIMER WILL PAUSE BUT NOT RESET AND AFTER RESTART
FIRST SERVICE WITH AIR WENT DONE AND THEN SERVICE CYCLE DONE.
4) IF BACKWASH CYCLE STOPPED DUE TO ANY REASON BACKWASH
CYCLE TIMER WILL PAUSE BUT NOT RESET. OPERATOR HAS TO RESET THE
TIMER MANUALLY.
5) IN THIS FLOW CHART N-PIT OPERATION NOT INCLUDED.

6) IN MANUAL MODE OF WHOLE SYSTEM ALL PUMP START STOPE


DONE BY MANUALLY BY SOFT BUTTON AND ALL THE INTERLOCK COME
IN PICTURE.
ALL VALVE OPEN CLOSE DONE WITH ALL THE INTERLOCK BY
MANUALLY.
7) IN UF -2101A CYCLE V-5218 VALVE SERIES SELECTED & IN UF-
2101B CYCLE V-5223 VALVE SERIES SELECTED
8) THIS LOGIC IS SUBJECT TO SOME CHANGES AS PER SITE
CONDITIONS AT TIME OF COMMISSING AND THE TIME OF TESTING.
Prepared By Checked By Approved By

Amit Prajapati Riapl Modi


Project Engineer Asst. Manager AGM-Projects
Page 43 & 43