6.0

CUMULATIVE DEVELOPMENT PROJECTS

The forecast of future pre-project conditions was prepared in accordance to procedures outlined
in Section 15130 of the CEQA Guidelines. Specifically, the CEQA Guidelines provide two
options for developing the future traffic volume forecast:
(A) A list of past, present, and probable future projects producing related or
cumulative impacts, including, if necessary, those projects outside the control of
the [lead] agency, or
(B) A summary of projections contained in an adopted local, regional or statewide
plan, or related planning document, that describes or evaluates conditions
contributing to the cumulative effect. Such plans may include: a general plan,
regional transportation plan, or plans for the reduction of greenhouse gas
emissions. A summary of projections may also be contained in an adopted or
certified prior environmental document for such a plan. Such projections may be
supplemented with additional information such as a regional modeling program.
Any such document shall be referenced and made available to the public at a
location specified by the lead agency.
Accordingly, the traffic analysis provides a highly conservative estimate of future pre-project
traffic volumes as it incorporates both the A and B options outlined in CEQA Guidelines for
purposes of developing the forecast.

6.1

Related Projects

A forecast of on-street traffic conditions prior to occupancy of the proposed project was prepared
by incorporating the potential trips associated with other known development projects (related
projects) in the area. With this information, the potential impact of the proposed project can be
evaluated within the context of the cumulative impact of all ongoing development. The related
projects research was based on information on file at the City of Los Angeles Departments of
Transportation and City of Culver City Planning Division. The list of related projects in the
project site area is presented in Table 61. The location of the related projects is shown in
Figure 61.
Traffic volumes expected to be generated by the related projects were provided by calculated
using rates provided in the Institute of Transportation Engineers (ITE) Trip Generation manual4.
The related projects respective traffic generation for the weekday AM and PM peak hours, as
well as on a daily basis for a typical weekday, is summarized in Table 61. The distribution of
the related projects traffic volumes to the study intersections during the weekday AM and PM
peak hours are displayed in Figure 62 and 63, respectively.

Institute of Transportation Engineers Trip Generation manual, 9th Edition, Washington, D.C., 2012.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 21 -

- 22 -

United Oil 78
9815 W. National Boulevard

Mixed-Use
11421 W. Olympic Boulevard

99 Cent Store - New


11040 W. Pico Boulevard

LA9

LA10

LA11

LINSCOTT, LAW & GREENSPAN, engineers

Motor Avenue Apartments


3425 S. Motor Avenue

Century Plaza (Hyatt Regency Hotel)


2025 S. Avenue of the Stars

LA5

LA8

The Palms Mixed-Use Project


10601 Washington Boulevard

LA4

Bellwood Avenue Senior Care & Medical Office


10330 W. Bellwood Avenue

Mixed-Use
3115 S. Sepulveda Boulevard

LA3

LA7

Simon Wiensenthal Center Expansion


9786 W. Pico Boulevard

LA2

Pico-Sepulveda Mixed-Use
11122 W. Pico Boulevard

Bellwood Condominiums
10331 Bellwood Avenue

LA1

LA6

PROJECT NAME/
PROJECT ADDRESS

MAP
NO.

Proposed

Proposed

Proposed

Under
Construciton

Proposed

Proposed

Proposed

Proposed

Proposed

Proposed

Proposed

PROJECT
STATUS

Retail
Less Existing Uses

Apartments
Specialty Retail

Gas Station

Apartments
Retail
Less Existing Uses

Medical Office
Assisted Living
Less Existing Uses

Apartments
Free-Standing Discount Store
Supermarket
Less Exisitng Uses

Apartments
Office
Retail
Condominium
Office
Hotel
Spa/Fitness Facility
Quality Restaurant
High-Turnover (Sit-Down) Restaurant
Retail
Less Existing Uses

Specialty Retail
Condominium

Museum
Private Events
Less Existing Uses

Condominium

DU
GLSF
GLSF
GSF

DU
GSF
GLSF
DU
GSF
Rooms
GSF
GSF
GSF
GLSF

19,819 GLSF

89 DU
6,030 GLSF

12 VFP

115 DU
975 GLSF

24,265 GSF
172 DU
(112) DU

538
212,450
54,350
(6,500)

132
26,000
18,000
271
119,412
394
14,000
7,711
3,856
85,175

28,000 GLSF
138 DU

100,000 GSF
500 or 800 Seats

131 DU

LAND USE DATA


LAND-USE
SIZE
City of Los Angeles

[5]

[4]

[3]

422

682

977

651

958

20,476

(826)

2,050

772

1,713

549

PROJECT
DAILY
DATA
TRIP ENDS [2]
SOURCE
VOLUMES

Table 6-1
RELATED PROJECTS LIST AND TRIP GENERATION [1]

10

30

50

277

69

82

46

139

36

31

39

355

12

68

27

103

44

15

46

61

45

58

632

81

150

73

242

46

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

52

21

53

15

88

901

131

151

58

159

19

104

55

105

47

113

1,853

123

252

111

369

55

LLG Ref. 5-13-0097-1


City Charter School Project

52

34

52

32

25

952

(8)

101

53

210

36

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

- 23 -

11012-11014 Washington Boulevard

Duquesne Avenue Condominiums


4139-4145 Duquesne Avenue

11281 Washington Place

Access Culver City


8770 Washington Boulevard

Mazda
11215 Washington Boulevard

4058 Madison Avenue

Parcel B
9300 Culver Boulevard

Washington National
Northwest Corner of Washington Boulevard
and National Boulevard

Culver Studios Ammend. No. 6


9336 Washington Boulevard

3846 Bentley Avenue

Globe Housing Project


4044-4068 Globe Avenue

Jazz Bakery
9814 Washington Boulevard

Sony
10202 Washington Boulevard

10808 Culver Boulevard

11198 Washington Place

11197 Washington Place

CC1

CC2

CC3

CC4

CC5

CC6

CC7

CC8

CC9

CC10

CC11

CC12

CC13

CC14

CC15

CC16

LINSCOTT, LAW & GREENSPAN, engineers

PROJECT NAME/
PROJECT ADDRESS

MAP
NO.

Proposed

Approved

Under
Construction

Proposed

Proposed

Proposed

Proposed

Proposed

Approved

Proposed

Approved

Proposed

Under
Construction

Proposed

Proposed

Proposed

PROJECT
STATUS

Gas Station with Car Wash

Commercial

Museum

Office

Bakery/Caf

Condominiums

Condominiums

Office

Apartments
Office
Retail
Hotel

Mixed-Use

Condominiums

Auto Dealership Addition

Apartments
Retail

Retail

Condominiums

Commercial

DU
GSF
GLSF
Rooms

6 VFP

3,850 GLSF

12,596 GSF

10,171 GSF

7,500 GSF

10 DU

4 DU

107,438 GSF

200
200,000
85,000
148

118,000 GLSF

4 DU

5,492 GSF

115 DU
31,240 GLSF

6,294 GLSF

7 DU

3,385 GLSF

LAND USE DATA


LAND-USE
SIZE
City of Culver City

[14]

[7]

[13]

[10]

[12]

[8]

[8]

[10]

[6]
[10]
[7]
[11]

[7]

[8]

[9]

[6]
[7]

[7]

[8]

[7]

917

164

426

112

675

58

23

1,185

1,330
2,206
3,630
1,320

5,039

23

177

765
1,334

269

41

145

PROJECT
DAILY
DATA
TRIP ENDS [2]
SOURCE
VOLUMES

Table 6-1 (Continued)


RELATED PROJECTS LIST AND TRIP GENERATION [1]

36

17

14

148

20
275
51
57

70

12
19

35

20

82
37
31
42

43

47
11

71

26

16

168

102
312
82
99

113

11

59
30

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

41

18

12

18

133

43
247
164
53

228

25
60

12

83

14

35

15

56

160

124
298
315
104

438

14

71
116

23

13

LLG Ref. 5-13-0097-1


City Charter School Project

42

17

38

27

81
51
151
51

210

46
56

11

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

- 24 -

The Platform
8810-8850 Washington Boulevard
and 3920 Landmark Street

NMS@Culver City
9901 Washington Boulevard

CC17

CC18

Under
Construction

Under
Construction

PROJECT
STATUS

Apartment

Office
Retail

LAND USE DATA


LAND-USE

131 DU

38,732 GSF
41,745 GLSF

SIZE

ITE Land Use Code 220 (Apartment) trip generation equation rates.
ITE Land Use Code 820 (Shopping Center) trip generation equation rates.
ITE Land Use Code 230 (Residential Townhome/Condominium) trip generation equation rates.
ITE Land Use Code 843 (Automobile Sales) trip generation equation rates.
ITE Land Use Code 710 (General Office Building) trip generation equation rates.
ITE Land Use Code 310 (Hotel) trip generation equation rates.
ITE Land Use Code 931 (Quality Restaurant) trip generation equation rates.
ITE Land Use Code 495 (Recreational/Community Center) trip generation equation rates.
ITE Land Use Code 946 (Gasoline/Service Station with Convenience Market and Car Wash) trip generation equation rates.

[6]

[10]
[7]

1,540

50,473

53
25

1,128

21

7
15

2,668

26

60
40

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

427
1,783

PROJECT
DAILY
DATA
TRIP ENDS [2]
SOURCE
VOLUMES

nom. = nominal
Source: City of Los Angeles Department of Transportation, unless otherwise noted in the Project Data Source column.
Trips are one-way traffic movements, entering or leaving.
Final Environmental Impact Report for Bellwood Condominium Project , Christopher A. Joseph & Associates, March 2009.
Traffic Impact Study for Simon Wiesenthal Center Museum of Tolerance at 9786 Pico Boulevard (at Roxbury Drive) , Crain & Associates, October 2008.
Traffic Impact Study Report for Century Plaza Project , Crain & Associates, December 2009.

LINSCOTT, LAW & GREENSPAN, engineers

[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
[11]
[12]
[13]
[14]

TOTAL

PROJECT NAME/
PROJECT ADDRESS

MAP
NO.

Table 6-1 (Continued)


RELATED PROJECTS LIST AND TRIP GENERATION [1]

2,858

12

48
81

5,292

35

58
155

LLG Ref. 5-13-0097-1


City Charter School Project

2,434

23

10
74

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

- 25 -

- 26 -

- 27 -

6.2

Ambient Traffic Growth Factor

In order to account for unknown related projects not included in this analysis, the existing traffic
volumes were increased at an annual rate of 1.0 percent (1.0%) per year to the year 2016 (i.e., the
anticipated year of project build-out). The ambient growth factor was based on general traffic
growth factors provided in the 2010 Congestion Management Program for Los Angeles County
(the CMP manual) and determined in consultation with LADOT staff. It is noted that based
on review of the general traffic growth factors provided in the CMP manual for the West/Central
L.A. area, it is anticipated that the existing traffic volumes are expected to increase at an annual
rate of less than 0.2% per year between the years 2010 and 2020. Thus, application of an annual
growth factor of 1.0% allows for a conservative, worst case forecast of future traffic volumes in
the area. Further, it is noted that the CMP manuals traffic growth rate is intended to anticipate
future traffic generated by development projects in the project vicinity. Thus, the inclusion in
this traffic analysis of both a forecast of traffic generated by known related projects plus the use
of an ambient growth traffic factor based on CMP traffic model data results in a conservative
estimate of future traffic volumes at the study intersections.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 28 -

7.0

TRAFFIC FORECASTING METHODOLOGY

In order to estimate the traffic impact characteristics of the City Charter School project, a multistep process has been utilized. The first step is trip generation, which estimates the total arriving
and departing traffic volumes on a peak hour and daily basis. The traffic generation potential is
forecast by applying the appropriate vehicle trip generation equations or rates to the project
development tabulation.
The second step of the forecasting process is trip distribution, which identifies the origins and
destinations of inbound and outbound project traffic volumes. These origins and destinations are
typically based on demographics and existing/anticipated travel patterns in the study area.
The third step is traffic assignment, which involves the allocation of project traffic to study area
streets and intersections. Traffic assignment is typically based on minimization of travel time,
which may or may not involve the shortest route, depending on prevailing operating conditions
and travel speeds. Traffic distribution patterns are indicated by general percentage orientation,
while traffic assignment allocates specific volume forecasts to individual roadway links and
intersection turning movements throughout the study area.
With the forecasting process complete and project traffic assignments developed, the impact of
the proposed project is isolated by comparing operational (i.e., Levels of Service) conditions at
the selected key intersections using existing and expected future traffic volumes without and
with forecast project traffic. The need for site-specific and/or cumulative local area traffic
improvements can then be evaluated and the significance of the projects impacts identified.

7.1

Project Traffic Generation

Traffic volumes expected to be generated by the proposed City Charter School project during the
weekday AM and PM peak hours, as well as on a daily basis, were estimated using rates
published in the ITE Trip Generation manual as well as the West Los Angeles Transportation
Improvement and Mitigation Specific Plan (TIMP).
Traffic volumes expected to be generated by the proposed project were based upon rates per
number of students. The following trip generation rates were used to forecast the traffic volumes
expected to be generated by the project land use components:

Private School: West Los Angeles TIMP trip generation average rates were used to
forecast the AM peak hour traffic volumes expected to be generated by the proposed
project.

Private School K-12: ITE Land Use Code 536 (Private School K-12) trip generation
average rates were used to forecast the AM peak hour directional distribution, PM peak
hour traffic volumes, and daily trips expected to be generated by the proposed project.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 29 -

The trip generation forecast for the proposed project is summarized in Table 71. As shown in
Table 71, a 15% adjustment was applied to the projects trip generation forecast to account for
trips expected to be made by public transit in lieu of the private automobile. As shown in Table
41 and Figure 42, the project site is well served by public transit, including the forthcoming
opening of the Metro Expo Line
In addition, the trip generation forecast includes a trip credit for the prior adult school that
operated at the site. It is noted that the trip generation forecast conservatively does not include a
trip credit for the existing commercial uses on the site (e.g., retail and restaurant space) as the
school is planned to occupy the site in phases; thus, some existing commercial tenants will be
permitted to remain on-site prior to full occupancy of the school.
Finally, as previously noted, it is recommended that the school stagger the start times of the
Middle School and High School so as to allow for better management of vehicle queuing on-site.
Conservatively, the effect of the staggering of the student start and dismissal times is not
included in the trip generation forecast for the project.
The trip generation forecast for the proposed project was submitted for review and approval by
LADOT staff. As shown in Table 71, the proposed project is expected to generate 556 net new
vehicle trips (314 inbound trips and 242 outbound trips) during the AM peak hour. During the
PM peak hour, the proposed project is expected to generate 306 net new vehicle trips (106
inbound trips and 200 outbound trips). Over a 24-hour period, the proposed project is forecast to
generate a net increase of 664 daily trip ends (332 inbound trips and 332 outbound trips) during a
typical weekday.

7.2

Project Traffic Distribution and Assignment

Project traffic volumes both entering and exiting the site have been distributed and assigned to
the adjacent street system based on the following considerations:

The site's proximity to major traffic corridors (i.e., Sepulveda Boulevard, Overland
Avenue, National Boulevard, Palms Boulevard, Venice Boulevard, I-10 Freeway, etc.);

Expected localized traffic flow patterns based on adjacent roadway channelization and
presence of traffic signals;

Existing intersection traffic volumes;

Ingress/egress availability at the project site assuming the site access and circulation
scheme described in Section 3.0;

Nearby population and employment centers as well as adjacent residential


neighborhoods;

Input from LADOT staff.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 30 -

- 31 -

(900) Students

840 Students

SIZE

664

(1,107)

(312)

2,083

DAILY
TRIP ENDS [2]
VOLUMES

314

(91)

(71)

476

242

(17)

(46)

305

556

(108)

(117)

781

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

106

(68)

(31)

205

200

(40)

(42)

282

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

306

(108)

(73)

487

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

[1] Sources: ITE "Trip Generation", 9th Edition, 2012;


West Los Angeles Transportation Improvement and Mitigation Specific Plan (TIMP).
[2] Trips are one-way traffic movements, entering or leaving.
[3] ITE Land Use Code 536 (Private School K-12) trip generation average rates per number of students.
- Daily Trip Rate: 2.48 trips/student; 50% inbound and 50% outbound
- PM Peak Hour Trip Rate: 0.58 trips/student; 42% inbound/58% outbound
- AM Peak Hour directional distribution 61% inbound/39% outbound
[4] West Los Angeles TIMP Schools (a.m. rates) - Private School per student.
- AM Peak Hour Trip Rate: 0.93 trips/student
[5] A 15% transit use reduction applied based on the project site location within 1/3 mile of the Expo Line Palms station.
[6] ITE Land Use Code 540 (Junior/Community College) trip generation average rates per number of students.
- Daily Trip Rate: 1.23 trips/student; 50% inbound and 50% outbound
- AM Peak Hour Trip Rate: 0.12 trips/student; 84% inbound/16% outbound
- PM Peak Hour Trip Rate: 0.12 trips/student; 63% inbound/37% outbound

NET INCREASE

Adult School [6]

Prior Use

Less 15% Transit Use [5]

Proposed Project
Charter School (6-12) [3][4]

LAND USE

05-Mar-14

Table 7-1
PROJECT TRIP GENERATION [1]

The general, directional traffic distribution patterns for the proposed project are presented in
Figure 71. The forecast net new weekday AM and PM peak hour project traffic volumes at the
study intersections associated with the proposed project are presented in Figures 72 and 73,
respectively. The traffic volume assignments presented in Figure 72 reflects the traffic
distribution characteristics shown in Figure 71 and the project traffic generation forecast
presented in Table 71.

8.0

TRAFFIC IMPACT ANALYSIS METHODOLOGY

The study intersections were evaluated using the Critical Movement Analysis (CMA) method of
analysis that determines Volume-to-Capacity (v/c) ratios on a critical lane basis. The overall
intersection v/c ratio is subsequently assigned a Level of Service (LOS) value to describe
intersection operations. Level of Service varies from LOS A (free flow) to LOS F (jammed
condition). A description of the CMA method and corresponding Level of Service is provided in
Appendix B.

8.1

Impact Criteria and Thresholds

The relative impact of the added project traffic volumes to be generated by the proposed project
during the AM and PM peak hours was evaluated based on analysis of future operating
conditions at the study intersections, without and with the proposed project. The previously
discussed capacity analysis procedures were utilized to evaluate the future v/c relationships and
service level characteristics at each study intersection.
The significance of the potential impacts of project generated traffic was identified using the
traffic impact criteria set forth in LADOTs Traffic Study Policies and Procedures, August 2014.
According to the Citys published traffic study guidelines, the impact is considered significant if
the project-related increase in the v/c ratio is equal to or exceeds the thresholds presented in
Table 81.
Table 8-1
CITY OF LOS ANGELES
INTERSECTION IMPACT THRESHOLD CRITERIA
Final v/c

Level of Service

Project Related Increase in v/c

> 0.701 - 0.800

equal to or greater than 0.040

> 0.801 - 0.900

equal to or greater than 0.020

> 0.901

E or F

equal to or greater than 0.010

The Citys Sliding Scale Method requires mitigation of project traffic impacts whenever traffic
generated by the proposed development causes an increase of the analyzed intersection v/c ratio
by an amount equal to or greater than the values shown above.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 32 -

- 33 -

- 34 -

- 35 -

- 36 -

8.2

LADOT ATSAC/ATCS

The City of Los Angeles Automated Traffic Surveillance and Control (ATSAC) and Adaptive
Traffic Control System (ATCS) provides computer control of traffic signals allowing automatic
adjustment of signal timing plans to reflect changing traffic conditions, identification of unusual
traffic conditions caused by accidents, the ability to centrally implement special purpose short
term traffic timing changes in response to incidents, and the ability to quickly identify signal
equipment malfunctions. ATCS provides real time control of traffic signals and includes
additional loop detectors, closed-circuit television, an upgrade in the communications links and a
new generation of traffic control software. LADOT estimates that the ATSAC system reduces
the critical v/c ratios by seven percent (0.07). The ATCS system upgrade further reduces the
critical v/c ratios by three percent (0.03) for a total of 10 percent (0.10). According to the City of
Los Angeles, ATSAC/ATCS system upgrades for all 22 study intersections have been
implemented. As such, the Level of Service calculations reflect a 0.10 adjustment for all
analysis scenarios evaluated.

8.3

Traffic Impact Analysis Scenarios

Pursuant to LADOTs traffic study, Level of Service calculations have been prepared for the
following scenarios for the study intersections:
(a)

Existing (2015) conditions.

(b)

Condition (a) with completion and occupancy of the project.

(c)

Condition (b) with implementation of project mitigation measures where


necessary.

(d)

Condition (a) plus one percent (1.0%) annual ambient traffic growth through year
2016 and with completion and occupancy of the related projects (i.e., future
cumulative baseline)

(e)

Condition (d) with completion and occupancy of the project.

(f)

Condition (e) with implementation of project mitigation measures where


necessary.

The traffic volumes for each new condition were added to the volumes in the prior condition to
determine the change in capacity utilization at the study intersections.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 37 -

9.0

TRAFFIC ANALYSIS

The traffic impact analysis prepared for the study intersections using the CMA methodology and
application of the City of Los Angeles significant traffic impact criteria is summarized in Table
91. The CMA data worksheets for the analyzed intersections are contained in Appendix B.

9.1

Existing Conditions

9.1.1 Existing Conditions


As indicated in column [1] of Table 91, the following intersections are currently operating at
LOS E or worse:

Int. No. 5: Overland Avenue / I-10 WB Freeway Ramps National Boulevard


(AM and PM peak hours)

Int. No. 9: Overland Avenue / Venice Boulevard (AM peak hour)

As indicated in column [1] Table 91, the other 20 study intersections are presently operating at
LOS D or better during the weekday AM and PM peak hours under existing conditions. The
existing traffic volumes at the study intersections during the weekday AM and PM peak hours
are displayed in Figures 51 and 52, respectively.
9.1.2 Existing With Project Conditions
As shown in column [2] of Table 91, application of the Citys threshold criteria to the Existing
With Project scenario indicates that the proposed project is not expected to create significant
impacts at any of the 22 study intersections. Incremental, but not significant, impacts are noted at
the study intersections. Because there are no significant impacts, no traffic mitigation measures
are required or recommended for the study intersections under the Existing With Project
conditions. The existing with project traffic volumes at the study intersections during the
weekday AM and PM peak hours are illustrated in Figures 91 and 92, respectively.

9.2

Future Conditions

9.2.1 Future Cumulative Baseline Conditions


The future cumulative baseline conditions were forecast based on the addition of traffic
generated by the plus completion and occupancy of related projects, as well as the growth in
traffic due to the combined effects of continuing development, intensification of existing
developments and other factors (i.e., ambient growth). The v/c ratios at all of the study
intersections are incrementally increased with the addition of ambient traffic and traffic
generated by the related projects listed in Table 61.
As presented in column [3] of Table 91, the following intersections are expected to operate at
LOS E or worse during the weekday AM and PM peak hours with the addition of growth in
ambient traffic and related project traffic under the future cumulative baseline conditions:

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 38 -

- 39 -

Overland Avenue /
National Place - National Boulevard

Overland Avenue /
Palms Boulevard

Overland Avenue /
Venice Boulevard

I-10 EB Off-Ramp /
National Boulevard

National Boulevard - Mentone Avenue /


Rose Avenue - National Boulevard

Motor Avenue /
Pico Boulevard

10

11

12

COTT, LAW & GREENSPAN, engineers

Overland Avenue /
I-10 EB On-Ramp

Overland Avenue /
Pico Boulevard

Westwood Boulevard /
National Boulevard

Overland Avenue /
I-10 WB On-Off Ramp National Boulevard

Sepulveda Boulevard /
Palms Boulevard

Sepulveda Boulevard /
National Boulevard

INTERSECTION

NO.

