You are on page 1of 1
POUWITESXNilx _ MUKAH SARAWAK cam 7/; Marks DEPARTMENT OF CIVIL ENGINEERING DEPARTMENT COURSE WORK ASSESSMENT (Session: JUNE 2012) Name: Revstration No, :20DKAE Code & Course : C5011 ~CONSTRUCTION MANAGEMENT __ Programme DKA Lecturer : MADAM MAZLINA BINTI HARUN. Week (Date) + WS (13 = 18 August 2012) __ Assgn (s)No: 1/2/3/4 Duration Instruction(s): Answer all the following question Question: (50 m) 1. Explain THREE (3) structure of the committee system (6marks) 2. Explain the following terms: Performance bond Insurance work (7marks) 3. List the important that can be obtained during the site visit by contractors. (6marks) 4, State THREE (3) purposes of site visit (6marks) 5. Whatis quality control concept (Bmarks) 6. Give THREE (3) objectives of project controlling system. (6marks) 7. Describe THREE (3) objectives of cost controlling (6marks) 8. List FIVE (5) rules of critical path (omarks) Submission Date. 07 September 2012 ‘Prepared hy: Reviewed by. Verified by. 4 h So | a Binti Ibrahim) | (Mazlina Binti Harun) (Arni Ri ‘inti Abd Rafal) Date. 06/0 ¢fin | pate. o¢/o fa Date. © 6/e¢f|2

You might also like