MSHEIREB DOWN TOWN DOHA PHASE 1B PROJECT PLANING SCHEDULE OF BALANCES SHOP DRAWING

TOTAL PENDING DWGS AS


PER LOG
SL.NO.

SERVICE

Revise and Resubmitt DRAWINGS(AS


PER SI / EI + RFI + SPECIALIST +
Requirements)

TOTAL NO OF DRAWINGS

OCT
Sub.Total

NS

Total

Submitted

24.10.2015

NOV

DEC

REMARKS

Week-3 Week-4 Week-1 Week-2 Week-3 Week-4 Week-1 Week-2 Week-3 Week-4

REMARKS

MECHANICAL

HVAC-DUCTING& PIPING

1345

58K

59

Kitchen

10

10

10

10

11

PLUMBING

1391

37K

46

To be Revied by Specialest

10

10

10

10

FIRE FIGHTING

401

To be Revied by Specialest

BUILDERS WORK

1013

11K

11

Solar BW

MEP CO-ORDINATION

537

6K

GENERAL MECHANICAL

60

4747

12

112

15

109

20

20

20

17

NO. OF DRAWINGS IN MECHANICAL

BMS-Specialist to be review and Stamp for approval

BMS-Specialist to be review and Stamp for approval 5+3+1

24

ELV
7

AUDIOVISUAL

180

FIRE ALRAM

509

34

30

64

Plan for new SI

BMS

363

47

32

79

Plan for new RFI

10

ICT

764

49

39

88

11

QTEL SERVICE

36

12

SECURITY

413

28

28

13

SECURITY( AS PER RFI)TO BE UPDAT

2265

160

101

262

24

NO.OF DRAWINGS ELV

1
0

Time estimation based on two drafsman. Drawing preparation and submission subject to
supplier input and stamping on time.

10

10

Time estimation based on one drafsman. Drawing preparation and submission subject to
supplier input and stamping on time. Approval of BMS PLC material submittal required.

10

10

10

10

10

10

10

10

Time estimation based on two drafsman. Drawing preparation and submission subject to
supplier input and stamping on time.

Time estimation based on one drafsman. Drawing preparation and submission subject to
supplier input and stamping on time.

32

29

29

29

29

29

31

30

10

10

10

10

12

Plan for new RFI

ELECTRICAL
14

CONTAINMENT

171

10

15

CSD(As per Furniture Layout)

134

26

16

KITCHEN LAYOUT

17

SMALL POWER

18

SMALL POWER EQUIPMENT

19

GENERAL ELECTRICAL & ELV

20

EMERGENCY LIGHTING

21

LIGHTING&LIGHTING CONTROL

22

LIGHT FITTING INSTALLALTION


DETAILS
ELECTRICAL ROOMS INSTALLATION
DETAILS

23
24

25

67

26 (M_I
Basement)

1170

76

20 M

12

143

15

15

694

52

19

40

111

10

10

12

22LS

22

34lc

34

0
0

EXTERNAL LANDSCAPE LIGHTING


CONTROL

0
0

12

88

Awaiting for Loads from Al Ansary


10

15

10

11

12

One dedicated draftsman.

12

14

14

14

13

2396

153

EXTERNAL CO-ORDINATION(ETA
RECIVING FROM CQBC REGULARLY)

3597

GRAND TOTAL

9408

325

AS BUILT DRAWINGS

6000

25

26

142

355

10

37

298

669

Time estimation based on one drafsman. Drawing preparation and submission subject to
supplier input and stamping on time.
One draftsman for dedicated work

26

35

30

31

33

72

72

59

62

63

No Of Electrical Drawings

8 MDB LOAD INFORMATION AWAITED FROM CQBC

27

43

42

31

40

10

10

10

10

40

85

105

101

90

Time estimation based on one electrical team drafsman. Drawing preparation and submission
subject to supplier input and stamping on time. Approved material required.

K=Kitchen, L = Lighting Control


Yet to Start after all Final Fix

M= MDB

Concerns

All Authority
Approvals to be
Obtain

Kahramaa-SS+MDB+Electrical Rooms+HV.Net work+11KV


Distribution+Transformer Plinth+CBS+UPS+Generator+Invertor+Storm
water+Potable water SC

Waqood

LS= Land Scape

QCD-FA+FF+Emmergency
Lighting+Battery Inverter+CFD
Analysis

MOI-CCTV

25-10-2015

Building & Basment

Impact & Non Impact

Services

IFC
Drawing No

Constructware
Item Number

ETA
Drawing
Reference

REV

PENDING DRAWINGS LOG FOR


Block Wise

Levels

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-1921

BP-1B-04-16003

CQB-ETA-CQ002-EPW-DRG-10925

02

BASEMENT I01 - LEVEL B2

SMALL POWER & EQUIPMENT ENLARGED PLANS SHEET 1 OF 2

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-1931

BP-1B-04-16004

CQB-ETA-CQ002-EPW-DRG-10926

02

BASEMENT I01 - LEVEL B1

SMALL POWER & EQUIPMENT ENLARGED PLANS SHEET 1 OF 4

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-1932

BP-1B-04-16005

CQB-ETA-CQ002-EPW-DRG-10927

02

BASEMENT I01 - LEVEL B1

173

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-1933

BP-1B-04-16006

CQB-ETA-CQ002-EPW-DRG-10928

02

BASEMENT I01 - LEVEL B1

192

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33446

CQB-ETA-CQ002-EPW-DRG-10979

01

193

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33447

CQB-ETA-CQ002-EPW-DRG-10980

194

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33448

195

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33449

Sl. No.

Super Block

I_01

I_01

Final Status

Final Date of
Submission

PLANNING
SUBMISSION TO
CONSULTANT

PLANNING
SUBMISSION TO
JBK / debbas

5225

3-Sep-15

19-Sep-15

5225

3-Sep-15

19-Sep-15

SMALL POWER & EQUIPMENT ENLARGED PLANS SHEET 2 OF 4

5225

3-Sep-15

SMALL POWER & EQUIPMENT ENLARGED PLANS SHEET 3 OF 4

5225

BASEMENT I01

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B1 ELECTRICAL


ROOM ENLARGED PLAN ( SHEET 2 OF 2 )

5225

01

BASEMENT I01

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B1 ELECTRICAL


ROOM ENLARGED PLAN ( SHEET 2 OF 6 )

CQB-ETA-CQ002-EPW-DRG-10981

01

BASEMENT I01

CQB-ETA-CQ002-EPW-DRG-10982

01

Area

Description

Package
No.

scope

FINAL STATUS (4P)

REMARK

15-Feb-15

U/R

C - SEPT 19 2015

15-Feb-15

U/R

C - SEPT 19 2015

19-Sep-15

15-Feb-15

U/R

C - SEPT 19 2015

3-Sep-15

19-Sep-15

15-Feb-15

U/R

C - SEPT 19 2015

9-Sep-15

21-Sep-15

17-Feb-15

U/R

C - SEPT 21 2015

5225

31-Oct-15

ETA

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B1 ELECTRICAL


ROOM ENLARGED PLAN ( SHEET 3 OF 6 )

5225

31-Oct-15

ETA

BASEMENT I01

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B1 ELECTRICAL


ROOM ENLARGED PLAN ( SHEET 4 OF 6 )

5225

31-Oct-15

ETA

5225

31-Oct-15

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

ETA

196

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33450

CQB-ETA-CQ002-EPW-DRG-10983

01

BASEMENT I01

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B1 ELECTRICAL


ROOM ENLARGED PLAN ( SHEET 5 OF 6 )

197

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33451

CQB-ETA-CQ002-EPW-DRG-10984

01

BASEMENT I01

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B1 ELECTRICAL


ROOM ENLARGED PLAN ( SHEET 6 OF 6 )

5225

31-Oct-15

198

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33452

CQB-ETA-CQ002-EPW-DRG-10985

01

BASEMENT I01

PHASE 1B - I01-SUPERBLOCK BASEMENT LEVEL B2 ELECTRICAL ROOM


ENLARGED PLAN (SHEET 2 OF 3)

5225

31-Oct-15

5225

31-Oct-15

200

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33454

CQB-ETA-CQ002-EPW-DRG-10987

01

BASEMENT I01

PHASE 1B - SUPERBLOCK I01 BASEMENT - LEVEL B2 ELECTRICAL ROOM


ENLARGED PLAN (SHEET 2 OF 3)

201

I_01

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33455

CQB-ETA-CQ002-EPW-DRG-10988

01

BASEMENT I01

PHASE 1B - SUPERBLOCK I01 BASEMENT - LEVEL B2 ELECTRICAL ROOM


ENLARGED PLAN (SHEET 3 OF 3)

