80 Questions
Number: C_TSCM42_65
Passing Score: 800
Time Limit: 120 min
File Version: 4.9
http://www.gratisexam.com/
C_TSCM42_65
SAP Certified Application Associate - Production - Planning & Manufacturing with
SAP ERP 6.0 EHP5
Finally, I got right questions for this exam and share with you guys. Best Wishes.
This is the best VCE I ever made. Try guys and if any suggestion please update this.
I have changed answers of Q2, Q11, Q31, Q44, Q59 and Q87.
Modified few questions, fixed few spelling mistakes and typos.
100% Valid in US, UK, Australia, India and Emirates. All my friends in group have these same
questions.
Exam A
QUESTION 1
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
A.
B.
C.
D.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 2
Which of the following functions does SAP Supply Chain Management (SCM) offer?
A.
B.
C.
D.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 3
What sequence do you follow in master data maintenance to define the production of a material?
A. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or
routing
B. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work
center
C. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or
routing
D. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work
center
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
appropriate answer.
QUESTION 4
In what sequence are the steps of material requirements planning performed in SAP ECC?
A.
B.
C.
D.
1. Net requirements calculation2. Lot sizing3. Scheduling4. Determination of the procurement type
1. Calculation of safety stock2. Lot sizing3. Scheduling4. Determination of the procurement type
1. Net requirements calculation2. Lot sizing3. Determination of the procurement type4. Scheduling
1. Availability check2. Lot sizing3. Determination of the procurement type4. Scheduling
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 5
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following
data:
- Start: 7:00:00 a.m.
- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1
How large is the standard available capacity?
http://www.gratisexam.com/
A.
B.
C.
D.
7 hours
6.16 hours
5.6 hours
8 hours
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 6
For which of the following objects can you enter a confirmation? (Choose two)
A.
B.
C.
D.
Production order
Production order operation
Trigger Point
Work Center
Correct Answer: AB
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 7
When modeling in-house production using SAP ECC, on which business levels can you create a bill of
material (BOM)? (Choose two)
A. At the client level
B. At the plant level
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 9
In which master data object do you set the standard values for an operation?
A.
B.
C.
D.
Work Center
Production Resource/Tool (PRT)
Material Master
Routing
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 10
You maintained the planning strategy group 10 (make-to-stock production) in the material master (SAP
ECC) of a material. For the coming months you have planned requirements with requirement type LSF
(derived from the main strategy 10). Now, you want to change the requirement type from LSF to VSF (in
accordance with planning strategy 40, planning with final assembly) for requirements in the existing
production plan.
Which of the following statements are applicable in this case? (Choose two)
A. You can enter the strategy group 40 in the material master and change the present requirement for the
product manually in the production plan.
B. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement
type for all existing requirements is then changed by the next planning run.
C. You can change the strategy group from 10 to 40 for the existing production plan in the material master,
and the requirement type for all requirements is changed automatically.
D. You can enter the strategy group 40 in the material master, but the requirement type is not changed
automatically for existing requirements.
Correct Answer: AD
Section: (none)
Explanation
Explanation/Reference:
most reliable answer.
QUESTION 11
Which activity can trigger an automatic availability check for the components of a production order?
A.
B.
C.
D.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 12
In the SAP ECC system, a material is produced using production orders. The planning table of repetitive
manufacturing should be used to plan line loading for this material. On the initial screen of the planning
table, you select this material and then receive a message informing you that you cannot use the planning
table for this material (see attached screenshot).
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 13
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
A.
B.
C.
D.
E.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 15
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
A.
B.
C.
D.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 16
What option for selecting a routing exists when creating a production order?
A.
B.
C.
D.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 17
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net
change planning in the planning horizon). The planning horizon should be set equally for all materials by
default. However, some materials need to have a different planning horizon.
http://www.gratisexam.com/
What procedure do you recommend for setting the planning horizon?
A. Set the planning horizon in the MRP groups in Customizing and assign variant entries via the plant
parameter settings.
B. Set the planning horizon in Customizing using the plant parameter settings and assign variant entries
via the MRP groups for the corresponding materials.
C. Set the planning horizon in the MRP groups in Customizing and store the variant values in the material
masters for the corresponding materials.
D. Set the planning horizon in the plant parameters in Customizing and store variant entries in the material
masters for corresponding materials.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 18
Which of the following requirements is supported by using process orders?
A.
B.
C.
D.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 19
Which of the following consequences result when a production order is set to Technically Complete
(TECO)? (Choose three)
A.
B.
C.
D.
E.
QUESTION 20
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)
A.
B.
C.
D.
E.
Correct Answer: AE
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 21
What can you use to organize material staging for production orders? (Choose three)
A.
B.
C.
D.
E.