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

PEAK
HOUR

0.771
0.699

0.258
0.272

0.685
0.389

0.941
0.791

0.878
0.843

0.775
0.734

0.817
0.590

1.186
1.028

0.838
0.828

0.687
0.621

0.798
0.704

0.890
0.870

C
B

A
A

B
A

E
C

D
D

C
C

D
A

F
F

D
D

B
B

C
C

D
D

YEAR 2015
EXISTING
V/C
LOS

[1]

0.760
0.705

0.258
0.281

0.685
0.389

0.950
0.796

0.887
0.854

0.793
0.745

0.817
0.590

1.193
1.035

0.848
0.835

0.695
0.628

0.801
0.711

0.899
0.872

C
C

A
A

B
A

E
C

D
D

C
C

D
A

F
F

D
D

B
B

D
C

D
D

YEAR 2015
EXISTING
W/ PROJECT
V/C
LOS

-0.011
0.006

0.000
0.009

0.000
0.000

0.009
0.005

0.009
0.011

0.018
0.011

0.000
0.000

0.007
0.007

0.010
0.007

0.008
0.007

0.003
0.007

0.009
0.002

CHANGE
V/C
[(2)-(1)]

[2]

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

SIGNIF.
IMPACT

Table 9-1
SUMMARY OF VOLUME TO CAPACITY RATIOS
AND LEVELS OF SERVICE
AM AND PM PEAK HOURS

0.782
0.715

0.282
0.297

0.705
0.423

0.975
0.871

0.897
0.866

0.815
0.776

0.831
0.609

1.199
1.040

0.864
0.877

0.707
0.654

0.828
0.753

0.916
0.911

C
C

A
A

C
A

E
D

D
D

D
C

D
B

F
F

D
D

C
B

D
C

E
E

[3]
YEAR 2016
FUTURE PREPROJECT
V/C
LOS

0.771
0.721

0.282
0.306

0.705
0.423

0.984
0.876

0.906
0.877

0.833
0.787

0.831
0.609

1.207
1.046

0.874
0.883

0.716
0.661

0.831
0.760

0.925
0.912

C
C

A
A

C
A

E
D

E
D

D
C

D
B

F
F

D
D

C
B

D
C

E
E

YEAR 2016
FUTURE WITH
PROJECT
V/C
LOS

-0.011
0.006

0.000
0.009

0.000
0.000

0.009
0.005

0.009
0.011

0.018
0.011

0.000
0.000

0.008
0.006

0.010
0.006

0.009
0.007

0.003
0.007

0.009
0.001

CHANGE
V/C
[(4)-(3)]

[4]

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

LLG Ref. 5-14-0097-1


City Charter School Project

SIGNIF.
IMPACT

- 40 -

Palms Boulevard - National Boulevard /


National Boulevard - Exposition Boulevard

National Boulevard /
I-10 WB Off-Ramp - Manning Avenue

Castle Heights Avenue /


National Boulevard

20

21

22

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

AM
PM

0.863
0.711

0.732
0.560

0.675
0.527

0.661
0.554

0.720
0.522

0.480
0.413

0.574
0.407

0.690
0.720

0.466
0.539

0.593
0.476

D
C

C
A

B
A

B
A

C
A

A
A

A
A

B
C

A
A

A
A

YEAR 2015
EXISTING
V/C
LOS

0.873
0.721

0.757
0.576

0.712
0.547

0.668
0.560

0.751
0.529

0.502
0.434

0.597
0.430

0.706
0.720

0.491
0.547

0.611
0.491

D
C

C
A

C
A

B
A

C
A

A
A

A
A

C
C

A
A

B
A

YEAR 2015
EXISTING
W/ PROJECT
V/C
LOS

0.010
0.010

0.025
0.016

0.037
0.020

0.007
0.006

0.031
0.007

0.022
0.021

0.023
0.023

0.016
0.000

0.025
0.008

0.018
0.015

CHANGE
V/C
[(2)-(1)]

[2]

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

SIGNIF.
IMPACT

0.875
0.737

0.751
0.586

0.716
0.611

0.681
0.593

0.765
0.603

0.497
0.435

0.592
0.429

0.720
0.753

0.492
0.567

0.601
0.482

D
C

C
A

C
B

B
A

C
B

A
A

A
A

C
C

A
A

B
A

[3]
YEAR 2016
FUTURE PREPROJECT
V/C
LOS

0.885
0.747

0.776
0.602

0.753
0.631

0.689
0.598

0.795
0.614

0.519
0.456

0.615
0.453

0.737
0.753

0.516
0.574

0.619
0.497

COTT, LAW & GREENSPAN, engineers

D
C

C
B

C
B

B
A

C
B

A
A

B
A

C
C

A
A

B
A

YEAR 2016
FUTURE WITH
PROJECT
V/C
LOS

According to LADOT's "Traffic Study Policies and Procedures, " August 2014, a transportation impact on an intersection shall be deemed significant in accordance
with the following table:
Final v/c
LOS
Project Related Increase in v/c
> 0.701 - 0.800
C
equal to or greater than 0.040
> 0.801 - 0.900
D
equal to or greater than 0.020
> 0.901
E,F
equal to or greater than 0.010

Motor Avenue /
Washington Boulevard

19

[a]

Motor Avenue /
Venice Boulevard

Motor Avenue/
Tabor Street

16

18

Motor Avenue /
Palms Boulevard

15

Motor Avenue /
Regent Street

Motor Avenue /
National Boulevard

14

17

Motor Avenue /
Manning Avenue

INTERSECTION

13

NO.

PEAK
HOUR

[1]

Table 9-1 (Continued)


SUMMARY OF VOLUME TO CAPACITY RATIOS
AND LEVELS OF SERVICE
AM AND PM PEAK HOURS

0.010
0.010

0.025
0.016

0.037
0.020

0.008
0.005

0.030
0.011

0.022
0.021

0.023
0.024

0.017
0.000

0.024
0.007

0.018
0.015

CHANGE
V/C
[(4)-(3)]

[4]

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

NO
NO

LLG Ref. 5-14-0097-1


City Charter School Project

SIGNIF.
IMPACT

- 41 -

- 42 -

Int. No. 1: Sepulveda Boulevard / National Boulevard (AM and PM peak hours)

Int. No. 5: Overland Avenue / I-10 WB Freeway Ramps National Boulevard


(AM and PM peak hours)

Int. No. 9: Overland Avenue / Venice Boulevard (AM peak hour)

The future cumulative baseline (existing, ambient growth and related projects) traffic volumes at
the study intersections during the weekday AM and PM peak hours are presented in Figures 93
and 94, respectively.
9.2.2 Future Cumulative With Project Conditions
As shown in column [4] of Table 91, application of the Citys threshold criteria to the Future
With Project scenario indicates that the proposed project is not expected to create significant
impacts at any of the 22 study intersections. Incremental, but not significant, impacts are noted at
the study intersections. Because there are no significant impacts, no traffic mitigation measures
are required or recommended for the study intersections under the Future With Project
conditions. The future cumulative with project (existing, ambient growth, related projects and
project) traffic volumes at the study intersections during the weekday AM and PM peak hours
are illustrated in Figures 95 and 96, respectively.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 43 -

- 44 -

- 45 -

- 46 -

- 47 -

10.0 CONGESTION MANAGEMENT PROGRAM TRAFFIC IMPACT ASSESSMENT


The Congestion Management Program (CMP) is a state-mandated program that was enacted by
the California State Legislature with the passage of Proposition 111 in 1990. The program is
intended to address the impact of local growth on the regional transportation system.
As required by the 2010 Congestion Management Program for Los Angeles County, a Traffic
Impact Assessment (TIA) has been prepared to determine the potential impacts on designated
monitoring locations on the CMP highway system. The analysis has been prepared in
accordance with procedures outlined in the 2010 Congestion Management Program for Los
Angeles County, County of Los Angeles Metropolitan Transportation Authority, 2010.
According to Section D.9.1 (Appendix D, page D-6) of the 2010 CMP manual, the criteria for
determining a significant transportation impact is listed below:
A significant transportation impact occurs when the proposed project increases
traffic demand on a CMP facility by 2% of capacity (V/C > 0.02), causing or
worsening LOS F (V/C > 1.00).
The CMP impact criteria apply for analysis of both intersection and freeway monitoring
locations.

10.1

Intersections

The following CMP intersection monitoring locations in the project vicinity have been identified:

CMP Station

Intersection

No. 15

Overland Avenue / Venice Boulevard

No. 71

La Cienega Boulevard / Venice Boulevard

The CMP TIA guidelines require that intersection monitoring locations must be examined if the
proposed project will add 50 or more trips during either the AM or PM weekday peak hours. As
shown in Figures 7-3 and 7-4, the proposed project will not add 50 or more trips during either
the AM or PM weekday peak hours (i.e., of adjacent street traffic) at the CMP monitoring
intersections in the project vicinity, which is stated in the CMP manual as the threshold criteria
for a traffic impact assessment. Therefore, no further review of potential impacts to intersection
monitoring locations that are part of the CMP highway system is required.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 48 -

10.2

Freeways

The following CMP freeway monitoring location has been identified in the project vicinity:

CMP Station

Location

No. 1011

I-10 Freeway east of Overland Avenue

The CMP TIA guidelines require that freeway monitoring locations must be examined if the
proposed project will add 150 or more trips (in either direction) during either the AM or PM
weekday peak periods. The proposed project will not add 150 or more trips (in either direction)
during either the AM or PM weekday peak hours to CMP freeway monitoring locations which is
the threshold for preparing a traffic impact assessment, as stated in the CMP manual. Therefore,
no further review of potential impacts to freeway monitoring locations that are part of the CMP
highway system is required

10.3

Transit Impact Review

As required by the 2010 Congestion Management Program for Los Angeles County, a review has
been made of the potential impacts of the project on transit service. As discussed in Subsection
4.5 herein, existing transit service is provided in the vicinity of the proposed City Charter School
project.
The project trip generation, as shown in Table 71, was adjusted by values set forth in the CMP
(i.e., person trips equal 1.4 times vehicle trips, and transit trips equal 3.5 percent of the total
person trips) to estimate transit trip generation. Pursuant to the CMP guidelines, the proposed
project is forecast to generate demand for 17 transit trips during the AM peak hour and 3 transit
trips during the PM peak hour. Over a 24-hour period, the proposed project is forecast to
generate demand for 47 daily transit trips. Therefore, the calculations are as follows:

AM Peak Hour = 556 1.4 0.035 = 28 Transit Trips

PM Peak Hour = 306 1.4 0.035 = 15 Transit Trips

Daily Trips = 664 1.4 0.035 = 33 Transit Trips

As shown in Table 41, six transit lines and routes are provided adjacent to or in close proximity
the project site. As outlined in Table 41, under the No. of Buses/Trains During Peak Hour
column, these six transit lines provide services for an average of (i.e., average of the directional
number of transit vehicles during the peak hours) generally 36 transit vehicles during the AM
peak hour and roughly 36 transit vehicles during the PM peak hour. Therefore, based on the
above calculated AM and PM peak hour trips, this would correspond to an insignificant number
of additional transit riders. It is anticipated that the existing transit service in the project area will
adequately accommodate the increase of project-generated transit trips. Thus, given the low
number of project-generated transit trips per transit vehicle, no project impacts on existing or
future transit services in the project area are expected to occur as a result of the proposed project.
LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 49 -

11.0 CONCLUSIONS
This traffic impact analysis has been prepared to evaluate the potential impacts to the local street
system due to the City Charter School project at 3280 Motor Avenue. A total of 22 intersections
were identified and analyzed in order to determine changes in operations following construction
and occupancy of the proposed project. Application of the impact threshold criteria from the
City of Los Angeles indicates that none of the 22 study intersections would be significantly
impacted by the forecast project traffic. Incremental but not significant impacts are noted at the
study intersections evaluated in this analysis. As no significant impacts are expected due to the
proposed project, no traffic mitigation measures are required or recommended for the study
intersections.
It is recommended that the Middle School and High School components of the project stagger
student start and dismissal times by at least 30 minutes to ensure that drop-off and pick-up
operations could be adequately accommodated on-site. The staggering of student start and
dismissal times further ensures that the traffic impacts of the project at the off-site intersections
well be less than significant.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 50 -

APPENDIX A
MANUAL TRAFFIC COUNT DATA

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-Appendix Covers.docx

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Sepulveda Blvd

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

53
12
76

71
14
36

62
27
36

64
23
54

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

451

7.30

185

9.45

410

8.15

242

7.45

PM PK 15 MIN

310

15.30

352

15.45

369

15.45

237

14.30

AM PK HOUR

1760

7.15

662

9.00

1585

8.00

833

7.30

PM PK HOUR

1115

15.00

1235

15.00

1353

15.00

878

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

SOUTHBOUND Approach

Lt
202
242
198
80
175

Th
1206
1197
812
333
765

897

4313

Rt Total
234
1642
245
1684
238
1248
83
496
175
1115
975

6185

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
264
348
286
157
329

TOTAL

1384

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

46
55
83
70
141

Th
243
319
342
260
772

Rt Total
146
435
204
578
237
662
141
471
322
1235

395

1936

1050

3381

WESTBOUND Approach
Th
811
1132
918
459
893

Rt
77
105
102
74
131

Total
1152
1585
1306
690
1353

4213

489

6086

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
574
621
573
365
701

298

2834

Rt

XING N/L

N-S
2077
2262
1910
967
2350

Ped
77
137
68
71
100

Sch
3
21
1
18
10

Ped
33
33
24
17
45

Sch
0
0
0
0
0

9566

453

53

152

TOTAL

42
56
61
53
86

XING S/L

XING W/L

XING E/L

70
75
65
53
71

Total
686
752
699
471
858

E-W
1838
2337
2005
1161
2211

Ped
20
20
18
24
51

Sch
0
0
0
0
0

Ped
56
50
33
33
69

Sch
0
0
0
0
0

334

3466

9552

133

241

Project ID: 14-5069-001


City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Day: Wednesday

TOTALS

Date: 2/12/2014

AM

Sepulveda Blvd

Sepulveda Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
2

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

36
51
58
57
65
62
61
54
50
52
51
45

240
325
322
319
320
294
297
286
255
204
159
194

45
54
71
64
54
70
52
69
78
61
50
49

9
15
13
9
20
13
11
11
19
17
27
20

40
52
64
87
73
81
81
84
84
80
89
89

26
30
38
52
53
56
53
42
48
52
61
76

55
61
69
79
94
90
92
72
79
68
64
75

130
168
281
232
287
294
270
281
257
247
210
204

2
15
27
33
27
26
26
26
27
33
27
15

6
8
11
17
16
16
7
17
9
12
16
24

104
104
157
209
173
166
122
160
138
151
139
145

18
20
16
16
22
14
22
17
19
16
15
15

711
903
1127
1174
1204
1182
1094
1119
1063
993
908
951

NL
NT
NR
SL
ST
SR
EL
ET
642
3215
717
184
904
587
898
2861
14.04% 70.29% 15.68% 10.99% 53.97% 35.04% 22.21% 70.76%
nb a
nb d
sb a
sb d
eb a
eb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

National Blvd

242

PEAK HR FACTOR :
CONTROL : Signalized

1255
0.973

259

55

305
0.932

199

332

1094
0.938

ER
284
7.02%

WL
WT
159
1768
7.44% 82.73%
wb a
nb d

WR
210
9.83%

TOTAL
12429
TOTAL

113

60

705
0.861

68

4687
0.973

Project ID: 14-5069-001


City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Day: Wednesday

TOTALS

Date: 2/12/2014

PM

Sepulveda Blvd

Sepulveda Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

National Blvd
WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
2

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

42
38
50
40
45
40

154
179
162
185
210
208

33
50
34
37
55
49

34
36
29
34
37
41

117
143
171
174
210
217

70
71
68
79
81
94

73
84
81
73
89
86

246
213
222
206
219
246

31
43
25
39
30
37

26
27
21
18
26
21

188
177
165
163
198
175

23
30
21
19
10
21

1037
1091
1049
1067
1210
1235

NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
255
1098
258
211
1032
463
486
1352
205
139
1066
15.83% 68.16% 16.01% 12.37% 60.49% 27.14% 23.79% 66.18% 10.03% 10.46% 80.21%
nb a
nb d
sb a
sb d
eb a
eb d
wb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

175

PEAK HR FACTOR :
CONTROL : Signalized

765
0.899

175

141

772
0.877

322

329

893
0.917

131

86

701
0.917

WR
124
9.33%

TOTAL
6689
TOTAL

71

4561
0.923

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Sepulveda Blvd

East/West

Palms Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

58
32
79

31
22
55

28
12
18

26
22
29

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

466

7.45

125

8.15

261

8.15

300

7.45

PM PK 15 MIN

324

15.45

295

15.45

295

15.45

270

15.00

AM PK HOUR

1715

7.15

473

8.15

994

8.00

1173

7.45

PM PK HOUR

1194

15.00

1050

15.00

1100

15.00

916

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

SOUTHBOUND Approach

Lt
196
178
148
60
127

Th
1348
1257
921
397
897

709

4820

Rt Total
162
1706
127
1562
101
1170
91
548
170
1194
651

6180

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
36
55
56
48
106

Th
252
339
331
268
819

301

2009

TOTAL
Rt

Th
551
826
603
373
875

Rt
43
53
49
28
103

Total
676
994
792
469
1100

527

3228

276

4031

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
337
469
456
368
1050

N-S
2043
2031
1626
916
2244

Ped
15
38
19
22
24

Sch
0
1
0
4
2

Ped
59
95
74
35
111

Sch
0
1
0
0
1

370

2680

8860

118

374

TOTAL

77
116
107
55
150

Th
701
889
774
299
671

505

3334

XING N/L

49
75
69
52
125

WESTBOUND Approach

82
115
140
68
122

XING S/L

Rt Total
127
905
160
1165
151
1032
39
393
95
916
572

4411

XING W/L

XING E/L

E-W
1581
2159
1824
862
2016

Ped
17
22
20
18
27

Sch
0
2
0
2
0

Ped
34
47
49
34
62

Sch
0
1
0
0
1

8442

104

226

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-002
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Sepulveda Blvd

Sepulveda Blvd

NORTHBOUND

SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
3

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

43
41
51
61
48
50
37
43
31
43
39
35

286
347
354
361
279
326
319
333
281
240
199
201

34
41
43
44
45
32
25
25
28
24
21
28

9
8
7
12
13
11
17
14
11
12
15
18

46
49
63
94
72
91
82
94
83
83
81
84

11
7
13
18
21
23
14
17
16
14
25
14

12
24
23
23
27
30
28
30
37
35
29
39

63
98
189
201
180
217
214
215
169
170
138
126

4
8
9
22
19
14
11
9
17
9
11
12

12
16
24
25
27
30
33
26
32
18
27
30

110
146
207
238
230
217
223
219
194
202
184
194

31
30
29
37
29
46
38
47
45
35
40
31

661
815
1012
1136
990
1087
1041
1072
944
885
809
812

WR
438
14.12%

TOTAL
11264

NL
NT
522
3526
11.76% 79.45%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

196

PEAK HR FACTOR :
CONTROL : Signalized

1285
0.873

NR
390
8.79%

SL
ST
147
922
11.65% 73.06%
sb a
sb d

SR
193
15.29%

EL
ET
337
1980
13.69% 80.42%
eb a
eb d

ER
145
5.89%

WL
WT
300
2364
9.67% 76.21%
wb a
nb d

TOTAL
146

53

339
0.936

76

108

812
0.944

66

115

908
0.978

150

4254
0.936

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-002
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Sepulveda Blvd

Sepulveda Blvd

NORTHBOUND

SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
3

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

30
30
30
38
35
24

173
224
168
226
254
249

37
54
48
38
33
51

26
22
39
18
20
29

123
145
166
205
220
228

19
33
22
29
36
38

29
39
32
34
25
31

182
191
203
207
233
232

12
16
28
25
18
32

32
23
51
35
35
29

150
149
193
180
149
149

16
23
26
22
25
22

829
949
1006
1057
1083
1114

WR
134
10.24%

TOTAL
6038

NL
NT
187
1294
10.73% 74.28%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

127

PEAK HR FACTOR :
CONTROL : Signalized

897
0.921

NR
261
14.98%

SL
ST
154
1087
10.86% 76.66%
sb a
sb d

SR
177
12.48%

EL
ET
190
1248
12.11% 79.54%
eb a
eb d

ER
131
8.35%

WL
WT
205
970
15.66% 74.10%
wb a
nb d

TOTAL
170

106

819
0.890

125

122

875
0.932

103

150

671
0.848

95

4260
0.956

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Westwood Blvd

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

23
48
34

44
15
63

81
18
52

62
9
17

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

196

7.45

143

7.45

350

8.15

141

7.45

PM PK 15 MIN

101

15.15

264

15.30

268

14.45

149

15.45

AM PK HOUR

749

7.30

534

7.45

1301

8.15

506

7.30

PM PK HOUR

362

14.45

1008

15.00

1065

14.30

540

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
154
190
164
59
100
667

SOUTHBOUND Approach

Th
486
495
345
97
232

Rt
14
30
23
14
21

Total
654
715
532
170
353

1655

102

2424

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
208
292
289
133
189

TOTAL

1111

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
108
130
102
100
182

Th
187
256
198
201
510

622

1352

TOTAL
Rt Total
100
395
117
503
143
443
148
449
316
1008
824

2798

WESTBOUND Approach
Th
606
823
719
296
591

Rt
75
164
96
103
268

Total
889
1279
1104
532
1048

3035

706

4852

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
327
327
302
191
349

104

1496

Rt Total
134
468
116
463
140
468
70
281
160
540
620

2220

XING N/L

N-S
1049
1218
975
619
1361

Ped
6
14
11
8
24

Sch
0
0
0
0
2

Ped
26
26
13
11
18

Sch
0
0
0
0
0

5222

63

94

TOTAL

7
20
26
20
31

XING S/L

XING W/L

XING E/L

E-W
1357
1742
1572
813
1588

Ped
15
15
13
16
41

Sch
0
0
0
0
2

Ped
13
13
15
8
16

Sch
0
0
0
0
0

7072

100

65

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-003
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Westwood Blvd

Westwood Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

National Blvd
WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
1

SR
1

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

25
40
45
44
55
42
45
48
42
40
48
34

79
111
148
148
121
128
134
112
97
86
86
76

4
4
2
4
5
7
10
8
7
2
7
7

23
30
22
33
36
33
31
30
27
26
29
20

31
22
61
73
70
67
64
55
57
49
47
45

17
22
24
37
33
32
25
27
34
35
36
38

46
53
56
53
52
90
74
76
80
67
74
68

126
114
188
178
181
215
223
204
192
195
156
176

17
12
17
29
44
45
41
34
27
23
21
25

1
0
4
2
3
7
4
6
7
7
5
7

69
68
81
109
103
75
66
83
70
88
61
83

35
35
34
30
31
27
29
29
32
27
33
48

473
511
682
740
734
768
746
712
672
645
603
627

WR
390
27.88%

TOTAL
7913

NL
NT
508
1326
26.72% 69.75%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

186

PEAK HR FACTOR :
CONTROL : Signalized

531
0.948

NR
67
3.52%

SL
ST
340
641
25.35% 47.80%
sb a
sb d

SR
360
26.85%

EL
ET
789
2148
24.11% 65.65%
eb a
eb d

ER
335
10.24%

WL
WT
53
956
3.79% 68.33%
wb a
nb d

TOTAL
26

133

274
0.934

127

269

797
0.875

159

16

353
0.862

117

2988
0.973

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-003
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Westwood Blvd

Westwood Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

National Blvd
WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
1

SR
1

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

31
28
20
27
31
22

41
56
55
70
55
52

9
5
2
4
9
6

45
55
58
35
50
39

90
111
110
137
129
134

78
70
68
81
85
82

66
67
49
54
45
41

151
145
139
157
138
157

47
56
80
54
66
68

12
8
7
8
7
9

99
92
78
81
92
98

32
38
34
45
39
42

701
731
700
753
746
750

WR
230
28.01%

TOTAL
4381

NL
NT
159
329
30.40% 62.91%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

100

PEAK HR FACTOR :
CONTROL : Signalized

232
0.874

NR
35
6.69%

SL
ST
282
711
19.35% 48.80%
sb a
sb d

SR
464
31.85%

EL
ET
322
887
20.38% 56.14%
eb a
eb d

ER
371
23.48%

WL
WT
51
540
6.21% 65.77%
wb a
nb d

TOTAL
21

182

510
0.955

316

189

591
0.978

268

31

349
0.906

160

2949
0.979

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

Pico Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

84
7
20

3
1
1

73
12
67

99
14
72

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

497

9.00

142

9.15

435

8.45

476

8.00

PM PK 15 MIN

372

14.45

172

14.45

341

15.15

427

15.15

AM PK HOUR

1909

8.15

493

8.30

1574

8.15

1783

8.00

PM PK HOUR

1414

14.45

599

14.45

1249

15.00

1669

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
269
284
262
144
316

TOTAL

1275

SOUTHBOUND Approach

Th
390
468
465
251
489
2063

Rt Total
818
1477
1079
1831
1045
1772
298
693
606
1411

Hours
7-8
8-9
9-10
14-15
15-16

3846

TOTAL

7184

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Lt
17
19
30
16
40

Th
342
440
403
254
500

122

1939

TOTAL
Rt

Th
757
1386
999
404
939

215

4485

Rt Total
113
908
128
1571
140
1188
107
530
258
1249

Total
386
474
454
280
567

N-S
1863
2305
2226
973
1978

Ped
13
16
11
20
36

Sch
0
0
0
0
0

Ped
5
20
14
8
21

Sch
0
0
0
0
0

100

2161

9345

96

68

746

5446

TOTAL

Hours
7-8
8-9
9-10
14-15
15-16

Lt
380
519
430
318
610

Th
1010
1230
974
480
971

TOTAL

2257

4665

XING N/L

27
15
21
10
27

WESTBOUND Approach

38
57
49
19
52

XING S/L

Rt

XING W/L

XING E/L

51
34
37
19
43

Total
1441
1783
1441
817
1624

E-W
2349
3354
2629
1347
2873

Ped
10
6
5
10
19

Sch
0
0
0
0
0

Ped
9
8
6
4
21

Sch
0
0
0
0
0

184

7106

12552

50

48

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-004
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

Pico Blvd

Pico Blvd

EASTBOUND

WESTBOUND

NL
2

NT
1

NR
2

SL
1

ST
2

SR
0

EL
1

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

72
63
53
81
74
65
81
64
73
53
66
70

70
106
97
117
109
118
122
119
118
122
124
101

176
201
209
232
236
282
275
286
306
259
257
223

1
3
3
10
3
3
3
10
6
8
9
7

69
79
99
95
108
128
107
97
116
125
86
76

4
6
4
13
2
5
4
4
4
9
4
4

3
2
7
26
9
13
15
20
13
18
10
8

141
146
212
258
287
384
333
382
300
268
215
216

23
23
32
35
42
33
20
33
28
39
32
41

78
95
116
91
123
127
120
149
108
115
98
109

201
242
270
297
340
308
270
312
192
243
257
282

6
6
7
32
13
6
4
11
7
9
11
10

844
972
1109
1287
1346
1472
1354
1487
1271
1268
1169
1147

NL
NT
815
1323
16.04% 26.04%
nb a
nb d
PEAK HR START TIME :
800 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