5225

31-Oct-15

222

I_01

BASEMENTS

IMPACT

CONTAINMENT

P1B-DWG-I01-00-ETR-BMD-1146

BP-1B-04-30597

CQB-ETA-CQ002-EGN-DRG-10915

02

BASEMENT I01 - LEVEL B2

AREA 6

CABLE SCHEDULE FOR ELECTRICAL CONTAINMENT LAYOUT - AREA 6

5225

31-Oct-15

223

I_01

BASEMENTS

IMPACT

CONTAINMENT

P1B-DWG-I01-00-ETR-BMD-1146

BP-1B-04-30598

CQB-ETA-CQ002-EGN-DRG-10916

02

BASEMENT I01 - LEVEL B2

AREA 6

CABLE SCHEDULE FOR ELECTRICAL CONTAINMENT LAYOUT AREA 6

5225

31-Oct-15

240

I_01

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I01-00-ICT-BMD-5202

BP-1B-04-08501

CQB-ETA-CQ002-ETD-DRG-10925

00

BASEMENT I01

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - BUILDING I02

5825

28-10-2015

241

I_01

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I01-00-ICT-BMD-5203

BP-1B-04-08502

CQB-ETA-CQ002-ETD-DRG-10926

00

BASEMENT I01

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - BUILDING I08

5825

28-10-2015

242

I_01

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I01-00-ICT-BMD-5204

BP-1B-04-08503

CQB-ETA-CQ002-ETD-DRG-10927

00

BASEMENT I01

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - BUILDING I09

5825

28-10-2015

243

I_01

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I01-00-ICT-BMD-5205

BP-1B-04-08504

CQB-ETA-CQ002-ETD-DRG-10928

00

BASEMENT I01

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - BUILDING I12

5825

28-10-2015

244

I_01

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I01-00-ICT-BMD-5206

BP-1B-04-08505

CQB-ETA-CQ002-ETD-DRG-10929

00

BASEMENT I01

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - BUILDING I13

5825

28-10-2015

245

I_01

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I01-00-ICT-BMD-5207

BP-1B-04-08506

CQB-ETA-CQ002-ETD-DRG-10930

00

BASEMENT I01

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - BUILDING I14

5825

28-10-2015

5825

10-11-2015

5825

10-11-2015

PHASE 1B SUPER BLOCK I01 BASEMENT B1 ICT SERVICES ENLARGED


MDF ROOM FOR
BUILDING I13
PHASE 1B SUPER BLOCK I01 BASEMENT- B1 ICT SERVICES ENLARGED
VODAFONE ROOM FOR BUILDING I13

268

I_01

BASEMENTS

IMPACT

ICT SERVICES

CQB-ETA-CQ002-ETD-DRG-10953

00

BASEMENT I01

269

I_01

BASEMENTS

IMPACT

ICT SERVICES

CQB-ETA-CQ002-ETD-DRG-10954

00

BASEMENT I01

278

I_01

BASEMENTS

IMPACT

SECURITY

P1B-DWG-I01-00-SEC-BMD-6001

BP-1B-04-16471

CQB-ETA-CQ002-ESC-DRG-10921

00

BASEMENT I01

SECURITY DOOR SCHEDULE

5825

29-11-2015

324

I_01

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-04422

CQB-ETA-CQ002-EBM-DRG-10920

01

BASEMENT I01

BMS LAYOUT RISER DIAGRAM

5075

28-10-2015

325

I_01

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-04423

CQB-ETA-CQ002-EBM-DRG-10921

01

BASEMENT I01

BMS LAYOUT RISER DIAGRAMS

5075

28-10-2015

326

I_01

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-04752

CQB-ETA-CQ002-EBM-DRG-10922

01

BASEMENT I01

BMS LAYOUT RISER DIAGRAMS

5075

28-10-2015

327

I_01

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-04753

CQB-ETA-CQ002-EBM-DRG-10923

01

BASEMENT I01

BMS LAYOUT RISER DIAGRAMS

5075

28-10-2015

328

I_01

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-27078

CQB-ETA-CQ002-EBM-DRG-10925

00

BASEMENT I01

BMS LAYOUT CALCULATIONS

5075

28-10-2015

630

I_01

BUILDING - I_02

IMPACT

LIGHTING

P1B-DWG-I01-02-ELP-BMD-6001

BP-1B-04-15140

CQB-ETA-CQ002-ELI-DRG-02026

00

BUILDING I02

LIGHTING SCHEDULES SHEET 1

5475

With debbas

671

I_01

BUILDING - I_02

IMPACT

SECURITY

P1B-DWG-I01-02-SEC-BMD-5001

BP-1B-04-16436

CQB-ETA-CQ002-ESC-DRG-02019

01

BUILDING I02

SECURITY RISER DIAGRAMS

5825

29-11-2015

672

I_01

BUILDING - I_02

IMPACT

SECURITY

P1B-DWG-I01-02-SEC-BMD-6001

BP-1B-04-16437

CQB-ETA-CQ002-ESC-DRG-02020

00

BUILDING I02

SECURITY SCHEDULES

5825

802

I_01

BUILDING - I_08

IMPACT

BUILDERS WORKS

Err:512

BP-1B-04-32507

CQB-ETA-CQ002-BWD-DRG-08032

01

BUILDING I08 - ROOF LEVEL

PHASE 1B - SUPER BLOCK I01 BUILDING I08 LEVEL ROOF SOLAR


THERMAL PANEL PLINTH LAYOUT

5851

935

I_01

BUILDING - I_08

IMPACT

LIGHTING

P1B-DWG-I01-08-ELP-BMD-6001

BP-1B-04-15186

CQB-ETA-CQ002-ELI-DRG-08015

00

BUILDING I08

LIGHTING SCHEDULES SHEET 1

5475

950

I_01

BUILDING - I_08

IMPACT

ICT SERVICES

P1B-DWG-I01-08-ICT-BMD-1901

BP-1B-04-16604

CQB-ETA-CQ002-ETD-DRG-08013

00

BUILDING I08

ICT ENLARGED COMMUNICATION ROOMS

5825

964

I_01

BUILDING - I_08

IMPACT

SECURITY

P1B-DWG-I01-08-SEC-BMD-6001

BP-1B-04-16451

CQB-ETA-CQ002-ESC-DRG-08010

00

BUILDING I08

SECURITY SCHEDULES

5825

22-Jan-13

28-Feb-13

23-Aug-15

16-Sep-15

ETA

Material submittal Approved JBK to be review &resubmit

Material submittal Approved JBK to be review &resubmit

Material submittal Approved JBK to be review &resubmit

Material submittal Approved JBK to be review &resubmit

Material submittal Approved JBK to be review &resubmit


Under review with debbas
ETA
Awating for MOI Regulation Approval

ETA

Withdebbas

Under review with debbas

10-11-2015

11-11-2015

ETA
C 4P FILE IS ETD 08010

CQB-ETA-CQ002-MDW-DRG-09071

00

BUILDING I09

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B3 AREA 4 SOLAR


THERMAL TANK ROOM I09 EQUIPMENT LAYOUT

5600

U/R

C - SEPT 16 2015

CQB-ETA-CQ002-ELI-DRG-09026

00

BUILDING I09

LIGHTING SCHEDULES SHEET 1

5475

With debbas

Under review with debbas

BP-1B-04-15201

CQB-ETA-CQ002-ELI-DRG-09028

00

BUILDING I09

LIGHTING SCHEDULES SHEET 3

5475

With debbas

Under review with debbas

BP-1B-04-16613

CQB-ETA-CQ002-ETD-DRG-09024

00

BUILDING I09

ICT ENLARGED PLAN MAJLIS AREA

5825

10-11-2015

P1B-DWG-I01-09-SEC-BMD-6001

BP-1B-04-16453

CQB-ETA-CQ002-ESC-DRG-09013

00

BUILDING I09

SECURITY SCHEDULES

5825

BMS

Err:512

BP-1B-04-26909

CQB-ETA-CQ002-EBM-DRG-09020

01

BUILDING I09 - LEVEL 04

AREA A

BMS SERVICE LAYOUT - AREA A

5075

5-Sep-15

BMS

Err:512

BP-1B-04-26910

CQB-ETA-CQ002-EBM-DRG-09021

01

BUILDING I09 - LEVEL 04

AREA B

BMS SERVICE LAYOUT - AREA B

5075

5-Sep-15

NON-IMPACT

BMS

Err:512

BP-1B-04-26911

CQB-ETA-CQ002-EBM-DRG-09022

01

BUILDING I09 - LEVEL 04

AREA C

BMS SERVICE LAYOUT - AREA C

5075

BUILDING - I_09

NON-IMPACT

BMS

Err:512

BP-1B-04-26912

CQB-ETA-CQ002-EBM-DRG-09023

01

BUILDING I09 - LEVEL 04

AREA D

BMS SERVICE LAYOUT - AREA D

5075

BUILDING - I_12

IMPACT

LIGHTING

P1B-DWG-I01-12-ELP-BMD-6001

BP-1B-04-15233

CQB-ETA-CQ002-ELI-DRG-12011

00

BUILDING I12

LIGHTING SCHEDULES SHEET 1

5475

I_01

BUILDING - I_12

IMPACT

LIGHTING

P1B-DWG-I01-12-ELP-BMD-6002

BP-1B-04-15234

CQB-ETA-CQ002-ELI-DRG-12012

00

BUILDING I12

LIGHTING SCHEDULES SHEET 2

I_01

BUILDING - I_12

IMPACT

LIGHTING

P1B-DWG-I01-12-ELP-BMD-6003

BP-1B-04-15235

CQB-ETA-CQ002-ELI-DRG-12013

00

BUILDING I12

LIGHTING SCHEDULES SHEET 3

1585

I_01

BUILDING - I_12

IMPACT

ICT SERVICES

P1B-DWG-I01-12-ICT-BMD-1901

BP-1B-04-03782

CQB-ETA-CQ002-ETD-DRG-12009

00

BUILDING I12

1598

I_01

BUILDING - I_12

IMPACT

SECURITY

P1B-DWG-I01-12-SEC-BMD-6001

BP-1B-04-03435

CQB-ETA-CQ002-ESC-DRG-12010

00

1626

I_01

BUILDING - I_12

IMPACT

BMS

Err:512

BP-1B-04-04419

CQB-ETA-CQ002-EBM-DRG-12009

1627

I_01

BUILDING - I_12

IMPACT

BMS

Err:512

BP-1B-04-04420

CQB-ETA-CQ002-EBM-DRG-12010

1628

I_01

BUILDING - I_12

IMPACT

BMS

Err:512

BP-1B-04-04421

1757

I_01

BUILDING - I_13

IMPACT

LIGHTING

P1B-DWG-I01-13-ELP-BMD-6001

1758

I_01

BUILDING - I_13

IMPACT

LIGHTING

1772

I_01

BUILDING - I_13

IMPACT

1785

I_01

BUILDING - I_13

1812

I_01

1813

I_01

1924

I_01

1937

1216

I_01

BUILDING - I_09

IMPACT

PLUMBING

1298

I_01

BUILDING - I_09

IMPACT

LIGHTING

P1B-DWG-I01-09-ELP-BMD-6001

BP-1B-04-15199

1300

I_01

BUILDING - I_09

IMPACT

LIGHTING

P1B-DWG-I01-09-ELP-BMD-6003

1327

I_01

BUILDING - I_09

IMPACT

ICT SERVICES

P1B-DWG-I01-09-ICT-BMD-1901

1345

I_01

BUILDING - I_09

IMPACT

SECURITY

1406

I_01

BUILDING - I_09

NON-IMPACT

1407

I_01

BUILDING - I_09

NON-IMPACT

1408

I_01

BUILDING - I_09

1409

I_01

1569

I_01

1570
1571

ETA

Awating for MOI Regulation Approval

26-10-2015

ETA

26-10-2015

ETA

5-Sep-15

26-10-2015

ETA

5-Sep-15

26-10-2015

ETA

With debbas

Under review with debbas

5475

With debbas

Under review with debbas

5475

With debbas

Under review with debbas

ICT ENLARGED COMMUNICATION ROOMS

5825

10-11-2015

BUILDING I12

SECURITY SCHEDULES

5825

00

BUILDING I12

PHASE 1B BUILDING I12 BMS LAYOUT RISER DIAGRAMS

5075

28-10-2015

00

BUILDING I12

PHASE 1B BUILDING I12 BMS LAYOUT RISER DIAGRAMS

5075

28-10-2015

CQB-ETA-CQ002-EBM-DRG-12011

00

BUILDING I12

PHASE 1B BUILDING I12 BMS LAYOUT RISER DIAGRAMS

5075

28-10-2015

BP-1B-04-15238

CQB-ETA-CQ002-ELI-DRG-13011

00

BUILDING I13

LIGHTING SCHEDULES SHEET 01

5475

With debbas

Under review with debbas

P1B-DWG-I01-13-ELP-BMD-6002

BP-1B-04-15239

CQB-ETA-CQ002-ELI-DRG-13012

00

BUILDING I13

LIGHTING SCHEDULES SHEET 02

5475

With debbas

Under review with debbas

ICT SERVICES

P1B-DWG-I01-13-ICT-BMD-1901

BP-1B-04-03664

CQB-ETA-CQ002-ETD-DRG-13009

01

BUILDING I13

ICT ENLARGED COMMUNICATION ROOMS

5825

10-11-2015

IMPACT

SECURITY

P1B-DWG-I01-13-SEC-BMD-6001

BP-1B-04-03437

CQB-ETA-CQ002-ESC-DRG-13010

00

BUILDING I13

SECURITY SCHEDULES

5825

BUILDING - I_13

IMPACT

BMS

Err:512

BP-1B-04-04424

CQB-ETA-CQ002-EBM-DRG-13009

00

BUILDING I13

BMS LAYOUT RISER DIAGRAMS

5075

31-10-2015

BUILDING - I_13

IMPACT

BMS

Err:512

BP-1B-04-26931

CQB-ETA-CQ002-EBM-DRG-13010

00

BUILDING I13

BMS LAYOUT SCHEDULES

5075

31-10-2015

BUILDING - I_14

IMPACT

LIGHTING

P1B-DWG-I01-14-ELP-BMD-6001

BP-1B-04-15242

CQB-ETA-CQ002-ELI-DRG-14009

00

BUILDING I14

LIGHTING SCHEDULES

5475

With debbas

I_01

BUILDING - I_14

IMPACT

ICT SERVICES

P1B-DWG-I01-14-ICT-BMD-1901

BP-1B-04-03670

CQB-ETA-CQ002-ETD-DRG-14008

00

BUILDING I14

ICT ENLARGED COMMUNICATION ROOMS

5825

17-11-2015

1948

I_01

BUILDING - I_14

IMPACT

SECURITY

P1B-DWG-I01-14-SEC-BMD-6001

BP-1B-04-03780

CQB-ETA-CQ002-ESC-DRG-14009

00

BUILDING I14

SECURITY SCHEDULES

5825

1958

I_01

BUILDING - I_14

IMPACT

FIRE ALRAM

P1B-DWG-I01-14-FFA-BMD-5001

BP-1B-04-03482

CQB-ETA-CQ002-EFA-DRG-14009

00

BUILDING I14

FIRE ALARM RISER DIAGRAMS

5300

1967

I_01

BUILDING - I_14

IMPACT

BMS

Err:512

BP-1B-04-26932

CQB-ETA-CQ002-EBM-DRG-14009

00

BUILDING I14

BMS LAYOUT SCHEDULES

5075

2171

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-1952

BP-1B-04-16008

CQB-ETA-CQ002-EPW-DRG-10930

02

BASEMENT I01 - LEVEL B2

SMALL POWER & EQUIPMENT ENLARGED PLANS (SHEET 2 OF 2)

5225

2173

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-4001

BP-1B-04-16010

CQB-ETA-CQ002-EPW-DRG-10932

00

BASEMENT I01

WATER COLLECTION AND TREATMENT POWER DETAILS

5225

BMS

2174

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-5001

BP-1B-04-16011

CQB-ETA-CQ002-EPW-DRG-10933

00

BASEMENT I01

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 1 OF 4

5225

BMS

2175

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-5002

BP-1B-04-16012

CQB-ETA-CQ002-EPW-DRG-10934

00

BASEMENT I01

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 2 OF 4

5225

BMS

2176

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-5003

BP-1B-04-16013

CQB-ETA-CQ002-EPW-DRG-10935

00

BASEMENT I01

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS

5225

2177

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-5004

BP-1B-04-16014

CQB-ETA-CQ002-EPW-DRG-10936

00

BASEMENT I01

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 4 OF 4

2178

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-6001

BP-1B-04-16015

CQB-ETA-CQ002-EPW-DRG-10937

00

BASEMENT I01

2179

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EPP-BMD-6002

BP-1B-04-16016

CQB-ETA-CQ002-EPW-DRG-10938

00

2189

I_01

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I01-00-EDG-BMD-1013

BP-1B-04-16021

CQB-ETA-CQ002-EPW-DRG-10949

05

ETA
Awating for MOI Regulation Approval
Material submittal Approved JBK to be review &resubmit
Material submittal Approved JBK to be review &resubmit
Material submittal Approved JBK to be review &resubmit

ETA
Awating for MOI Regulation Approval
Material submittal Approved JBK to be review &resubmit
Material submittal Approved JBK to be review &resubmit
Under review with debbas
ETA
Awating for MOI Regulation Approval

14-Nov-12

U/R

31-10-2015

15-Feb-15

U/R

C - SEPT 21 2015

JBK STAMP REQUIRED ( Action by NAZMODDIN)

JBK STAMP REQUIRED ( Action by NAZMODDIN)

JBK STAMP REQUIRED ( Action by NAZMODDIN)

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

WATER COLLECTION AND TREATMENT I/O SCHEDULES SHEET 1 OF 2

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

BASEMENT I01

WATER COLLECTION AND TREATMENT I/O SCHEDULES SHEET 2 OF 2

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

BASEMENT I01

ELECTRICAL SERVICES MDB-0I1-3 SCHEMATIC DIAGRAM

5225

ETA

5-Jul-12

9-Sep-15

25-Oct-15

12-Nov-12

21-Sep-15

NO SUBMISSION OF HARD COPY


Material submittal Approved JBK to be review &resubmit

2227

I_01

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-I01-00-ELP-BMD-5001

BP-1B-04-15215

CQB-ETA-CQ002-ELI-DRG-10920

00

BASEMENT I01

OVERALL LIGHTING CONTROL RISER DIAGRAM

5475

2228

I_01

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-I01-00-ELP-BMD-5101

BP-1B-04-15216

CQB-ETA-CQ002-ELI-DRG-10921

00

BASEMENT I01

LIGHTING CONTROL DIAGRAMS

5475

Need debbas input

2235

I_01

BASEMENTS

NON-IMPACT

LIGHTING

P1B-DWG-I01-00-ELP-BMD-6025

BP-1B-04-15228

CQB-ETA-CQ002-ELI-DRG-10933

00

BASEMENT I01

LIGHTING LCP SCHEDULES SHEET 12

5475

As per Bullitin 45- LSDB

2236

I_01

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-I01-00-ELP-BMD-6026

BP-1B-04-15229

CQB-ETA-CQ002-ELI-DRG-10934

00

BASEMENT I01

LIGHTING LCP SCHEDULES SHEET 13

5475

As per Bullitin 45- LSDB

2241

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-00-LAN-EL-001

Err:512

CQB-ETA-CQ002-ELI-DRG-10939

00

BASEMENT I01

LAND SCAPE LIGHTING POWER LAYOUT

5475

NS

N/S

Lighting control supplier not conformed

2242

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-00-LAN-EL-002

Err:512

CQB-ETA-CQ002-ELI-DRG-10940

00

BASEMENT I01

LAND SCAPE LIGHTING ELECTRICAL TYPICAL DETAILS

5475

NS

N/S

Lighting control supplier not conformed

2243

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-10I-00-LAN-EL-10I

Err:512

CQB-ETA-CQ002-ELI-DRG-10941

00

BASEMENT I01

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-1

5475

NS

N/S

Lighting control supplier not conformed

2244

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-10I-00-LAN-EL-102

Err:512

CQB-ETA-CQ002-ELI-DRG-10942

00

BASEMENT I01

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-2

5475

NS

N/S

Lighting control supplier not conformed

2245

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-10I-00-LAN-EL-103

Err:512

CQB-ETA-CQ002-ELI-DRG-10943

00

BASEMENT I01

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-3

5475

NS

N/S

Lighting control supplier not conformed

2246

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-10I-00-LAN-EL-104

Err:512

CQB-ETA-CQ002-ELI-DRG-10944

00

BASEMENT I01

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-4

5475

NS

N/S

Lighting control supplier not conformed

2247

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-10I-00-LAN-EL-105

Err:512

CQB-ETA-CQ002-ELI-DRG-10945

00

BASEMENT I01

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-5

5475

NS

N/S

Lighting control supplier not conformed

2248

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-10I-00-LAN-EL-106

Err:512

CQB-ETA-CQ002-ELI-DRG-10946

00

BASEMENT I01

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-6

5475

NS

N/S

Lighting control supplier not conformed

2249

I_01

BASEMENTS

IMPACT

LIGHTING

7409-B-10I-00-LAN-EL-107

Err:512

CQB-ETA-CQ002-ELI-DRG-10947

00

BASEMENT I01

LAND SCAPE LIGHTING LOAD SCHEDULE

5475

NS

N/S

Lighting control supplier not conformed

2256

I_01

BASEMENTS

IMPACT

LIGHTING

Err:512

CQB-ETA-CQ002-ELI-DRG-10054

00

BASEMENT I01

PHASE -1B LANDSCAPE LIGHTING CIRCUIT LAYOUT SHEET-7

5475

Lighting control supplier not conformed

2293

I_01

BASEMENTS

IMPACT

SECURITY

P1B-DWG-I01-00-SEC-BMD-6002

BP-1B-04-16472

CQB-ETA-CQ002-ESC-DRG-10922

00

BASEMENT I01

SECURITY CAMERA SCHEDULE

5825

Awating for MOI Regulation Approval

2301

I_01

BASEMENTS

IMPACT

FIRE ALRAM

Err:512

BP-1B-04-14921

CQB-ETA-CQ002-EFA-DRG-10930

00

BASEMENT I01

FIRE ALARM CALCULATIONS SHEET 2 OF 2

5300

2332

I_01

BUILDING - I_02

IMPACT

LIGHTING

P1B-DWG-I01-02-ELP-BMD-5001

BP-1B-04-26747

CQB-ETA-CQ002-ELI-DRG-02024

00

BUILDING I02

LIGHTING CONTROL DIAGRAMS PUBLIC

5475

2333

I_01

BUILDING - I_02

IMPACT

LIGHTING

P1B-DWG-I01-02-ELP-BMD-5002

BP-1B-04-26748

CQB-ETA-CQ002-ELI-DRG-02025

00

BUILDING I02

LIGHTING CONTROL DIAGRAMS RESIDENTIAL

5475

2334

I_01

BUILDING - I_02

IMPACT

LIGHTING

P1B-DWG-I01-02-ELP-BMD-6002

BP-1B-04-15141

CQB-ETA-CQ002-ELI-DRG-02027

00

BUILDING I02

LIGHTING SCHEDULES SHEET 2

5475

2339

I_01

BUILDING - I_02

IMPACT

FIRE ALRAM

P1B-DWG-I01-02-FFA-BMD-4001

BP-1B-04-14853

CQB-ETA-CQ002-EFA-DRG-02024

02

BUILDING I02

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAILS

2343

I_01

BUILDING - I_02

IMPACT

BMS

Err:512

BP-1B-04-27345

CQB-ETA-CQ002-EBM-DRG-02028

00

BMS RISER DIAGRAMS

2344

I_01

BUILDING - I_02

IMPACT

BMS

Err:512

BP-1B-04-27346

CQB-ETA-CQ002-EBM-DRG-02029

00

2345

I_01

BUILDING - I_02

IMPACT

BMS

Err:512

BP-1B-04-27347

CQB-ETA-CQ002-EBM-DRG-02030

00

2360

I_01

BUILDING - I_08

IMPACT

PLUMBING

2375

I_01

BUILDING - I_08

IMPACT

SMALL POWER

P1B-DWG-I01-08-EEP-BMD-5001

2376

I_01

BUILDING - I_08

IMPACT

LIGHTING

2377

I_01

BUILDING - I_08

IMPACT

LIGHTING

2384

I_01

BUILDING - I_08

IMPACT

FIRE ALRAM

2388

I_01

BUILDING - I_08

IMPACT

FIRE ALRAM

2392

I_01

BUILDING - I_08

IMPACT

2393

I_01

BUILDING - I_08

2394

I_01

BUILDING - I_08

2415

I_01

2424

I_01

2425

I_01

2426

With debbas

29-10-2015

With Debbas

Under review with debbas

ETA

Need debbas input

Need debbas input

Under review with debbas

5300

PHASE 1B SUPERBLOCK I01 BUILDING I02 BMS RISER DIAGRAMS

BUILDING I02

3-11-15

C
C

BMS SCHEDULES SHEET - 01

PHASE 1B SUPERBLOCK I01 BUILDING I02 BMS SCHEDULES SHEET - 01

BUILDING I02

3-11-15

BMS SCHEDULES SHEET - 02

PHASE 1B SUPERBLOCK I01 BUILDING I02 BMS SCHEDULES SHEET - 02

BUILDING I02

3-11-15

PHASE 1B - SUPER BLOCK I01 BASEMENT I01 - LEVEL B3 AREA 3 SOLAR


TANK ROOM I08 EQUIPMENT LAYOUT

5600

23-Aug-15
25-Oct-15

U/R

Material submittal not done ( Action by JBK)