Transfer orders
Logistics Information System (LIS)
KANBAN
Material documents
Pull list
D. Accounting type
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 24
Which issue can occur if the lot size-dependent in-house production time in the material master is not
updated after changing the routing?
A.
B.
C.
D.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
actual answer.
QUESTION 25
Where in the SAP ECC system can you define production versions?
A.
B.
C.
D.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 26
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula
parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)
A.
B.
C.
D.
E.
QUESTION 27
Which of the following statements regarding ATP checks in SAP ECC that are triggered from customer
orders is correct?
A. An ATP check creates fixed links between customer orders and their confirmed receipts.
B. The ATP check does not take stocks and receipts into account. It checks consumption of planned
independent requirements.
C. If the ATP check determines non-availability. It then checks in the next step whether it is possible to
procure or produce in time.
D. The ATP quantity is the available quantity, which can be used to confirm incoming customer orders.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 28
During a project phase, your customer raises some questions concerning parameters of the procurement
type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)
A. If procurement type E (in-house production) is set, external procurement may still be possible
depending on the material type.
B. A material's procurement type can be freely selected between E (in-house production), F (external
procurement) and X (both procurement types) independent of material type.
C. Procurement types E (in-house production) and F (external procurement) have to be further refined with
special procurement types.
D. If both procurement types are allowed with entry X (both procurement types), requirements planning
assumes in-house production.
Correct Answer: AD
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 29
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?
A.
B.
C.
D.
Goods receipts
Goods issues
Maintenance notifications
Confirmations
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 30
What is SAP Solution Manager?
A. A part of the SAP ECC System
B. A managed system in a system landscape
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 32
Which of the following elements can be used in a process order? (Choose three)
A.
B.
C.
D.
E.
Phases
Process instructions
Relationships
Suboperations
Parallel sequences
http://www.gratisexam.com/
A.
B.
C.
D.
ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
ATP checks are used to evaluate the free capacity on a certain work center.
ATP checks can be adjusted to also consider future requirements and receipts.
ATP checks can be carried out automatically when releasing a production order.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 35
Which of the following statements regarding lot size procedures is correct?
A.
B.
C.
D.
The lot size quantity can be influenced using a minimum lot size and the rounding profile.
If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
If a long-term lot size is used, procurement is conducted with a long-term perspective.
The procurement quantity of a lot size procedure can be specified using a safety time period profile.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 36
In which scenario will the error message shown in the attached screenshot occur?
A.
B.
C.
D.
The selection method is set to "selection only by production version" in the material master.
The routing is not valid at the explosion date.
The Customizing for the order type is set to manual routing selection and a valid routing exists.
The material master is set to manual routing selection and a valid routing exists.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 37
What functions can you use for suboperations? (Choose two)
A.
B.
C.
D.
Correct Answer: CD
Section: (none)
Explanation
Explanation/Reference:
appropriate selection of answer.
QUESTION 38
Which of the following activities is necessary for the capacity availability check to be carried out
automatically when a production order is released?
A. Activate the availability check and assign an overall profile in checking control for the business function
order release.
B. Assign an appropriate availability checking rule to the material master for the product.
C. Activate the availability check and assign an overall profile in the production scheduling profile.
D. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be
checked.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 39
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
A.
B.
C.
D.
E.
A.
B.
C.
D.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 41
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
A.
B.
C.
D.
E.
Material master
Bill of material
Production version
Task list
Work center
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 43
Which statements regarding SAP ECC long-term planning (LTP) are correct? (Choose two)
A.
B.
C.
D.
Correct Answer: BD
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 44
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
A.
B.
C.
D.
E.
Correct Answer: BC
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 46
In which of the following objects can you activate backflushing for production orders? (Choose three)
A.
B.
C.
D.
E.
A. When a customer order is created for the finished material, the dependent requirements are
automatically triggered for the components in the bill of material without a planning run.
B. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the
planned order of the finished material.
D. If the individual material components are explicitly assigned to the operations of a routing, the
requirement dates of the dependent requirements are scheduled at each start date of the operations.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 48
The stock/requirements list for a finished product contains only one customer order and one fixed planned
order with the same quantity. The availability dates for both MRP elements are on working days. The
availability date of the fixed planned order is set to a later date compared to the one of the customer order.
However, a corresponding rescheduling exception message does not occur.
What could be the reason? (Choose two)
A.
B.
C.
D.
Correct Answer: CD
Section: (none)
Explanation
Explanation/Reference:
righat answer.
QUESTION 49
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and
thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
A. A suitable repetitive manufacturing profile that contains an option for automatic line selection
B. Manual assignment of planned production quantities in a planning table
C. Automatic selection of the production version by applying quota arrangement records in material
requirements planning (MRP)
D. Automatic selection of the production version in material requirements planning (MRP) using selection
methods setting
E. A planning algorithm from capacity planning
Correct Answer: BCD
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 50
You want to enhance the system statuses of a production order with user statuses.