284

PEAK HR FACTOR :
CONTROL : Signalized

468
0.958

NR
2942
57.91%

SL
ST
66
1185
5.02% 90.18%
sb a
sb d

SR
63
4.79%

EL
ET
144
3142
3.93% 85.68%
eb a
eb d

ER
381
10.39%

WL
WT
1329
3214
28.49% 68.90%
wb a
nb d

WR
122
2.62%

TOTAL
14726
TOTAL

1079

19

440
0.871

15

57

1386
0.903

128

519

1230
0.936

34

5659
0.951

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-004
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

Pico Blvd

Pico Blvd

EASTBOUND

WESTBOUND

NL
2

NT
1

NR
2

SL
1

ST
2

SR
0

EL
1

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

73
71
73
85
68
90

101
150
103
121
134
131

147
151
139
154
165
148

4
12
10
8
14
8

99
155
113
143
117
127

5
5
6
7
9
5

13
6
8
22
11
11

225
179
241
259
191
248

53
54
73
60
75
50

150
168
168
164
147
131

262
218
246
254
225
246

12
7
11
9
10
13

1144
1176
1191
1286
1166
1208

NL
NT
460
740
21.86% 35.17%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

316

PEAK HR FACTOR :
CONTROL : Signalized

489
0.956

NR
904
42.97%

SL
ST
56
754
6.61% 89.02%
sb a
sb d

SR
37
4.37%

EL
ET
71
1343
3.99% 75.49%
eb a
eb d

ER
365
20.52%

WL
WT
928
1451
38.02% 59.44%
wb a
nb d

WR
62
2.54%

TOTAL
7171
TOTAL

606

40

500
0.897

27

52

939
0.916

258

610

971
0.951

43

4851
0.943

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

I-10 WB On-Off Ramp_National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

76
19
11

71
4
15

83
7
8

125
3
24

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

594

8.45

345

7.45

275

8.15

223

7.45

PM PK 15 MIN

395

15.15

441

15.30

221

14.45

304

15.45

AM PK HOUR

2289

8.00

1340

7.30

1005

8.15

849

7.00

PM PK HOUR

1426

14.30

1722

15.00

834

14.30

1097

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

1
0
2
2
4

Th
1046
1289
1254
376
824

4789

Rt Total
909
1956
1000
2289
693
1949
314
692
494
1322

Hours
7-8
8-9
9-10
14-15
15-16

Lt
356
443
341
252
482

Th
670
732
627
462
1128

3410

TOTAL

1874

3619

8208

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
210
387
354
130
265

TOTAL

1346

TOTAL
Rt

111
128
90
61
76

Rt Total
422
743
455
970
423
867
237
428
468
809

Hours
7-8
8-9
9-10
14-15
15-16

466

2005

TOTAL

3817

Lt

XING N/L

69
85
102
84
112

Total
1095
1260
1070
798
1722

N-S
3051
3549
3019
1490
3044

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
4
12
12
5
16

Sch
0
0
0
0
2

452

5945

14153

49

TOTAL

XING W/L

WESTBOUND Approach
Th

XING S/L

79
80
59
89
191

Th
392
358
344
193
406

Rt Total
378
849
366
804
339
742
277
559
500
1097

498

1693

1860

4051

XING E/L

E-W
1592
1774
1609
987
1906

Ped
3
5
6
1
12

Sch
0
0
0
0
2

Ped
2
7
5
1
10

Sch
0
0
0
0
0

7868

27

25

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-005
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 WB On-Off
Ramp_National Blvd
EASTBOUND

I-10 WB On-Off
Ramp_National Blvd
WESTBOUND

NL
1

NT
3

NR
1

SL
2

ST
2

SR
0

EL
1.5

ET
0.5

ER
1

WL
0.5

WT
1.5

WR
1

TOTAL

0
0
1
0
0
0
0
0
0
0
1
1

202
264
268
312
320
319
307
343
336
330
299
289

179
212
274
244
240
254
255
251
166
178
183
166

58
77
114
107
120
115
94
114
87
103
71
80

146
140
176
208
194
206
179
153
155
182
142
148

9
9
21
30
27
22
8
28
20
27
19
36

33
31
62
84
80
99
96
112
106
97
69
82

21
26
32
32
27
36
37
28
27
13
21
29

94
93
116
119
90
140
133
92
99
122
109
93

13
10
23
33
27
26
16
11
11
8
25
15

97
92
100
103
95
85
91
87
89
78
77
100

110
96
85
87
83
86
105
92
72
90
78
99

962
1050
1272
1359
1303
1388
1321
1311
1168
1228
1094
1138

WR
1083
45.22%

TOTAL
14594

NL
NT
3
3589
0.05% 57.94%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

1258
0.982

NR
2602
42.01%

SL
ST
1140
2029
33.28% 59.24%
sb a
sb d

SR
256
7.47%

EL
ET
951
329
36.86% 12.75%
eb a
eb d

ER
1300
50.39%

WL
WT
218
1094
9.10% 45.68%
wb a
nb d

TOTAL
993

436

787
0.949

87

359

132
0.885

482

102

374
0.938

361

5371
0.967

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-005
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 WB On-Off
Ramp_National Blvd
EASTBOUND

I-10 WB On-Off
Ramp_National Blvd
WESTBOUND

NL
1

NT
3

NR
1

SL
2

ST
2

SR
0

EL
1.5

ET
0.5

ER
1

WL
0.5

WT
1.5

WR
1

TOTAL

0
2
0
1
1
2

205
171
199
250
205
170

168
146
140
144
97
113

129
123
125
124
130
103

230
232
264
280
280
304

47
37
28
26
31
27

67
63
56
62
70
77

29
32
21
24
19
12

111
126
123
120
113
112

46
43
56
37
49
49

91
102
86
101
97
122

145
132
108
126
133
133

1268
1209
1206
1295
1225
1224

WR
777
46.92%

TOTAL
7427

NL
NT
6
1200
0.30% 59.58%
nb a
nb d
PEAK HR START TIME :
230 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

825
0.903

NR
808
40.12%

SL
ST
734
1590
29.13% 63.10%
sb a
sb d

SR
196
7.78%

EL
ET
395
137
31.93% 11.08%
eb a
eb d

ER
705
56.99%

WL
WT
280
599
16.91% 36.17%
wb a
nb d

TOTAL
598

501

1006
0.956

138

248

106
0.943

480

182

380
0.951

511

4978
0.961

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

I-10 EB On-Ramp

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

105
19
19

116
7
19

0
0
0

0
0
0

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

682

8.00

374

8.15

0.00

0.00

PM PK 15 MIN

514

15.15

463

15.45

0.00

0.00

AM PK HOUR

2697

7.30

1360

7.45

0.00

0.00

PM PK HOUR

1856

14.30

1778

15.00

0.00

0.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

0
0
0
0
0

Th
1958
2261
1943
690
1301

8153

Rt Total
507
2465
406
2667
358
2301
184
874
447
1748

Hours
7-8
8-9
9-10
14-15
15-16

Lt
802
787
731
408
804

Th
359
467
373
382
974

1902

TOTAL

3532

2555

10055

EASTBOUND Approach
Hours
TOTAL

Lt

Rt

Rt
0

Total
0

Hours
0

TOTAL

Lt

Th
0

XING N/L

Total
1161
1254
1104
790
1778

N-S
3626
3921
3405
1664
3526

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
0
0
0
0
0

Sch
0
0
0
0
0

6087

16142

TOTAL

XING W/L

Rt
0

XING S/L

0
0
0
0
0

WESTBOUND Approach
Th

TOTAL

Total
0

E-W
0

XING E/L

Ped

Sch

Ped

Sch

26

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-006
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 EB On-Ramp

I-10 EB On-Ramp

EASTBOUND

WESTBOUND

NL
0

NT
3.5

NR
0.5

SL
2

ST
2

SR
0

EL
0

ET
0

ER
0

WL
0

WT
0

WR
0

TOTAL

0
0
0
0
0
0
0
0
0
0
0
0

391
469
551
547
566
560
575
560
509
498
477
459

140
125
119
123
116
115
88
87
87
93
94
84

195
179
215
213
181
234
199
173
164
222
189
156

47
66
95
151
125
140
117
85
93
93
85
102

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

773
839
980
1034
988
1049
979
905
853
906
845
801

NL
NT
0
6162
0.00% 82.90%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

2224
0.989

NR
1271
17.10%

SL
ST
2320
1199
65.93% 34.07%
sb a
sb d

SR
EL
ET
ER
WL
WT
WR
0
0
0
0
0
0
0
0.00% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
eb a
eb d
wb a
nb d

TOTAL
10952
TOTAL

473

843

511
0.905

0
0.000

0
0.000

4051
0.965

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-006
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 EB On-Ramp

I-10 EB On-Ramp

EASTBOUND

WESTBOUND

NL
0

NT
3.5

NR
0.5

SL
2

ST
2

SR
0

EL
0

ET
0

ER
0

WL
0

WT
0

WR
0

TOTAL

0
0
0
0
0
0

364
326
338
383
310
270

89
95
130
131
90
96

199
209
204
209
195
196

191
191
241
222
244
267

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

843
821
913
945
839
829

NL
NT
0
1991
0.00% 75.93%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

1301
0.850

NR
631
24.07%

SL
ST
1212
1356
47.20% 52.80%
sb a
sb d

SR
EL
ET
ER
WL
WT
WR
0
0
0
0
0
0
0
0.00% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
eb a
eb d
wb a
nb d

TOTAL
5190
TOTAL

447

804

974
0.960

0
0.000

0
0.000

3526
0.933

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

National Pl_National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

44
19
29

16
4
10

35
15
40

59
29
29

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

553

7.30

142

7.45

133

8.00

427

7.45

PM PK 15 MIN

389

15.15

252

15.30

226

15.45

261

14.30

AM PK HOUR

2146

7.30

530

7.45

494

7.45

1607

7.30

PM PK HOUR

1327

14.30

973

15.00

886

15.00

984

14.30

NORTHBOUND Approach

SOUTHBOUND Approach

Hours
7-8
8-9
9-10
14-15
15-16

Lt
327
338
296
91
153

Th
1626
1712
1421
500
1095

TOTAL

1205

6354

Rt
8
9
16
12
25

Total
1961
2059
1733
603
1273

70

7629

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
27
34
31
33
99

Th
313
399
328
315
845

224

2200

TOTAL
Rt

Th
127
174
124
139
322

Rt Total
120
297
242
488
169
352
167
373
354
886

Hours
7-8
8-9
9-10
14-15
15-16

458

886

1052

TOTAL

2396

XING N/L

9
37
17
22
29

Total
349
470
376
370
973

N-S
2310
2529
2109
973
2246

Ped
30
38
27
7
20

Sch
0
0
0
0
0

Ped
0
0
0
0
1

Sch
0
0
0
0
0

114

2538

10167

122

WESTBOUND Approach

50
72
59
67
210

XING S/L

TOTAL

Lt
198
274
211
98
214

Th
385
379
258
102
220

Rt Total
789
1372
890
1543
817
1286
298
498
460
894

995

1344

3254

5593

XING W/L

XING E/L

E-W
1669
2031
1638
871
1780

Ped
20
33
29
3
19

Sch
0
0
0
0
0

Ped
4
8
8
4
10

Sch
0
0
0
0
0

7989

104

34

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-007
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

National Pl_National Blvd

National Pl_National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
1

WR
2

TOTAL

59
73
103
92
83
91
93
71
81
74
75
66

363
385
450
428
456
433
413
410
367
367
363
324

3
0
0
5
3
2
2
2
1
5
8
2

3
5
6
13
13
8
7
6
6
8
4
13

35
63
90
125
110
119
98
72
87
84
71
86

1
1
3
4
9
10
14
4
2
3
6
6

10
14
10
16
18
18
25
11
13
12
20
14

22
18
39
48
54
39
32
49
43
30
22
29

19
16
39
46
61
76
61
44
46
42
37
44

27
39
62
70
62
73
59
80
70
65
43
33

54
81
110
140
98
110
98
73
72
56
72
58

162
194
216
217
213
236
230
211
211
208
186
212

758
889
1128
1204
1180
1215
1132
1033
999
954
907
887

WR
2496
59.41%

TOTAL
12286

NL
NT
961
4759
16.70% 82.72%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

359

PEAK HR FACTOR :
CONTROL : Signalized

1730
0.969

NR
33
0.57%

SL
ST
92
1040
7.70% 87.03%
sb a
sb d

SR
63
5.27%

EL
ET
181
425
15.92% 37.38%
eb a
eb d

ER
531
46.70%

WL
WT
683
1022
16.26% 24.33%
wb a
nb d

TOTAL
12

41

452
0.933

37

77

173
0.929

244

264

446
0.940

896

4731
0.973

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-007
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

National Pl_National Blvd

National Pl_National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
1

WR
2

TOTAL

41
50
32
44
44
33

264
236
296
340
233
226

6
6
7
5
5
8

13
20
20
20
32
27

158
157
219
195
215
216

5
17
8
10
5
6

21
46
53
49
49
59

64
75
74
86
82
80

77
90
91
87
89
87

46
52
54
67
63
30

52
50
60
56
43
61

163
135
132
117
117
94

910
934
1046
1076
977
927

WR
758
54.45%

TOTAL
5870

NL
NT
244
1595
13.01% 85.02%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

170

PEAK HR FACTOR :
CONTROL : Signalized

1105
0.834

NR
37
1.97%

SL
ST
132
1160
9.83% 86.37%
sb a
sb d

SR
51
3.80%

EL
ET
277
461
22.00% 36.62%
eb a
eb d

ER
521
41.38%

WL
WT
312
322
22.41% 23.13%
wb a
nb d

TOTAL
23

92

786
0.911

40

197

317
0.981

357

236

209
0.961

501

4033
0.937

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

Palms Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

32
17
17

24
12
14

28
11
32

34
13
55

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

442

7.30

232

8.30

298

7.45

273

7.45

PM PK 15 MIN

336

15.00

365

15.15

289

15.15

229

14.45

AM PK HOUR

1654

7.30

865

8.00

1112

7.30

1010

8.45

PM PK HOUR

1270

14.30

1332

15.00

1138

15.00

875

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

SOUTHBOUND Approach

Lt
147
129
105
53
91

Th
1325
1284
1091
505
931

525

5136

Rt Total
108
1580
177
1590
171
1367
69
627
150
1172
675

6336

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
174
207
146
48
120
695

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
55
62
59
35
90

Th
491
741
652
424
1149

301

3457

TOTAL
Rt

625
780
607
334
868

Rt
69
109
95
55
150

Total
868
1096
848
437
1138

3214

478

4387

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
602
865
775
511
1332

N-S
2182
2455
2142
1138
2504

Ped
66
19
15
9
84

Sch
2
0
0
0
0

Ped
105
38
27
7
86

Sch
2
0
0
0
2

327

4085

10421

193

263

TOTAL

81
141
121
70
109

Th
696
687
666
301
607

522

2957

XING N/L

56
62
64
52
93

WESTBOUND Approach
Th

XING S/L

Rt Total
132
909
172
1000
216
1003
72
443
86
802
678

4157

XING W/L

XING E/L

E-W
1777
2096
1851
880
1940

Ped
31
16
25
14
36

Sch
0
0
0
1
0

Ped
60
37
25
20
57

Sch
1
0
0
0
0

8544

122

199

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-008
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

Palms Blvd

Palms Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

26
42
35
44
30
36
32
31
15
25
32
33

282
318
383
342
324
325
345
290
291
262
297
241

22
29
24
33
38
40
48
51
46
40
48
37

7
13
15
20
15
15
15
17
15
16
14
14

81
89
166
155
194
173
200
174
193
167
145
147

10
4
17
25
11
18
17
16
9
21
20
14

43
37
47
47
55
53
49
50
38
46
34
28

77
127
194
227
189
197
192
202
169
165
135
138

7
12
26
24
18
35
23
33
18
24
31
22

22
22
19
18
33
35
37
36
26
29
34
32

119
167
187
223
177
171
159
180
178
156
157
175

32
40
28
32
40
32
50
50
49
54
61
52

728
900
1141
1190
1124
1130
1167
1130
1047
1005
1008
933

WR
520
17.86%

TOTAL
12503

NL
NT
381
3700
8.40% 81.55%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

142

PEAK HR FACTOR :
CONTROL : Signalized

1336
0.963

NR
456
10.05%

SL
ST
176
1884
7.85% 84.03%
sb a
sb d

SR
182
8.12%

EL
ET
527
2012
18.74% 71.55%
eb a
eb d

ER
273
9.71%

WL
WT
343
2049
11.78% 70.36%
wb a
nb d

TOTAL
159

65

722
0.925

71

204

805
0.930

100

123

730
0.922

154

4611
0.969

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-008
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

Palms Blvd

Palms Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

26
27
30
18
24
19

243
262
256
254
200
221

44
25
50
35
33
32

20
15
25
21
24
20

204
220
244
313
297
295

35
17
12
31
23
27

24
24
38
33
24
25

164
170
213
224
227
204

23
32
36
32
37
45

32
38
27
28
27
27

142
159
150
164
138
155

40
32
36
27
15
8

997
1021
1117
1180
1069
1078

WR
158
12.69%

TOTAL
6462

NL
NT
144
1436
8.00% 79.82%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

91

PEAK HR FACTOR :
CONTROL : Signalized

931
0.872

NR
219
12.17%

SL
ST
125
1573
6.78% 85.35%
sb a
sb d

SR
145
7.87%

EL
ET
168
1202
10.67% 76.32%
eb a
eb d

ER
205
13.02%

WL
WT
179
908
14.38% 72.93%
wb a
nb d

TOTAL
150

90

1149
0.912

93

120

868
0.984

150

109

607
0.916

86

4444
0.942

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

Venice Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

46
11
17

30
21
14

91
114
59

86
112
65

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

480

8.45

442

8.00

388

9.15

394

9.00

PM PK 15 MIN

299

14.30

371

15.15

412

15.30

378

15.00

AM PK HOUR

1769

8.00

1631

7.30

1408

9.00

1493

9.00

PM PK HOUR

1087

14.30

1418

15.00

1598

15.00

1424

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
148
232
122
68
127
697

SOUTHBOUND Approach

Th
963
1369
910
410
778
4430

Rt Total
105
1216
168
1769
126
1158
70
548
118
1023
587

5714

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
118
158
221
111
244
852

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
211
312
134
61
186

Th
1032
1094
685
352
1044

904

4207

TOTAL
Rt Total
183
1426
179
1585
125
944
77
490
188
1418
752

5863

WESTBOUND Approach
Th
539
775
1055
571
1234

Rt
76
120
132
71
120

Total
733
1053
1408
753
1598

4174

519

5545

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Th
1100
1001
1029
451
995

917

4576

Rt Total
109
1351
111
1220
185
1493
90
651
151
1424
646

6139

XING N/L

N-S
2642
3354
2102
1038
2441

Ped
35
61
65
58
153

Sch
0
2
1
2
1

Ped
62
57
75
38
92

Sch
0
0
0
0
0

11577

372

324

TOTAL

Lt
142
108
279
110
278

XING S/L

XING W/L

XING E/L

E-W
2084
2273
2901
1404
3022

Ped
56
66
72
48
135

Sch
1
1
0
0
0

Ped
48
43
54
24
62

Sch
1
0
0
0
1

11684

377

231

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-009
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

Venice Blvd

Venice Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
1

EL
2

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

31
40
40
37
53
59
55
65
31
28
30
33

205
224
250
284
337
342
331
359
270
215
248
177

22
18
24
41
27
49
36
56
23
28
37
38

36
46
54
75
79
84
70
79
33
40
26
35

214
250
265
303
322
241
246
285
202
193
142
148

39
42
56
46
41
65
23
50
27
25
34
39

21
17
36
44
43
39
37
39
54
59
60
48

78
102
175
184
170
185
216
204
281
292
274
208

19
12
24
21
28
32
37
23
41
37
28
26

28
34
40
40
28
26
33
21
74
67
65
73

234
290
318
258
252
253
273
223
268
261
271
229

27
26
27
29
30
25
34
22
52
42
47
44

954
1101
1309
1362
1410
1400
1391
1426
1356
1287
1262
1098

NL
NT
502
3242
12.12% 78.25%
nb a
nb d
PEAK HR START TIME :
800 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

232

PEAK HR FACTOR :
CONTROL : Signalized

1369
0.921

NR
399
9.63%

SL
ST
657
2811
16.61% 71.07%
sb a
sb d

SR
487
12.31%

EL
ET
497
2369
15.56% 74.17%
eb a
eb d

ER
328
10.27%

WL
WT
529
3130
13.02% 77.02%
wb a
nb d

WR
405
9.97%

TOTAL
15356
TOTAL

168

312

1094
0.896

179

158

775
0.908

120

108

1001
0.897

111

5627
0.987

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-009
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

Venice Blvd

Venice Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
1

EL
2

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

35
33
30
31
35
31

226
184
217
201
179
181

38
32
32
28
34
24

24
37
45
54
53
34

166
186
228
274
259
283

36
41
46
43
49
50

58
53
63
63
67
51

292
279
318
293
312
311

37
34
23
27
33
37

50
60
82
63
72
61

217
234
254
223
256
262

35
55
42
39
32
38

1214
1228
1380
1339
1381
1363

WR
241
11.61%

TOTAL
7905

NL
NT
195
1188
12.41% 75.62%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

127

PEAK HR FACTOR :
CONTROL : Signalized

778
0.917

NR
188
11.97%

SL
ST
247
1396
12.95% 73.17%
sb a
sb d

SR
265
13.89%

EL
ET
355
1805
15.10% 76.78%
eb a
eb d

ER
191
8.12%

WL
WT
388
1446
18.70% 69.69%
wb a
nb d

TOTAL
118

186

1044
0.956

188

244

1234
0.970

120

278

995
0.942

151

5463
0.989

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

I-10 EB Off-Ramp

East/West

National Blvd

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

0
0
0

38
0
10

26
8
33

44
36
21

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

0.00

296

9.15

69

8.00

261

7.45

PM PK 15 MIN

0.00

231

15.15

117

15.30

125

15.00

AM PK HOUR

0.00

1131

9.00

225

7.45

919

7.30

PM PK HOUR

0.00

851

14.45

441

15.00

477

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

0
0
0
0
0

Th
0
0
0
0
0

Rt
0
0
0
0
0

Total
0
0
0
0
0

Hours
7-8
8-9
9-10
14-15
15-16

Lt
229
262
336
140
375

TOTAL

1342

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

Th
0
0
0
0
0

Rt Total
592
821
745
1007
795
1131
261
401
468
843

2861

4203

WESTBOUND Approach

0
0
0
0
0

Th
157
217
170
179
441

Rt
0
0
0
0
0

Total
157
217
170
179
441

1164

1164

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
801
814
504
239
438

2796

Rt

XING N/L

N-S
821
1007
1131
401
843

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
3
5
8
3
9

Sch
0
0
0
0
0

4203

28

TOTAL

0
0
0
0
0

XING S/L

XING W/L

XING E/L

0
0
0
0
0

Total
801
814
504
239
438

E-W
958
1031
674
418
879

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
0
0
0
0
0

Sch
0
0
0
0
0

2796

3960

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-010
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

I-10 EB Off-Ramp

I-10 EB Off-Ramp

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

37
45
67
80
70
56
55
81
81
90
71
94

0
0
0
0
0
0
0
0
0
0
0
0

118
137
161
176
171
199
172
203
212
206
177
200

0
0
0
0
0
0
0
0
0
0
0
0

27
24
41
65
69
49
42
57
49
42
33
46

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

131
174
235
261
213
210
221
170
145
123
124
112

0
0
0
0
0
0
0
0
0
0
0
0

313
380
504
582
523
514
490
511
487
461
405
452

NL

NT

NR

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
827
0
27.95%
0.00%
sb a
sb d

SR
2132
72.05%

EL
ET
0
544
0.00% 100.00%
eb a
eb d

ER
0
0.00%

WL
WT
0
2119
0.00% 100.00%
wb a
nb d

WR
0
0.00%

730 AM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
5622
TOTAL

0
0.000

273

0
0.957

707

224
0.812

919
0.880

2123
0.912

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-010
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

I-10 EB Off-Ramp

I-10 EB Off-Ramp

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

67
73
77
102
100
96

0
0
0
0
0
0

134
127
119
129
124
96

0
0
0
0
0
0

82
97
99
110
117
115

0
0
0
0
0
0

0
0
0
0
0
0

123
116
125
113
98
102

0
0
0
0
0
0

406
413
420
454
439
409

NL

NT

NR

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
515
0
41.40%
0.00%
sb a
sb d