Material submittal Approved (JBK to be review &resubmit)
Material submittal Approved (JBK to be review &resubmit)
Material submittal Approved (JBK to be review &resubmit)

CQB-ETA-CQ002-MDW-DRG-08038

00

BUILDING I08 - LEVEL 06

BP-1B-04-15378

CQB-ETA-CQ002-ELP-DRG-08026

02

BUILDING I08

EARTHING RISER DIAGRAMS

5225

P1B-DWG-I01-08-ELP-BMD-5001

BP-1B-04-26749

CQB-ETA-CQ002-ELI-DRG-08013

00

BUILDING I08

LIGHTING CONTROL DIAGRAMS PUBLIC

5475

P1B-DWG-I01-08-ELP-BMD-5002

BP-1B-04-26750

CQB-ETA-CQ002-ELI-DRG-08014

00

BUILDING I08

LIGHTING CONTROL DIAGRAMS RESIDENTIAL

5475

Need debbas input

P1B-DWG-I01-08-FFA-BMD-4001

BP-1B-04-14883

CQB-ETA-CQ002-EFA-DRG-08013

01

BUILDING I08

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAIL

5300

Material submittal not done ( Action by JBK)

CQB-ETA-CQ002-EFA-DRG-08020

00

BUILDING I08

PHASE 1B SUPER BLOCK- I01 BUILDING I08 FIRE ALARM MIMIC PANEL
DIAGRAM

5300

BMS

Err:512

BP-1B-04-27348

CQB-ETA-CQ002-EBM-DRG-08012

00

BUILDING I08

BMS RISER DIAGRAMS

5075

3-11-15

IMPACT

BMS

Err:512

BP-1B-04-27349

CQB-ETA-CQ002-EBM-DRG-08013

00

BUILDING I08

BMS SCHEDULES SHEET - 01

5075

3-11-15

IMPACT

BMS

Err:512

BP-1B-04-27350

CQB-ETA-CQ002-EBM-DRG-08014

00

BUILDING I08

BMS SCHEDULES SHEET - 02

5075

3-11-15

BUILDING - I_09

IMPACT

SMALL POWER

P1B-DWG-I01-09-EDG-BMD-6011

BP-1B-04-15936

CQB-ETA-CQ002-EPW-DRG-09030

02

BUILDING I09

STANDBY DISTRIBUTION BOARD SCHEDULES

5225

26-Oct-15

BUILDING - I_09

IMPACT

SMALL POWER

P1B-DWG-I01-09-EEP-BMD-5001

BP-1B-04-15386

CQB-ETA-CQ002-ELP-DRG-09035

02

BUILDING I09

EARTHING RISER DIAGRAMS

5225

27-Oct-15

BUILDING - I_09

IMPACT

LIGHTING

P1B-DWG-I01-09-ELP-BMD-5001

BP-1B-04-26751

CQB-ETA-CQ002-ELI-DRG-09024

00

BUILDING I09

LIGHTING CONTROL DIAGRAMS PUBLIC

5475

I_01

BUILDING - I_09

IMPACT

LIGHTING

P1B-DWG-I01-09-ELP-BMD-5002

BP-1B-04-26752

CQB-ETA-CQ002-ELI-DRG-09025

00

BUILDING I09

LIGHTING CONTROL DIAGRAMS RESIDENTIAL

5475

Need debbas input

2433

I_01

BUILDING - I_09

IMPACT

FIRE ALRAM

CQB-ETA-CQ002-EFA-DRG-09030

00

BUILDING I09

PHASE 1B SUPER BLOCK I01 BUILDING I09 FIRE ALARM MIMIC PANEL
DIAGRAM

5300

Material submittal not done ( Action by JBK)

2437

I_01

BUILDING - I_09

IMPACT

BMS

Err:512

BP-1B-04-27351

CQB-ETA-CQ002-EBM-DRG-09024

00

BUILDING I09

BMS RISER DIAGRAMS

5075

7-11-2015

2438

I_01

BUILDING - I_09

IMPACT

BMS

Err:512

BP-1B-04-27352

CQB-ETA-CQ002-EBM-DRG-09025

00

BUILDING I09

I09 BMS SCHEDULES SHEET - 01

5075

7-11-2015

2439

I_01

BUILDING - I_09

IMPACT

BMS

Err:512

BP-1B-04-27353

CQB-ETA-CQ002-EBM-DRG-09026

00

BUILDING I09

I09 BMS SCHEDULES SHEET - 02

5075

7-11-2015

2456

I_01

BUILDING - I_12

IMPACT

LIGHTING

P1B-DWG-I01-12-ELP-BMD-5001

BP-1B-04-15231

CQB-ETA-CQ002-ELI-DRG-12009

00

BUILDING I12

LIGHTING CONTROL DIAGRAMS PUBLIC

5475

2457

I_01

BUILDING - I_12

IMPACT

LIGHTING

P1B-DWG-I01-12-ELP-BMD-5002

BP-1B-04-15232

CQB-ETA-CQ002-ELI-DRG-12010

00

BUILDING I12

LIGHTING CONTROL DIAGRAMS

5475

Need debbas input

2467

I_01

BUILDING - I_12

IMPACT

FIRE ALRAM

P1B-DWG-I01-12-FFA-BMD-4001

BP-1B-04-14922

CQB-ETA-CQ002-EFA-DRG-12010

01

BUILDING I12

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAILS

5300

Material submittal not done ( Action by JBK)

2479

I_01

BUILDING - I_12

IMPACT

FIRE ALRAM

CQB-ETA-CQ002-EFA-DRG-12025

00

BUILDING I12

PHASE 1B SUPER BLOCK I01 BUILDING-I12 FIRE ALARM MIMIC PANEL


DIAGRAM

5300

Material submittal not done ( Action by JBK)

2489

I_01

BUILDING - I_13

IMPACT

SMALL POWER

P1B-DWG-I01-13-EEP-BMD-5001

BP-1B-04-23052

CQB-ETA-CQ002-ELP-DRG-13017

01

BUILDING I13

EARTHING RISER DIAGRAMS

5225

2490

I_01

BUILDING - I_13

IMPACT

LIGHTING

P1B-DWG-I01-13-ELP-BMD-5001

BP-1B-04-26753

CQB-ETA-CQ002-ELI-DRG-13009

00

BUILDING I13

LIGHTING CONTROL DIAGRAMS PUBLIC

5475

Need debbas input

2491

I_01

BUILDING - I_13

IMPACT

LIGHTING

P1B-DWG-I01-13-ELP-BMD-5002

BP-1B-04-26754

CQB-ETA-CQ002-ELI-DRG-13010

00

BUILDING I13

LIGHTING CONTROL DIAGRAMS RESIDENTIAL

5475

Need debbas input

2492

I_01

BUILDING - I_13

IMPACT

ICT SERVICES

P1B-DWG-I01-13-ICT-BMD-5004

BP-1B-04-03668

CQB-ETA-CQ002-ETD-DRG-13013

00

BUILDING I13

ICT RISER DIAGRAMS

5825

17-11-2015

2493

I_01

BUILDING - I_13

IMPACT

ICT SERVICES

P1B-DWG-I01-13-ICT-BMD-5005

BP-1B-04-03669

CQB-ETA-CQ002-ETD-DRG-13014

00

BUILDING I13

ICT RISER DIAGRAMS

5825

17-11-2015

2494

I_01

BUILDING - I_13

IMPACT

SECURITY

P1B-DWG-I01-13-SEC-BMD-5001

BP-1B-04-03436

CQB-ETA-CQ002-ESC-DRG-13009

01

BUILDING I13

SECURITY RISER DIAGRAMS

5825

29-11-2015

ETA

2495

I_01

BUILDING - I_13

IMPACT

FIRE ALRAM

P1B-DWG-I01-13-FFA-BMD-4001

BP-1B-04-03476

CQB-ETA-CQ002-EFA-DRG-13009

01

BUILDING I13

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAIL

5300

Material submittal not done ( Action by JBK)

2498

I_01

BUILDING - I_13

IMPACT

FIRE ALRAM

CQB-ETA-CQ002-EFA-DRG-13015

00

BUILDING I13

PHASE 1B SUPER BLOCK-I01 BUILDING I13 FIRE ALARM MIMIC PANEL


DIAGRAM

5300

Material submittal not done ( Action by JBK)

2508

I_01

BUILDING - I_14

IMPACT

SMALL POWER

P1B-DWG-I01-14-EEP-BMD-5001

BP-1B-04-23053

CQB-ETA-CQ002-ELP-DRG-14014

01

BUILDING I14

EARTHING RISER DIAGRAMS

5225

2509

I_01

BUILDING - I_14

IMPACT

LIGHTING

P1B-DWG-I01-14-ELP-BMD-5001

BP-1B-04-26755

CQB-ETA-CQ002-ELI-DRG-14008

00

BUILDING I14

LIGHTING CONTROL DIAGRAMS

5475

2512

I_01

BUILDING - I_14

IMPACT

ICT SERVICES

P1B-DWG-I01-14-ICT-BMD-5004

BP-1B-04-06140

CQB-ETA-CQ002-ETD-DRG-14013

00

BUILDING I14

ICT RISER DIAGRAMS

5825

2517

I_01

BUILDING - I_14

IMPACT

FIRE ALRAM

P1B-DWG-I01-14-FFA-BMD-4001

BP-1B-04-03481

CQB-ETA-CQ002-EFA-DRG-14008

01

BUILDING I14

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAIL

5300

2520

I_01

BUILDING - I_14

NON-IMPACT

FIRE ALRAM

CQB-ETA-CQ002-EFA-DRG-14012

00

BUILDING I14

PHASE 1B SUPER BLOCK-I01 BUILDING-I14 FIRE ALARM MIMIC PANEL


DIAGRAM

5300

2521

I_01

BUILDING - I_14

NON-IMPACT

BMS

Err:512

BP-1B-04-04754

CQB-ETA-CQ002-EBM-DRG-14008

00

BUILDING I14

BMS LAYOUT RISER DIAGRAMS

5075

2703

I_02

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33806

CQB-ETA-CQ002-EPW-DRG-20065

01

BASEMENT I02 - LEVEL B1

PHASE 1B - SUPERBLOCK I02 , BASEMENT-3 ELECTRICAL ROOM ENLARGED


PLAN (SHEET 3 OF 3)

5225

2-Nov-15

ETA

2706

I_02

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33809

CQB-ETA-CQ002-EPW-DRG-20068

01

BASEMENT I02 - LEVEL B1

PHASE 1B - SUPERBLOCK I02 BASEMENT - LEVEL B1 ELECTRICAL ROOM


ENLARGED PLAN (SHEET 2 OF 3)

5225

2-Nov-15

ETA

2707

I_02

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-33810

CQB-ETA-CQ002-EPW-DRG-20069

01

BASEMENT I02 - LEVEL B1

PHASE 1B - SUPERBLOCK I02 BASEMENT - LEVEL B1 ELECTRICAL ROOM


ENLARGED PLAN (SHEET 3 OF 3)

5225

2-Nov-15

ETA

2751

I_02

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I02-00-ICT-BMD-5202

BP-1B-04-05876

CQB-ETA-CQ002-ETD-DRG-20026

00

BASEMENT I02

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - I21

5825

17-11-2015

2752

I_02

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I02-00-ICT-BMD-5203

BP-1B-04-05877

CQB-ETA-CQ002-ETD-DRG-20027

00

BASEMENT I02

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - I22

5825

17-11-2015

2756

I_02

BASEMENTS

IMPACT

SECURITY

P1B-DWG-I02-00-SEC-BMD-6001

BP-1B-04-08129

CQB-ETA-CQ002-ESC-DRG-20019

00

BASEMENT I02

SECURITY DOOR SCHEDULE SHEET 1 OF 2

5825

2779

I_02

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-06722

CQB-ETA-CQ002-EBM-DRG-20003

01

BASEMENT I02 - LEVEL B3

AREA 4

BMS LAYOUT PLAN - AREA 4

5075

6-Sep-15

2780

I_02

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-06724

CQB-ETA-CQ002-EBM-DRG-20005

01

BASEMENT I02 - LEVEL B3

AREA 6

BMS LAYOUT PLAN - AREA 6

5075

6-Sep-15

2781

I_02

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-06743

CQB-ETA-CQ002-EBM-DRG-20008

01

BASEMENT I02 - LEVEL B2

AREA 3

BMS LAYOUT PLAN - AREA 3

5075

2782

I_02

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-06744

CQB-ETA-CQ002-EBM-DRG-20009

01

BASEMENT I02 - LEVEL B2

AREA 4

BMS LAYOUT PLAN - AREA 4

5075

2783

I_02

BASEMENTS

IMPACT

BMS

Err:512

BP-1B-04-06746

CQB-ETA-CQ002-EBM-DRG-20011

01

BASEMENT I02 - LEVEL B2

AREA 6

BMS LAYOUT PLAN - AREA 6

3147

I_02

BUILDING - I_21

IMPACT

LIGHTING

P1B-DWG-I02-21-ELP-BMD-6001

BP-1B-04-15313

CQB-ETA-CQ002-ELI-DRG-21034

00

BUILDING I21

3188

I_02

BUILDING - I_21

IMPACT

ICT SERVICES

P1B-DWG-I02-21-ICT-BMD-1902

Err:512

CQB-ETA-CQ002-ETD-DRG-21032

00

3189

I_02

BUILDING - I_21

IMPACT

ICT SERVICES

P1B-DWG-I02-21-ICT-BMD-1903

Err:512

CQB-ETA-CQ002-ETD-DRG-21033

00

3226

I_02

BUILDING - I_21

IMPACT

SECURITY

P1B-DWG-I02-21-SEC-BMD-6001

BP-1B-04-08132

CQB-ETA-CQ002-ESC-DRG-21033

3227

I_02

BUILDING - I_21

IMPACT

SECURITY

P1B-DWG-I02-21-SEC-BMD-6002

BP-1B-04-08133

3713

I_02

BUILDING - I_22

IMPACT

LIGHTING

P1B-DWG-I02-22-ELP-BMD-6001

BP-1B-04-15335

3754

I_02

BUILDING - I_22

IMPACT

ICT SERVICES

P1B-DWG-I02-22-ICT-BMD-1901

3755

I_02

BUILDING - I_22

IMPACT

ICT SERVICES

P1B-DWG-I02-22-ICT-BMD-1902

16-Sep-15

U/R

Need debbas input

Material submittal not done ( Action by JBK)


