LineRelays,BusRelays,StationServiceRelaysReplacementTimeline

2013
Resource

PPE/WR
PPE/EUC
PPE/EUC
PPE/WR
PPE
PPE
PPE
PPE/WR
PPE/WR
PPE/WR
PPE/WR
PPE/WR
PPE/WR

TaskDescription

Duration

Start

End

TotalProjectDuration

20months

07/30/13

04/01/15

ProjectKickoff/CommunicationPlan

8months
1day
1month
3months

7/30/13
07/30/13
07/30/13
09/06/13

3/31/14
07/30/14
09/06/13
11/22/13

9months
9months

10/14/13
10/14/13

07/09/14
07/09/14

11months
4months

09/02/13
09/02/13

09/01/14
01/29/14

9months

11/01/13

09/01/14

DevelopPanelElevationDrawings
OrderPanelsforProcurement
DesignPackagetoInterconnectingUtility
OutageClearancePoints
ProcurementofMaterial
FMCTIncludesdesigndrawings

7months
4months

11/01/13
05/01/14

05/21/14
09/01/14

ProtectiveSettings

7months
7months

02/03/14
02/03/14

09/02/14
09/02/14

05/05/14

08/31/14

3months
3months

07/01/14
07/01/14

09/30/14
09/30/14

SiteWalkdown
InitialcoordinationwithElectricalUtilityCompany
ProvideTechniciantoTestExistingPLCYardEquipment
ReviewExistingRelayIssues
Develop/PublishSchedule
TripandControlLogicDiagrams
ReviewInterconnectionHandbook
PRC001Notification
CommunicationOverview
EquipmentPhysicalLocation
CoordinationwithCommandControlSystems
CoordinationwithOps/Dispatch
CoordinationofplannedoutageswithdivisionensureinOperationsCenterschedule

DrawingDevelopment
PPE

Validation,RemovalandInstallationDrawingsfortheFollowingEquipment:UPLC,Trap
TuningPack,LineTuner,Coax,230kVRelays,DFR,StationServiceRelays,RTAC,311L
Relocation,WaveTrap,CouplingCapacitor

EquipmentSpecification/Procurement
PPE

PPE

PPE
PPE
PPE
PPE/WR
PPE/WR
PPE/WR

SpecificationoftheFollowingEquipment:UPLC,PLCYardApparatus,230kVProtective
Relays,DigitalFaultRecorder,StationServiceRelays,RTAC(RTU),UPLCTestEquipment,
311L's,UPLC'sfortraining
PanelSpecificationandProcurementoftheFollowingEquipment:UPLC,230kV
Line/Bus,SSTXMR,230kVInsulatedCable;RTU+DFRPanelLayoutsforConstruction

DevelopNewSettingsfortheFollowingEquipment:UPLC,LineTuner,230kVrelays,
DFR,StationServiceTransformer,RTAC(RTU)
PPE/WR ReviewUPLCand230kVProtectiveRelaySettingswithEUC
PPE/WR PRC001CoordinationwithEUC
PPE

TestPlanDevelopment
PPE

CreateTestPlansforCommissioningoftheFollowingEquipment:UPLC,230kVRelaysand
Schemes,DFR,StationServiceRelaysandSchemes,RTAC(RTU)

PPE
PPE

CoordinateOutageswithEUCforUPLCandRelayInstallation
CoordinatewithEUCforwitnesstestingasnecessary

3months
3months

07/01/14
07/01/14

09/30/14
09/30/14

Installation/Commissioning

4months
4months

09/01/14
09/01/14

12/22/14
12/22/14

PPE

ProvideEngineeringSupportDuringInstall,TestingandCommissioningoftheFollowing
Equipment:UPLCandAssociatedYardEquip,230kVLineandBusRelays,StationService
TransformerRelays,RelocationofInsulatedCableRelays,DFR

PPE
WR
WR
PPE

ProvideThirdPartyTechniciantoPerformCommissioningofUPLC
Prework
OutageDates
CoordinatewithEUCforwitnesstestingasnecessary

3months

09/29/14

12/22/14

Documentation

7months
7months
3months

09/01/14
09/01/14
01/05/15

04/01/15
04/01/15
04/01/15

PPE
PPE
PPE
PPE/WR
PPE
WR
PPE/WR

DocumentanoverviewofUPLCschemes
AsBuiltDrawings
CommunicationOverview
ThirdPartyTraining
DocumentSettingsandCalculations
UpdatePRC005Database
DescriptionofOperationDocuments(AsRequired)

Jul

Aug

Sep

2014
Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

2015
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr