Original Document Title : ITP-Fabrication, Erection & Testing of A/G & u/G welded pipe
COMPANYs Review Comments Transmittal No. :
Document
No., Rev,
Page No.
Serial
No.
1
Pg 8 &9
Pg 10
Action
Code
(*)
COMPANYs COMMENT
Serial 1.2, 1.4, 1.5, 1.6, 1.7, 1.10 & 1.11
RT Film Interpretation
On Regular basis
Pg 11
Serial 1.9
Pg 13
Pg 15,16.18
Pg 18
Removed
Pg 18
Included as commented
Pg 18
Included
Pg 20 Pg 25
10
Pg 26 to Pg 29
COMPANYs
Response
(Open or
Closed)
Date :
Removed
SIGNED BY CONTRACTOR
SIGNED BY COMPANY
Prepared By (Name):
Date :
Signature:
Approved By (Name):
Signature:
P6012MAB.000.10.03.QCF.003, Rev O1
Approved by (Name):
Date :
Signature:
Date :
Page
1 of 3
Original Document Title : ITP-Fabrication, Erection & Testing of A/G & u/G welded pipe
COMPANYs Review Comments Transmittal No. :
Serial
No.
Document
No., Rev,
Page No.
Action
Code
(*)
COMPANYs COMMENT
Date :
COMPANYs
Response
(Open or
Closed)
SIGNED BY CONTRACTOR
SIGNED BY COMPANY
Prepared By (Name):
Date :
Signature:
Approved By (Name):
Approved by (Name):
Date :
Signature:
Signature:
P6012MAB.000.10.03.QCF.003, Rev O1
Date :
Page
2 of 3
Original Document Title : ITP-Fabrication, Erection & Testing of A/G & u/G welded pipe
COMPANYs Review Comments Transmittal No. :
Serial
No.
Document
No., Rev,
Page No.
Action
Code
(*)
COMPANYs COMMENT
Date :
COMPANYs
Response
(Open or
Closed)
SIGNED BY CONTRACTOR
SIGNED BY COMPANY
Prepared By (Name):
Date :
Signature:
Approved By (Name):
Approved by (Name):
Date :
Signature:
Signature:
P6012MAB.000.10.03.QCF.003, Rev O1