Material submittal Approved (JBK to be review &resubmit)
Material submittal Approved (JBK to be review &resubmit)
Material submittal Approved (JBK to be review &resubmit)

Need debbas input

Material submittal Approved (JBK to be review &resubmit)


Material submittal Approved (JBK to be review &resubmit)
Material submittal Approved (JBK to be review &resubmit)
Need debbas input

28-Oct-15

29-Oct-15

17-11-2015

ETA

ETA

Need debbas input

R
C
C

31-10-2015

ETA

ETA
Material submittal not done ( Action by JBK)
Material submittal not done ( Action by JBK)
Material submittal Approved (JBK to be review &resubmit)

ETA
ETA

Awating for MOI Regulation Approval

12-12-2015

ETA

12-12-2015

ETA

30-Aug-15

12-12-2015

ETA

27-Aug-15

12-12-2015

ETA

5075

27-Aug-15

12-12-2015

ETA

LIGHTING SCHEDULES

5475

With Debbas

Under review with debbas

BUILDING I21

ENLARGED ICT FLOOR PLAN

5825

RT

17-Nov-12

19-Nov-12

19-Nov-12

U/R

NO SUBMISSION SINCE 2012

BUILDING I21

ENLARGED ICT FLOOR PLAN

5825

RT

17-Nov-12

19-Nov-12

19-Nov-12

U/R

NO SUBMISSION SINCE 2012

00

BUILDING I21

SECURITY SCHEDULES SHEET 1 OF 4

5825

Awating for MOI Regulation Approval

CQB-ETA-CQ002-ESC-DRG-21034

00

BUILDING I21

SECURITY SCHEDULES SHEET 2 OF 4

5825

Awating for MOI Regulation Approval

CQB-ETA-CQ002-ELI-DRG-22033

00

BUILDING I22

LIGHTING SCHEDULES

5475

Err:512

CQB-ETA-CQ002-ETD-DRG-22032

00

BUILDING I22

ICT ENLARGED PLAN

5825

RT

BP-1B-04-16709

CQB-ETA-CQ002-ETD-DRG-22033

01

BUILDING I22 - LEVEL MZ

ICT FLOOR PLAN AREA A

5825

AREA A

2-Aug-12

19-Nov-12

With Debbas

Under review with debbas

19-Nov-12

U/R

NO SUBMISSION SINCE 2012

17-11-2015

ETA

3756

I_02

BUILDING - I_22

IMPACT

ICT SERVICES

P1B-DWG-I02-22-ICT-BMD-1903

Err:512

CQB-ETA-CQ002-ETD-DRG-22034

00

BUILDING I22

ICT ENLARGED PLAN

5825

RT

U/R

NO SUBMISSION SINCE 2012

3794

I_02

BUILDING - I_22

IMPACT

SECURITY

P1B-DWG-I02-22-SEC-BMD-6001

BP-1B-04-08136

CQB-ETA-CQ002-ESC-DRG-22033

00

BUILDING I22

SECURITY SCHEDULES SHEET 1 OF 4

5825

Awating for MOI Regulation Approval

3795

I_02

BUILDING - I_22

IMPACT

SECURITY

P1B-DWG-I02-22-SEC-BMD-6002

BP-1B-04-16507

CQB-ETA-CQ002-ESC-DRG-22034

00

BUILDING I22

SECURITY SCHEDULES SHEET 2 OF 4

5825

Awating for MOI Regulation Approval

3796

I_02

BUILDING - I_22

IMPACT

SECURITY

P1B-DWG-I02-22-SEC-BMD-6003

BP-1B-04-16508

CQB-ETA-CQ002-ESC-DRG-22035

00

BUILDING I22

SECURITY SCHEDULES SHEET 3 OF 4

5825

Awating for MOI Regulation Approval

3830

I_02

BUILDING - I_22

IMPACT

FIRE ALRAM

P1B-DWG-I02-22-FFA-BMD-5002

BP-1B-04-14991

CQB-ETA-CQ002-EFA-DRG-22034

01

BUILDING I22

FIRE ALARM RISER DIAGRAMS SHEET 2 OF 6

5300

24-10-2015

Under review with JBK

3834

I_02

BUILDING - I_22

IMPACT

FIRE ALRAM

P1B-DWG-I02-22-FFA-BMD-5006

BP-1B-04-14995

CQB-ETA-CQ002-EFA-DRG-22038

00

BUILDING I22

FIRE ALARM RISER DIAGRAMS SHEET 6 OF 6

5300

24-10-2015

Under review with JBK

4112

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-4001

BP-1B-04-16216

CQB-ETA-CQ002-EPW-DRG-20049

00

BASEMENT I02

WATER COLLECTION AND TREATMENT POWER DETAILS

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4113

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-5001

BP-1B-04-16217

CQB-ETA-CQ002-EPW-DRG-20050

00

BASEMENT I02

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 1 OF 5

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4114

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-5002

BP-1B-04-16218

CQB-ETA-CQ002-EPW-DRG-20051

00

BASEMENT I02

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 2 OF 5

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4115

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-5003

BP-1B-04-16219

CQB-ETA-CQ002-EPW-DRG-20052

00

BASEMENT I02

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 3 OF 5

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4116

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-5004

BP-1B-04-16220

CQB-ETA-CQ002-EPW-DRG-20053

00

BASEMENT I02

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 4 OF 5

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4117

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-5005

BP-1B-04-16221

CQB-ETA-CQ002-EPW-DRG-20054

00

BASEMENT I02

WATER COLLECTION AND TREATMENT SCHEMATIC DIAGRAMS SHEET 5 OF 5

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4118

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-6001

BP-1B-04-16222

CQB-ETA-CQ002-EPW-DRG-20055

00

BASEMENT I02

WATER COLLECTION AND TREATMENT I/O SCHEDULES SHEET 1 OF 2

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4119

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-EPP-BMD-6002

BP-1B-04-16223

CQB-ETA-CQ002-EPW-DRG-20056

00

BASEMENT I02

WATER COLLECTION AND TREATMENT I/O SCHEDULES SHEET 2 OF 2

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

4120

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-ESU-BMD-1031

BP-1B-04-16224

CQB-ETA-CQ002-EPW-DRG-20057

00

BASEMENT I02

AREA 1

ELECTRICAL SITE LIGHTING & SIGNAGE PLAN AREA 1

5225

C (Not reqd)

Dwg Superceeded by Cracknell IFC (Approved)

4121

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-ESU-BMD-1032

BP-1B-04-16225

CQB-ETA-CQ002-EPW-DRG-20058

00

BASEMENT I02

AREA 2

ELECTRICAL SITE LIGHTING & SIGNAGE PLAN AREA 2

5225

C (Not reqd)

Dwg Superceeded by Cracknell IFC (Approved)

4122

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-ESU-BMD-1033

BP-1B-04-16226

CQB-ETA-CQ002-EPW-DRG-20059

00

BASEMENT I02

AREA 3

ELECTRICAL SITE LIGHTING & SIGNAGE PLAN AREA 3

5225

C (Not reqd)

Dwg Superceeded by Cracknell IFC (Approved)

4123

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-ESU-BMD-1034

BP-1B-04-16227

CQB-ETA-CQ002-EPW-DRG-20060

00

BASEMENT I02

AREA 4

ELECTRICAL SITE LIGHTING & SIGNAGE PLAN AREA 4

5225

C (Not reqd)

Dwg Superceeded by Cracknell IFC (Approved)

4124

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-ESU-BMD-1035

BP-1B-04-16228

CQB-ETA-CQ002-EPW-DRG-20061

00

BASEMENT I02

AREA 5

ELECTRICAL SITE LIGHTING & SIGNAGE PLAN AREA 5

5225

C (Not reqd)

Dwg Superceeded by Cracknell IFC (Approved)

4125

I_02

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-I02-00-ESU-BMD-1036

BP-1B-04-16229

CQB-ETA-CQ002-EPW-DRG-20062

00

BASEMENT I02

AREA 6

ELECTRICAL SITE LIGHTING & SIGNAGE PLAN AREA 6

5225

C (Not reqd)

Dwg Superceeded by Cracknell IFC (Approved)

4140

I_02

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-I02-00-ELP-BMD-5001

BP-1B-04-15298

CQB-ETA-CQ002-ELI-DRG-20018

00

BASEMENT I02

OVERALL LIGHTING CONTROL RISER DIAGRAM

5475

Need debbas input

4141

I_02

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-I02-00-ELP-BMD-5101

BP-1B-04-15299

CQB-ETA-CQ002-ELI-DRG-20019

00

BASEMENT I02

LIGHTING CONTROL DIAGRAMS

5475

Need debbas input

4151

I_02

BASEMENTS

NON-IMPACT

LIGHTING

P1B-DWG-I02-00-ELP-BMD-6023

BP-1B-04-15309

CQB-ETA-CQ002-ELI-DRG-20029

00

BASEMENT I02

LIGHTING LCP SCHEDULES SHEET - 10

5475

As per Bullitin 45- LSDB

4152

I_02

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-I02-00-ELP-BMD-6101

BP-1B-04-15310

CQB-ETA-CQ002-ELI-DRG-20030

00

BASEMENT I02

LIGHTING SCHEDULES

5475

4177

I_02

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I02-00-ICT-BMD-1901

Err:512

CQB-ETA-CQ002-ETD-DRG-20018

00

BASEMENT I02 - LEVEL B3,B2

ICT SERVICES ENLARGED PLANS

5825

RT

17-Nov-12

19-Nov-12

4178

I_02

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I02-00-ICT-BMD-1902

Err:512

CQB-ETA-CQ002-ETD-DRG-20019

00

BASEMENT I02 - LEVEL B1

ICT SERVICES ENLARGED PLANS

5825

RT

17-Nov-12

19-Nov-12

4184

I_02

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-I02-00-ICT-BMD-5201

BP-1B-04-05875

CQB-ETA-CQ002-ETD-DRG-20025

00

BASEMENT I02

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - BASEMENT

5825

4204

I_02

BASEMENTS

IMPACT

SECURITY

P1B-DWG-I02-00-SEC-BMD-6002

BP-1B-04-08130

CQB-ETA-CQ002-ESC-DRG-20020

00

BASEMENT I02

SECURITY CAMERA SCHEDULE SHEET 2 OF 2

5825

4210

I_02

BASEMENTS

IMPACT

FIRE ALRAM

P1B-DWG-I02-00-FFA-BMD-6001

BP-1B-04-14976

CQB-ETA-CQ002-EFA-DRG-20026

01

BASEMENT I02

FIRE ALARM SCHEDULES

5300

4212

I_02

BASEMENTS

NON-IMPACT

FIRE ALRAM

P1B-DWG-I02-00-FFA-BMD-7002

BP-1B-04-14978

CQB-ETA-CQ002-EFA-DRG-20028

00

BASEMENT I02

FIRE ALARM CALCULATIONS SHEET 2 OF 2

5300

29-10-2015

4214

I_02

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-06719

CQB-ETA-CQ002-EBM-DRG-20000

01

BASEMENT I02 - LEVEL B3

AREA 1

BMS LAYOUT PLAN - AREA 1

5075

6-Sep-15

4215

I_02

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-06720

CQB-ETA-CQ002-EBM-DRG-20001

01

BASEMENT I02 - LEVEL B3

AREA 2

BMS LAYOUT PLAN - AREA 2

5075

4216

I_02

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-06721

CQB-ETA-CQ002-EBM-DRG-20002

01

BASEMENT I02 - LEVEL B3

AREA 3

BMS LAYOUT PLAN - AREA 3

5075

4217

I_02

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-06723

CQB-ETA-CQ002-EBM-DRG-20004

01

BASEMENT I02 - LEVEL B3

AREA 5

BMS LAYOUT PLAN - AREA 5

4218

I_02

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-06741

CQB-ETA-CQ002-EBM-DRG-20006

01

BASEMENT I02 - LEVEL B2

AREA 1

4219

I_02

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-06742

CQB-ETA-CQ002-EBM-DRG-20007

01

BASEMENT I02 - LEVEL B2

4220

I_02

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-06745

CQB-ETA-CQ002-EBM-DRG-20010

01

BASEMENT I02 - LEVEL B2

4297

I_02

BUILDING - I_21

IMPACT

LIGHTING

P1B-DWG-I02-21-ELP-BMD-5001

BP-1B-04-15311

CQB-ETA-CQ002-ELI-DRG-21032

00

BUILDING I21

4298

I_02

BUILDING - I_21

NON-IMPACT

LIGHTING

P1B-DWG-I02-21-ELP-BMD-5002

BP-1B-04-15312

CQB-ETA-CQ002-ELI-DRG-21033

00

BUILDING I21

4299

I_02

BUILDING - I_21

NON-IMPACT

EMERGENCY LIGHTING

Err:512

Err:512

CQB-ETA-CQ002-ELS-DRG-21031

00

BUILDING I21 - LEVEL


PENTHOUSE

4340

I_02

BUILDING - I_21

IMPACT

SECURITY

P1B-DWG-I02-21-SEC-BMD-6003

BP-1B-04-08134

CQB-ETA-CQ002-ESC-DRG-21035

00

4341

I_02

BUILDING - I_21

IMPACT

SECURITY

P1B-DWG-I02-21-SEC-BMD-6004

BP-1B-04-08135

CQB-ETA-CQ002-ESC-DRG-21036

4343

I_02

BUILDING - I_21

IMPACT

FIRE ALRAM

P1B-DWG-I02-21-FFA-BMD-4001

BP-1B-04-14979

CQB-ETA-CQ002-EFA-DRG-21032

4346

I_02

BUILDING - I_21

NON-IMPACT

FIRE ALRAM

P1B-DWG-I02-21-FFA-BMD-7003

BP-1B-04-14988

CQB-ETA-CQ002-EFA-DRG-21041

00

BUILDING I21

4391

I_02

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

Err:512

CQB-ETA-CQ002-MCW-DRG-20039

00

BASEMENT I02

4453

I_02

BUILDING - I_22

IMPACT

SECURITY

P1B-DWG-I02-22-SEC-BMD-5001

BP-1B-04-08314

CQB-ETA-CQ002-ESC-DRG-22032

00

4454

I_02

BUILDING - I_22

NON-IMPACT

SECURITY

P1B-DWG-I02-22-SEC-BMD-6004

BP-1B-04-16509

CQB-ETA-CQ002-ESC-DRG-22036

4455

I_02

BUILDING - I_22

IMPACT

FIRE ALRAM

P1B-DWG-I02-22-FFA-BMD-4001

Err:512

CQB-ETA-CQ002-EFA-DRG-22032

4457

I_02

BUILDING - I_22

NON-IMPACT

FIRE ALRAM

P1B-DWG-I02-22-FFA-BMD-7002

Err:512

CQB-ETA-CQ002-EFA-DRG-22041

4637

HHH

BASEMENTS

IMPACT

SMALL POWER

Err:512

BP-1B-04-16346

CQB-ETA-CQ002-EPW-DRG-30031

4658

HHH

BASEMENTS

IMPACT

CONTAINMENT

P1B-DWG-HHH-00-ETR-BMD-1146

BP-1B-04-02982

4699

HHH

BASEMENTS

NON-IMPACT

ICT SERVICES

Err:512

4712

HHH

BASEMENTS

NON-IMPACT

SECURITY

Err:512

Err:512

4733

HHH

BASEMENTS

IMPACT

FIRE ALRAM

P1B-DWG-HHH-00-FFA-BMD-6001

BP-1B-04-15007

4748

HHH

BASEMENTS

IMPACT

BMS

Err:512

4975

HHH

BUILDING - H_05

IMPACT

BUILDERS WORKS

Err:512

5081

HHH

BUILDING - H_05

IMPACT

LIGHTING

5082

HHH

BUILDING - H_05

IMPACT

LIGHTING

5095

HHH

BUILDING - H_05

IMPACT

5100

HHH

BUILDING - H_05

IMPACT

5120

HHH

BUILDING - H_05

5121

HHH

5122

HHH

5123

17-Nov-12

19-Nov-12

19-Nov-12

Need debbas input

19-Nov-12

U/R

NO SUBMISSION SINCE 2012

19-Nov-12

U/R

NO SUBMISSION SINCE 2012

24-11-2015

ETA

Awating for MOI Regulation Approval

COMMENTED DRG WITH JBK (Input requured from JBK)

ETA

12-12-2015

ETA

6-Sep-15

12-12-2015

ETA

6-Sep-15

12-12-2015

ETA

5075

6-Sep-15

12-12-2015

ETA

BMS LAYOUT PLAN - AREA 1

5075

27-Aug-15

12-12-2015

ETA

AREA 2

BMS LAYOUT PLAN - AREA 2

5075

27-Aug-15

12-12-2015

ETA

AREA 5

BMS LAYOUT PLAN - AREA 5

5075

27-Aug-15

12-12-2015

ETA

LIGHTING CONTROL DIAGRAMS

5475

Need deccas input

ELECTRICAL LIGHTING CONTROLS DIAGRAMS

5475

Under review with debbas

EMERGENCY LIGHTING FLOOR PLAN - AREA D

5475

NS

Not reqd

Not required

BUILDING I21

SECURITY SCHEDULES SHEET 3 OF 4

5825

Awating for MOI Regulation Approval

00

BUILDING I21

SECURITY SCHEDULES SHEET 4 OF 4

5825

Awating for MOI Regulation Approval

01

BUILDING I21

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAILS

5300

Material submittal not done ( Action by JBK)

ETA

AREA D

FIRE ALARM CALCULATIONS SHEET 3 OF 3

With Debbas

5300

29-10-2015

CHILLED WATER FLOW DIAGRAM

5575

20-Sep-15

BUILDING I22

SECURITY RISER DIAGRAMS

5825

00

BUILDING I22

SECURITY SCHEDULES SHEET 4 OF 4

5825

Awating for MOI Regulation Approval

00

BUILDING I22

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAIL

5300

Material submittal not done ( Action by JBK)

00

BUILDING I22

FIRE ALARM CALCULATIONS SHEET 2 OF 2

5300

ETA

04

BASEMENT HHH

ELECTRICAL SERVICES MDB-H-3 SCHEMATIC DIAGRAM

5225

U/R

U/R

CQB-ETA-CQ002-EGN-DRG-30014

05

BASEMENT HHH - LEVEL B1

CABLE TRAY FLOOR PLAN - AREA 6

5225

CQB-ETA-CQ002-ETD-DRG-30050

00

BASEMENT HHH - LEVEL B3

BASEMENT HHH ICT VOICE & DATA NETWORK BACKBONE RISER


DIAGRAM FOR BUILDING H15 ( SHEET 02 OF 02 )

5825

24-11-2015

CQB-ETA-CQ002-ESC-DRG-30021

00

BASEMENT HHH

5825

NS

29-11-2015

N/S

ETA

CQB-ETA-CQ002-EFA-DRG-30023

01

BASEMENT HHH

FIRE ALARM SCHEDULES

5300

COMMENTED DRG WITH JBK (Input requured from JBK)

BP-1B-04-08411

CQB-ETA-CQ002-EBM-DRG-30014

04

BASEMENT HHH - LEVEL B1

AREA 6

BMS SYSTEM LAYOUT PLAN - AREA 6

5075

Err:512

CQB-ETA-CQ002-BWD-DRG-05019

00

BUILDING H05 - LEVEL 05

AREA B

STRUCTURAL BUILDERS WORK LAYOUT PLAN - AREA B

5851

P1B-DWG-HHH-05-ELP-BMD-6001

BP-1B-04-15156

CQB-ETA-CQ002-ELI-DRG-05011

00

BUILDING H05

LIGHTING SCHEDULES SHEET 01

5475

P1B-DWG-HHH-05-ELP-BMD-6001

Err:512

CQB-ETA-CQ002-ELI-DRG-05020

00

BUILDING H05

PHASE-1B SUPER BLOCK-HHH BUILDING H05 LEVEL-03 MECHANICAL


ROOM ENLARGEDE PLAN LIGHTING LAYOUT AREA B

5475

ICT SERVICES

P1B-DWG-HHH-05-ICT-BMD-5003

BP-1B-04-16585

CQB-ETA-CQ002-ETD-DRG-05013

00

BUILDING H05

SECURITY

P1B-DWG-HHH-05-SEC-BMD-5001

BP-1B-04-16445

CQB-ETA-CQ002-ESC-DRG-05004

01

BUILDING H05

IMPACT

BMS

Err:512

BP-1B-04-14625

CQB-ETA-CQ002-EBM-DRG-05000

02

BUILDING H05 - LEVEL 00

BUILDING - H_05

IMPACT

BMS

Err:512

BP-1B-04-14626

CQB-ETA-CQ002-EBM-DRG-05001

02

BUILDING - H_05

IMPACT

BMS

Err:512

BP-1B-04-14627

CQB-ETA-CQ002-EBM-DRG-05002

HHH

BUILDING - H_05

IMPACT

BMS

Err:512

BP-1B-04-14628

5125

HHH

BUILDING - H_05

IMPACT

BMS

Err:512

5126

HHH

BUILDING - H_05

IMPACT

BMS

5314

HHH

BUILDING - H_09

IMPACT

5637

HHH

BUILDING - H_15

5672

HHH

BUILDING - H_15

5723

HHH

BUILDING - H_15

5921

HHH

BASEMENTS

5922

HHH

5923

HHH

5972

AREA 6

AREA B

ICT RISER DIAGRAMS

4-Oct-15
29-11-2015

29-10-2015

U/R

U/R

ETA

4-Nov-15

ETA

ETA

Not reqd

Not required

Need deddas input

NS

N/S

5-Sep-15

17-11-2015

5825

24-11-2015

SECURITY RISER DIAGRAMS

5825

29-11-2015

ETA

AREA A

BMS SYSTEM LAYOUT PLAN - AREA A

5075

27-Aug-15

14-11-2015

ETA

BUILDING H05 - LEVEL 00

AREA B

BMS SYSTEM LAYOUT PLAN - AREA B

5075

27-Aug-15

14-11-2015

ETA

02

BUILDING H05 - LEVEL 01

AREA A

BMS SYSTEM LAYOUT PLAN - AREA A

5075

27-Aug-15

14-11-2015

ETA

CQB-ETA-CQ002-EBM-DRG-05003

02

BUILDING H05 - LEVEL 01

AREA B

BMS SYSTEM LAYOUT PLAN - AREA B

5075

27-Aug-15

14-11-2015

ETA

BP-1B-04-14630

CQB-ETA-CQ002-EBM-DRG-05005

02

BUILDING H05 - LEVEL 03

AREA B

BMS SYSTEM LAYOUT PLAN - AREA B

5075

27-Aug-15

14-11-2015

ETA

Err:512

BP-1B-04-14631

CQB-ETA-CQ002-EBM-DRG-05006

02

BUILDING H05 - LEVEL 04

AREA A

BMS SYSTEM LAYOUT PLAN - AREA A

5075

27-Aug-15

14-11-2015

ETA

SECURITY

P1B-DWG-HHH-09-SEC-BMD-6001

BP-1B-04-26793

CQB-ETA-CQ002-ESC-DRG-90011

00

BUILDING H09

SECURITY SCHEDULES

5825

Awating for MOI Regulation Approval

IMPACT

SMALL POWER

P1B-DWG-HHH-15-EPP-BMD-1901

BP-1B-04-16108

CQB-ETA-CQ002-EPW-DRG-15044

02

BUILDING H15

ENLARGED SMALL POWER & EQUIPMENT FLOOR PLANS

5225

IMPACT

LIGHTING

P1B-DWG-HHH-15-ELP-BMD-6001

BP-1B-04-15272

CQB-ETA-CQ002-ELI-DRG-15031

00

BUILDING H15

LIGHTING ZONE SCHEDULES SHEET 01

5475

IMPACT

SECURITY

P1B-DWG-HHH-15-SEC-BMD-6001

BP-1B-04-16498

CQB-ETA-CQ002-ESC-DRG-15025

00

BUILDING H15

SECURITY SCHEDULES

5825

IMPACT

PLUMBING

CQB-ETA-CQ002-MDW-DRG-30024

00

BASEMENT HHH

PHASE-1B SUPER BLOCK HHH BASEMENT- HHH LEVEL B3 AREA-3 SOLAR


THERMAL TANK ROOM H03 EQUIPMENT LAYOUT

5600

22-Aug-15

BASEMENTS

IMPACT

PLUMBING

CQB-ETA-CQ002-MDW-DRG-30025

00

BASEMENT HHH

PHASE-1B SUPER BLOCK HHH BASEMENT- HHH LEVEL B3 AREA-3 SOLAR


THERMAL TANK ROOM H05 EQUIPMENT LAYOUT

5600

BASEMENTS

IMPACT

PLUMBING

CQB-ETA-CQ002-MDW-DRG-30026

00

BASEMENT HHH

PHASE-1B SUPER BLOCK HHH BASEMENT- HHH LEVEL B3 AREA-3 SOLAR


THERMAL TANK ROOM H09 EQUIPMENT LAYOUT

5600

HHH

BASEMENTS

NON-IMPACT

PLUMBING

CQB-ETA-CQ002-MDW-DRG-30063

00

BASEMENT HHH - LEVEL B3

PHASE-1B SUPER BLOCK HHH BASEMENT- HHH LEVEL B3 AREA 5 SOLAR


THERMAL TANK ROOM H15 EQUIPMENT LAYOUT

6000

HHH

BASEMENTS

IMPACT

SMALL POWER

Err:512

BP-1B-04-16366

CQB-ETA-CQ002-EPW-DRG-30051

02

BASEMENT HHH

6004

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-4001

BP-1B-04-16372

CQB-ETA-CQ002-EPW-DRG-30057

01

6005

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-5001

BP-1B-04-16373

CQB-ETA-CQ002-EPW-DRG-30058

00

ETA

ETA

dabbas

Under review with dabbas

Awating for MOI Regulation Approval

2-Sep-15

14-Sep-15

U/R

U/R

17-Aug-15

2-Sep-15

14-Sep-15

U/R

U/R

22-Aug-15

2-Sep-15

14-Sep-15

U/R

U/R

5600

24-Aug-15

16-Sep-15

EARTHING RISER DIAGRAM

5225

5-Nov-15

BASEMENT HHH

WATER COLLECTION AND TREATMENT POWER DETAILS

5225

BMS

BASEMENT HHH

WATER COLLECTION AND TREATMENT CONTROL SCHEMATIC DIAGRAMS

5225

BMS

4-Nov-15

U/R

U/R

ETA

JBK STAMP REQUIRED ( Action by NAZMODDIN)

JBK STAMP REQUIRED ( Action by NAZMODDIN)

6006

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-5002

BP-1B-04-16374

CQB-ETA-CQ002-EPW-DRG-30059

00

BASEMENT HHH

WATER COLLECTION AND TREATMENT CONTROL SCHEMATIC DIAGRAMS

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

6007

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-5003

BP-1B-04-16375

CQB-ETA-CQ002-EPW-DRG-30060

00

BASEMENT HHH

WATER COLLECTION AND TREATMENT CONTROL SCHEMATIC DIAGRAMS

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

6008

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-5004

BP-1B-04-16376

CQB-ETA-CQ002-EPW-DRG-30061

00

BASEMENT HHH

WATER COLLECTION AND TREATMENT CONTROL SCHEMATIC DIAGRAMS

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

6009

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-5005

BP-1B-04-16377

CQB-ETA-CQ002-EPW-DRG-30062

00

BASEMENT HHH

WATER COLLECTION AND TREATMENT CONTROL SCHEMATIC DIAGRAMS

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

6010

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-6001

BP-1B-04-16378

CQB-ETA-CQ002-EPW-DRG-30063

00

BASEMENT HHH

WATER COLLECTION AND TREATMENT I/O SCHEDULES

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

6011

HHH

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-HHH-00-EPP-BMD-6002

BP-1B-04-16379

CQB-ETA-CQ002-EPW-DRG-30064

00

BASEMENT HHH

WATER COLLECTION AND TREATMENT I/O SCHEDULES

5225

BMS

JBK STAMP REQUIRED ( Action by NAZMODDIN)

6017

HHH

BASEMENTS

IMPACT

CONTAINMENT

P1B-DWG-HHH-00-ETR-BMD-1123

BP-1B-04-02042

CQB-ETA-CQ002-EGN-DRG-30001

04

BASEMENT HHH - LEVEL B3

AREA 3

CABLE TRAY FLOOR PLAN - AREA 3

5225

7-Nov-15

6018

HHH

BASEMENTS

IMPACT

CONTAINMENT

P1B-DWG-HHH-00-ETR-BMD-1124

BP-1B-04-02043

CQB-ETA-CQ002-EGN-DRG-30002

04

BASEMENT HHH - LEVEL B3

AREA 4

CABLE TRAY FLOOR PLAN - AREA 4

5225

8-Nov-15

6019

HHH

BASEMENTS

IMPACT

CONTAINMENT

P1B-DWG-HHH-00-ETR-BMD-1125

BP-1B-04-02044

CQB-ETA-CQ002-EGN-DRG-30003

04

BASEMENT HHH - LEVEL B3

AREA 5

CABLE TRAY FLOOR PLAN - AREA 5

5225

9-Nov-15

6029

HHH

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-HHH-00-ELP-BMD-5001

BP-1B-04-15336

CQB-ETA-CQ002-ELI-DRG-30015

00

BASEMENT HHH

OVERALL LIGHTING CONTROL RISER DIAGRAM

5475

Need debbas input

6030

HHH

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-HHH-00-ELP-BMD-5101

BP-1B-04-15337

CQB-ETA-CQ002-ELI-DRG-30016

01

BASEMENT HHH

LIGHTING CONTROL DIAGRAMS

5475

Need debbas input

6036

HHH

BASEMENTS

IMPACT

LIGHTING

P1B-DWG-HHH-00-ELP-BMD-6022

BP-1B-04-15346

CQB-ETA-CQ002-ELI-DRG-30025

00

BASEMENT HHH

LIGHTING LCP SCHEDULE

5475

Need debbas input

6040

HHH

BASEMENTS

NON-IMPACT

LIGHTING

7409-B-HHH-00-LAN-EL-501

Err:512

CQB-ETA-CQ002-ELI-DRG-30029

00

BASEMENT HHH

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-1

5475

NS

N/S

6041

HHH

BASEMENTS

NON-IMPACT

LIGHTING

7409-B-HHH-00-LAN-EL-502

Err:512

6042

HHH

BASEMENTS

NON-IMPACT

LIGHTING

7409-B-HHH-00-LAN-EL-503

Err:512

6043

HHH

BASEMENTS

NON-IMPACT

LIGHTING

7409-B-HHH-00-LAN-EL-504

6044

HHH

BASEMENTS

NON-IMPACT

LIGHTING

7409-B-HHH-00-LAN-EL-505

6045

HHH

BASEMENTS

NON-IMPACT

LIGHTING

7409-B-HHH-00-LAN-EL-506

6046

HHH

BASEMENTS

NON-IMPACT

LIGHTING

7409-B-HHH-00-LAN-EL-508

6073

HHH

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-HHH-00-ICT-BMD-5205

6087

HHH

BASEMENTS

IMPACT

SECURITY

P1B-DWG-HHH-00-SEC-BMD-6002

6092

HHH

BASEMENTS

NON-IMPACT

FIRE ALRAM

6107

HHH

BUILDING - H_03

IMPACT

SMALL POWER

6108

HHH

BUILDING - H_03

IMPACT

6119

HHH

BUILDING - H_03

NON-IMPACT

6123

HHH

BUILDING - H_03

IMPACT

FIRE ALRAM

6152

HHH

BUILDING - H_05

NON-IMPACT

6153

HHH

BUILDING - H_05

6154

HHH

BUILDING - H_05

6155

HHH

6161

HHH

6182
6186

CQB-ETA-CQ002-ELI-DRG-30030

00

BASEMENT HHH

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-2

5475

NS

N/S

00

BASEMENT HHH

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-3

5475

NS

N/S

00

BASEMENT HHH

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-4

5475

NS

N/S

00

BASEMENT HHH

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-5

5475

NS

N/S

00

BASEMENT HHH

LAND SCAPE LIGHTING CIRCUIT LAYOUT-SHEET-6

5475

NS

N/S

00

BASEMENT HHH

LAND SCAPE LIGHTING LOAD SCHEDULE

5475

NS

00

BASEMENT HHH

ICT VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - H15

5825

00

BASEMENT HHH

SECURITY CAMERA SCHEDULE

5825

P1B-DWG-HHH-00-FFA-BMD-7002

CQB-ETA-CQ002-ELI-DRG-30031
wi
ns
oft
Err:512
CQB-ETA-CQ002-ELI-DRG-30032
:
OL
Err:512
CQB-ETA-CQ002-ELI-DRG-30033
D:
winsoft:
PO
PLANS
Err:512 OLD:POWER ENLARGED
CQB-ETA-CQ002-ELI-DRG-30034
WE
R
EN
Err:512
CQB-ETA-CQ002-ELI-DRG-30035
LA
RG
Err:512
CQB-ETA-CQ002-ETD-DRG-30028
ED
PL
BP-1B-04-16512
CQB-ETA-CQ002-ESC-DRG-30017
AN
S
BP-1B-04-15009
CQB-ETA-CQ002-EFA-DRG-30025

00

BASEMENT HHH

FIRE ALARM CALCULATIONS (SHEET 2 OF 2)

5300

P1B-DWG-HHH-03-EEP-BMD-5001

BP-1B-04-15370

CQB-ETA-CQ002-ELP-DRG-03020

01

BUILDING H03

EARTHING RISER DIAGRAMS

5225

LIGHTING

P1B-DWG-HHH-03-ELP-BMD-5001

BP-1B-04-15143

CQB-ETA-CQ002-ELI-DRG-03009

00

BUILDING H03

LIGHTING CONTROL DIAGRAMS

5475

Need debbas input

FIRE ALRAM

Err:512

BP-1B-04-14860

CQB-ETA-CQ002-EFA-DRG-03010

01

BUILDING H03

FIRE FIGHTERS STAIRWAY PRESSURIZATION PANEL DETAILS

5300

Material submittal not done ( Action by JBK)

CQB-ETA-CQ002-EFA-DRG-03016

01

BUILDING H03

PHASE 1B SUPER BLOCK HHH BUILDING H03 FIRE ALARM MIMIC PANEL
DIAGRAM

5300

Material submittal not done ( Action by JBK)

SMALL POWER

P1B-DWG-HHH-05-EEP-BMD-5001

Err:512

CQB-ETA-CQ002-ELP-DRG-05017

00

BUILDING H05

EARTHING RISER DIAGRAMS

5225

NS

NON-IMPACT

LIGHTING

P1B-DWG-HHH-05-ELP-BMD-5001

BP-1B-04-15154

CQB-ETA-CQ002-ELI-DRG-05009

00

BUILDING H05

LIGHTING CONTROL DIAGRAMS PUBLIC AREAS

5475

Need debbas input

NON-IMPACT

LIGHTING

P1B-DWG-HHH-05-ELP-BMD-5002

BP-1B-04-15155

CQB-ETA-CQ002-ELI-DRG-05010

00

BUILDING H05

LIGHTING CONTROL DIAGRAMS RESIDENTIAL AREAS

5475

Need debbas input

BUILDING - H_05

NON-IMPACT

LIGHTING

P1B-DWG-HHH-05-ELP-BMD-6002

BP-1B-04-15157

CQB-ETA-CQ002-ELI-DRG-05012

00

BUILDING H05

LIGHTING SCHEDULES SHEET 02

5475

Need debbas input

BUILDING - H_05

NON-IMPACT

FIRE ALRAM

Err:512

CQB-ETA-CQ002-EFA-DRG-05015

00

BUILDING H05

PHASE 1B SUPER BLOCK HHH BUILDING H05 FIRE ALARM MIMIC


PANEL DIAGRAM

5300

Material submittal not done ( Action by JBK)

HHH

BUILDING - H_09

IMPACT

SMALL POWER

P1B-DWG-HHH-09-EEP-BMD-5001

BP-1B-04-26885

CQB-ETA-CQ002-ELP-DRG-90022

01

BUILDING H09

EARTHING RISER DIAGRAMS

5225

HHH

BUILDING - H_09

IMPACT

LIGHTING

P1B-DWG-HHH-09-ELP-BMD-5001

BP-1B-04-26695

CQB-ETA-CQ002-ELI-DRG-90010

00

BUILDING H09

LIGHTING CONTROL DIAGRAMS

5475

6187

HHH

BUILDING - H_09

IMPACT

ICT SERVICES

P1B-DWG-HHH-09-ICT-BMD-5004

BP-1B-04-26297

CQB-ETA-CQ002-ETD-DRG-90016

00

BUILDING H09

ICT RISER DIAGRAMS

5825

6188

HHH

BUILDING - H_09

IMPACT

ICT SERVICES

P1B-DWG-HHH-09-ICT-BMD-5005

BP-1B-04-26298

CQB-ETA-CQ002-ETD-DRG-90017

00

BUILDING H09

ICT RISER DIAGRAMS

5825

6189

HHH

BUILDING - H_09

IMPACT

ICT SERVICES

P1B-DWG-HHH-09-ICT-BMD-5006

BP-1B-04-26299

CQB-ETA-CQ002-ETD-DRG-90018

00

BUILDING H09

ICT RISER DIAGRAMS

5825

4-Feb-13

6190

HHH

BUILDING - H_09

IMPACT

ICT SERVICES

P1B-DWG-HHH-09-ICT-BMD-5007

BP-1B-04-26300

CQB-ETA-CQ002-ETD-DRG-90019

00

BUILDING H09

ICT RISER DIAGRAMS

5825

24-11-2015

6191

HHH

BUILDING - H_09

IMPACT

ICT SERVICES

P1B-DWG-HHH-09-ICT-BMD-5008

BP-1B-04-26301

CQB-ETA-CQ002-ETD-DRG-90020

00

BUILDING H09

ICT RISER DIAGRAMS

5825

24-11-2015

6192

HHH

BUILDING - H_09

IMPACT

ICT SERVICES

P1B-DWG-HHH-09-ICT-BMD-5009

BP-1B-04-26302

CQB-ETA-CQ002-ETD-DRG-90021

00

BUILDING H09

ICT RISER DIAGRAMS

5825

31-11-2015

6194

HHH

BUILDING - H_09

IMPACT

FIRE ALRAM

P1B-DWG-HHH-09-FFA-BMD-4001

BP-1B-04-26997

CQB-ETA-CQ002-EFA-DRG-90010

01

BUILDING H09

FIRE FIGHTER SMOKE CONTROL PANEL DETAILS

5300

N/S
24-11-2015

As per Bullitin 45- LSDB


ETA

Awating for MOI Regulation Approval

29-10-2015

ETA

8-Nov-15

N/S

9-Nov-15

10-Nov-15

C
6-Jan-13

6-Jan-13

4-Feb-13

4-Feb-13

4-Feb-13

24-11-2015

Need debbas input


B
ETA
B
ETA
ETA
ETA

Material submittal not done ( Action by JBK)

Material submittal not done ( Action by JBK)

6197

HHH

BUILDING - H_09

NON-IMPACT

FIRE ALRAM

CQB-ETA-CQ002-EFA-DRG-90016

00

BUILDING H09

PHASE 1B SUPER BLOCK HHH BUILDING H09 FIRE ALARM MIMIC


PANEL DIAGRAM

5300

6232

HHH

BUILDING - H_15

IMPACT

SMALL POWER

P1B-DWG-HHH-15-EEP-BMD-5001

BP-1B-04-15397

CQB-ETA-CQ002-ELP-DRG-15043

01

BUILDING H15

EARTHING RISER DIAGRAMS

5225

6233

HHH

BUILDING - H_15

IMPACT

LIGHTING

P1B-DWG-HHH-15-ELP-BMD-5001

BP-1B-04-15270

CQB-ETA-CQ002-ELI-DRG-15029

00

BUILDING H15

LIGHTING CONTROL DIAGRAMS

5475

6234

HHH

BUILDING - H_15

IMPACT

LIGHTING

P1B-DWG-HHH-15-ELP-BMD-5002

BP-1B-04-15271

CQB-ETA-CQ002-ELI-DRG-15030

00

BUILDING H15

LIGHTING CONTROL DIAGRAMS RESIDENTIAL

5475

Need debbas input

6250

HHH

BUILDING - H_15

IMPACT

FIRE ALRAM

P1B-DWG-HHH-15-FFA-BMD-4001

BP-1B-04-14950

CQB-ETA-CQ002-EFA-DRG-15030

01

BUILDING H15

FIRE-FIGHTER'S STAIRWAY PRESSURIZATION CONTROL PANEL DETAILS

5300

Material submittal not done ( Action by JBK)

6253

HHH

BUILDING - H_15

NON-IMPACT

FIRE ALRAM

Err:512

BP-1B-04-14956

CQB-ETA-CQ002-EFA-DRG-15036

00

BUILDING H15

FIRE ALARM CALCULATIONS (SHEET 2 OF 2)

5300

6255

HHH

BUILDING - H_15

NON-IMPACT

FIRE ALRAM

Err:512

CQB-ETA-CQ002-EFA-DRG-15038

00

BUILDING H15 - LEVEL 00

PHASE 1B SUPER BLOCK HHH BUILDING H15 FIRE ALARM MIMIC


PANEL DIAGRAM

5300

6282

M_I

BASEMENTS

IMPACT

HVAC & PIPING

P1B-DWG-M_I-00-MZZ-BMD-5004

BP-1B-04-17248

CQB-ETA-CQ002-MAC-DRG-40024

01

BASEMENT M_I

AIR RISER DIAGRAM MAU-M07-B1-002

5575

20-Apr-15

U/R

U/R

6380

M_I

BASEMENTS

IMPACT

SECURITY

Err:512

Err:512

CQB-ETA-CQ002-ESC-DRG-40017

00

BASEMENT M_I

5825

NS

29-11-2015

N/S

ETA

6381

M_I

BASEMENTS

IMPACT

SECURITY

Err:512

Err:512

CQB-ETA-CQ002-ESC-DRG-40018

00

BASEMENT M_I

29-11-2015

8002

M_I

BASEMENTS

NON-IMPACT

BUILDERS WORKS

Err:512

CQB-ETA-CQ002-BWD-DRG-40054

00

BASEMENT M_I - LEVEL B3

8005

M_I

BASEMENTS

NON-IMPACT

BUILDERS WORKS

Err:512

CQB-ETA-CQ002-BWD-DRG-40057

00

BASEMENT M_I

8081

M_I

BASEMENTS

IMPACT

HVAC & PIPING

P1B-DWG-M_I-00-MPP-BMD-1141

BP-1B-04-08042

CQB-ETA-CQ002-MCW-DRG-40008

02

BASEMENT M_I - LEVEL B1

8086

M_I

BASEMENTS

IMPACT

HVAC & PIPING

P1B-DWG-M_I-00-MZZ-BMD-5007

BP-1B-04-17250

CQB-ETA-CQ002-MAC-DRG-40026

01

8113

M_I

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

CQB-ETA-CQ002-MCW-DRG-40037

8122

M_I

BASEMENTS

IMPACT

PLUMBING

P1B-DWG-M_I-00-PZZ-BMD-3001

BP-1B-04-18041

8152

M_I

BASEMENTS

IMPACT

PLUMBING

P1B-DWG-M_I-00-PZZ-BMD-5204

8153

M_I

BASEMENTS

IMPACT

PLUMBING

P1B-DWG-M_I-00-PZZ-BMD-5205

8155

M_I

BASEMENTS

IMPACT

PLUMBING

8157

M_I

BASEMENTS

IMPACT

8158

M_I

BASEMENTS

8177

M_I

8198

M_I

8199

11-Nov-15

29-10-2015

7-Apr-15

18-Apr-15

Need debbas input

ETA

Material submittal not done ( Action by JBK)

5825

NS

N/S

ETA

PHASE 1B - SUPER BLOCK - M_I BASEMENT M_I LEVEL - B 3 AREA -1


STORM WATER LIFT STATION PLINTH LAYOUT

5851

U/R

U/R

PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL - B1 AHU PLINTH


LAYOUT - AREA 1

5851

U/R

U/R

HVAC PIPING FLOOR PLAN - AREA 1

5575

17-Sep-15

28-Sep-15

8-Jun-14

U/R

U/R

BASEMENT M_I

AIR RISER DIAGRAM

5575

27-Aug-15

9-Sep-15

14-Sep-15

U/R

U/R

00

BASEMENT M_I

PHASE -1B SUPER BLOCK - M_I BASEMENT - M_I LEVEL-B3 EQUIPMENT


ROOM (I17) CHILLED WATER FLOW DIAGRAMS

5575

24-Aug-15

9-Sep-15

14-Sep-15

U/R

U/R

CQB-ETA-CQ002-MDR-DRG-40012

02

BASEMENT M_I

PLUMBING & DRAINAGE SECTIONS

5600

26.10.2015

ETA

BP-1B-04-17862

CQB-ETA-CQ002-MDW-DRG-40025

01

BASEMENT M_I

SERVICED APARTMENTS PLUMBING SYSTEMS P&ID STORM WATER


TREATMENT

5600

With JBK

BMS (ELV TEAM)( WITH JBK)

BP-1B-04-17863

CQB-ETA-CQ002-MDW-DRG-40026

01

BASEMENT M_I

SERVICED APARTMENTS PLUMBING SYSTEMS P&ID STORM WATER LIFT


STATION

5600

With JBK

BMS (ELV TEAM)( WITH JBK)

P1B-DWG-M_I-00-PZZ-BMD-5207

BP-1B-04-17865

CQB-ETA-CQ002-MDW-DRG-40028

02

BASEMENT M_I

SERVICED APARTMENTS PLUMBING SYSTEMS P&ID NON-POTABLE


RECIRCULATION SYSTEM

5600

With JBK

BMS (ELV TEAM)( WITH JBK)

PLUMBING

P1B-DWG-M_I-00-PZZ-BMD-5209

BP-1B-04-17867

CQB-ETA-CQ002-MDW-DRG-40030

03

BASEMENT M_I

SERVICED APARTMENTS NON-POTABLE WATER SUPPLY SCHEMATIC &


CONTROLS

5600

With JBK

BMS (ELV TEAM)( WITH JBK)

IMPACT

PLUMBING

P1B-DWG-M_I-00-PZZ-BMD-5210

BP-1B-04-17868

CQB-ETA-CQ002-MDW-DRG-40031

03

BASEMENT M_I

SERVICED APARTMENTS POTABLE WATER SUPPLY SCHEMATIC & CONTROLS

5600

With JBK

BMS (ELV TEAM)( WITH JBK)

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-27056

CQB-ETA-CQ002-EPW-DRG-40055

01

BASEMENT M_I

ELECTRICAL SERVICES MDB- M_I -4 SCHEMATIC DIAGRAM

5225

23-Aug-15

21-Sep-15

1-Jun-13

U/R

C - SEPT 21 2015

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31907

CQB-ETA-CQ002-EPW-DRG-40101

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M_I-1 SCHEMATIC DIAGRAM


sheet 1 of 2

5225

2-Sep-15

19-Sep-15

11-Mar-15

U/R

C - SEPT 19 2015

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31908

CQB-ETA-CQ002-EPW-DRG-40102

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M_I-1 SCHEMATIC DIAGRAM


sheet 2 of 2

5225

2-Sep-15

19-Sep-15

11-Mar-15

U/R

C - SEPT 19 2015

8200

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31909

CQB-ETA-CQ002-EPW-DRG-40103

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M_I-2 SCHEMATIC DIAGRAM

5225

Final Actual Load input required from Al-Futaim

8202

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31911

CQB-ETA-CQ002-EPW-DRG-40105

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M-1 SCHEMATIC DIAGRAM

5225

Final Actual Load input required from Al-Futaim

8203

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31912

CQB-ETA-CQ002-EPW-DRG-40106

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M-2 SCHEMATIC DIAGRAM


sheet 1 of 2

5225

Final Actual Load input required from Al-Futaim

8204

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31913

CQB-ETA-CQ002-EPW-DRG-40107

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M-2 SCHEMATIC DIAGRAM


sheet 2 of 2

5225

Final Actual Load input required from Al-Futaim

8206

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31915

CQB-ETA-CQ002-EPW-DRG-40109

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M_I-E1 SCHEMATIC DIAGRAM


sheet 1 of 2

5225

Final Actual Load input required from Al-Futaim

8207

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31916

CQB-ETA-CQ002-EPW-DRG-40110

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M_I-E1 SCHEMATIC DIAGRAM


sheet 2 of 2

5225

Final Actual Load input required from Al-Futaim

8208

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31917

CQB-ETA-CQ002-EPW-DRG-40111

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M-E1 SCHEMATIC DIAGRAM


sheet 1 of 2

5225

31-Aug-15

19-Sep-15

11-Mar-15

U/R

C - SEPT 19 2015

8209

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-31918

CQB-ETA-CQ002-EPW-DRG-40112

02

BASEMENT M_I

BASEMENT - M_I ELECTRICAL SERVICES MDB-M-E1 SCHEMATIC DIAGRAM


sheet 2 of 2

5225

31-Aug-15

19-Sep-15

11-Mar-15

U/R

C - SEPT 19 2015

8228

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-35388

CQB-ETA-CQ002-EPW-DRG-40131

01

BASEMENT M_I

PHASE 1B SUPER BLOCK M_I BASEMENT M_I ENLARGED SMALL POWER &
EQUIPMENT FLOOR PLAN (SHEET-9)

5225

14-Nov-15

ETA

8236

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

BP-1B-04-35267

CQB-ETA-CQ002-EPW-DRG-40139

01

BASEMENT M_I

PHASE 1B SUPER BLOCK M_I BASEMENT M_I ENLARGED SMALL POWER &
EQUIPMENT FLOOR PLAN (SHEET-2)

5225

15-Nov-15

ETA

8242

M_I

BASEMENTS

IMPACT

SMALL POWER

P1B-DWG-M_I-00-EDG-BMD-1008

CQB-ETA-CQ002-EPW-DRG-40145

00

BASEMENT M_I

5225

16-Nov-15

Elevation Dwg

8246

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40149

00

BASEMENT M_I

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

8247

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40150

00

BASEMENT M_I

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

AREA 1

PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL B2 11KV SWITCH


GEAR ROOM M-BLOCK HV ROOM (M_I.B2:3.08) ENLARGED PLAN
PHASE 1B - SUPERBLOCK M_I BASEMENT - LEVEL B1 ELECTRICAL ROOM
ENLARGED PLAN
(SHEET
1 OF
3)
PHASE 1B
- SUPERBLOCK
M_I BASEMENT - LEVEL B1 ELECTRICAL ROOM
ENLARGED PLAN
(SHEET 2 OF 3)

PHASE 1B - SUPERBLOCK M_I BASEMENT - LEVEL B1 ELECTRICAL ROOM


ENLARGED PLAN
(SHEET 3 OF 3)
PHASE 1B-SUPER BLOCK M_I BASEMENT LEVEL-B2 ELECTRICAL ROOM
ENLARGED PLAN ELECTRICAL ROOM ENLARGED PLAN
PHASE 1B-SUPER BLOCK M_I BASEMENT LEVEL-B2 ELECTRICAL ROOM
ENLARGED PLAN
(SHEET1B-SUPER
2 OF 3) BLOCK M-I BASEMENT LEVEL-B2 ELECTRICAL ROOM
PHASE

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL B 3 ELECTRICAL


CONTAINMENT LAYOUT PLAN - AREA 2 (CABLE SCHEDULE )

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

AREA 3

PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL B 3 ELECTRICAL


CONTAINMENT LAYOUT PLAN - AREA 3

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

BASEMENT M_I - LEVEL B3

AREA 4

PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL B3 ELECTRICAL


CONTAINMENT LAYOUT PLAN - AREA 4 ( CABLE SCHEDULE )

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

03

BASEMENT M_I - LEVEL B3

AREA 4

PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL B3 ELECTRICAL


CONTAINMENT LAYOUT PLAN - AREA 4 ( CABLE SCHEDULE )

5225

Final Actual Load input required from Al-Futaim (Cable Size changed As
IFC DD drawing)

CQB-ETA-CQ002-EGN-DRG-40018

00

BASEMENT M_I - LEVEL B1

5225

NS

Not reqd

Not required

Err:512

CQB-ETA-CQ002-EGN-DRG-40024

00

BASEMENT M_I - LEVEL B1

5225

NS

Not reqd

Not required

P1B-DWG-M_I-00-ELP-BMD-6000

BP-1B-04-15358

CQB-ETA-CQ002-ELI-DRG-40021

00

BASEMENT M_I - LEVEL B3

LCP SCHEDULES

5475

Need debbas input

LIGHTING

P1B-DWG-M_I-00-ELP-BMD-6001

BP-1B-04-15359

CQB-ETA-CQ002-ELI-DRG-40022

00

BASEMENT M_I - LEVEL B2

LCP SCHEDULES

5475

Need debbas input

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-4000

BP-1B-04-07674

CQB-ETA-CQ002-ETD-DRG-40019

00

BASEMENT M_I

BUILDING M01 ICT SERVICES - LAN NETWORK DISTRIBUTION RISER


DIAGRAM

5825

31-11-2015

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-4001

BP-1B-04-16746

CQB-ETA-CQ002-ETD-DRG-40020

00

BASEMENT M_I

BUILDING M07 ICT SERVICES - LAN NETWORK DISTRIBUTION RISER


DIAGRAM

5825

31-11-2015

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-4002

BP-1B-04-16747

CQB-ETA-CQ002-ETD-DRG-40021

00

BASEMENT M_I

BUILDING I17 ICT SERVICES - LAN NETWORK DISTRIBUTION RISER


DIAGRAM

5825

31-11-2015

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5001

BP-1B-04-08433

CQB-ETA-CQ002-ETD-DRG-40024

00

BASEMENT M_I

ICT RISER DIAGRAMS - M01

5825

31-11-2015

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5002

BP-1B-04-08434

CQB-ETA-CQ002-ETD-DRG-40025

00

BASEMENT M_I

ICT RISER DIAGRAMS - M01

5825

8-12-2015

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5003

BP-1B-04-08435

CQB-ETA-CQ002-ETD-DRG-40026

00

BASEMENT M_I

ICT RISER DIAGRAMS - M01

5825

8-12-2015

8353

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5004

BP-1B-04-08436

CQB-ETA-CQ002-ETD-DRG-40027

00

BASEMENT M_I

ICT RISER DIAGRAMS - M01

5825

8-12-2015

8354

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5005

BP-1B-04-08439

CQB-ETA-CQ002-ETD-DRG-40028

00

BASEMENT M_I

ICT RISER DIAGRAMS - M07

5825

8-12-2015

8355

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5006

BP-1B-04-08440

CQB-ETA-CQ002-ETD-DRG-40029

00

BASEMENT M_I

ICT RISER DIAGRAMS - M07

5825

8-12-2015

8356

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5007

BP-1B-04-08441

CQB-ETA-CQ002-ETD-DRG-40030

00

BASEMENT M_I

ICT RISER DIAGRAMS - M07

5825

16-12-2015

8357

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5008

BP-1B-04-08442

CQB-ETA-CQ002-ETD-DRG-40031

00

BASEMENT M_I

ICT RISER DIAGRAMS - M07

5825

16-12-2015

8358

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5009

BP-1B-04-08443

CQB-ETA-CQ002-ETD-DRG-40032

00

BASEMENT M_I

ICT RISER DIAGRAMS - I17

5825

16-12-2015

8359

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5010

BP-1B-04-08444

CQB-ETA-CQ002-ETD-DRG-40033

00

BASEMENT M_I

ICT RISER DIAGRAMS - I17

5825

16-12-2015

8360

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5011

BP-1B-04-08445

CQB-ETA-CQ002-ETD-DRG-40034

00

BASEMENT M_I

ICT RISER DIAGRAMS - I17

5825

16-12-2015

8361

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5012

BP-1B-04-08446

CQB-ETA-CQ002-ETD-DRG-40035

00

BASEMENT M_I

ICT RISER DIAGRAMS - I17

5825

16-12-2015

8362

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5013

BP-1B-04-08447

CQB-ETA-CQ002-ETD-DRG-40036

00

BASEMENT M_I

ICT RISER DIAGRAMS - I17

5825

16-12-2015

8363

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5201

BP-1B-04-16763

00

BASEMENT M_I

VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - M01

5825

23-12-2015

8364

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5202

00

BASEMENT M_I

VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - M07

5825

23-12-2015

8365

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5203

00

BASEMENT M_I

VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - I17

5825

23-12-2015

8366

M_I

BASEMENTS

IMPACT

ICT SERVICES

P1B-DWG-M_I-00-ICT-BMD-5204

USE
CQB-ETA-CQ002-ETD-DRG-40037
R:
USER:
OLD:
BP-1B-04-16764
OLD:FIRE ALARMCQB-ETA-CQ002-ETD-DRG-40038
CALCULATIONS
FIRE
ALAR
BP-1B-04-16765
CQB-ETA-CQ002-ETD-DRG-40039
M
CALC
BP-1B-04-16766
CQB-ETA-CQ002-ETD-DRG-40040
ULAT
IONS
CQB-ETA-CQ002-EFA-DRG-40016

00

BASEMENT M_I

VOICE & DATA NETWORK BACKBONE RISER DIAGRAM - I17

5825

23-12-2015

00

BASEMENT M_I - LEVEL B1

PHASE 1B SUPER BLOCK M_I BASEMENT M_I FIRE ALARM AYATEM


OPERATION MATRIX

5300

8248

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40151

00

BASEMENT M_I

8249

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40152

00

BASEMENT M_I

8250

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40153

00

BASEMENT M_I

8251

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40154

00

BASEMENT M_I

8252

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40155

00

BASEMENT M_I

8253

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40156

00

BASEMENT M_I

8254

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40157

00

BASEMENT M_I

8257

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40160

00

BASEMENT M_I

8258

M_I

BASEMENTS

IMPACT

SMALL POWER

CQB-ETA-CQ002-EPW-DRG-40161

00

BASEMENT M_I

8272

M_I

BASEMENTS

IMPACT

CONTAINMENT

Err:512

BP-1B-04-30319

CQB-ETA-CQ002-EGN-DRG-40013

03

BASEMENT M_I - LEVEL B3

AREA 2

8273

M_I

BASEMENTS

IMPACT

CONTAINMENT

Err:512

BP-1B-04-30320

CQB-ETA-CQ002-EGN-DRG-40014

03

BASEMENT M_I - LEVEL B3

8275

M_I

BASEMENTS

IMPACT

CONTAINMENT

Err:512

BP-1B-04-30322

CQB-ETA-CQ002-EGN-DRG-40016

03

8276

M_I

BASEMENTS

IMPACT

CONTAINMENT

Err:512

BP-1B-04-30323

CQB-ETA-CQ002-EGN-DRG-40017

8277

M_I

BASEMENTS

IMPACT

CONTAINMENT

Err:512

Err:512

8283

M_I

BASEMENTS

IMPACT

CONTAINMENT

Err:512

8313

M_I

BASEMENTS

IMPACT

LIGHTING

8314

M_I

BASEMENTS

IMPACT

8347

M_I

BASEMENTS

IMPACT

8348

M_I

BASEMENTS

IMPACT

8349

M_I

BASEMENTS

8350

M_I

8351

M_I

8352

ENLARGED PLAN
(SHEET 3 OF 3)
PHASE 1B - SUPERBLOCK M_I LEVEL BASEMENT-3 ELECTRICAL ROOM
ENLARGED PLAN (SHEET 1 OF 3)
PHASE 1B - SUPER BLOCK M_I LEVEL BASEMENT-3 ELECTRICAL ROOM
ENLARGED PLAN ELECTRICAL ROOM ENLARGED PLAN
PHASE 1B - SUPER BLOCK M_I LEVEL BASEMENT-3 ELECTRICAL ROOM
ENLARGED PLAN (SHEET 3 OF 3)
PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL B2 M_I MV ROOM
ENLARGED PLAN
SHEET 1 OF 2
PHASE 1B - SUPER BLOCK M_I BASEMENT M_I - LEVEL B2 M_I MV ROOM
ENLARGED PLAN M_I MV ROOM ENLARGED PLAN

