PROYECTO:
Fecha
10%
UTILIDAD (10%)
10%
SUBTOTAL
IGV (18%)
VR
18%
TOTAL DE LA OBRA
EXPEDIENTE TECNICO 3%CD
3.0%
SUPERVISIN (5%)CD
5.0%
CAPACITACIN
LIQUIDACION
GASTOS DE GESTION EN FASE DE INVERSION
GASTOS DE MEDIDAS DE REDUCCION DE RIESGOS
EVALUACION EX-POST
COSTO TOTAL
UND
METRADO
DESCRIPCION
GLB
1.00
111,322.82
111,322.82
02.00.00 GRADERIAS
GLB
1.00
75,552.08
75,552.08
GLB
1.00
62,185.26
62,185.26
GLB
1.00
13,979.71
13,979.71
GLB
1.00
50,675.91
50,675.91
GLB
1.00
46,153.21
COSTO DIRECTO
TOTAL
46,153.21
359,868.99
10%
UTILIDAD (10%C.D)
10%
SUB TOTAL
I.G.V (18%)
P.U.
35,986.90
35,986.90
431,842.79
18%
TOTAL DE LA OBRA
77,731.70
509,574.49
ELABORACION DE EXPEDIENTE(3.0%CD)
3.0%
10,796.07
SUPERVISION (5.0%CD)
5.0%
17,993.45
LIQUIDACION
GASTOS DE GESTION EN FASE DE INVERSION
EVALUACION EX-POST
COSTO TOTAL
1,000.00
5,000.00
10,000.00
554,364.01
3,688,259.74
368,825.97
368,825.97
4,425,911.69
796,664.10
5,222,575.79
110,647.79
184,412.99
12,500.00
2,500.00
15,000.00
25,000.00
20,000.00
5,592,636.57
ALTERNATIVA 01
PROYECTO:
"MEJORAMIENTO DE LA PLATAFORMA DEPORTIVA DEL ASENTAMIENTO HUMANO CIUDAD DEL SOL EN EL DISTRITO
Y DEPARTAMENTO DE PIURA"
Fecha
Sep-12
COSTO DIRECTO
GASTOS GENERALES (10%)
10%
UTILIDAD (10%)
10%
SUBTOTAL
IGV (18%)
VR
18%
TOTAL DE LA OBRA
EXPEDIENTE TECNICO 3%
3.0%
SUPERVISIN (5%)
5.0%
LIQUIDACION
GASTOS DE GESTION EN FASE DE INVERSION
EVALUACION EX-POST
COSTO TOTAL
DESCRIPCION
UND
METRADO
GLB
1.00
111,322.82
02.00.00 GRADERIAS
GLB
1.00
75,552.08
GLB
GLB
1.00
1.00
53,414.27
13,979.71
GLB
GLB
1.00
1.00
50,675.91
46,153.21
COSTO DIRECTO
GASTOS GENERALES (10%CD)
10%
UTILIDAD (10%C.D)
10%
SUB TOTAL
I.G.V (18%)
18%
TOTAL DE LA OBRA
ELABORACION DE EXPEDIENTE(3.0%CD)
3.0%
SUPERVISION (5.0%CD)
5.0%
LIQUIDACION
GASTOS DE GESTION EN FASE DE INVERSION
EVALUACION EX-POST
COSTO TOTAL
P.U.
351,098.00
35,109.80
35,109.80
421,317.60
75,837.17
497,154.77
10,532.94
17,554.90
1,000.00
5,000.00
10,000.00
541,242.61
TOTAL
111,322.82
75,552.08
53,414.27
13,979.71
50,675.91
46,153.21
351,098.00
35,109.80
35,109.80
421,317.60
75,837.17
497,154.8
10,532.94
17,554.90
1,000.00
5,000.00
10,000.00
541,242.608
DESCRIPCION
CARACTERISTICAS
GRADERIAS 01
2
sobrecimientos,
vigas,
graderas
PLATAFORMA DEPORTIVA
ADOQUINADO PARA
ESTACIONAMIENTO
SARDINELES
CERCO PERIMETRICO
ROYECTO
METRADO
COSTO
4.515 m2
29.115 m2
S/.
111,322.82
S/.
75,552.08
S/.
53,414.27
S/.
13,979.71
S/.
50,675.91
S/.
46,153.21
27.515 m2
4.00ml X 16.50ml y
ancho de cobertura =
5.30 ml
4.00ml X 16.50ml y
ancho de cobertura =
5.30 ml
20 x 30
109.35 m2
161.29 m2
163.99m2
111.15 m2
59.41m2
121.44 ml
72.8ml
METAS FISICAS
METAS
UNIDAD
3333%
3333%
INVERSION
4
INTANGIBLES
GLOBAL
GLOBAL
100%
SUPERVISION (5%)
GLOBAL
3333%
LIQUIDACION
GLOBAL
100%
GLOBAL
100%
EVALUACION EX - POST
GLOBAL
100%
OBRAS CIVILES
GLOBAL
GLOBAL
40%
40%
20%
GRADERIAS
GLOBAL
40%
40%
20%
PLATAFORMA DEPORTIVA 20 X 30
GLOBAL
OBRAS INTERIORES
GLOBAL
100%
OBRAS EXTERIORES
GLOBAL
100%
CERCO PERIMETRICO
GLOBAL
100%
GLOBAL
UTILIDAD (10%)
GLOBAL
SUBTOTAL
GLOBAL
IGV (18%)
TOTAL
80%
20%
GLOBAL
GLOBAL
100%
100%
100%
100%
TOTAL
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%