How do you do this?
A. Define a status profile in Customizing and assign it to the production scheduling profile.
B. Define the user statuses in the Customizing table of the system statuses.
C. Define the user statuses in the order type-dependent parameters.
D. Define a status profile in Customizing and assign it to the order type.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 51
Which function is supported by production orders?
A.
B.
C.
D.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
correct answer.
QUESTION 52
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP)
requirements? (Choose three)
A.
B.
C.
D.
E.
Availability check
Digital signature
Resource selection
Electronic batch record
Approved master recipes
Explanation:
QUESTION 54
Where can you define the valid receivers for production order costs?
A.
B.
C.
D.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
real answer.
QUESTION 55
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one
of the assemblies will not be available in time for the scheduled final assembly because of automatic
forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning
perspective?
A.
B.
C.
D.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 56
What does SAP ERP mean?
A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials
management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be
imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 57
Which functions can be triggered before releasing a production order? (Choose three)
A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM
Correct Answer: BCE
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 58
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity
bottlenecks occur, you should be able to use a second sequence on other work centers for operations 30
and 40.
What sequence category do you use to create the second sequence in the system?
A.
B.
C.
D.
Substitute sequence
Standard sequence
Alternative sequence
Parallel sequence
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 59
Where can you define the default storage location for the material component of a production order?
(Choose three)
http://www.gratisexam.com/
A.
B.
C.
D.
E.
D. In demand management (DM) material shortage situations are identified and corresponding receipt
elements are created.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 61
Which properties does ECC Master Production Scheduling (MPS) have? (Choose three)
A.
B.
C.
D.
E.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 63
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a
dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?
A.
B.
C.
D.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 64
When testing requirements planning in plant 1000, you receive the error message displayed below. Large
numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate
requirements planning in the Customizing for plant 1000.
What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?
A. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.
B. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing
of the MRP group.
C. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP
views in material master.
D. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant
parameters for plant 1000 in the MRP views in material master.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 65
What are characteristics of repetitive manufacturing? (Choose three)
A.
B.
C.
D.
E.
D. E (external procurement)
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 67
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
A. Sales and operations planning -> Demand management -> Long-term planning -> Material
requirements planning -> Capacity planning
B. Material requirements planning -> Demand management -> Sales and operations planning -> Longterm planning -> Capacity planning
C. Long-term planning -> Sales and operations planning -> Demand management -> Material
requirements planning -> Capacity planning
D. Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning ->
Material requirements planning
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 68
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
A.
B.
C.
D.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 69
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
A.
B.
C.
D.
Correct Answer: AB
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 70
You want to create a new material with the following properties: the material is kept in stock, is externally
procured, and is used as a component in the bills of material for various final products. The material must
not be sold directly.
Which standard SAP material type do you use?
A.
B.
C.
D.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
truthfull.
QUESTION 71
The availability check during production order creation should use a different scope of check than during
order release.
How can you fulfill this requirement?
A.
B.
C.
D.
Maintain appropriate checking rules in checking control for order creation and order release.
Maintain appropriate availability checking rules in the production scheduling profile.
Maintain an appropriate availability checking group in the material master.
Maintain appropriate availability checking rules in the order type-dependent parameters.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 72
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting
of the goods receipt?
A.
B.
C.
D.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 73
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and
P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives
represents a firming type.
What does a firming type define? (Choose two)
Serial numbers
Production versions
Resources
Master recipies
Production/resource tools
Work center
Planned order
Product cost collector
Production order
Correct Answer: CD
Section: (none)
Explanation
Explanation/Reference:
well executed answer.
QUESTION 76
Which of the following properties applies to multi-site planning in SAP ECC?
A. Multi-site planning can be activated using the corresponding planning strategy.
B. Both withdrawal from alternative plant and stock transfer from another plant are defined via special
procurement keys.
C. The use of "scope of planning" (cross-plant total planning) is mandatory for multi-site planning.
D. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 77
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
A.
B.
C.
D.
E.
Forwards
Only capacity requirements
Backwards
Midpoint
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 79
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the
unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
A. Create a new material with a reference to the original material and assign the metric unit of measure to
the new material master.
B. There is no need to take any action. In this scenario, the conversion of units of measurements is done
automatically.
C. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and
assign it to the material master on basic data view 1.
D. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 80
You want to produce a finished product only when it is requested by a customer order in make-to-order
production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
A. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly
level) for all assemblies in the bill of material.
B. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the
assembly level) for all assemblies in the bill of material.
C. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all
assemblies in the bill of material.
D. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the
assembly level) for all assemblies in the bill of material.
Correct Answer: CD
Section: (none)
Explanation
Explanation/Reference:
true answer.