SR
729
58.60%

EL
ET
0
620
0.00% 100.00%
eb a
eb d

ER
0
0.00%

WL
WT
0
677
0.00% 100.00%
wb a
nb d

WR
0
0.00%

245 PM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
2541
TOTAL

0
0.000

352

0
0.921

499

423
0.904

452
0.904

1726
0.950

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

National Blvd_Mentone Ave

East/West

Rose Ave_National Blvd

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

5
10
2

47
11
39

2
2
1

45
17
20

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

49

7.45

141

7.45

24

7.45

191

7.30

PM PK 15 MIN

14

14.45

205

15.45

45

15.15

127

15.00

AM PK HOUR

178

7.30

495

7.30

88

7.45

716

7.15

PM PK HOUR

51

14.45

767

15.00

99

14.45

468

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

1
2
4
2
1

Th
118
153
79
9
26

Rt
6
16
16
9
18

Total
125
171
99
20
45

10

385

65

460

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16

Lt
303
378
403
271
683

TOTAL

2038

TOTAL

Th

Rt

Th

Rt

Total

38
50
22
19
74

3
2
5
1
3

50
76
40
30
99

78

203

14

295

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

XING N/L

53
62
61
16
61

15
16
10
13
23

Total
371
456
474
300
767

N-S
496
627
573
320
812

Ped
11
10
10
10
27

Sch
0
0
0
0
1

Ped
23
25
9
12
17

Sch
0
0
0
0
0

253

77

2368

2828

68

86

WESTBOUND Approach

9
24
13
10
22

XING S/L

TOTAL

Th
5
5
6
3
9

38
38
13
19
48

28

156

Rt Total
593
636
565
608
322
341
204
226
367
424
2051

2235

XING W/L

XING E/L

E-W
686
684
381
256
523

Ped
4
13
11
6
14

Sch
0
0
0
0
1

Ped
4
2
5
13
9

Sch
0
1
0
0
0

2530

48

33

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-011
City: Los Angeles

National Blvd_Mentone Ave

NORTHBOUND

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Rose Ave_National Blvd

SOUTHBOUND

Rose Ave_National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1.5

ST
0.5

SR
1

EL
0

ET
1

ER
0

WL
0

WT
1

WR
1

TOTAL

0
0
0
1
0
0
1
1
2
1
1
0

10
20
43
45
31
43
37
42
32
19
11
17

0
2
1
3
7
4
1
4
3
10
1
2

51
50
87
115
116
90
67
105
119
98
77
109

7
9
17
20
13
18
7
24
17
16
16
12

2
3
4
6
5
4
4
3
2
4
2
2

1
2
1
5
10
4
6
4
6
4
1
2

4
9
7
18
14
15
13
8
7
5
5
5

0
0
2
1
0
1
1
0
3
0
1
1

0
0
0
5
1
1
0
3
2
1
2
1

5
3
8
22
21
10
6
1
5
2
6
0

106
146
183
158
169
131
155
110
86
78
91
67

186
244
353
399
387
321
298
305
284
238
214
218

WR
1480
93.38%

TOTAL
3447

NL
NT
7
350
1.77% 88.61%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NS/EW Streets: National Blvd_Mentone Ave

LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

162
0.908

NR
38
9.62%

SL
ST
1084
176
83.32% 13.53%
sb a
sb d

SR
41
3.15%

EL
ET
46
110
27.71% 66.27%
eb a
eb d

ER
10
6.02%

WL
WT
16
89
1.01%
5.62%
wb a
nb d

TOTAL
15

408

68
0.878

19

20

54
0.813

61
0.928

641

1460
0.915

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-011
City: Los Angeles

National Blvd_Mentone Ave

NORTHBOUND

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Rose Ave_National Blvd

SOUTHBOUND

Rose Ave_National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1.5

ST
0.5

SR
1

EL
0

ET
1

ER
0

WL
0

WT
1

WR
1

TOTAL

1
1
0
1
0
0

1
8
8
7
8
3

4
5
5
2
6
5

121
150
149
170
182
182

7
9
10
19
16
16

6
7
5
6
5
7

4
6
5
7
4
6

8
11
13
37
12
12

0
1
0
1
2
0

2
1
2
2
3
2

9
10
17
17
4
10

112
92
108
96
85
78

275
301
322
365
327
321

WR
571
87.85%

TOTAL
1911

NL
NT
3
35
4.62% 53.85%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NS/EW Streets: National Blvd_Mentone Ave

LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

26
0.804

NR
27
41.54%

SL
ST
954
77
89.41%
7.22%
sb a
sb d

SR
36
3.37%

EL
ET
32
93
24.81% 72.09%
eb a
eb d

ER
4
3.10%

WL
WT
12
67
1.85% 10.31%
wb a
nb d

TOTAL
18

683

61
0.935

23

22

74
0.550

48
0.835

367

1335
0.914

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Pico Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

19
8
13

11
1
0

74
17
53

86
20
63

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

297

9.00

21

9.00

643

8.45

507

7.45

PM PK 15 MIN

173

14.45

63

14.30

412

15.15

459

15.00

AM PK HOUR

1090

8.15

62

8.45

2306

8.15

1885

7.45

PM PK HOUR

587

14.45

204

14.30

1561

15.00

1693

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
212
241
214
84
155
906

SOUTHBOUND Approach

Th
6
13
22
7
5

Rt Total
403
621
730
984
751
987
211
302
391
551

Hours
7-8
8-9
9-10
14-15
15-16

53

2486

TOTAL

3445

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

Th

Rt

Total

Th
1079
1804
1477
565
1218

946

6143

Rt Total
141
1346
173
2257
115
1975
96
726
251
1561
776

7865

XING N/L

11
16
24
45
69

0
1
2
0
4

11
26
30
67
98

22
43
56
112
171

N-S
643
1027
1043
414
722

Ped
14
9
14
9
13

Sch
0
0
0
0
0

Ped
13
11
20
9
11

Sch
0
0
1
0
0

165

232

404

3849

59

64

WESTBOUND Approach

Lt
126
280
383
65
92

XING S/L

TOTAL

Hours
7-8
8-9
9-10
14-15
15-16

Lt
128
167
161
182
373

Th
1378
1468
1208
579
1244

TOTAL

1011

5877

Rt

XING W/L

XING E/L

68
198
275
58
66

Total
1574
1833
1644
819
1683

E-W
2920
4090
3619
1545
3244

Ped
14
8
17
10
14

Sch
0
0
0
0
0

Ped
0
0
0
0
0

Sch
0
0
0
0
0

665

7553

15418

63

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-012
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Pico Blvd

SOUTHBOUND

Pico Blvd

EASTBOUND

WESTBOUND

NL
1

NT
0

NR
2

SL
1

ST
0

SR
1

EL
1

ET
3

ER
0

WL
1

WT
3

WR
0

TOTAL

30
29
66
87
61
65
54
61
62
59
46
47

1
1
1
3
1
2
6
4
3
6
6
7

71
75
110
147
129
197
192
212
232
189
171
159

2
1
4
4
5
4
3
4
11
2
6
5

0
0
0
0
0
0
0
1
1
0
0
1

4
1
2
4
2
6
9
9
9
11
8
2

26
28
36
36
44
62
73
101
109
113
91
70

184
230
287
378
419
453
441
491
433
385
363
296

29
27
39
46
54
26
42
51
24
34
28
29

23
25
36
44
43
45
47
32
37
40
38
46

272
306
358
442
403
373
353
339
278
261
319
350

13
13
21
21
41
34
39
84
67
60
79
69

655
736
960
1212
1202
1267
1259
1389
1266
1160
1155
1081

WR
541
10.71%

TOTAL
13342

NL
NT
667
41
25.73%
1.58%
nb a
nb d
PEAK HR START TIME :
815 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

242

PEAK HR FACTOR :
CONTROL : Signalized

15
0.918

NR
1884
72.69%

SL
ST
51
3
42.15%
2.48%
sb a
sb d

SR
67
55.37%

EL
ET
789
4360
14.14% 78.16%
eb a
eb d

ER
429
7.69%

WL
WT
456
4054
9.03% 80.26%
wb a
nb d

TOTAL
833

22

2
0.679

33

345

1818
0.897

143

161

1343
0.949

224

5181
0.933

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-012
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Pico Blvd

SOUTHBOUND

Pico Blvd

EASTBOUND

WESTBOUND

NL
1

NT
0

NR
2

SL
1

ST
0

SR
1

EL
1

ET
3

ER
0

WL
1

WT
3

WR
0

TOTAL

35
49
43
42
44
26

4
3
1
2
2
0

90
121
80
88
112
111

23
22
19
15
14
21

0
0
2
2
0
0

40
27
32
22
22
22

31
34
20
20
30
22

294
271
285
333
288
312

40
56
63
59
60
69

104
78
102
93
80
98

303
276
339
305
282
318

28
30
18
17
14
17

992
967
1004
998
948
1016

NL
NT
239
12
28.02%
1.41%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

155

PEAK HR FACTOR :
CONTROL : Signalized

5
0.872

NR
602
70.57%

SL
ST
114
4
40.28%
1.41%
sb a
sb d

SR
165
58.30%

EL
ET
157
1783
6.86% 77.96%
eb a
eb d

ER
347
15.17%

WL
WT
555
1823
22.18% 72.86%
wb a
nb d

WR
124
4.96%

TOTAL
5925
TOTAL

391

69

4
0.807

98

92

1218
0.947

251

373

1244
0.917

66

3966
0.976

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Manning Ave

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

17
13
10

8
1
9

9
1
2

25
3
2

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

134

7.45

107

8.00

71

8.00

191

7.45

PM PK 15 MIN

139

14.45

132

14.45

116

15.30

119

15.30

AM PK HOUR

503

7.45

370

7.30

242

7.30

691

8.30

PM PK HOUR

505

14.45

470

14.30

395

15.00

436

14.45

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

48
49
39
36
63

Th
309
423
404
182
321

Rt
39
25
23
41
91

Total
396
497
466
259
475

235

1639

219

2093

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
68
66
96
90
139

Th
214
260
196
154
286

459

1110

TOTAL
Rt

Th
118
128
108
107
261

Rt
50
73
55
41
116

Total
181
239
179
156
395

93

722

335

1150

Hours
7-8
8-9
9-10
14-15
15-16

Total
287
335
305
253
434

N-S
683
832
771
512
909

Ped
1
4
2
0
3

Sch
0
0
0
0
0

Ped
4
6
7
3
5

Sch
0
0
0
0
0

45

1614

3707

10

25

TOTAL

TOTAL

Lt
136
119
124
36
98

Th
231
284
274
93
170

513

1052

XING N/L

5
9
13
9
9

WESTBOUND Approach

13
38
16
8
18

XING S/L

Rt Total
155
522
237
640
233
631
87
216
136
404
848

2413

XING W/L

XING E/L

E-W
703
879
810
372
799

Ped
10
8
3
4
1

Sch
0
0
0
0
0

Ped
1
4
4
1
8

Sch
0
0
0
0
0

3563

26

18

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-013
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Manning Ave

SOUTHBOUND

Manning Ave

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

13
6
14
15
17
14
7
11
8
13
11
7

55
67
83
104
94
110
108
111
103
104
101
96

9
2
13
15
8
8
3
6
4
5
10
4

21
10
18
19
20
16
18
12
25
21
24
26

29
43
72
70
85
65
60
50
55
45
50
46

2
1
1
1
2
1
5
1
4
4
2
3

1
3
5
4
11
9
5
13
3
6
4
3

17
27
44
30
42
29
28
29
31
28
23
26

6
12
16
16
18
18
18
19
11
19
13
12

12
26
46
52
35
22
31
31
40
25
29
30

40
41
69
81
66
64
81
73
70
79
60
65

30
34
33
58
44
59
59
75
73
54
50
56

235
272
414
465
442
415
423
431
427
403
377
374

WR
625
34.86%

TOTAL
4678

NL
NT
136
1136
10.01% 83.59%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

53

PEAK HR FACTOR :
CONTROL : Signalized

416
0.938

NR
87
6.40%

SL
ST
230
670
24.81% 72.28%
sb a
sb d

SR
27
2.91%

EL
ET
67
354
11.19% 59.10%
eb a
eb d

ER
178
29.72%

WL
WT
379
789
21.14% 44.00%
wb a
nb d

TOTAL
34

73

280
0.846

29

129
0.803

70

140

292
0.853

220

1745
0.938

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-013
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Manning Ave

SOUTHBOUND

Manning Ave

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

16
20
11
22
15
15

85
97
74
90
85
72

19
22
24
22
23
22

45
45
35
35
35
34

74
80
63
80
79
64

2
7
1
3
3
2

4
4
2
5
8
3

45
62
56
68
71
66

14
27
14
30
37
35

18
18
31
18
28
21

38
55
41
49
48
32

45
42
26
37
43
30

405
479
378
459
475
396

WR
223
35.97%

TOTAL
2592

NL
NT
99
503
13.49% 68.53%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

68

PEAK HR FACTOR :
CONTROL : Signalized

346
0.908

NR
132
17.98%

SL
ST
229
440
33.33% 64.05%
sb a
sb d

SR
18
2.62%

EL
ET
26
368
4.72% 66.79%
eb a
eb d

ER
157
28.49%

WL
WT
134
263
21.61% 42.42%
wb a
nb d

TOTAL
91

150

302
0.883

14

19

257
0.828

108

95

193
0.916

148

1791
0.935

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

32
27
20

24
9
4

45
7
36

14
27
6

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

162

7.30

145

8.00

139

8.00

129

8.00

PM PK 15 MIN

139

14.45

154

15.30

211

15.30

60

15.15

AM PK HOUR

604

7.15

511

7.30

468

7.30

480

7.45

PM PK HOUR

481

14.30

588

15.00

780

15.00

206

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
135
30
82
63
115
425

SOUTHBOUND Approach

Th
435
497
476
189
304

Rt
10
6
13
11
16

Total
580
533
571
263
435

1901

56

2382

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
26
44
23
13
36

Th
196
265
205
181
398

142

1245

TOTAL
Rt Total
152
374
164
473
151
379
95
289
154
588
716

2103

WESTBOUND Approach
Th

6
7
16
64
144

202
251
252
148
459

237

1312

Rt Total
129
337
178
436
180
448
88
300
177
780
752

2301

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
343
410
102
72
160

30

1087

Rt

XING N/L

N-S
954
1006
950
552
1023

Ped
16
17
13
10
23

Sch
0
0
0
0
0

Ped
15
20
13
10
22

Sch
0
0
0
0
0

4485

79

80

TOTAL

6
6
8
3
7

XING S/L

XING W/L

XING E/L

16
19
9
19
25

Total
365
435
119
94
192

E-W
702
871
567
394
972

Ped
14
10
12
8
25

Sch
0
1
0
0
0

Ped
12
20
12
6
18

Sch
0
0
0
0
0

88

1205

3506

69

68

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-014
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

34
51
40
10
14
6
7
3
13
20
32
17

80
96
121
138
125
125
123
124
121
122
125
108

3
2
1
4
2
2
1
1
3
5
1
4

3
5
4
14
17
10
8
9
7
8
6
2

25
37
73
61
71
65
57
72
55
46
45
59

20
28
43
61
57
35
42
30
45
32
47
27

3
0
1
2
1
2
1
3
1
8
4
3

28
38
51
85
84
56
45
66
79
54
49
70

23
19
42
45
54
45
32
47
52
47
39
42

0
0
1
5
2
0
3
1
3
1
1
3

55
72
102
114
119
102
113
76
33
28
16
25

4
3
4
5
8
4
5
2
2
4
2
1

278
351
483
544
554
452
437
434
414
375
367
361

NL
NT
247
1408
14.67% 83.61%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

70

PEAK HR FACTOR :
CONTROL : Signalized

509
0.907

NR
29
1.72%

SL
ST
93
666
7.59% 54.32%
sb a
sb d

SR
467
38.09%

EL
ET
29
705
2.38% 57.74%
eb a
eb d

ER
487
39.89%

WL
WT
20
855
2.18% 93.04%
wb a
nb d

WR
44
4.79%

TOTAL
5050
TOTAL

45

270
0.881

196

276
0.842

186

437
0.903

21

2033
0.917

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-014
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

26
37
39
26
29
21

92
97
68
78
80
78

6
5
3
4
8
1

6
7
14
8
5
9

83
98
80
97
116
105

54
41
39
42
33
40

31
33
34
47
33
30

65
83
96
107
129
127

41
47
38
49
49
41

1
2
2
2
2
1

39
33
47
47
33
33

6
13
3
11
5
6

450
496
463
518
522
492

WR
44
15.38%

TOTAL
2941

NL
NT
178
493
25.50% 70.63%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

131

PEAK HR FACTOR :
CONTROL : Signalized

323
0.853

NR
27
3.87%

SL
ST
49
579
5.59% 66.02%
sb a
sb d

SR
249
28.39%

EL
ET
208
607
19.26% 56.20%
eb a
eb d

ER
265
24.54%

WL
WT
10
232
3.50% 81.12%
wb a
nb d

TOTAL
20

34

391
0.942

155

147

415
0.883

183

160
0.833

32

1999
0.957

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Palms Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

22
35
26

11
12
21

19
20
38

45
22
54

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

224

7.30

152

8.00

282

8.45

231

9.00

PM PK 15 MIN

155

14.30

170

15.30

314

15.15

204

15.00

AM PK HOUR

836

7.30

509

7.30

1076

8.00

885

9.00

PM PK HOUR

563

14.30

626

14.45

1116

15.00

777

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
202
251
174
63
104
794

SOUTHBOUND Approach

Th
450
355
367
191
306

Rt
98
148
105
48
87

Total
750
754
646
302
497

1669

486

2949

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
61
55
47
30
78

Th
230
355
316
218
446

271

1565

TOTAL
Rt

Th
702
922
656
316
937

Rt
54
58
98
42
91

Total
839
1076
860
409
1116

424

3533

343

4300

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
369
499
440
305
617

N-S
1119
1253
1086
607
1114

Ped
59
72
15
31
107

Sch
7
17
0
10
13

Ped
31
29
20
14
35

Sch
0
5
0
4
2

394

2230

5179

284

47

129

11

TOTAL

50
72
77
47
93

Th
682
688
732
322
643

339

3067

XING N/L

78
89
77
57
93

WESTBOUND Approach

83
96
106
51
88

XING S/L

Rt

XING W/L

XING E/L

43
18
76
19
12

Total
775
778
885
388
748

E-W
1614
1854
1745
797
1864

Ped
43
60
27
28
90

Sch
3
6
0
4
7

Ped
39
62
28
44
63

Sch
0
7
0
9
4

168

3574

7874

248

20

236

20

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-015
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave
SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

37
44
59
62
60
59
79
53
47
43
47
37

85
110
141
114
113
86
84
72
95
75
101
96

23
16
24
35
47
36
38
27
24
22
29
30

11
13
14
23
21
11
8
15
13
9
15
10

34
41
79
76
96
77
82
100
95
69
70
82

8
18
30
22
35
25
14
15
24
16
22
15

18
18
23
24
25
27
20
24
31
24
28
23

98
151
217
236
235
214
230
243
178
169
155
154

7
10
23
14
16
18
9
15
28
22
19
29

11
10
9
20
15
16
19
22
19
17
18
23

136
168
199
179
174
174
176
164
202
179
178
173

10
10
12
11
3
2
7
6
10
16
34
16

478
609
830
816
840
745
766
756
766
661
716
688

NL
NT
627
1172
29.16% 54.51%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

240

PEAK HR FACTOR :
CONTROL : Signalized

454
0.933

NR
351
16.33%

SL
ST
163
901
12.46% 68.88%
sb a
sb d

SR
244
18.65%

EL
ET
285
2280
10.27% 82.16%
eb a
eb d

ER
210
7.57%

WL
WT
199
2102
8.16% 86.22%
wb a
nb d

WR
137
5.62%

TOTAL
8671
TOTAL

142

69

328
0.837

112

99

902
0.971

71

60

726
0.925

28

3231
0.962

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-015
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave
SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

33
30
31
20
23
30

93
98
84
74
80
68

29
19
27
25
18
17

14
16
25
17
17
19

106
112
95
117
128
106

25
32
18
24
25
26

28
23
15
31
27
15

159
157
228
259
215
235

22
20
26
24
23
18

27
20
25
22
29
17

158
164
172
162
150
159

9
10
7
1
1
3

703
701
753
776
736
713

NL
NT
167
497
20.90% 62.20%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

104

PEAK HR FACTOR :
CONTROL : Signalized

306
0.875

NR
135
16.90%

SL
ST
108
664
11.71% 72.02%
sb a
sb d

SR
150
16.27%

EL
ET
139
1253
9.11% 82.16%
eb a
eb d

ER
133
8.72%

WL
WT
140
965
12.32% 84.95%
wb a
nb d

WR
31
2.73%

TOTAL
4382
TOTAL

87

78

446
0.907

93

88

937
0.889

91

93

643
0.917

12

2978
0.959

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Regent St

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

17
28
17

15
22
14

5
6
2

5
5
1

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

173

7.45

150

9.00

63

8.30

64

8.00

PM PK 15 MIN

121

15.00

189

15.30

37

15.45

26

14.30

AM PK HOUR

648

7.30

549

8.15

190

8.00

226

7.30

PM PK HOUR

457

14.45

657

15.00

132

14.30

95

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

12
26
12
5
11

Th
523
510
449
207
384

Rt
28
45
50
19
52

Total
563
581
511
231
447

66

2073

194

2333

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

18
24
28
13
41

Th
314
483
444
269
598

124

2108

Rt

Th
22
54
41
22
40

Rt
55
106
55
24
56

Total
90
190
131
65
129

Hours
7-8
8-9
9-10
14-15
15-16

130

179

296

605

TOTAL

Lt

Total
347
542
495
290
657

N-S
910
1123
1006
521
1104

Ped
11
13
14
6
22

Sch
0
1
0
0
1

Ped
9
19
9
6
19

Sch
1
0
0
0
0

99

2331

4664

66

62

TOTAL

Th
35
58
42
19
24

33
45
19
5
17

178

119

XING N/L

15
35
23
8
18

WESTBOUND Approach

13
30
35
19
33

XING S/L

Rt Total
104
172
68
171
60
121
24
48
41
82
297

594

XING W/L

XING E/L

E-W
262
361
252
113
211

Ped
22
38
14
19
37

Sch
2
2
0
1
0

Ped
14
24
15
17
27

Sch
0
3
0
0
0

1199

130

97

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-016
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Regent St

SOUTHBOUND

Regent St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

3
1
3
5
6
13
4
3
6
2
1
3

99
124
144
156
142
138
116
114
117
96
109
127

5
6
5
12
17
7
6
15
12
15
9
14

3
1
3
11
8
10
3
3
9
5
7
7

42
58
108
106
124
108
115
136
133
94
104
113

2
3
6
4
11
11
8
5
8
4
5
6

3
1
3
6
10
4
11
5
6
7
12
10

4
5
2
11
9
14
20
11
12
11
9
9

10
11
18
16
18
33
32
23
18
13
13
11

2
8
6
19
18
11
14
15
13
9
4
16

0
5
18
10
16
14
6
9
7
4
3
5

19
21
31
33
30
20
11
7
13
18
21
8

192
244
347
389
409
383
346
346
354
278
297
329

WR
232
50.00%

TOTAL
3914

NL
NT
50
1482
3.02% 89.55%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

27

PEAK HR FACTOR :
CONTROL : Signalized

580
0.936

NR
123
7.43%

SL
ST
70
1241
5.06% 89.67%
sb a
sb d

SR
73
5.27%

EL
ET
78
117
18.98% 28.47%
eb a
eb d

ER
216
52.55%

WL
WT
135
97
29.09% 20.91%
wb a
nb d

TOTAL
41

32

446
0.892

32

23

36
0.706

85

54

58
0.883

114

1528
0.934

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-016
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Regent St

SOUTHBOUND

Regent St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

2
3
5
1
1
4

103
104
103
90
100
91

8
11
13
13
13
13

4
9
12
8
12
9

146
123
142
142
173
141

3
5
4
7
4
3

11
8
7
8
8
10

7
15
11
11
7
11

11
13
16
14
10
16

7
12
5
6
4
9

4
1
3
7
5
2

15
9
13
13
8
7

321
313
334
320
345
316

WR
65
50.00%

TOTAL
1949

NL
NT
16
591
2.36% 87.17%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

11

PEAK HR FACTOR :
CONTROL : Signalized

384
0.924

NR
71
10.47%

SL
ST
54
867
5.70% 91.55%
sb a
sb d

SR
26
2.75%

EL
ET
52
62
26.80% 31.96%
eb a
eb d

ER
80
41.24%

WL
WT
43
22
33.08% 16.92%
wb a
nb d

TOTAL
52

41

598
0.869

18

33

40
0.872

56

24

17
0.788

41

1315
0.953

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Tabor St

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

24
23
22

18
24
17

4
7
1

3
12
5

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

197

7.45

142

9.00

44

7.45

88

8.00

PM PK 15 MIN

130

14.30

184

15.30

26

15.45

44

14.45

AM PK HOUR

726

7.30

508

8.15

113

7.30

281

7.45

PM PK HOUR

481

14.30

638

14.45

93

15.00

134

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

20
19
20
7
20

Th
612
575
517
233
417

Rt
19
32
19
7
15

Total
651
626
556
247
452

86

2354

92

2532

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

15
14
23
16
21

Th
292
449
430
267
586

89

2024

TOTAL
Rt

Th

Rt

Total

30
20
20
8
28

29
41
37
8
41

86
86
76
26
93

105

106

156

367

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
321
492
486
301
633

N-S
972
1118
1042
548
1085

Ped
17
27
19
27
30

Sch
1
7
0
14
6

Ped
28
59
13
36
50

Sch
8
18
1
14
3

120

2233

4765

120

28

186

44

TOTAL

20
49
29
18
29

Th
25
43
21
13
19

145

121

XING N/L

14
29
33
18
26

WESTBOUND Approach

27
25
19
10
24

XING S/L

Rt Total
161
206
167
259
118
168
51
82
70
118
567

833

XING W/L

XING E/L

E-W
292
345
244
108
211

Ped
17
29
22
17
38

Sch
1
11
1
3
2

Ped
25
54
22
47
48

Sch
0
9
0
20
8

1200

123

18

196

37

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-017
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Tabor St

SOUTHBOUND

Tabor St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

6
2
4
8
8
7
2
2
6
3
6
5

114
145
175
178
173
143
135
124
133
113
133
138

2
3
3
11
9
7
13
3
9
3
2
5

3
1
4
7
3
5
0
6
5
8
5
5

43
55
100
94
115
100
107
127
128
92
95
115

3
3
7
1
8
11
5
5
9
6
9
9

3
5
7
12
9
5
6
5
4
3
8
4

1
4
10
15
4
9
2
5
9
2
5
4

3
5
4
17
6
15
12
8
10
10
9
8

1
2
8
9
20
15
8
6
10
4
10
5

3
2
10
10
21
9
10
3
8
4
6
3

33
39
48
41
47
41
50
29
33
25
31
29

215
266
380
403
423
367
350
323
364
273
319
330

WR
446
70.46%

TOTAL
4013

NL
NT
59
1704
3.22% 92.96%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

27

PEAK HR FACTOR :
CONTROL : Signalized

669
0.921

NR
70
3.82%

SL
ST
52
1171
4.00% 90.15%
sb a
sb d

SR
76
5.85%

EL
ET
71
70
28.63% 28.23%
eb a
eb d

ER
107
43.15%

WL
WT
98
89
15.48% 14.06%
wb a
nb d

TOTAL
30

19

409
0.903

27

33

38
0.642

42

52

50
0.793

177

1573
0.930

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-017
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Tabor St

SOUTHBOUND

Tabor St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

3
4
6
5
6
3

121
112
118
99
100
100

6
1
2
4
6
3

8
8
6
6
6
3

139
128
136
147
171
132

9
9
10
4
7
5

4
6
5
6
7
6

5
3
8
9
4
7

4
4
11
6
11
13

8
10
6
5
10
8

6
7
5
5
4
5

24
27
14
17
16
23

337
319
327
313
348
308

WR
121
60.50%

TOTAL
1952

NL
NT
27
650
3.86% 92.99%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

21

PEAK HR FACTOR :
CONTROL : Signalized

429
0.919

NR
22
3.15%

SL
ST
37
853
3.96% 91.33%
sb a
sb d

SR
44
4.71%

EL
ET
34
36
28.57% 30.25%
eb a
eb d

ER
49
41.18%

WL
WT
47
32
23.50% 16.00%
wb a
nb d

TOTAL
13

26

582
0.867

30

24

24
0.833

32

31

21
0.716

74

1307
0.939

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Venice Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

13
23
18

19
27
19

88
106
49

86
83
67

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

153

7.45

175

8.45

413

8.15

387

7.30

PM PK 15 MIN

95

14.45

179

15.45

373

15.00

343

15.00

AM PK HOUR

538

7.30

661

8.00

1611

8.00

1517

7.30

PM PK HOUR

350

14.45

682

15.00

1430

15.00

1251

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

41
52
26
13
49

Th
397
404
329
125
248

Rt
36
29
39
25
37

Total
474
485
394
163
334

181

1503

166

1850

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
96
147
121
66
112

Th
215
319
237
152
332

542

1255

TOTAL
Rt Total
107
418
195
661
194
552
106
324
238
682
840

2637

WESTBOUND Approach

95
118
120
76
131

Th
1071
1462
1191
567
1256

540

5547

Rt
11
31
32
20
43

Total
1177
1611
1343
663
1430

137

6224

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
1250
1283
1267
514
1099

288

5413

Rt

XING N/L

N-S
892
1146
946
487
1016

Ped
25
61
72
41
79

Sch
1
0
0
4
4

Ped
74
92
81
36
111

Sch
0
0
0
0
0

4487

278

394

TOTAL

57
63
70
28
70

XING S/L

XING W/L

XING E/L

78
76
84
32
82

Total
1385
1422
1421
574
1251

E-W
2562
3033
2764
1237
2681

Ped
26
45
49
35
49

Sch
1
0
0
2
1

Ped
56
55
48
27
83

Sch
0
1
0
2
1

352

6053

12277

204

269

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-018
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave
SOUTHBOUND

Venice Blvd

Venice Blvd

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
2

SR
0

EL
1

ET
4

ER
0

WL
1

WT
4

WR
0

TOTAL

10
11
10
10
10
22
7
13
8
8
5
5

73
92
102
130
114
108
97
85
92
81
73
83

8
12
3
13
5
11
4
9
11
10
3
15

16
18
30
32
38
34
39
36
26
31
35
29

23
43
69
80
79
87
79
74
71
53
50
63

19
15
31
42
41
49
40
65
60
38
48
48

26
20
16
33
30
31
27
30
23
19
38
40

232
247
284
308
358
375
371
358
329
338
293
231

0
3
6
2
8
7
4
12
10
6
5
11

12
13
19
13
21
16
16
10
24
15
13
18

254
297
340
359
348
321
310
304
326
331
299
311

16
20
28
14
18
20
17
21
17
22
24
21

689
791
938
1036
1070
1081
1011
1017
997
952
886
875

NL
NT
119
1130
8.80% 83.52%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

49

PEAK HR FACTOR :
CONTROL : Signalized

449
0.868

NR
104
7.69%

SL
ST
364
771
22.32% 47.27%
sb a
sb d

SR
496
30.41%

EL
ET
333
3724
8.06% 90.15%
eb a
eb d

ER
74
1.79%

WL
WT
190
3800
4.49% 89.88%
wb a
nb d

WR
238
5.63%

TOTAL
11343
TOTAL

33

143

325
0.941

172

121

1412
0.941

21

66

1338
0.952

69

4198
0.971

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-018
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave
SOUTHBOUND

Venice Blvd

Venice Blvd

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
2

SR
0

EL
1

ET
4

ER
0

WL
1

WT
4

WR
0

TOTAL

5
8
16
14
12
7

55
70
68
54
61
65

8
17
10
11
9
7

38
28
31
22
32
27

80
72
77
82
85
88

49
57
56
60
58
64

37
39
26
33
38
34

286
281
339
325
304
288

10
10
8
14
10
11

14
14
22
13
11
24

253
261
296
279
260
264

17
15
25
19
19
19

852
872
974
926
899
898

NL
NT
62
373
12.47% 75.05%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

49

PEAK HR FACTOR :
CONTROL : Signalized

248
0.888

NR
62
12.47%

SL
ST
178
484
17.69% 48.11%
sb a
sb d

SR
344
34.19%

EL
ET
207
1823
9.89% 87.10%
eb a
eb d

ER
63
3.01%

WL
WT
98
1613
5.37% 88.38%
wb a
nb d

WR
114
6.25%

TOTAL
5421
TOTAL

37

112

332
0.953

238

131

1256
0.958

43

70

1099
0.912

82

3697
0.949

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Washington Blvd

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

0
0
0

16
5
11

16
14
31

26
19
30

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

0.00

119

8.00

327

7.45

337

7.45

PM PK 15 MIN

0.00

107

15.45

301

15.45

299

15.00

AM PK HOUR

0.00

430

7.45

1261

7.45

1152

7.30

PM PK HOUR

0.00

415

15.00

1151

15.00

954

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

0
0
0
0
0

Th
0
0
0
0
0

Rt
0
0
0
0
0

Total
0
0
0
0
0

Hours
7-8
8-9
9-10
14-15
15-16

TOTAL

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
320
323
281
108
201

TOTAL

1233

Lt

TOTAL

85
171
122
57
150

Th
0
0
0
0
0

Rt Total
180
265
259
430
200
322
135
192
265
415

585

1039

1624

WESTBOUND Approach
Th
647
920
757
425
950

Rt
0
0
0
0
0

Total
967
1243
1038
533
1151

3699

4932

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
944
923
784
391
796

3838

Rt Total
142
1086
143
1066
108
892
46
437
124
920
563

4401

XING N/L

N-S
265
430
322
192
415

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
15
27
32
9
36

Sch
0
0
0
0
1

1624

119

TOTAL

0
0
0
0
0

XING S/L

XING W/L

XING E/L

E-W
2053
2309
1930
970
2071

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
2
7
7
3
10

Sch
0
0
0
0
1

9333

29

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-019
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Washington Blvd

SOUTHBOUND

Washington Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
1

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

5
17
31
32
43
46
35
47
40
32
27
23

0
0
0
0
0
0
0
0
0
0
0
0

26
37
54
63
76
72
63
48
56
50
38
56

57
81
70
112
91
84
73
75
81
72
63
65

115
132
185
215
205
235
246
234
231
195
182
149

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

185
204
257
298
221
233
213
256
225
178
186
195

30
42
31
39
30
43
36
34
26
27
25
30

418
513
628
759
666
713
666
694
659
554
521
518

NL

NT

NR

WR
393
12.91%

TOTAL
7309

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
378
0
37.17%
0.00%
sb a
sb d

SR
639
62.83%

EL
ET
924
2324
28.45% 71.55%
eb a
eb d

ER
0
0.00%

WL
WT
0
2651
0.00% 87.09%
wb a
nb d

745 AM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
0

0.000

156

0
0.903

274

360

901
0.964

965
0.826

148

2804
0.924

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-019
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Washington Blvd

SOUTHBOUND

Washington Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
1

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

28
29
28
37
40
45

0
0
0
0
0
0

72
63
73
65
65
62

52
56
47
48
49
57

189
236
242
234
230
244

0
0
0
0
0
0

0
0
0
0
0
0

194
197
257
184
181
174

21
25
42
34
26
22

556
606
689
602
591
604

NL

NT

NR

WR
170
12.53%

TOTAL
3648

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
207
0
34.10%
0.00%
sb a
sb d

SR
400
65.90%

EL
ET
309
1375
18.35% 81.65%
eb a
eb d

ER
0
0.00%

WL
WT
0
1187
0.00% 87.47%
wb a
nb d

245 PM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
0

0.000

134

0
0.952

266

200

942
0.978

819
0.791

127

2488
0.903

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Palms Blvd_National Blvd

East/West

National Blvd_Exposition Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

24
6
44

43
11
57

31
12
13

16
21
1

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

372

8.45

222

7.45

85

8.00

126

7.45

PM PK 15 MIN

297

15.15

279

15.45

149

15.45

49

14.45

AM PK HOUR

1419

8.00

824

7.30

282

9.00

444

7.45

PM PK HOUR

1053

15.00

1022

15.00

518

15.00

176

14.45

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

0
0
0
0
1

Th
975
1347
944
346
900

Rt
55
72
52
47
152

Total
1030
1419
996
393
1053

4512

378

4891

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
102
134
163
92
271
762

Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

0
0
0
1
8

Th
658
675
770
432
926

3461

TOTAL
Rt Total
128
786
110
785
6
776
46
479
88
1022
378

3848

WESTBOUND Approach
Th
72
93
95
70
237

Rt
11
12
24
8
10

Total
185
239
282
170
518

567

65

1394

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
174
186
3
27
61

398

451

Rt Total
105
372
135
414
113
253
30
91
64
166
447

1296

XING N/L

N-S
1816
2204
1772
872
2075

Ped
35
40
20
9
23

Sch
0
0
0
0
0

Ped
2
2
2
0
0

Sch
0
0
0
0
0

8739

127

TOTAL

93
93
137
34
41

XING S/L

XING W/L

XING E/L

E-W
557
653
535
261
684

Ped
2
0
3
0
4

Sch
0
0
0
0
0

Ped
34
30
27
0
20

Sch
0
0
0
0
0

2690

111

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

National Blvd

East/West

I-10 WB Off-Ramp_Manning Ave

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

29
21
54

32
15
57

3
1
0

51
0
3

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

435

8.30

259

7.45

47

8.00

110

9.45

PM PK 15 MIN

322

15.15

224

15.15

47

15.45

182

14.45

AM PK HOUR

1630

8.00

977

7.45

151

7.30

363

9.00

PM PK HOUR

1232

15.00

807

14.45

164

15.00

651

14.45

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
358
417
336
82
151

TOTAL

1344

SOUTHBOUND Approach

Th
818
1213
884
387
1081

Rt
0
0
0
0
0

Total
1176
1630
1220
469
1232

4383

5727

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

0
0
0
0
0

Th
574
612
591
277
590

Rt Total
290
864
328
940
279
870
94
371
210
800

2644

1201

3845

WESTBOUND Approach

62
90
67
60
121

Th
0
0
0
0
0

Rt
47
39
35
19
43

Total
109
129
102
79
164

400

183

583

Lt
167
144
149
190
369

Th
148
161
175
115
184

TOTAL

1019

783

Rt

XING N/L

N-S
2040
2570
2090
840
2032

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
15
22
9
8
26

Sch
0
0
0
1
2

9572

80

TOTAL

Hours
7-8
8-9
9-10
14-15
15-16

XING S/L

XING W/L

XING E/L

27
24
39
49
74

Total
342
329
363
354
627

E-W
451
458
465
433
791

Ped
0
1
0
0
0

Sch
0
0
0
0
0

Ped
42
31
20
11
73

Sch
2
0
0
2
1

213

2015

2598

177

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-021
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

National Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

Date: 2/12/2014
AM
I-10 WB Off-Ramp_Manning I-10 WB Off-Ramp_Manning
Ave
Ave
EASTBOUND
WESTBOUND

NL
1

NT
2

NR
0

SL
0

ST
1

SR
1

EL
1

ET
0

ER
1

WL
1

WT
0.5

WR
0.5

TOTAL

82
82
107
87
102
99
108
108
91
77
86
82

103
190
232
293
293
272
327
321
273
223
199
189

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

112
152
153
157
150
168
145
149
153
159
148
131

49
52
87
102
68
81
106
73
83
64
64
68

6
10
20
26
31
19
15
25
22
16
15
14

0
0
0
0
0
0
0
0
0
0
0
0

7
11
15
14
16
10
9
4
9
9
8
9

49
36
35
47
34
32
37
41
44
29
35
41

28
31
43
46
28
45
44
44
39
49
33
54

4
11
4
8
7
6
4
7
7
7
10
15

440
575
696
780
729
732
795
772
721
633
598
603

NL
NT
1111
2915
27.60% 72.40%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

396

PEAK HR FACTOR :
CONTROL : Signalized

1185
0.909

NR
0
0.00%

SL
ST
0
1777
0.00% 66.45%
sb a
sb d

SR
897
33.55%

EL
ET
219
0
64.41%
0.00%
eb a
eb d

ER
121
35.59%

WL
WT
460
484
44.49% 46.81%
wb a
nb d

WR
90
8.70%

TOTAL
8074
TOTAL

620
0.943

357

91

0
0.745

49

150

163
0.837

25

3036
0.955

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-021
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

National Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

Date: 2/12/2014
PM
I-10 WB Off-Ramp_Manning I-10 WB Off-Ramp_Manning
Ave
Ave
EASTBOUND
WESTBOUND

NL
1

NT
2

NR
0

SL
0

ST
1

SR
1

EL
1

ET
0

ER
1

WL
1

WT
0.5

WR
0.5

TOTAL

47
35
41
39
39
32

198
189
262
283
253
283

0
0
0
0
0
0

0
0
0
0
0
0

128
149
146
165
127
152

47
47
54
59
60
37

35
25
26
21
37
37

0
0
0
0
0
0

10
9
18
7
8
10

93
97
79
81
106
103

55
60
36
55
59
34

24
25
18
19
16
21

637
636
680
729
705
709

WR
123
12.54%

TOTAL
4096

NL
NT
233
1468
13.70% 86.30%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

151

PEAK HR FACTOR :
CONTROL : Signalized

1081
0.957

NR
0
0.00%

SL
ST
0
867
0.00% 74.04%
sb a
sb d

SR
304
25.96%

EL
ET
181
0
74.49%
0.00%
eb a
eb d

ER
62
25.51%

WL
WT
559
299
56.98% 30.48%
wb a
nb d

TOTAL
0

590
0.893

210

121

0
0.872

43

369

184
0.866

74

2823
0.968

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Castle Heights Ave

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

5
7
0

13
7
10

40
14
51

39
15
51

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

83

7.45

135

8.15

339

8.45

217

7.30

PM PK 15 MIN

27

15.30

142

14.45

305

15.45

148

15.15

AM PK HOUR

291

7.45

456

7.45

1204

8.00

784

8.30

PM PK HOUR

100

15.00

504

14.45

1131

15.00

550

14.45

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

45
45
32
13
32

Th
99
184
76
19
45

Rt
36
32
31
14
23

Total
180
261
139
46
100

167

423

136

726

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
194
319
337
112
245

TOTAL

1207

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

Th

88
149
91
76
165

33
64
41
22
74

569

234

Rt Total
157
278
209
422
151
283
135
233
242
481
894

1697

WESTBOUND Approach
Th
605
860
571
331
842

Rt
13
25
13
11
44

Total
812
1204
921
454
1131

3209

106

4522

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
663
646
641
198
459

57

2607

Rt

XING N/L

N-S
458
683
422
279
581

Ped
22
18
14
8
38

Sch
0
0
0
0
0

Ped
18
22
19
9
30

Sch
0
0
0
1
0

2423

100

98

TOTAL

8
17
9
8
15

XING S/L

XING W/L

XING E/L

74
87
76
38
75

Total
745
750
726
244
549

E-W
1557
1954
1647
698
1680

Ped
9
10
17
4
22

Sch
0
0
0
0
0

Ped
13
15
19
4
13

Sch
0
0
0
1
0

350

3014

7536

62

64

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-022
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Castle Heights Ave

Castle Heights Ave

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

3
13
15
14
8
14
12
11
7
7
6
12

5
16
27
51
67
40
45
32
26
18
22
10

5
8
5
18
8
6
8
10
12
3
8
8

8
18
24
38
44
51
36
18
23
17
24
27

3
6
11
13
19
22
8
15
11
8
16
6

22
30
45
60
45
62
58
44
42
38
29
42

34
50
48
62
75
67
84
93
100
86
68
83

69
117
202
217
210
190
221
239
188
155
121
107

1
2
4
6
8
8
2
7
5
3
3
2

2
1
2
3
7
3
5
2
1
1
4
3

139
165
193
166
155
153
168
170
176
176
146
143

13
19
22
20
21
21
22
23
23
17
24
12

304
445
598
668
667
637
669
664
614
529
471
455

WR
237
10.67%

TOTAL
6721

NL
NT
122
359
21.03% 61.90%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

48

PEAK HR FACTOR :
CONTROL : Signalized

203
0.877

NR
99
17.07%

SL
ST
328
138
33.37% 14.04%
sb a
sb d

SR
517
52.59%

EL
ET
850
2036
28.94% 69.32%
eb a
eb d

ER
51
1.74%

WL
WT
34
1950
1.53% 87.80%
wb a
nb d

TOTAL
40

169

62
0.844

225

288

838
0.936

24

18

642
0.954

84

2641
0.987

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-022
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Castle Heights Ave

Castle Heights Ave

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

6
7
6
9
9
8

11
8
7
12
13
13

6
8
9
4
5
5

27
49
49
51
27
38

7
15
16
18
19
21

57
78
64
64
54
60

49
63
54
70
62
59

182
149
198
212
205
227

6
5
8
7
10
19

3
5
2
5
4
4

100
98
123
125
121
90

25
13
20
18
16
21

479
498
556
595
545
565

WR
113
14.25%

TOTAL
3238

NL
NT
45
64
30.82% 43.84%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

32

PEAK HR FACTOR :
CONTROL : Signalized

45
0.926

NR
37
25.34%

SL
ST
241
96
33.75% 13.45%
sb a
sb d

SR
377
52.80%

EL
ET
357
1173
22.52% 74.01%
eb a
eb d

ER
55
3.47%

WL
WT
23
657
2.90% 82.85%
wb a
nb d

TOTAL
23

165

74
0.904

242

245

842
0.927

44

15

459
0.927

75

2261
0.950

APPENDIX B
CMA AND LEVELS OF SERVICE EXPLANATION
CMA DATA WORKSHEETS WEEKDAY AM AND PM PEAK HOURS

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-Appendix Covers.docx

CRITICAL MOVEMENT ANALYSIS (CMA) DESCRIPTION


Level of Service is a term used to describe prevailing conditions and their effect on traffic. Broadly interpreted, the Level of Service
concept denotes any one of a number of differing combinations of operating conditions which may take place as a roadway is
accommodating various traffic volumes. Level of Service is a qualitative measure of the effect of such factors as travel speed, travel
time, interruptions, freedom to maneuver, safety, driving comfort and convenience.
Six Levels of Service, A through F, have been defined in the 1965 Highway Capacity Manual. Level of Service A describes a
condition of free flow, with low traffic volumes and relatively high speeds, while Level of Service F describes forced traffic flow at
low speeds with jammed conditions and queues which cannot clear during the green phases.
Critical Movement Analysis (CMA) is a procedure which provides a capacity and level of service geometry and traffic signal
operation and results in a level of service determination for the intersection as a whole operating unit.
The per lane volume for each movement in the intersection is determined and the per lane intersection capacity based on the
Transportation Research Board (TRB) Report 212 (Interim Materials on Highway Capacity). The resulting CMA represents the ratio
of the intersection's cumulative volume over its respective capacity (V/C ratio). Critical Movement Analysis takes into account lane
widths, bus and truck operations, pedestrian activity and parking activity, as well as number of lanes and geometrics.
The Level of Service (abbreviated from the Highway Capacity Manual) are listed here with their corresponding CMA and Load
Factor equivalents. Load Factor is that proportion of the signal cycles during the peak hour which are fully loaded; i.e. when all of the
vehicles waiting at the beginning of green are not able to clear on that green phase.
Critical Movement Analysis Characteristics
Level of Service
A (free flow)

Load Factor

Equivalent CMA

0.0

0.00 - 0.60

B (rural design)

0.0 - 0.1

0.61 - 0.70

C (urban design)

0.1 - 0.3

0.71 - 0.80

D (maximum urban design)

0.3 - 0.7

0.81 - 0.90

E (capacity)
F (force flow)

0.7 - 1.0

0.91 - 1.00

Not Applicable

Not Applicable

SERVICE LEVEL A
There are no loaded cycles and few are even close to loaded at this service level. No approach phase is fully utilized by traffic and no
vehicle waits longer than one red indication.
SERVICE LEVEL B
This level represents stable operation where an occasional approach phase is fully utilized and a substantial number are approaching
full use. Many drivers begin to feel restricted within platoons of vehicles.
SERVICE LEVEL C
At this level stable operation continues. Loading is still intermittent but more frequent than at Level B. Occasionally drivers may
have to wait through more one red signal indication and backups may develop behind turning vehicles. Most drivers feel somewhat
restricted, but not objectionably so.
SERVICE LEVEL D
This level encompasses a zone of increasing restriction approaching instability at the intersection. Delays to approaching vehicles
may be substantial during short peaks within the peak hour, but enough cycles with lower demand occur to permit periodic clearance
of queues, thus preventing excessive backups. Drivers frequently have to wait through more than one red signal. This level is the
lower limit of acceptable operation to most drivers.
SERVICE LEVEL E
This represents near capacity and capacity operation. At capacity (CMA = 1.0) it represents the most vehicles that the particular
intersection can accommodate. However, full utilization of every signal cycle is seldom attained no matter how great the demand. At
this level all drivers wait through more than one red signal, and frequently through several.
SERVICE LEVEL F
Jammed conditions. Traffic backed up from a downstream location on one of the street restricts or prevents movement of traffic
through the intersection under consideration.

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA1

Sepulveda Boulevard

North-South Street:

4
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

244
1268
262

56
308
201

335
1105
114

61
712
69

2015

Ambient Growth: (%):

2016
4
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

East-West Street:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
2
0
1
0
0

244

244

244

246

634

1268

634

43

1324

232

262

232

265

1
0
1
1
0
0
0

56

62

62

57

255

308

255

66

377

201

201

201

203

184

335

184

338

610

13

1118

616

1116

114

114

114

115

61

61

61

62

391

10

722

398

719

69

74

74

70

2
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

690
671
1361

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
4
0
0
0
2
0

696
677
1373

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

246

246

662

1324

234

265

1
0
1
1
0
0
0

57

63

290

377

203

203

2
0
1
1
0
0
0

186

338

616

13

1129

115

115

1
0
1
1
0
0
0

62

62

395

10

729

70

75

North-South:
East-West:
SUM:

719
678
1397

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

1
0
2
0
1
0
0

246

246

662

1324

234

265

1
0
1
1
0
0
0

63

63

290

377

203

203

186

338

622

1129

115

115

62

62

402

729

75

75

2
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

725
684
1409

No. of
Lanes

Lane
Volume

1
0
2
0
1
0
0

246

1
0
1
1
0
0
0

63

662
234

290
203

2
0
1
1
0
0
0

186

1
0
1
1
0
0
0

62

622
115

402
75

North-South:
East-West:
SUM:

725
684
1409

VOLUME/CAPACITY (V/C) RATIO:

0.990

0.999

1.016

1.025

1.025

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.890

0.899

0.916

0.925

0.925

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-4:09 PM

0.009
NO

v/c after mitigation:


Fully mitigated?

0.009
N/A

CMA01

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA1

Sepulveda Boulevard

North-South Street:

4
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

177

142

773
177

780
325

332
902
132

87
708
72

2015

Ambient Growth: (%):

2016
4
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

East-West Street:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
2
0
1
0
0

177

177

177

179

387

773

387

101

882

134

177

134

179

1
0
1
1
0
0
0

142

144

144

143

553

780

553

86

874

325

325

325

328

183

332

183

335

517

906

519

911

132

132

132

133

87

87

87

88

390

716

396

715

72

76

76

73

2
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

730
604
1334

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
4
0
0
0
2
0

730
606
1336

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

179

179

441

882

135

179

1
0
1
1
0
0
0

143

145

601

874

328

328

2
0
1
1
0
0
0

184

335

522

915

133

133

1
0
1
1
0
0
0

88

88

394

723

73

77

North-South:
East-West:
SUM:

780
610
1390

No. of
Lanes

1
0
2
0
1
0
0
1
0
1
1
0
0
0
2
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

179

179

441

882

135

179

145

145

601

874

328

328

184

335

524

915

133

133

88

88

400

723

77

77

780
612
1392

No. of
Lanes

Lane
Volume

1
0
2
0
1
0
0

179

1
0
1
1
0
0
0

145

2
0
1
1
0
0
0

184

1
0
1
1
0
0
0

88

441
135

601
328

524
133

400
77

North-South:
East-West:
SUM:

780
612
1392

VOLUME/CAPACITY (V/C) RATIO:

0.970

0.972

1.011

1.012

1.012

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.870

0.872

0.911

0.912

0.912

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-4:09 PM

0.001
NO

v/c after mitigation:


Fully mitigated?

0.001
N/A

CMA01

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA2

Sepulveda Boulevard

North-South Street:

2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

109

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

198

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

116

CRITICAL VOLUMES

1298
147

54
342
77

820
67

917
152

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Palms Boulevard

East-West Street:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
2
0
1
0
0

198

198

198

200

649

1298

649

43

1354

89

13

160

97

149

1
0
2
0
1
0
0

54

54

54

58

171

342

171

58

403

23

77

23

78

1
0
1
1
0
0
0

109

109

109

110

444

13

833

450

834

67

67

67

68

1
0
1
1
0
0
0

116

10

126

126

123

535

10

927

540

934

152

152

152

159

North-South:
East-West:
SUM:

703
644
1347

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
2
0
0
0
2
0

703
649
1352

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

200

200

677

1354

88

13

162

1
0
2
0
1
0
0

58

58

202

403

23

78

110

110

451

13

847

68

68

123

10

133

547

10

944

159

159

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

735
657
1392

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

1
0
2
0
1
0
0

200

200

677

1354

96

162

1
0
2
0
1
0
0

58

58

202

403

23

78

110

110

458

847

68

68

133

133

552

944

159

159

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

735
662
1397

No. of
Lanes

Lane
Volume

1
0
2
0
1
0
0

200

1
0
2
0
1
0
0

58

677
96

202
23

1
0
1
1
0
0
0

110
458
68

1
0
1
1
0
0
0

133
552
159

North-South:
East-West:
SUM:

735
662
1397

VOLUME/CAPACITY (V/C) RATIO:

0.898

0.901

0.928

0.931

0.931

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.798

0.801

0.828

0.831

0.831

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:56 PM

0.003
NO

v/c after mitigation:


Fully mitigated?

0.003
N/A

CMA02

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA2

Sepulveda Boulevard

North-South Street:

2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

123

EASTBOUND

107

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

128

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

CRITICAL VOLUMES

906
172

827
126

884
104

678
96

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Palms Boulevard

East-West Street:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
2
0
1
0
0

128

128

128

129

453

906

453

93

1008

96

176

96

179

1
0
2
0
1
0
0

107

107

107

115

414

827

414

81

916

65

126

65

127

1
0
1
1
0
0
0

123

123

123

124

494

888

496

12

905

104

104

104

105

1
0
1
1
0
0
0

152

160

160

156

387

686

391

12

697

96

96

96

103

North-South:
East-West:
SUM:

560
646
1206

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
2
0
0
0
2
0

560
656
1216

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

129

129

504

1008

101

183

1
0
2
0
1
0
0

115

115

458

916

65

127

124

124

505

909

105

105

156

164

400

705

103

103

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

619
661
1280

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

1
0
2
0
1
0
0

129

129

504

1008

101

183

1
0
2
0
1
0
0

115

115

458

916

65

127

124

124

507

909

105

105

164

164

404

705

103

103

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

619
671
1290

No. of
Lanes

Lane
Volume

1
0
2
0
1
0
0

129

1
0
2
0
1
0
0

115

504
101

458
65

1
0
1
1
0
0
0

124
507
105

1
0
1
1
0
0
0

164
404
103

North-South:
East-West:
SUM:

619
671
1290

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.811

0.853

0.860

0.860

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.711

0.753

0.760

0.760

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:56 PM

0.007
NO

v/c after mitigation:


Fully mitigated?

0.007
N/A

CMA02

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA3

Westwood Boulevard

North-South Street:

2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

272

EASTBOUND

134

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

188

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

CRITICAL VOLUMES

536
26

277
128

805
161

357
118

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

East-West Street:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

188

188

188

190

536

536

536

20

561

18

26

18

26

1
0
1
0
1
0
0

134

134

134

135

277

25

302

302

31

311

128

129

1
0
1
1
0
0
0

272

272

272

275

483

805

493

813

161

19

180

180

163

1
0
1
1
0
0
0

16

16

16

16

238

15

372

250

361

118

10

128

128

119

North-South:
East-West:
SUM:

670
510
1180

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
2
0
0
0
2
0

670
522
1192

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

190

190

561

561

18

26

1
0
1
0
1
0
0

135

135

311

25

336

129

275

275

488

813

163

19

182

16

16

240

15

376

119

10

129

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

696
515
1211

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

190

190

561

561

18

26

1
0
1
0
1
0
0

135

135

336

336

129

275

275

498

813

182

182

16

16

253

376

129

129

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

696
528
1224

No. of
Lanes

Lane
Volume

1
0
1
0
1
0
0

190

1
0
1
0
1
0
0

135

1
0
1
1
0
0
0

275

561
18

336
0

498
182

1
0
1
1
0
0
0

16
253
129

North-South:
East-West:
SUM:

696
528
1224

VOLUME/CAPACITY (V/C) RATIO:

0.787

0.795

0.807

0.816

0.816

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.687

0.695

0.707

0.716

0.716

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:56 PM

0.009
NO

v/c after mitigation:


Fully mitigated?

0.009
N/A

CMA03

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA3

Westwood Boulevard

North-South Street:

2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

191

EASTBOUND

184

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

101

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

31

CRITICAL VOLUMES

234
21

515
319

597
271

352
162

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

East-West Street:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

101

101

101

102

234

234

234

49

285

21

21

1
0
1
0
1
0
0

184

184

184

186

515

523

523

39

559

224

319

224

322

1
0
1
1
0
0
0

191

191

191

193

434

597

437

603

271

277

277

274

1
0
1
1
0
0
0

31

31

31

31

257

12

364

267

356

162

170

170

164

North-South:
East-West:
SUM:

616
465
1081

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
2
0
0
0
2
0

624
468
1092

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

102

102

285

285

21

1
0
1
0
1
0
0

186

186

559

567

226

322

193

193

439

603

274

280

31

31

260

12

368

164

172

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

661
470
1131

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

102

102

285

285

21

186

186

567

567

226

322

193

193

442

603

280

280

31

31

270

368

172

172

669
473
1142

No. of
Lanes

Lane
Volume

1
0
1
0
1
0
0

102

1
0
1
0
1
0
0

186

285
6

567
226

1
0
1
1
0
0
0

193
442
280

1
0
1
1
0
0
0

31
270
172

North-South:
East-West:
SUM:

669
473
1142

VOLUME/CAPACITY (V/C) RATIO:

0.721

0.728

0.754

0.761

0.761

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.621

0.628

0.654

0.661

0.661

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:56 PM

0.007
NO

v/c after mitigation:


Fully mitigated?

0.007
N/A

CMA03

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA4

Overland Avenue

North-South Street:

4
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

287
473
1090

19
444
15

58
1400
129

524
1242
34

2015

Ambient Growth: (%):

2016
4
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Pico Boulevard

East-West Street:

No. of
Lanes

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

2
0
1
0
2
0
0

158

19

306

168

290

473

10

483

483

22

500

312

1090

312

1101

1
0
1
1
0
0
0

19

19

19

19

230

13

457

236

35

483

15

15

15

15

58

58

58

59

510

1400

514

1414

129

13

142

142

130

288

524

288

529

425

1242

425

1254

34

34

34

34

1
0
2
1
0
0
0
2
0
2
1
0
0
0

North-South:
East-West:
SUM:

492
798
1290

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
4
0
0
0
2
0

502
802
1304

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

2
0
1
0
2
0
0

160

19

309

500

10

510

315

1101

1
0
1
1
0
0
0

19

19

249

13

496

15

15

59

59

515

1414

130

13

143

291

529

429

1254

34

34

1
0
2
1
0
0
0
2
0
2
1
0
0
0

North-South:
East-West:
SUM:

519
806
1325

No. of
Lanes

2
0
1
0
2
0
0
1
0
1
1
0
0
0
1
0
2
1
0
0
0
2
0
2
1
0
0
0

North-South:
East-West:
SUM:

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

170

309

510

510

315

1101

19

19

256

496

15

15

59

59

519

1414

143

143

291

529

429

1254

34

34

529
810
1339

No. of
Lanes

Lane
Volume

2
0
1
0
2
0
0

170

1
0
1
1
0
0
0

19

510
315

256
15

1
0
2
1
0
0
0

59
519
143

2
0
2
1
0
0
0

291
429
34

North-South:
East-West:
SUM:

529
810
1339

VOLUME/CAPACITY (V/C) RATIO:

0.938

0.948

0.964

0.974

0.974

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.838

0.848

0.864

0.874

0.874

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.010
NO

v/c after mitigation:


Fully mitigated?

0.010
N/A

CMA04

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA4

Overland Avenue

North-South Street:

4
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

319

40

494
612

505
27

53
948
261

616
981
43

2015

Ambient Growth: (%):

2016
4
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Pico Boulevard

East-West Street:

No. of
Lanes

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

2
0
1
0
2
0
0

175

16

335

184

322

494

502

502

55

554

612

618

1
0
1
1
0
0
0

40

40

40

40

266

509

268

43

553

27

27

27

27

53

53

53

54

403

948

404

957

261

265

265

264

339

616

339

622

341

981

341

991

43

43

43

43

1
0
2
1
0
0
0
2
0
2
1
0
0
0

North-South:
East-West:
SUM:

534
742
1276

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
4
0
0
0
2
0

542
743
1285

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

2
0
1
0
2
0
0

177

16

338

554

562

618

1
0
1
1
0
0
0

40

40

290

557

27

27

54

54

407

957

264

268

342

622

345

991

43

43

1
0
2
1
0
0
0
2
0
2
1
0
0
0

North-South:
East-West:
SUM:

594
749
1343

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

2
0
1
0
2
0
0

186

338

562

562

618

1
0
1
1
0
0
0

40

40

292

557

27

27

54

54

408

957

268

268

342

622

345

991

43

43

1
0
2
1
0
0
0
2
0
2
1
0
0
0

North-South:
East-West:
SUM:

602
750
1352

No. of
Lanes

Lane
Volume

2
0
1
0
2
0
0

186

1
0
1
1
0
0
0

40

562
0

292
27

1
0
2
1
0
0
0

54
408
268

2
0
2
1
0
0
0

342
345
43

North-South:
East-West:
SUM:

602
750
1352

VOLUME/CAPACITY (V/C) RATIO:

0.928

0.935

0.977

0.983

0.983

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.828

0.835

0.877

0.883

0.883

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.006
NO

v/c after mitigation:


Fully mitigated?

0.006
N/A

CMA04

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA5

Overland Avenue

North-South Street:

I-10 Westbound On-Off Ramp/National

East-West Street:

4
0
0
3
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
1271
1003

440
795
88

363
133
487

103
378
365

No. of
Lanes

0
0
3
0
1
0
0
2
0
1
1
0
0
0
1
1
0
0
1
0
0
0
1
1
0
1
0
0

North-South:
East-West:
SUM:

2015

Ambient Growth: (%):

2016
4
0
SB-0
3
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

424

1271

424

22

1306

900

1003

900

1013

242

19

459

252

444

442

25

820

466

35

838

88

24

112

112

89

248

363

248

367

248

133

248

134

487

487

487

492

103

103

103

104

378

378

378

382

123

365

113

369

1142
626
1768

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
4
0
0
3
2
0

1152
626
1778

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-0
NB-3
SB-0
EB-0
WB-3
EB-0
WB-3
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

435

1306

909

1013

2
0
1
1
0
0
0

244

19

463

464

25

863

89

24

113

1
1
0
0
1
0
0

251

367

251

134

492

492

0
1
1
0
1
0
0

104

104

382

382

125

369

0
0
3
0
1
0
0

North-South:
East-West:
SUM:

1153
633
1786

No. of
Lanes

0
0
3
0
1
0
0
2
0
1
1
0
0
0
1
1
0
0
1
0
0
0
1
1
0
1
0
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

435

1306

909

1013

255

463

488

863

113

113

251

367

251

134

492

492

104

104

382

382

114

369

1164
633
1797

No. of
Lanes

Lane
Volume

0
0
3
0
1
0
0

435
909

2
0
1
1
0
0
0

255

1
1
0
0
1
0
0

251

488
113

251
492

0
1
1
0
1
0
0

104
382
114

North-South:
East-West:
SUM:

1164
633
1797

VOLUME/CAPACITY (V/C) RATIO:

1.286

1.293

1.299

1.307

1.307

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.186

1.193

1.199

1.207

1.207

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.008
NO

v/c after mitigation:


Fully mitigated?

0.008
N/A

CMA05

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA5

Overland Avenue

North-South Street:

I-10 Westbound On-Off Ramp/National

East-West Street:

4
0
0
3
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
833
604

506
1016
139

250
107
485

184
384
516

No. of
Lanes

0
0
3
0
1
0
0
2
0
1
1
0
0
0
1
1
0
0
1
0
0
0
1
1
0
1
0
0

North-South:
East-West:
SUM:

2015

Ambient Growth: (%):

2016
4
0
SB-0
3
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

278

833

278

55

896

604

604

604

610

278

16

522

287

511

578

1024

592

43

1069

139

20

159

159

140

179

250

179

253

179

107

179

108

485

485

485

490

184

184

184

186

376

384

376

388

238

516

229

521

882
669
1551

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
4
0
0
3
2
0

891
669
1560

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-0
NB-3
SB-0
EB-0
WB-3
EB-0
WB-3
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

299

896

610

610

2
0
1
1
0
0
0

281

16

527

605

1077

140

20

160

1
1
0
0
1
0
0

180

253

180

108

490

490

0
1
1
0
1
0
0

186

186

380

388

240

521

0
0
3
0
1
0
0

North-South:
East-West:
SUM:

891
676
1567

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

299

896

610

610

290

527

619

1077

160

160

1
1
0
0
1
0
0

180

253

180

108

490

490

0
1
1
0
1
0
0

186

186

380

388

231

521

0
0
3
0
1
0
0
2
0
1
1
0
0
0

North-South:
East-West:
SUM:

900
676
1576

No. of
Lanes

Lane
Volume

0
0
3
0
1
0
0

299
610

2
0
1
1
0
0
0

290

1
1
0
0
1
0
0

180

0
1
1
0
1
0
0

186

619
160

180
490

380
231

North-South:
East-West:
SUM:

900
676
1576

VOLUME/CAPACITY (V/C) RATIO:

1.128

1.135

1.140

1.146

1.146

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.028

1.035

1.040

1.046

1.046

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.006
NO

v/c after mitigation:


Fully mitigated?

0.006
N/A

CMA05

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA6

North-South Street:

Overland Avenue

East-West Street:

I-10 EB On-Ramp
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
2246
478

851
516
0

0
0
0

0
0
0

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

No. of
Lanes

0
0
2
1
0
0
0
2
0
2
0
0
0
0

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

Lane
Volume

Added
Volume

Total
Volume

908

2246

908

22

2290

478

478

478

483

468

851

468

860

258

25

541

271

35

556

0
0
0
0
0
0
0

1376
0
1376

North-South:
East-West:
SUM:

SB-WB--

FUTURE CONDITION W/O PROJECT

Total
Volume

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

NB-EB--

1.0
AM
2
0
0
0
2
0

1376
0
1376

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

924

2290

483

483

473

860

278

25

581

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
2
1
0
0
0
2
0
2
0
0
0
0

North-South:
East-West:
SUM:

1397
0
1397

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

924

2290

483

483

473

860

291

581

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
2
1
0
0
0
2
0
2
0
0
0
0

North-South:
East-West:
SUM:

1397
0
1397

No. of
Lanes

Lane
Volume

0
0
2
1
0
0
0

924
483

2
0
2
0
0
0
0

473

0
0
0
0
0
0
0

0
0
0
0
0
0
0

291
0

0
0

0
0

North-South:
East-West:
SUM:

1397
0
1397

VOLUME/CAPACITY (V/C) RATIO:

0.917

0.917

0.931

0.931

0.931

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.817

0.817

0.831

0.831

0.831

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

CMA06

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA6

North-South Street:

Overland Avenue

East-West Street:

I-10 EB On-Ramp
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
1314
451

812
984
0

0
0
0

0
0
0

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

No. of
Lanes

0
0
2
1
0
0
0
2
0
2
0
0
0
0

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

Lane
Volume

Added
Volume

Total
Volume

588

1314

588

55

1382

451

451

451

456

447

812

447

820

492

992

496

43

1037

0
0
0
0
0
0
0

1035
0
1035

North-South:
East-West:
SUM:

SB-WB--

FUTURE CONDITION W/O PROJECT

Total
Volume

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

NB-EB--

1.0
PM
2
0
0
0
2
0

1035
0
1035

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

613

1382

456

456

451

820

519

1045

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
2
1
0
0
0
2
0
2
0
0
0
0

North-South:
East-West:
SUM:

1064
0
1064

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

613

1382

456

456

451

820

523

1045

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
2
1
0
0
0
2
0
2
0
0
0
0

North-South:
East-West:
SUM:

1064
0
1064

No. of
Lanes

Lane
Volume

0
0
2
1
0
0
0

613
456

2
0
2
0
0
0
0

451

0
0
0
0
0
0
0

0
0
0
0
0
0
0

523
0

0
0

0
0

North-South:
East-West:
SUM:

1064
0
1064

VOLUME/CAPACITY (V/C) RATIO:

0.690

0.690

0.709

0.709

0.709

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.590

0.590

0.609

0.609

0.609

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

CMA06

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA7

Overland Avenue

North-South Street:

4
0
0
2
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

363
1747
12

41
457
37

78
175
246

267
450
905

No. of
Lanes

2015

Ambient Growth: (%):

2016
4
0
SB-0
2
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Place-National Boulevard

East-West Street:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
2
1
0
0
0

363

363

363

371

586

1747

586

1772

12

12

12

12

1
0
1
1
0
0
0

41

25

66

66

30

71

247

457

247

10

472

37

37

37

37

78

78

78

79

175

44

219

219

26

203

65

246

65

253

267

267

267

270

450

450

450

16

471

498

905

498

18

932

1
0
1
1
0
0
0
1
0
1
0
2
0
0

North-South:
East-West:
SUM:

627
576
1203

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
4
0
0
2
2
0

652
576
1228

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-2
EB-0
WB-2
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
1
0
0
0

371

371

595

1772

12

12

1
0
1
1
0
0
0

71

25

96

255

472

37

37

79

79

203

44

247

68

253

270

270

470

471

513

932

1
0
1
1
0
0
0
1
0
1
0
2
0
0

North-South:
East-West:
SUM:

666
592
1258

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

1
0
2
1
0
0
0

371

371

595

1772

12

12

1
0
1
1
0
0
0

96

96

255

472

37

37

79

79

247

247

68

253

270

270

470

471

513

932

1
0
1
1
0
0
0
1
0
1
0
2
0
0

North-South:
East-West:
SUM:

691
592
1283

No. of
Lanes

Lane
Volume

1
0
2
1
0
0
0

371

1
0
1
1
0
0
0

96

595
12

255
37

1
0
1
1
0
0
0

79
247
68

1
0
1
0
2
0
0

270
470
513

North-South:
East-West:
SUM:

691
592
1283

VOLUME/CAPACITY (V/C) RATIO:

0.875

0.893

0.915

0.933

0.933

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.775

0.793

0.815

0.833

0.833

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.018
NO

v/c after mitigation:


Fully mitigated?

0.018
N/A

CMA07

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA7

Overland Avenue

North-South Street:

4
0
0
2
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

172
1116
23

93
794
40

199
320
361

238
211
506

No. of
Lanes

2015

Ambient Growth: (%):

2016
4
0
SB-0
2
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Place-National Boulevard

East-West Street:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
2
1
0
0
0

172

172

172

182

380

1116

380

17

1144

23

23

23

23

1
0
1
1
0
0
0

93

101

101

37

131

417

794

417

12

814

40

40

40

40

199

199

199

201

320

15

335

335

33

356

275

361

275

371

238

238

238

240

211

211

211

41

254

278

506

278

47

558

1
0
1
1
0
0
0
1
0
1
0
2
0
0

North-South:
East-West:
SUM:

589
558
1147

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
4
0
0
2
2
0

589
573
1162

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-2
EB-0
WB-2
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
1
0
0
0

182

182

389

1144

23

23

1
0
1
1
0
0
0

131

139

427

814

40

40

1
0
1
1
0
0
0

201

201

356

15

371

280

371

1
0
1
0
2
0
0

240

240

254

254

307

558

North-South:
East-West:
SUM:

609
596
1205

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

182

182

389

1144

23

23

1
0
1
1
0
0
0

139

139

427

814

40

40

1
0
1
1
0
0
0

201

201

371

371

280

371

240

240

254

254

307

558

1
0
2
1
0
0
0

1
0
1
0
2
0
0

North-South:
East-West:
SUM:

609
611
1220

No. of
Lanes

Lane
Volume

1
0
2
1
0
0
0

182

1
0
1
1
0
0
0

139

1
0
1
1
0
0
0

201

1
0
1
0
2
0
0

240

389
23

427
40

371
280

254
307

North-South:
East-West:
SUM:

609
611
1220

VOLUME/CAPACITY (V/C) RATIO:

0.834

0.845

0.876

0.887

0.887

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.734

0.745

0.776

0.787

0.787

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.011
NO

v/c after mitigation:


Fully mitigated?

0.011
N/A

CMA07

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA8

North-South Street:

Overland Avenue

East-West Street:

Palms Boulevard
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

206

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

143

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

124

CRITICAL VOLUMES

1349
161

66
729
72

813
101

737
156

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
2
0
1
0
0

143

143

143

144

675

1349

675

1370

99

16

177

109

163

1
0
1
1
0
0
0

66

66

66

67

401

729

401

10

746

72

72

72

73

1
0
1
1
0
0
0

206

206

206

208

457

31

844

473

11

832

101

101

101

102

1
0
1
1
0
0
0

124

12

136

136

125

447

24

761

459

19

763

156

156

156

158

North-South:
East-West:
SUM:

741
653
1394

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
3
0
0
0
2
0

741
665
1406

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

144

144

685

1370

101

16

179

1
0
1
1
0
0
0

67

67

410

746

73

73

208

208

467

31

863

102

102

125

12

137

461

24

787

158

158

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

752
669
1421

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

1
0
2
0
1
0
0

144

144

685

1370

111

179

1
0
1
1
0
0
0

67

67

410

746

73

73

208

208

483

863

102

102

137

137

473

787

158

158

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

752
681
1433

No. of
Lanes

Lane
Volume

1
0
2
0
1
0
0

144

1
0
1
1
0
0
0

67

685
111

410
73

1
0
1
1
0
0
0

208
483
102

1
0
1
1
0
0
0

137
473
158

North-South:
East-West:
SUM:

752
681
1433

VOLUME/CAPACITY (V/C) RATIO:

0.978

0.987

0.997

1.006

1.006

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.878

0.887

0.897

0.906

0.906

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.009
NO

v/c after mitigation:


Fully mitigated?

0.009
N/A

CMA08

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA8

North-South Street:

Overland Avenue

East-West Street:

Palms Boulevard
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

121

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

92

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

CRITICAL VOLUMES

940
152

91
1160
94

877
152

613
87

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

92

92

92

93

470

945

473

17

966

97

152

92

154

91

91

91

92

627

1160

627

12

1184

94

94

94

95

1
0
1
1
0
0
0

121

121

121

122

515

11

888

520

24

910

152

152

152

154

1
0
1
1
0
0
0

110

10

120

120

111

350

20

633

360

20

639

87

87

87

88

1
0
2
0
1
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

719
625
1344

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
3
0
0
0
2
0

719
640
1359

No. of
Lanes

1
0
2
0
1
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

93

93

483

971

99

154

92

92

640

1184

95

95

122

122

532

11

921

154

154

111

10

121

364

20

659

88

88

733
643
1376

No. of
Lanes

1
0
2
0
1
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

93

93

486

971

94

154

92

92

640

1184

95

95

122

122

538

921

154

154

121

121

374

659

88

88

733
659
1392

No. of
Lanes

Lane
Volume

93

1
0
2
0
1
0
0

486
94

1
0
1
1
0
0
0

92
640
95

1
0
1
1
0
0
0

122
538
154

1
0
1
1
0
0
0

121
374
88

North-South:
East-West:
SUM:

733
659
1392

VOLUME/CAPACITY (V/C) RATIO:

0.943

0.954

0.966

0.977

0.977

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.843

0.854

0.866

0.877

0.877

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.011
NO

v/c after mitigation:


Fully mitigated?

0.011
N/A

CMA08

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA9

North-South Street:

Overland Avenue

East-West Street:

Venice Boulevard
4
0
3
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

234
1383
170

315
1105
181

160
783
121

109
1011
112

2015

Ambient Growth: (%):

2016
4
0
SB-3
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

No. of
Lanes

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

234

234

234

12

248

692

16

1399

700

1405

110

170

110

180

1
0
2
0
1
0
0

315

315

315

318

553

12

1117

559

10

1126

93

181

93

183

88

160

88

162

261

16

799

266

152

943

121

15

137

60

109

60

10

120

337

12

1023

341

84

1105

112

113

2
0
3
0
1
0
0
2
0
3
0
1
0
0

North-South:
East-West:
SUM:

1007
425
1432

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
4
0
3
0
2
0

1015
429
1444

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-3
NB-3
SB-3
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

248

248

703

16

1421

114

180

1
0
2
0
1
0
0

318

318

563

12

1138

94

183

2
0
3
0
1
0
0

89

162

314

16

959

13

137

66

120

368

12

1117

113

2
0
3
0
1
0
0

North-South:
East-West:
SUM:

1021
457
1478

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

248

248

711

1421

114

180

1
0
2
0
1
0
0

318

318

569

1138

94

183

2
0
3
0
1
0
0

89

162

320

959

13

137

66

120

372

1117

113

2
0
3
0
1
0
0

North-South:
East-West:
SUM:

1029
461
1490

No. of
Lanes

Lane
Volume

1
0
2
0
1
0
0

248

1
0
2
0
1
0
0

318

2
0
3
0
1
0
0

89

711
114

569
94

320
13

2
0
3
0
1
0
0

66
372
0

North-South:
East-West:
SUM:

1029
461
1490

VOLUME/CAPACITY (V/C) RATIO:

1.041

1.050

1.075

1.084

1.084

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.941

0.950

0.975

0.984

0.984

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.009
NO

v/c after mitigation:


Fully mitigated?

0.009
N/A

CMA09

Level of Service Workheet


(Circular 212 Method)
I/S #:
CMA9

North-South Street:

Overland Avenue

East-West Street:

Venice Boulevard
4
0
3
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

128

188

786
119

1054
190

246
1246
121

281
1005
153

2015

Ambient Growth: (%):

2016
4
0
SB-3
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

No. of
Lanes

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

128

128

128

25

154

393

791

396

17

811

119

17

137

1
0
2
0
1
0
0

188

188

188

190

527

10

1064

532

12

1077

55

190

55

192

135

246

135

248

415

1251

417

179

1437

57

121

57

18

140

155

281

155

12

296

335

10

1015

338

231

1246

59

153

59

155

2
0
3
0
1
0
0
2
0
3
0
1
0
0

North-South:
East-West:
SUM:

655
570
1225

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
4
0
3
0
2
0

660
572
1232

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-3
NB-3
SB-3
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
1
0
0

154

154

406

816

137

1
0
2
0
1
0
0

190

190

539

10

1087

56

192

2
0
3
0
1
0
0

136

248

479

1442

63

140

2
0
3
0
1
0
0

163

296

415

10

1256

60

155

North-South:
East-West:
SUM:

693
642
1335

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

154

154

408

816

137

1
0
2
0
1
0
0

190

190

544

1087

56

192

2
0
3
0
1
0
0

136

248

481

1442

63

140

2
0
3
0
1
0
0

163

296

419

1256

60

155

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

698
644
1342

No. of
Lanes

Lane
Volume

1
0
2
0
1
0
0

154

1
0
2
0
1
0
0

190

2
0
3
0
1
0
0

136

2
0
3
0
1
0
0

163

408
0

544
56

481
63

419
60

North-South:
East-West:
SUM:

698
644
1342

VOLUME/CAPACITY (V/C) RATIO:

0.891

0.896

0.971

0.976

0.976

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.791

0.796

0.871

0.876

0.876

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.005
NO

v/c after mitigation:


Fully mitigated?

0.005
N/A

CMA09

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA10

East-West Street:

I-10 EB Off-Ramp
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0
0

276
0
714

0
226
0

0
928
0

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

No. of
Lanes

0
0
2
0
0
0
0
0
0
2
0
0
0
0

North-South:
East-West:
SUM:

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

Lane
Volume

Added
Volume

Total
Volume

276

25

301

301

279

714

714

714

721

113

69

295

148

57

285

464

928

464

36

973

714
464
1178

North-South:
East-West:
SUM:

SB-WB--

FUTURE CONDITION W/O PROJECT

Total
Volume

0
0
0
0
0
0
0
1
0
0
0
1
0
0

NB-EB--

1.0
AM
2
0
0
0
2
0

714
464
1178

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

279

25

304

721

721

0
0
2
0
0
0
0

143

69

354

487

973

0
0
2
0
0
0
0

North-South:
East-West:
SUM:

721
487
1208

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
1
0
0

304

304

721

721

0
0
2
0
0
0
0

177

354

487

973

0
0
0
0
0
0
0

0
0
2
0
0
0
0

North-South:
East-West:
SUM:

721
487
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

304

0
0
2
0
0
0
0

0
0

0
721

177
0

0
0
2
0
0
0
0

0
487
0

North-South:
East-West:
SUM:

721
487
1208

VOLUME/CAPACITY (V/C) RATIO:

0.785

0.785

0.805

0.805

0.805

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.685

0.685

0.705

0.705

0.705

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

CMA10

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA10

East-West Street:

I-10 EB Off-Ramp
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0
0

356
0
504

0
427
0

0
457
0

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

No. of
Lanes

0
0
2
0
0
0
0
0
0
2
0
0
0
0

North-South:
East-West:
SUM:

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

Lane
Volume

Added
Volume

Total
Volume

356

364

364

360

504

504

504

509

214

23

450

225

71

502

229

457

229

87

549

504
229
733

North-South:
East-West:
SUM:

SB-WB--

FUTURE CONDITION W/O PROJECT

Total
Volume

0
0
0
0
0
0
0
1
0
0
0
1
0
0

NB-EB--

1.0
PM
2
0
0
0
2
0

504
229
733

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

360

368

509

509

0
0
2
0
0
0
0

251

23

525

275

549

0
0
2
0
0
0
0

North-South:
East-West:
SUM:

509
275
784

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
1
0
0

368

368

509

509

0
0
2
0
0
0
0

263

525

275

549

0
0
0
0
0
0
0

0
0
2
0
0
0
0

North-South:
East-West:
SUM:

509
275
784

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

368

0
0
2
0
0
0
0

0
0

0
509

263
0

0
0
2
0
0
0
0

0
275
0

509
275
784

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.489

0.489

0.523

0.523

0.523

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.389

0.389

0.423

0.423

0.423

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

CMA10

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA11

East-West Street:

National Boulevard-Mentone Avenue


Rose Avenue-National Boulevard
3
0
0
1
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

2
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

412

20

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

164
15

69
19

55
4

7
62
647

No. of
Lanes

0
0
0
0
0
1
0
1
1
0
0
1
0
0
0
0
0
0
0
1
0
0
1
0
0
1
0
0

North-South:
East-West:
SUM:

2015

Ambient Growth: (%):

2016
3
0
SB-0
1
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

2
2

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

2
2

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

180

164

180

11

177

15

15

241

412

241

31

447

241

69

241

74

19

19

19

19

20

20

20

20

79

55

79

56

69

62

69

63

647

19

672

421
89
510

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
3
0
0
1
2
0

421
89
510

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-2
SB-0
NB-2
SB-0
EB-2
WB-1
EB-2
WB-1
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

193

177

15

1
1
0
0
1
0
0

261

447

261

74

19

19

0
0
0
0
0
1
0

20

20

80

56

0
1
0
0
1
0
0

70

63

672

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

454
90
544

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

193

177

15

1
1
0
0
1
0
0

261

447

261

74

19

19

0
0
0
0
0
1
0

20

20

80

56

70

63

672

0
0
0
0
0
1
0

0
1
0
0
1
0
0

North-South:
East-West:
SUM:

454
90
544

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0

193
0

1
1
0
0
1
0
0

261

0
0
0
0
0
1
0

20

0
1
0
0
1
0
0

261
19

80
0

70
0

454
90
544

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.358

0.358

0.382

0.382

0.382

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.258

0.258

0.282

0.282

0.282

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

CMA11

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA11

East-West Street:

National Boulevard-Mentone Avenue


Rose Avenue-National Boulevard
3
0
0
1
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

690

22

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26
18

62
23

75
3

9
48
371

No. of
Lanes

0
0
0
0
0
1
0
1
1
0
0
1
0
0
0
0
0
0
0
1
0
0
1
0
0
1
0
0

North-South:
East-West:
SUM:

2015

Ambient Growth: (%):

2016
3
0
SB-0
1
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

0
2

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
2

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

45

26

45

33

18

18

376

16

706

384

34

731

376

62

384

13

76

23

23

23

23

22

22

22

22

100

80

105

76

57

48

57

48

371

44

419

421
109
530

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
3
0
0
1
2
0

429
114
543

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-2
WB-1
EB-2
WB-1
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

52

33

18

1
1
0
0
1
0
0

404

16

747

404

76

23

23

0
0
0
0
0
1
0

22

22

101

81

57

48

419

0
0
0
0
0
1
0

0
1
0
0
1
0
0

North-South:
East-West:
SUM:

456
110
566

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

52

33

18

1
1
0
0
1
0
0

412

747

412

76

23

23

0
0
0
0
0
1
0

22

22

106

81

57

48

419

0
0
0
0
0
1
0

0
1
0
0
1
0
0

North-South:
East-West:
SUM:

464
115
579

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0

52
0

1
1
0
0
1
0
0

412

0
0
0
0
0
1
0

22

412
23

106
0

0
1
0
0
1
0
0

9
57
0

464
115
579

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.372

0.381

0.397

0.406

0.406

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.272

0.281

0.297

0.306

0.306

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.009
NO

v/c after mitigation:


Fully mitigated?

0.009
N/A

CMA11

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA12

East-West Street:

Motor Avenue
5
1
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

244

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

22

348

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

2015

Ambient Growth: (%):

2016
5
1
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Pico Boulevard

15
841

2
33

1836
144

163
1356
226

No. of
Lanes

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
2
0
0

244

244

244

246

15

15

300

19

860

285

849

1
0
0
0
1
0
0

22

22

22

22

33

33

1
0
2
1
0
0
0

348

348

348

351

660

1836

660

31

1885

144

144

144

145

1
0
2
1
0
0
0

163

25

188

188

165

527

1356

527

17

1387

226

226

226

228

North-South:
East-West:
SUM:

322
875
1197

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
5
1
0
0
2
0

307
875
1182

No. of
Lanes

7/23/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
5
5
1
1
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
2
0
0

246

246

15

302

19

868

1
0
0
0
1
0
0

22

22

33

1
0
2
1
0
0
0

351

351

677

1885

145

145

165

25

190

538

1387

228

228

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

324
889
1213

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
2
0
0

246

246

15

287

868

1
0
0
0
1
0
0

22

22

33

1
0
2
1
0
0
0

351

351

677

1885

145

145

190

190

538

1387

228

228

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

309
889
1198

No. of
Lanes

Lane
Volume

1
0
0
0
2
0
0

246

1
0
0
0
1
0
0

22

1
0
2
1
0
0
0

351

0
287

0
0

677
145

1
0
2
1
0
0
0

190
538
228

North-South:
East-West:
SUM:

309
889
1198

VOLUME/CAPACITY (V/C) RATIO:

0.871

0.860

0.882

0.871

0.871

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.771

0.760

0.782

0.771

0.771

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project: -0.011


Significant impacted?
7/23/2015-1:28 PM

NO

v/c after mitigation: -0.011


Fully mitigated?

N/A

CMA12

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA12

East-West Street:

Motor Avenue
5
1
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume
Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

2015

Ambient Growth: (%):

2016
5
1
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Pico Boulevard

157

70

5
395

4
99

93
1230
254

377
1256
67

No. of
Lanes

NB-EB--

3
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

3
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
2
0
0

157

157

157

159

16

411

399

1
0
0
0
1
0
0

70

70

70

71

53

99

53

100

93

93

93

94

495

1230

495

30

1272

254

254

254

257

377

385

385

381

441

1256

441

44

1313

67

67

67

68

1
0
2
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

227
872
1099

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
5
1
0
0
2
0

227
880
1107

No. of
Lanes

7/23/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
5
5
1
1
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
2
0
0

159

159

16

415

1
0
0
0
1
0
0

71

71

53

100

1
0
2
1
0
0
0

94

94

510

1272

257

257

381

389

460

1313

68

68

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

230
891
1121

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
2
0
0

159

159

415

1
0
0
0
1
0
0

71

71

53

100

1
0
2
1
0
0
0

94

94

510

1272

257

257

389

389

460

1313

68

68

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

230
899
1129

No. of
Lanes

Lane
Volume

1
0
0
0
2
0
0

159

1
0
0
0
1
0
0

71

0
0

0
53

1
0
2
1
0
0
0

94
510
257

1
0
2
1
0
0
0

389
460
68

North-South:
East-West:
SUM:

230
899
1129

VOLUME/CAPACITY (V/C) RATIO:

0.799

0.805

0.815

0.821

0.821

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.699

0.705

0.715

0.721

0.721

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
7/23/2015-1:28 PM

0.006
NO

v/c after mitigation:


Fully mitigated?

0.006
N/A

CMA12

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA13

East-West Street:

Motor Avenue
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

54
420
34

74
283
9

29
130
71

141
295
222

2015

Ambient Growth: (%):

2016
2
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Manning Avenue

No. of
Lanes

1
0
1
0
1
0
0
1
0
0
1
0
0
0
1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

54

77

131

131

55

420

27

447

447

426

138

172

102

34

74

74

74

75

292

35

318

327

286

29

29

29

29

130

130

130

131

44

77

12

72

141

141

141

142

517

295

517

298

222

224

494
546
1040

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
2
0
0
0
2
0

521
546
1067

No. of
Lanes

1
0
1
0
1
0
0
1
0
0
1
0
0
0
1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

55

77

132

426

27

453

138

172

75

75

295

35

321

29

29

131

131

45

78

142

142

522

298

224

501
551
1052

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

132

132

453

453

101

172

1
0
0
1
0
0
0

75

75

330

321

29

29

131

131

12

78

142

142

522

298

224

1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

528
551
1079

No. of
Lanes

Lane
Volume

1
0
1
0
1
0
0

132

1
0
0
1
0
0
0

75

453
101

330
0

1
0
1
0
1
0
0

29
131
12

1
0
0
1
0
0
0

142
522
0

North-South:
East-West:
SUM:

528
551
1079

VOLUME/CAPACITY (V/C) RATIO:

0.693

0.711

0.701

0.719

0.719

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.593

0.611

0.601

0.619

0.619

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-4:27 PM

0.018
NO

v/c after mitigation:


Fully mitigated?

0.018
N/A

CMA13

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA13

East-West Street:

Motor Avenue
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

69
349
92

152
305
14

19
260
109

96
195
149

2015

Ambient Growth: (%):

2016
2
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Manning Avenue

No. of
Lanes

1
0
1
0
1
0
0
1
0
0
1
0
0
0
1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

69

64

133

133

70

349

22

371

371

353

44

114

206

158

93

152

152

152

154

319

12

317

331

310

14

14

19

19

19

19

260

260

260

263

75

111

45

110

96

96

96

97

344

195

344

197

149

150

501
363
864

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
2
0
0
0
2
0

523
363
886

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

70

64

134

353

22

375

45

114

207

1
0
0
1
0
0
0

154

154

324

12

322

14

1
0
1
0
1
0
0

19

19

263

263

75

112

97

97

347

197

150

1
0
1
0
1
0
0

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

507
366
873

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

134

134

375

375

159

207

1
0
0
1
0
0
0

154

154

336

322

14

19

19

263

263

45

112

97

97

347

197

150

1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

529
366
895

No. of
Lanes

Lane
Volume

1
0
1
0
1
0
0

134

1
0
0
1
0
0
0

154

1
0
1
0
1
0
0

19

375
159

336
0

263
45

1
0
0
1
0
0
0

97
347
0

529
366
895

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.576

0.591

0.582

0.597

0.597

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.476

0.491

0.482

0.497

0.497

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-4:27 PM

0.015
NO

v/c after mitigation:


Fully mitigated?

0.015
N/A

CMA13

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA14

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

71
514
9

45
273
198

6
279
188

8
441
21

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
1
0
1
0
0
0
0
1
0
1
0
0
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

SB-WB--

1.0
AM
3
0
0
0
2
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

71

71

71

72

514

35

549

549

521

45

45

45

45

273

273

273

276

198

198

198

200

240

279

240

53

335

240

188

240

190

239

441

239

25

470

239

21

239

21

559
248
807

North-South:
East-West:
SUM:

594
248
842

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
1
0
1
0
0
0
0
1
0
1
0
0
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

72

72

521

35

556

45

45

276

276

200

200

269

335

269

190

254

470

254

21

566
277
843

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
1
0
1
0
0
0
0
1
0
1
0
0
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

72

72

556

556

45

45

276

276

200

200

269

335

269

190

254

470

254

21

601
277
878

No. of
Lanes

Lane
Volume

72

1
0
1
0
1
0
0

556
9

1
0
1
0
1
0
0

45
276
200

0
1
0
1
0
0
0

6
269
269

0
1
0
1
0
0
0

8
254
254

601
277
878

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.566

0.591

0.592

0.616

0.616

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.466

0.491

0.492

0.516

0.516

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.024
NO

v/c after mitigation:


Fully mitigated?

0.024
N/A

CMA14

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA14

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

148

EASTBOUND

34

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

132

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

CRITICAL VOLUMES

326
20

395
157

419
185

162
32

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

132

132

132

133

326

12

338

338

330

20

20

20

20

1
0
1
0
1
0
0

34

34

34

34

395

395

395

401

157

157

157

159

0
1
0
1
0
0
0

148

21

169

169

149

376

419

387

58

481

376

185

387

187

0
1
0
1
0
0
0

113

162

113

80

244

113

32

113

32

527
384
911

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
3
0
0
0
2
0

527
395
922

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

133

133

330

12

342

20

20

1
0
1
0
1
0
0

34

34

401

401

159

159

149

21

170

409

481

409

187

154

244

154

32

0
1
0
1
0
0
0
0
1
0
1
0
0
0

North-South:
East-West:
SUM:

534
417
951

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

133

133

342

342

20

20

1
0
1
0
1
0
0

34

34

401

401

159

159

170

170

419

481

419

187

154

244

154

32

0
1
0
1
0
0
0
0
1
0
1
0
0
0

North-South:
East-West:
SUM:

534
427
961

No. of
Lanes

Lane
Volume

1
0
1
0
1
0
0

133

1
0
1
0
1
0
0

34

342
20

401
159

0
1
0
1
0
0
0

170
419
419

0
1
0
1
0
0
0

8
154
154

534
427
961

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.639

0.647

0.667

0.674

0.674

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.539

0.547

0.567

0.574

0.574

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:57 PM

0.007
NO

v/c after mitigation:


Fully mitigated?

0.007
N/A

CMA14

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA15

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

100

EASTBOUND

70

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

242

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61

CRITICAL VOLUMES

459
143

331
113

911
72

733
28

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Palms Boulevard

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
1
0
1
0
0

242

242

242

244

459

35

494

487

465

113

143

113

15

159

1
0
1
0
1
0
0

70

70

70

77

331

331

331

342

63

113

63

10

124

1
0
1
1
0
0
0

100

100

100

103

492

47

958

515

929

72

72

72

73

1
0
1
1
0
0
0

61

61

61

20

82

381

36

769

421

749

28

44

72

72

29

North-South:
East-West:
SUM:

573
553
1126

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
3
0
0
0
2
0

573
576
1149

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

244

244

465

35

500

118

159

1
0
1
0
1
0
0

77

77

342

342

73

124

103

103

501

47

976

73

73

82

82

389

36

785

29

44

73

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

586
583
1169

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

244

244

493

500

118

159

77

77

342

342

73

124

1
0
1
1
0
0
0

103

103

525

976

73

73

1
0
1
1
0
0
0

82

82

429

785

73

73

1
0
1
0
1
0
0
1
0
1
0
1
0
0

North-South:
East-West:
SUM:

586
607
1193

No. of
Lanes

Lane
Volume

1
0
1
0
1
0
0

244

1
0
1
0
1
0
0

77

493
118

342
73

1
0
1
1
0
0
0

103

1
0
1
1
0
0
0

82

525
73

429
73

North-South:
East-West:
SUM:

586
607
1193

VOLUME/CAPACITY (V/C) RATIO:

0.790

0.806

0.820

0.837

0.837

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.690

0.706

0.720

0.737

0.737

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.017
NO

v/c after mitigation:


Fully mitigated?

0.017
N/A

CMA15

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA15

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

105

79

309
88

450
94

89
946
92

94
649
12

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Palms Boulevard

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

Total
Volume

Lane
Volume

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Added
Volume

Total
Volume

1
0
1
0
1
0
0

105

105

105

106

309

12

321

321

318

41

88

41

34

123

1
0
1
0
1
0
0

79

79

79

82

450

450

450

458

50

94

44

99

89

11

100

100

98

519

946

519

16

971

92

92

92

93

94

94

94

24

119

331

30

679

364

16

671

12

36

48

48

17

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

555
613
1168

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
3
0
0
0
2
0

555
613
1168

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

1
0
1
0
1
0
0

106

106

318

12

330

64

123

1
0
1
0
1
0
0

82

82

458

458

50

99

98

11

109

532

971

93

93

119

119

344

30

701

17

36

53

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

564
651
1215

No. of
Lanes

Lane
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

Total
Volume

1
0
1
0
1
0
0

106

106

330

330

64

123

1
0
1
0
1
0
0

82

82

458

458

45

99

1
0
1
1
0
0
0

109

109

532

971

93

93

1
0
1
1
0
0
0

119

119

377

701

53

53

North-South:
East-West:
SUM:

564
651
1215

No. of
Lanes

Lane
Volume

1
0
1
0
1
0
0

106

1
0
1
0
1
0
0

82

330
64

458
45

1
0
1
1
0
0
0

109

1
0
1
1
0
0
0

119

532
93

377
53

North-South:
East-West:
SUM:

564
651
1215

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.853

0.853

0.853

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.753

0.753

0.753

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

CMA15

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA16

East-West Street:

Motor Avenue
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

33

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

27

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

53

CRITICAL VOLUMES

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Tabor Street

676
30

19
413
27

38
42

51
179

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

27

27

27

27

676

31

707

707

16

699

30

30

30

30

19

19

19

19

413

41

454

454

28

445

27

29

29

27

33

36

36

33

113

38

116

38

42

42

53

53

53

54

283

51

283

52

179

181

695
316
1011

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
2
0
0
0
2
0

726
319
1045

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

27

27

699

31

730

30

30

19

19

445

41

486

27

29

33

36

113

38

42

54

54

287

52

181

718
320
1038

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

27

27

730

730

30

30

19

19

486

486

29

29

36

36

116

38

42

54

54

287

52

181

749
323
1072

No. of
Lanes

Lane
Volume

27

1
0
1
0
1
0
0

730
30

1
0
1
0
1
0
0

19
486
29

0
0
0
0
0
1
0

36
116
0

0
0
0
0
0
1
0

54
287
0

North-South:
East-West:
SUM:

749
323
1072

VOLUME/CAPACITY (V/C) RATIO:

0.674

0.697

0.692

0.715

0.715

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.574

0.597

0.592

0.615

0.615

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.023
NO

v/c after mitigation:


Fully mitigated?

0.023
N/A

CMA16

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA16

East-West Street:

Motor Avenue
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

24

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

21

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

31

CRITICAL VOLUMES

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Tabor Street

433
13

26
588
30

24
32

21
75

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

21

21

21

21

433

11

444

444

40

477

13

13

13

13

26

26

26

26

588

34

622

622

27

621

30

32

32

30

0
0
0
0
0
1
0

24

25

25

24

80

24

81

24

32

32

0
0
0
0
0
1
0

31

31

31

31

127

21

127

21

75

76

1
0
1
0
1
0
0
1
0
1
0
1
0
0

North-South:
East-West:
SUM:

609
151
760

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
2
0
0
0
2
0

643
152
795

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

21

21

477

11

488

13

13

26

26

621

34

655

30

32

24

25

80

24

32

31

31

128

21

76

642
152
794

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

21

21

488

488

13

13

26

26

655

655

32

32

25

25

81

24

32

31

31

128

21

76

676
153
829

No. of
Lanes

Lane
Volume

21

1
0
1
0
1
0
0

488
13

1
0
1
0
1
0
0

26
655
32

0
0
0
0
0
1
0

25

0
0
0
0
0
1
0

31

81
0

128
0

676
153
829

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.507

0.530

0.529

0.553

0.553

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.407

0.430

0.429

0.453

0.453

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.024
NO

v/c after mitigation:


Fully mitigated?

0.024
N/A

CMA16

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

Motor Avenue

CMA17

East-West Street:

Regent Street
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

27

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

55

CRITICAL VOLUMES

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

586
41

32
450
32

36
86

59
115

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

27

27

27

27

586

31

617

617

16

608

41

41

41

41

32

34

34

32

450

39

489

489

24

479

32

32

32

32

23

23

23

23

145

36

145

36

86

87

55

55

55

56

229

59

229

60

115

116

618
252
870

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
2
0
0
0
2
0

651
252
903

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

27

27

608

31

639

41

41

32

34

478

39

518

32

32

23

23

146

36

87

56

56

232

60

116

640
255
895

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

27

27

639

639

41

41

34

34

518

518

32

32

23

23

146

36

87

56

56

232

60

116

673
255
928

No. of
Lanes

Lane
Volume

27

1
0
1
0
1
0
0

639
41

1
0
1
0
1
0
0

34
518
32

0
0
0
0
0
1
0

23
146
0

0
0
0
0
0
1
0

56
232
0

673
255
928

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.580

0.602

0.597

0.619

0.619

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.480

0.502

0.497

0.519

0.519

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.022
NO

v/c after mitigation:


Fully mitigated?

0.022
N/A

CMA17

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

Motor Avenue

CMA17

East-West Street:

Regent Street
2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

33

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

11

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

24

CRITICAL VOLUMES

2015

Ambient Growth: (%):

2016
2
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

388
53

41
604
18

40
57

17
41

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

11

11

11

11

388

11

399

399

37

429

53

53

53

54

41

43

43

41

604

32

636

636

26

636

18

18

18

18

33

33

33

33

130

40

130

40

57

58

24

24

24

24

82

17

82

17

41

41

615
154
769

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
2
0
0
0
2
0

647
154
801

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

11

11

429

11

440

54

54

41

43

636

32

668

18

18

33

33

131

40

58

24

24

82

17

41

647
155
802

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

11

11

440

440

54

54

43

43

668

668

18

18

33

33

131

40

58

24

24

82

17

41

679
155
834

No. of
Lanes

Lane
Volume

11

1
0
1
0
1
0
0

440
54

1
0
1
0
1
0
0

43
668
18

0
0
0
0
0
1
0

33
131
0

0
0
0
0
0
1
0

24
82
0

679
155
834

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.513

0.534

0.535

0.556

0.556

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.413

0.434

0.435

0.456

0.456

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.021
NO

v/c after mitigation:


Fully mitigated?

0.021
N/A

CMA17

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA18

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

49
453
33

144
328
174

122
1426
21

67
1351
70

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Venice Boulevard

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

49

49

49

49

453

462

462

15

473

33

33

144

19

163

163

149

328

335

335

20

351

113

12

186

117

180

1
0
3
0
1
0
0

122

16

138

138

124

475

1426

475

162

1602

21

21

1
0
3
0
1
0
0

67

67

67

68

450

1351

450

93

1458

73

72

1
0
1
0
1
0
0
1
0
1
0
1
0
0

North-South:
East-West:
SUM:

597
572
1169

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
3
0
0
0
2
0

625
588
1213

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
3
0
1
0
0
1
0
3
0
1
0
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

49

49

473

482

33

149

19

168

351

358

118

12

192

124

16

140

534

1602

21

68

68

486

1458

75

622
610
1232

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
3
0
1
0
0
1
0
3
0
1
0
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

49

49

482

482

33

168

168

358

358

122

192

140

140

534

1602

21

68

68

486

1458

75

650
626
1276

No. of
Lanes

Lane
Volume

49

1
0
1
0
1
0
0

482
0

1
0
1
0
1
0
0

168
358
122

1
0
3
0
1
0
0

140

1
0
3
0
1
0
0

68

534
0

486
0

North-South:
East-West:
SUM:

650
626
1276

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.851

0.865

0.895

0.895

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.751

0.765

0.795

0.795

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.030
NO

v/c after mitigation:


Fully mitigated?

0.030
N/A

CMA18

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA18

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

49
250
37

113
335
240

132
1269
43

71
1110
83

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Venice Boulevard

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

49

49

49

49

250

253

253

34

287

37

37

113

16

129

129

116

335

341

341

24

362

174

10

250

182

244

1
0
3
0
1
0
0

132

137

137

136

423

1269

423

200

1482

19

43

19

43

1
0
3
0
1
0
0

71

71

71

72

370

1110

370

245

1366

27

84

20

87

1
0
1
0
1
0
0
1
0
1
0
1
0
0

North-South:
East-West:
SUM:

384
502
886

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
3
0
0
0
2
0

390
507
897

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
3
0
1
0
0
1
0
3
0
1
0
0

North-South:
East-West:
SUM:

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

49

49

286

290

37

116

16

132

362

368

176

10

254

136

141

494

1482

19

43

72

72

455

1366

29

88

411
591
1002

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
3
0
1
0
0
1
0
3
0
1
0
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

49

49

290

290

37

132

132

368

368

184

254

141

141

494

1482

19

43

72

72

455

1366

22

88

422
596
1018

No. of
Lanes

Lane
Volume

49

1
0
1
0
1
0
0

290
1

1
0
1
0
1
0
0

132
368
184

1
0
3
0
1
0
0

141
494
19

1
0
3
0
1
0
0

72
455
22

North-South:
East-West:
SUM:

422
596
1018

VOLUME/CAPACITY (V/C) RATIO:

0.622

0.629

0.703

0.714

0.714

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.522

0.529

0.603

0.614

0.614

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.011
NO

v/c after mitigation:


Fully mitigated?

0.011
N/A

CMA18

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA19

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

364

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

CRITICAL VOLUMES

0
0

158
0
277

910
0

975
149

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Washington Boulevard

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
1
0
0

158

158

158

160

95

284

98

20

300

1
0
2
0
0
0
0

364

373

373

15

383

455

910

455

924

0
0
1
1
0
0
0

562

975

564

990

149

152

152

150

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

158
926
1084

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
3
0
0
0
2
0

158
937
1095

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

160

160

109

307

383

392

462

924

570

990

150

153

1
0
2
0
0
0
0
0
0
1
1
0
0
0

North-South:
East-West:
SUM:

160
953
1113

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

160

160

111

307

392

392

462

924

572

990

153

153

1
0
2
0
0
0
0
0
0
1
1
0
0
0

North-South:
East-West:
SUM:

160
964
1124

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

160

0
0

0
111

1
0
2
0
0
0
0

392

0
0
1
1
0
0
0

462
0

572
153

North-South:
East-West:
SUM:

160
964
1124

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.768

0.781

0.789

0.789

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.668

0.681

0.689

0.689

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.008
NO

v/c after mitigation:


Fully mitigated?

0.008
N/A

CMA19

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA19

East-West Street:

Motor Avenue
3
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

202

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

CRITICAL VOLUMES

0
0

135
0
269

951
0

975
149

2015

Ambient Growth: (%):

2016
3
0
0
SB-0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

Washington Boulevard

No. of
Lanes

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

135

135

135

136

168

275

173

24

296

1
0
2
0
0
0
0

202

205

205

34

238

476

951

476

969

0
0
1
1
0
0
0

562

975

563

993

149

150

150

150

168
764
932

North-South:
East-West:
SUM:

0
0
0
0
0
0
0
1
0
0
0
1
0
0

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
3
0
0
0
2
0

173
768
941

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

136

136

177

302

1
0
2
0
0
0
0

238

241

485

969

572

993

150

151

0
0
1
1
0
0
0

North-South:
East-West:
SUM:

177
810
987

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

1
0
0
0
1
0
0

136

136

182

302

1
0
2
0
0
0
0

241

241

485

969

572

993

151

151

0
0
0
0
0
0
0

0
0
1
1
0
0
0

North-South:
East-West:
SUM:

182
813
995

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

1
0
0
0
1
0
0

136

1
0
2
0
0
0
0

241

0
0
1
1
0
0
0

0
0

0
182

485
0

572
151

182
813
995

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.654

0.660

0.693

0.698

0.698

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.554

0.560

0.593

0.598

0.598

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.005
NO

v/c after mitigation:


Fully mitigated?

0.005
N/A

CMA19

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA20

East-West Street:

Palms Boulevard-National Boulevard


National Boulevard-Exposition Boulev
2
0
2
2
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
1

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

1
1359
76

0
707
131

122
136
11

67
167
155

No. of
Lanes

1
0
1
1
0
0
0
1
0
1
1
0
0
0
1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

2015

Ambient Growth: (%):

2016
2
0
SB-2
2
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

0
1

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
1

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

47

48

48

718

1359

718

1373

76

76

76

77

15

15

15

419

80

787

488

714

131

57

188

188

132

122

122

122

123

136

136

136

76

213

11

11

67

67

67

68

322

41

208

363

50

219

155

157

718
444
1162

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
2
0
2
2
2
0

733
485
1218

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-2
NB-0
SB-2
EB-1
WB-2
EB-1
WB-2
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

47

48

725

1373

77

77

15

15

423

80

794

132

57

189

1
0
1
0
1
0
0

123

123

213

213

11

1
0
0
1
0
0
0

68

68

376

41

260

157

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

725
499
1224

No. of
Lanes

1
0
1
1
0
0
0
1
0
1
1
0
0
0
1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

48

48

725

1373

77

77

15

15

492

794

189

189

123

123

213

213

11

68

68

417

260

157

740
540
1280

No. of
Lanes

Lane
Volume

48

1
0
1
1
0
0
0

725
77

1
0
1
1
0
0
0

15
492
189

1
0
1
0
1
0
0

123

1
0
0
1
0
0
0

68

213
0

417
0

North-South:
East-West:
SUM:

740
540
1280

VOLUME/CAPACITY (V/C) RATIO:

0.775

0.812

0.816

0.853

0.853

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.675

0.712

0.716

0.753

0.753

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.037
NO

v/c after mitigation:


Fully mitigated?

0.037
N/A

CMA20

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA20

East-West Street:

Palms Boulevard-National Boulevard


National Boulevard-Exposition Boulev
2
0
2
2
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
1

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

1
909
154

8
935
89

274
239
10

41
62
65

No. of
Lanes

1
0
1
1
0
0
0
1
0
1
1
0
0
0
1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

2015

Ambient Growth: (%):

2016
2
0
SB-2
2
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

0
1

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
1

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

532

909

532

918

154

154

154

156

12

20

20

512

66

1001

555

944

89

19

108

108

90

274

274

274

277

239

239

239

102

343

10

10

41

41

41

41

127

14

76

141

115

178

65

66

540
401
941

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
2
0
2
2
2
0

556
415
971

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-2
NB-0
SB-2
EB-1
WB-2
EB-1
WB-2
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

537

918

156

156

12

20

517

66

1010

90

19

109

1
0
1
0
1
0
0

277

277

343

343

10

1
0
0
1
0
0
0

41

41

244

14

192

66

1
0
1
1
0
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

545
521
1066

No. of
Lanes

1
0
1
1
0
0
0
1
0
1
1
0
0
0
1
0
1
0
1
0
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

537

918

156

156

20

20

560

1010

109

109

277

277

343

343

10

41

41

258

192

66

561
535
1096

No. of
Lanes

Lane
Volume

1
0
1
1
0
0
0

537
156

1
0
1
1
0
0
0

20
560
109

1
0
1
0
1
0
0

277

1
0
0
1
0
0
0

41

343
0

258
0

North-South:
East-West:
SUM:

561
535
1096

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.647

0.711

0.731

0.731

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.547

0.611

0.631

0.631

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.020
NO

v/c after mitigation:


Fully mitigated?

0.020
N/A

CMA20

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA21

East-West Street:

National Boulevard
I-10 WB Off-Ramp-Manning Avenue
3
0
0
2
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
1

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

372
1209
0

0
706
369

91
0
60

130
155
29

No. of
Lanes

2015

Ambient Growth: (%):

2016
3
0
SB-0
2
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

0
1

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
1

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
0
0
0

372

372

372

13

389

605

1209

605

1221

0
0
1
1
0
0
0

538

28

734

552

713

369

369

369

373

1
0
0
0
1
0
0

91

22

113

113

92

94

154

61

1
0
0
1
0
0
0

130

28

158

158

10

141

184

155

184

157

29

32

North-South:
East-West:
SUM:

910
275
1185

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
3
0
0
2
2
0

924
297
1221

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-1
WB-2
EB-1
WB-2
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

389

389

611

1221

543

28

741

373

373

1
0
0
0
1
0
0

92

22

114

94

155

1
0
0
1
0
0
0

141

28

169

189

157

32

1
0
2
0
0
0
0
0
0
1
1
0
0
0

North-South:
East-West:
SUM:

932
281
1213

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

389

389

611

1221

557

741

373

373

1
0
0
0
1
0
0

114

114

155

1
0
0
1
0
0
0

169

169

189

157

32

1
0
2
0
0
0
0
0
0
1
1
0
0
0

North-South:
East-West:
SUM:

946
303
1249

No. of
Lanes

Lane
Volume

1
0
2
0
0
0
0

389

0
0
1
1
0
0
0

611
0

557
373

1
0
0
0
1
0
0

114

1
0
0
1
0
0
0

169

0
0

189
0

North-South:
East-West:
SUM:

946
303
1249

VOLUME/CAPACITY (V/C) RATIO:

0.832

0.857

0.851

0.876

0.876

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.732

0.757

0.751

0.776

0.776

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.025
NO

v/c after mitigation:


Fully mitigated?

0.025
N/A

CMA21

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA21

East-West Street:

National Boulevard
I-10 WB Off-Ramp-Manning Avenue
3
0
0
2
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
1

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

122

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

153

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

373

CRITICAL VOLUMES

1092
0

0
596
212

0
43

186
75

No. of
Lanes

2015

Ambient Growth: (%):

2016
3
0
SB-0
2
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

NB-EB--

0
1

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
1

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

1
0
2
0
0
0
0

153

153

153

23

178

546

1092

546

1103

0
0
1
1
0
0
0

404

10

606

409

602

212

212

212

214

1
0
0
0
1
0
0

122

18

140

140

123

78

121

43

1
0
0
1
0
0
0

373

10

383

383

14

391

261

186

261

188

75

81

North-South:
East-West:
SUM:

557
383
940

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
3
0
0
2
2
0

562
401
963

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-1
WB-2
EB-1
WB-2
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

178

178

552

1103

408

10

612

214

214

1
0
0
0
1
0
0

123

18

141

78

121

1
0
0
1
0
0
0

391

10

401

269

188

81

1
0
2
0
0
0
0
0
0
1
1
0
0
0

North-South:
East-West:
SUM:

586
392
978

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

178

178

552

1103

413

612

214

214

1
0
0
0
1
0
0

141

141

121

1
0
0
1
0
0
0

401

401

269

188

81

1
0
2
0
0
0
0
0
0
1
1
0
0
0

North-South:
East-West:
SUM:

591
410
1001

No. of
Lanes

Lane
Volume

1
0
2
0
0
0
0

178

0
0
1
1
0
0
0

552
0

413
214

1
0
0
0
1
0
0

141

1
0
0
1
0
0
0

401

0
0

269
0

North-South:
East-West:
SUM:

591
410
1001

VOLUME/CAPACITY (V/C) RATIO:

0.660

0.676

0.686

0.702

0.702

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.560

0.576

0.586

0.602

0.602

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-3:58 PM

0.016
NO

v/c after mitigation:


Fully mitigated?

0.016
N/A

CMA21

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA22

East-West Street:

Castle Heights Avenue


2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

245

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

64

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

199
41

75
218

964
38

9
721
90

2015

Ambient Growth: (%):

2016
2
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

No. of
Lanes

0
0
0
0
0
1
0
1
0
0
1
0
0
0
1
0
1
0
1
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

64

64

64

65

304

199

304

201

41

41

167

167

167

172

293

75

302

76

227

17

237

245

252

252

17

264

964

15

979

979

974

38

38

38

38

406

19

740

415

728

90

90

90

94

471
973
1444

North-South:
East-West:
SUM:

SB-WB--

1.0
AM
2
0
0
0
2
0

471
988
1459

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

65

65

307

201

41

1
0
0
1
0
0
0

172

172

313

76

246

1
0
1
0
1
0
0

264

271

974

15

989

38

38

1
0
1
1
0
0
0

411

19

747

94

94

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

479
983
1462

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

65

65

307

201

41

172

172

322

76

246

1
0
1
0
1
0
0

271

271

989

989

38

38

1
0
1
1
0
0
0

421

747

94

94

0
0
0
0
0
1
0
1
0
0
1
0
0
0

North-South:
East-West:
SUM:

479
998
1477

No. of
Lanes

Lane
Volume

65

0
0
0
0
0
1
0

307
0

1
0
0
1
0
0
0

172

1
0
1
0
1
0
0

271

1
0
1
1
0
0
0

322
0

989
38

421
94

North-South:
East-West:
SUM:

479
998
1477

VOLUME/CAPACITY (V/C) RATIO:

0.963

0.973

0.975

0.985

0.985

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.863

0.873

0.875

0.885

0.885

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-4:10 PM

0.010
NO

v/c after mitigation:


Fully mitigated?

0.010
N/A

CMA22

Level of Service Workheet


(Circular 212 Method)
I/S #:

North-South Street:

CMA22

East-West Street:

Castle Heights Avenue


2
0
0
0
2
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity
EXISTING CONDITION

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

32

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

247

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

45
23

75
244

850
44

15
464
76

2015

Ambient Growth: (%):

2016
2
0
SB-0
0
WB-2
0

Peak Hour:

Year of Count:
Projection Year:

National Boulevard

No. of
Lanes

0
0
0
0
0
1
0
1
0
0
1
0
0
0
1
0
1
0
1
0
0
1
0
1
1
0
0
0

North-South:
East-West:
SUM:

NB-EB--

0
0

EXISTING PLUS PROJECT

Lane
Volume

Project
Traffic

NB-EB--

0
0

FUTURE CONDITION W/O PROJECT

Total
Volume

Lane
Volume

Added
Volume

Total
Volume

32

32

32

32

100

45

100

45

23

23

167

167

167

174

319

75

322

76

247

29

275

247

253

253

29

278

850

12

862

862

859

44

44

44

44

15

15

15

15

270

470

273

469

76

76

76

82

351
865
1216

North-South:
East-West:
SUM:

SB-WB--

1.0
PM
2
0
0
0
2
0

354
877
1231

No. of
Lanes

6/24/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0
FUTURE CONDITION W/ PROJECT

Lane
Volume

Added
Volume

Total
Volume

32

32

100

45

23

1
0
0
1
0
0
0

174

174

351

76

278

1
0
1
0
1
0
0

278

284

858

12

871

44

44

1
0
1
1
0
0
0

15

15

276

475

82

82

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

383
873
1256

No. of
Lanes

FUTURE W/ PROJECT W/ MITIGATION

Lane
Volume

Added
Volume

Total
Volume

32

32

100

45

23

1
0
0
1
0
0
0

174

174

354

76

278

1
0
1
0
1
0
0

284

284

870

871

44

44

1
0
1
1
0
0
0

15

15

279

475

82

82

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

386
885
1271

No. of
Lanes

Lane
Volume

32

0
0
0
0
0
1
0

100
0

1
0
0
1
0
0
0

174

1
0
1
0
1
0
0

284

1
0
1
1
0
0
0

15

354
0

870
44

279
82

North-South:
East-West:
SUM:

386
885
1271

VOLUME/CAPACITY (V/C) RATIO:

0.811

0.821

0.837

0.847

0.847

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.711

0.721

0.737

0.747

0.747

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
6/24/2015-4:10 PM

0.010
NO

v/c after mitigation:


Fully mitigated?

0.010
N/A

CMA22

Table 7-1
PROJECT TRIP GENERATION [1]
22-Jan-14

LAND USE
Charter School (6-12) [3][4]
Less 15% Transit Use [5]
NET INCREASE

SIZE

DAILY
TRIP ENDS [2]
VOLUMES

840 Students

2,083
(312)
1,771

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

476

305

781

205

282

487

(71)

(46)

(117)

(31)

(42)

(73)

405

259

664

174

240

414

[1] Sources: ITE "Trip Generation", 9th Edition, 2012;


West Los Angeles Transportation Improvement and Mitigation Specific Plan (TIMP).
[2] Trips are one-way traffic movements, entering or leaving.
[3] ITE Land Use Code 536 (Private School K-12) trip generation average rates per number of students.
- Daily Trip Rate: 2.48 trips/student; 50% inbound and 50% outbound
- PM Peak Hour Trip Rate: 0.58 trips/student; 42% inbound/58% outbound
- AM Peak Hour directional distribution 61% inbound/39% outbound
[4] West Los Angeles TIMP Schools (a.m. rates) - Private School per student.
- AM Peak Hour Trip Rate: 0.93 trips/student
[5] A 15% transit use reduction applied based on the project site location within 1/3 mile of the Expo Line Palms station.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

Table 7-1
PROJECT TRIP GENERATION [1]
05-Mar-14

LAND USE
Proposed Project
Charter School (6-12) [3][4]

SIZE

DAILY
TRIP ENDS [2]
VOLUMES

840 Students

2,083

Less 15% Transit Use [5]

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

476

305

781

205

282

487

(312)

(71)

(46)

(117)

(31)

(42)

(73)

(1,107)

(91)

(17)

(108)

(68)

(40)

(108)

314

242

556

106

200

306

Prior Use
Adult School [6]
NET INCREASE

(900) Students

664

[1] Sources: ITE "Trip Generation", 9th Edition, 2012;


West Los Angeles Transportation Improvement and Mitigation Specific Plan (TIMP).
[2] Trips are one-way traffic movements, entering or leaving.
[3] ITE Land Use Code 536 (Private School K-12) trip generation average rates per number of students.
- Daily Trip Rate: 2.48 trips/student; 50% inbound and 50% outbound
- PM Peak Hour Trip Rate: 0.58 trips/student; 42% inbound/58% outbound
- AM Peak Hour directional distribution 61% inbound/39% outbound
[4] West Los Angeles TIMP Schools (a.m. rates) - Private School per student.
- AM Peak Hour Trip Rate: 0.93 trips/student
[5] A 15% transit use reduction applied based on the project site location within 1/3 mile of the Expo Line Palms station.
[6] ITE Land Use Code 540 (Junior/Community College) trip generation average rates per number of students.
- Daily Trip Rate: 1.23 trips/student; 50% inbound and 50% outbound
- AM Peak Hour Trip Rate: 0.12 trips/student; 84% inbound/16% outbound
- PM Peak Hour Trip Rate: 0.12 trips/student; 63% inbound/37% outbound

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

TRAFFIC STUDY - MEMORANDUM OF UNDERSTANDING (MOU)


This MOU acknowledges that the traffic study for the following project will be prepared in accordance
with the latest version of LADOT's Traffic Study Policies and Procedures:
Project Name:
Project Address:
Project Description:

City Charter School


3280 Motor Avenue
New Charter Middle/High School with a maximum student enrollment of 840
6th-12th grade students. See Figure 2-1, Site Plan

Geographic Distribution:
N
25%
S
25%
E
25%
W
25%
Attach graphic illustrating project distribution percentages [Figures 7-1, 7-2] at the studied intersections
Trip Generation Rate(s) ITE 9th Edition/Other ITE Trip Generation, 9th Edition, 2012; West LA TIMP
Attach trip generation table [Table 7-1] with a description of the proposed land uses, ITE rates, estimated
morning and afternoon peak hour volumes (ins/outs/totals), proposed trip credits, etc.

AM Trips
PM Trips

Project Buildout Year:


Related Projects:

In
405
174

Out
259
240

2015

Total
664
414

Ambient or CMP Growth Rate:

1.0 % Per Yr.

(to be researched by the consultant and approved by LADOT)

Subject to Freeway Impact Analysis Screening review:

YES

x NO

Study Intersections:
(Subject to LADOT revision after initial impact analysis), See Figure 1-1, Vicinity Map
1. Sepulveda Boulevard / National Boulevard

12. Motor Avenue / Pico Boulevard

2. Sepulveda Boulevard / Palms Boulevard

13. Motor Avenue / Manning Avenue

3. Westwood Boulevard / National Boulevard

14. Motor Avenue / National Boulevard

4. Overland Avenue / Pico Boulevard

15. Motor Avenue / Palms Boulevard

5. Overland Avenue /

16. Motor Avenue / Tabor Street

I-10 WB On-Off Ramp-National Boulevard

17. Motor Avenue / Regent Street

6. Overland Avenue / I-10 EB On-Ramp

18. Motor Avenue / Venice Boulevard

7. Overland Avenue / National Place-National Boulevard

19. Motor Avenue / Washington Boulevard

8. Overland Avenue / Palms Boulevard

20. Palms Boulevard-National Boulevard /

9. Overland Avenue / Venice Boulevard

National Boulevard-Exposition Boulevard

10. I-10 EB Off-Ramp / National Boulevard

21. National Boulevard /

11. National Boulevard-Mentone Avenue /

I-10 WB Off-Ramp-Manning Avenue

Rose Avenue-National Boulevard


Trip Credits:

22. Castle Heights Avenue / National Boulevard

(Exact amount of credit subject to approval by LADOT)


Yes

Transit Usage

No

Transportation Demand Management

Existing Active Land Use

Previous Land Use

Internal Trip

Pass-by Trip

Consultant
Linscott, Law & Greenspan, Engineers
20931 Burbank Boulevard, Suite C
Woodland Hills, CA 91367
Phone No. 818.835.8648
E-Mail
nguyen@llgengineers.com
Name
Address

Developer
The City School
11625 W. Pico Boulevard
Los Angeles, CA 90094
310.273.2489

Approved by:
2/4/2014

Consultant's Representative

Date

LADOT's Representative

Date

840 Students

SIZE

1,771

(312)

2,083

DAILY
TRIP ENDS [2]
VOLUMES

405

(71)

476

259

(46)

305

664

(117)

781

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

174

(31)

205

240

(42)

282

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

414

(73)

487

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

[1] Sources: ITE "Trip Generation", 9th Edition, 2012;


West Los Angeles Transportation Improvement and Mitigation Specific Plan (TIMP).
[2] Trips are one-way traffic movements, entering or leaving.
[3] ITE Land Use Code 536 (Private School K-12) trip generation average rates per number of students.
- Daily Trip Rate: 2.48 trips/student; 50% inbound and 50% outbound
- PM Peak Hour Trip Rate: 0.58 trips/student; 42% inbound/58% outbound
- AM Peak Hour directional distribution 61% inbound/39% outbound
[4] West Los Angeles TIMP Schools (a.m. rates) - Private School per student.
- AM Peak Hour Trip Rate: 0.93 trips/student
[5] A 15% transit use reduction applied based on the project site location within 1/3 mile of the Expo Line Palms station.

NET INCREASE

Less 15% Transit Use [5]

Charter School (6-12) [3][4]

LAND USE

22-Jan-14

Table 7-1
PROJECT TRIP GENERATION [1]