AREA 4

ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA
ETA

8380

M_I

BASEMENTS

IMPACT

FIRE ALRAM

8512

SERVICE
CORIDOR

BASEMENTS

IMPACT

HVAC & PIPING

Err:512

BP-1B-04-17426

CQB-ETA-CQ002-MCW-DRG-50047

01

SERVICE CORRIDOR

MVAC MOTOR CONTROL PANEL SCHEMATIC DIAGRAM

5575

U/R

U/R

8593

SERVICE
CORIDOR

BASEMENTS

IMPACT

SMALL POWER

2081-ARU-INF-PTD-DWG-6100

Err:512

CQB-ETA-CQ002-EPW-DRG-50033

00

SERVICE CORRIDOR

NETWORK SUBSTATIONS AND SERVICE CORRIDOR LOCATION PLAN

5225

NS

Not reqd

Not required

8594

SERVICE
CORIDOR

BASEMENTS

IMPACT

SMALL POWER

2081-ARU-INF-MEP-DWG-0451

Err:512

CQB-ETA-CQ002-EPW-DRG-50057

00

SERVICE CORRIDOR

LV POWER SYSTEM DISTIBUTION SYSTEM SCHEMATIC

5475

NS

Not reqd

Not required

8634

SERVICE
CORIDOR

BASEMENTS

IMPACT

EMERGENCY LIGHTING

Err:512

Err:512

CQB-ETA-CQ002-ELS-DRG-50034

00

SERVICE CORRIDOR

Lighting Control

5475

NS

Not reqd

Not required

8635

SERVICE
CORIDOR

BASEMENTS

IMPACT

EMERGENCY LIGHTING

Err:512

Err:512

CQB-ETA-CQ002-ELS-DRG-50035

00

SERVICE CORRIDOR

Lighting Control

5475

NS

Not reqd

Not required

8693

SERVICE
CORIDOR

BASEMENTS

IMPACT

BMS

2081-ARU-INF-MEP-DWG-0163

BP-1B-04-06217

CQB-ETA-CQ002-EBM-DRG-50033

00

SERVICE CORRIDOR

BMS SCHEMATICS

5075

After Material submital approval JBK will be submit

8713

SERVICE
CORIDOR

BASEMENTS

IMPACT

HVAC & PIPING

2081-ARU-INF-MEP-DWG-0141

BP-1B-04-07368

CQB-ETA-CQ002-MCW-DRG-50037

01

SERVICE CORRIDOR

STAIRCASE PRESSURIZATION SYSTEM SCHEMATIC DIAGRAM

5575

Not in eta scope

8714

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07376

CQB-ETA-CQ002-MCW-DRG-50038

01

SERVICE CORRIDOR

VENTILATION SYSTEM FOR PHASE 1B SCHEMATIC DIAGRAM

5575

U/R

C - SEPT 17 2015

8717

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07306

CQB-ETA-CQ002-MCW-DRG-50041

01

SERVICE CORRIDOR

MVAC MOTOR CONTROL PANEL SCHEMATIC DIAGRAM

5575

U/R

C - SEPT 13 2015

8718

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-17425

CQB-ETA-CQ002-MCW-DRG-50042

00

SERVICE CORRIDOR

BMS FOR WHOLE DEVELOPMENT SCHEMATIC DIAGRAM

5575

BMS Material approval required

8720

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07308

CQB-ETA-CQ002-MCW-DRG-50045

01

SERVICE CORRIDOR

MVAC MOTOR CONTROL PANEL SCHEMATIC DIAGRAM

5575

U/R

U/R

8721

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07309

CQB-ETA-CQ002-MCW-DRG-50046

01

SERVICE CORRIDOR

MVAC MOTOR CONTROL PANEL SCHEMATIC DIAGRAM

5575

U/R

U/R

8722

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07375

CQB-ETA-CQ002-MCW-DRG-50051

00

SERVICE CORRIDOR

VENTILATION SYSTEM, OPERATION MODE SCHEDULE

5575

U/R

U/R

8723

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07293

CQB-ETA-CQ002-MCW-DRG-50052

00

SERVICE CORRIDOR

VENTILATION SYSTEM, OPERATION MODE SCHEDULE

5575

U/R

U/R

8724

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07374

CQB-ETA-CQ002-MCW-DRG-50058

03

SERVICE CORRIDOR

MVAC INSTALLATION DETAILS PHASE 1B

5575

U/R

U/R

8726

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07373

CQB-ETA-CQ002-MCW-DRG-50060

03

SERVICE CORRIDOR

MVAC INSTALLATION DETAILS PHASE 1B

5575

U/R

U/R

8729

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07371

CQB-ETA-CQ002-MCW-DRG-50063

03

SERVICE CORRIDOR

MVAC INSTALLATION DETAILS PHASE 1B

5575

U/R

U/R

8731

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

HVAC & PIPING

Err:512

BP-1B-04-07369

CQB-ETA-CQ002-MCW-DRG-50065

03

SERVICE CORRIDOR

MVAC INSTALLATION DETAILS PHASE 1B

5575

U/R

U/R

8770

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

PLUMBING

Err:512

BP-1B-04-26684

CQB-ETA-CQ002-MDR-DRG-50047

01

SERVICE CORRIDOR

DRAINAGE MOTOR CONTROL PANEL SHCEMATIC

5600

ELECTRICAL

8771

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

PLUMBING

Err:512

BP-1B-04-07382

CQB-ETA-CQ002-MDR-DRG-50048

01

SERVICE CORRIDOR

DRAINAGE MOTOR CONTROL PANEL SHCEMATIC

5600

ELECTRICAL

8772

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

PLUMBING

Err:512

BP-1B-04-07383

CQB-ETA-CQ002-MDR-DRG-50049

01

SERVICE CORRIDOR

DRAINAGE MOTOR CONTROL PANEL SHCEMATIC

5600

ELECTRICAL

8853

SERVICE
CORIDOR

BASEMENTS

IMPACT

FIRE FIGHTING

CQB-ETA-CQ002-MFP-DRG-50043

00

SERVICE CORRIDOR

PHASE 1B SERVICE CORRIDOR - PR-4 LEVEL-B2 FIRE PROTECTION CLEAN


AGENT SYSTEM LAYOUT (SHEET 1 OF 2)

5300

WAITING FOR SUPPLIER

8877

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

Err:512

CQB-ETA-CQ002-EPW-DRG-50036

00

SERVICE CORRIDOR

11KV DISTRBUTION CABLES CONSTRUCTION & INSTALLATION DETAILS

5225

RT

8882

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

Err:512

CQB-ETA-CQ002-EPW-DRG-50041

00

SERVICE CORRIDOR

SUBSTATION NO. 3 ELECTRICAL INFRASTRUCTURE PLANS & SECTIONS

5225

NS

8886

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

Err:512

CQB-ETA-CQ002-EPW-DRG-50045

00

SERVICE CORRIDOR

11KV DISTRIBUTION NETWORK WESTERN SITEWIDE CABLE JOINTING


DETAILS

5225

8889

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

Err:512

CQB-ETA-CQ002-EPW-DRG-50048

00

SERVICE CORRIDOR

HOD2 - 66/11KV PRIMARY SUBSTATION, ELECTRCAL SINGLE LINE DIAGRAM

5225

8890

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

Err:512

CQB-ETA-CQ002-EPW-DRG-50049

00

SERVICE CORRIDOR

SERVICE CORRIDOR SUBSTATIONS, 11KV SUPPLY ARRANGEMENT

8891

SERVICE
CORIDOR

BASEMENTS

IMPACT

SMALL POWER

Err:512

BP-1B-04-06319

CQB-ETA-CQ002-EPW-DRG-50050

02

SERVICE CORRIDOR

8898

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

Err:512

CQB-ETA-CQ002-EPW-DRG-50058

00

SERVICE CORRIDOR

8906

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-05762

CQB-ETA-CQ002-EPW-DRG-50068

00

SERVICE CORRIDOR - LEVEL B2

8911

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

Err:512

BP-1B-04-06417

CQB-ETA-CQ002-EPW-DRG-50073

01

SERVICE CORRIDOR

8923

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

SMALL POWER

2081-ARU-MEP-DWG-0430

Err:512

CQB-ETA-CQ002-EPW-DRG-50085

00

SERVICE CORRIDOR

8966

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

CONTAINMENT

Err:512

Err:512

CQB-ETA-CQ002-IHV-DRG-50021

00

SERVICE CORRIDOR - LEVEL B2 LOCATION 9 11KV CABLE CONTAINMENT LAYOUT - LOCATION 9

8970

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

CONTAINMENT

Err:512

Err:512

CQB-ETA-CQ002-IHV-DRG-50025

00

SERVICE CORRIDOR - LEVEL B1

8979

SERVICE
CORIDOR

BASEMENTS

IMPACT

LIGHTING

2081-ARU-INF-LGT-DWG-0031

BP-1B-04-05887

CQB-ETA-CQ002-ELI-DRG-50039

00

SERVICE CORRIDOR - LEVEL B1

8980

SERVICE
CORIDOR

BASEMENTS

IMPACT

LIGHTING

2081-ARU-INF-LGT-DWG-0032

BP-1B-04-05888

CQB-ETA-CQ002-ELI-DRG-50040

00

8981

SERVICE
CORIDOR

BASEMENTS

IMPACT

LIGHTING

2081-ARU-INF-LGT-DWG-0033

BP-1B-04-05889

CQB-ETA-CQ002-ELI-DRG-50041

9001

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

QTEL SERVICES

Err:512

BP-1B-04-26715

9002

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

QTEL SERVICES

Err:512

BP-1B-04-26716

18-Oct-12

COMMENTED DRG WITH JBK (Input requured from JBK)

U/R

U/R

Not reqd

Not required

NS

N/S

Waiting for Material Submittal Approval for cable joint

NS

Not reqd

Not required

5475

NS

Not reqd

Not required

SUBSTATION NO. 2 ELECTRICAL MV SCHEMATIC

5475

dwg superceeded by another dwg

UPS SYSTEM SCHEMATIC

5475

NS

Not reqd

Not Required

ELECTRICAL INSTALLATION DETAILS

5475

18-Nov-15

Electrical Plantroom Details

5475

19-Nov-15

5475

NS

5225

NS

21-Nov-15

N/S

11KV CABLE CONTAINMENT LAYOUT- LOCATION -12

5225

NS

22-Nov-15

N/S

Lighting Control

5475

N/S

Need debbas input

SERVICE CORRIDOR - LEVEL B1

Lighting Control

5475

Need debbas input

00

SERVICE CORRIDOR - LEVEL B1

Lighting Control

5475

Need debbas input

CQB-ETA-CQ002-ITD-DRG-50020

00

SERVICE CORRIDOR

DETAILS AND SECTIONS

5825

CQB-ETA-CQ002-ITD-DRG-50021

00

SERVICE CORRIDOR

TELECOMMUNICATION QTEL DETAILS

5825

LOCATION
12

22-Oct-12

17-Nov-15

23-Oct-12

23-Oct-12

C
C

dwg superceeded by EPW-50093

Not reqd

Not required

9032

SERVICE
CORIDOR

BASEMENTS

IMPACT

FIRE ALRAM

2081-ARU-INF-FIR-DWG-0140

BP-1B-04-26709

CQB-ETA-CQ002-EFA-DRG-50035

00

SERVICE CORRIDOR

Automatic Fire Detection and Alarm System

5300

COMMENTED DRG WITH JBK (Input requured from JBK)

9033

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

FIRE ALRAM

Err:512

BP-1B-04-26710

CQB-ETA-CQ002-EFA-DRG-50036

00

SERVICE CORRIDOR

Automatic Fire Detection and Alarm System

5300

COMMENTED DRG WITH JBK (Input requured from JBK)

9045

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-07440

CQB-ETA-CQ002-EBM-DRG-50035

00

SERVICE CORRIDOR

BMS SCHEMATICS

5075

17-Dec-12

JBK

After Material submital approval JBK will be submit

9046

SERVICE
CORIDOR

BASEMENTS

NON-IMPACT

BMS

Err:512

BP-1B-04-07441

CQB-ETA-CQ002-EBM-DRG-50036

00

SERVICE CORRIDOR

BMS FOR WHOLE DEVELOPMENT SCHEMATIC DIAGRAM

5075

17-Dec-12

JBK

After Material submital approval JBK will be submit

9130

MOSQUE

BUILDING - H_17

NON-IMPACT

SMALL POWER

Err:512

Err:512

MOSQUE H17 - ROOF

EARTHING & LIGHTNING PROTECTION

5225

NS

24-Nov-15

9131

MOSQUE

BUILDING - H_17

NON-IMPACT

SMALL POWER

Err:512

Err:512

MOSQUE H17

EARTHING RISER DIAGRAMS

5225

NS

24-Nov-15

9136

MOSQUE

BUILDING - H_17

NON-IMPACT

LIGHTING

Err:512

Err:512

MOSQUE H17

LIGHTING SECTIONS & ELEVATIONS STAIR 01 & 02

5475

9137

MOSQUE

BUILDING - H_17

NON-IMPACT

LIGHTING

Err:512

BP-1B-04-27885

MOSQUE H17

OVERALL LIGHTING CONTROL RISER DIAGRAM

5475

9154

MOSQUE

BUILDING - H_17

NON-IMPACT

SECURITY

Err:512

BP-1B-04-10606

MOSQUE H17

SECURITY RISER DIAGRAM

5825

9160

MOSQUE

BUILDING - H_17

NON-IMPACT

FIRE ALRAM

Err:512

Err:512

MOSQUE H17

FIRE FIGHTER'S SMOKE CONTROL PANEL DETAILS

5300

9165

MOSQUE

BUILDING - H_17

NON-IMPACT

FIRE ALRAM

Err:512

MOSQUE H17

PHASE 1B SUPER BLOCK HHH MOSQUE- H17 FIRE ALARM MIMIC PANEL
DIAGRAM

5300

9169

MOSQUE

BUILDING - H_17

NON-IMPACT

AUDIO VISUAL

Err:512

MOSQUE H17

AUDIO VISUAL SYSTEMS DETAILS

5075

9194

COOL POOL

NON-IMPACT

HVAC & PIPING

Err:512

PHASE 1B - SUPER BLOCK I02 BASEMENT I02 - LEVEL B1 - AREA 1 COOL


POOL ETS ROOM CHILLED WATER PIPING ENLARGED PLAN LAYOUT

5075

9207

COOL POOL

NON-IMPACT

SMALL POWER

Err:512

5075

25-Nov-15

9212

COOL POOL

NON-IMPACT

SMALL POWER

5075

26-Nov-15

9213

COOL POOL

NON-IMPACT

ICT SERVICES

5075

29-12-2015

9214

COOL POOL

NON-IMPACT

PHASE 1B BHRAHATH AL NOUQ ICT SERVICES FLOOR PLAN FOR COOL


POOL AREA B (SHEET 02 OF 02 )

5075

29-12-2015

9280

GENERAL

OVER ALL

9281

GENERAL

9286

GENERAL

9287

CQB-ETA-CQ002-ELP-DRG-27001
CQB-ETA-CQ002-ELP-DRG-27002
CQB-ETA-CQ002-ELI-DRG-27004
CQB-ETA-CQ002-ELI-DRG-27005
CQB-ETA-CQ002-ESC-DRG-27003
CQB-ETA-CQ002-EFA-DRG-27004
CQB-ETA-CQ002-EFA-DRG-27009

Err:512

CQB-ETA-CQ002-EAV-DRG-27003

00
00
00
00
01
00
00
00

N/S
N/S

NS

Not reqd

not required

Need debbas input

29-11-2015

C
C
NS

15-11-2015

ETA

Material submittal not done ( Action by JBK)

Material submittal not done ( Action by JBK)

N/S

ETA

CQB-ETA-CQ002-MCW-DRG-09123

00

CQB-ETA-CQ002-EPW-DRG-09253

00

Err:512

CQB-ETA-CQ002-EPW-DRG-09258

00

Err:512

CQB-ETA-CQ002-ETD-DRG-10920

00

ICT SERVICES

Err:512

CQB-ETA-CQ002-ETD-DRG-10921

00

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-EEP-BMD-4003

BP-1B-04-26305

CQB-ETA-CQ002-EGN-DRG-03004

01

GENERAL

EARTHING & LIGHTNING PROTECTION STANDARD DETAILS SHEET 3 OF 3

5225

26-Nov-15

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-EPP-BMD-4000

BP-1B-04-26718

CQB-ETA-CQ002-EGN-DRG-03005

01

GENERAL

POWER STANDARD DETAILS SHEET 1 OF 3

5225

28-Nov-15

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4010

BP-1B-04-15017

CQB-ETA-CQ002-EGN-DRG-03010

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 1 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4011

BP-1B-04-15018

CQB-ETA-CQ002-EGN-DRG-03011

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 2 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9288

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4012

BP-1B-04-15019

CQB-ETA-CQ002-EGN-DRG-03012

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 3 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9289

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4013

BP-1B-04-15020

CQB-ETA-CQ002-EGN-DRG-03013

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 4 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9290

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4014

BP-1B-04-15021

CQB-ETA-CQ002-EGN-DRG-03014

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 5 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9291

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4016

BP-1B-04-15022

CQB-ETA-CQ002-EGN-DRG-03015

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 6 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9292

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4017

BP-1B-04-15023

CQB-ETA-CQ002-EGN-DRG-03016

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 7 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9293

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4018

BP-1B-04-15024

CQB-ETA-CQ002-EGN-DRG-03017

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 8 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9294

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4019

BP-1B-04-15025

CQB-ETA-CQ002-EGN-DRG-03018

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 9 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9295

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4020

BP-1B-04-15026

CQB-ETA-CQ002-EGN-DRG-03019

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 10 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9296

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4021

BP-1B-04-15027

CQB-ETA-CQ002-EGN-DRG-03020

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 11 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9297

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-4022

BP-1B-04-15028

CQB-ETA-CQ002-EGN-DRG-03021

00

GENERAL

STANDARD DETAILS SITE LIGHTING DETAILS SHEET 12 OF 12

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9298

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5010

BP-1B-04-15029

CQB-ETA-CQ002-EGN-DRG-03022

00

GENERAL

STANDARD DETAILS SITE LIGHT FIXTURE SCHEDULE SHEET 01

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9299

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5011

BP-1B-04-15030

CQB-ETA-CQ002-EGN-DRG-03023

00

GENERAL

STANDARD DETAILS SITE LIGHT FIXTURE SCHEDULE SHEET 02

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9300

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5012

BP-1B-04-15031

CQB-ETA-CQ002-EGN-DRG-03024

00

GENERAL

STANDARD DETAILS SITE LIGHT FIXTURE SCHEDULE SHEET 03

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9301

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5013

BP-1B-04-15032

CQB-ETA-CQ002-EGN-DRG-03025

00

GENERAL

STANDARD DETAILS SITE LIGHT FIXTURE SCHEDULE SHEET 04

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9302

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5014

BP-1B-04-15033

CQB-ETA-CQ002-EGN-DRG-03026

00

GENERAL

STANDARD DETAILS SITE LIGHT FIXTURE SCHEDULE SHEET 05

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9303

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5015

BP-1B-04-15034

CQB-ETA-CQ002-EGN-DRG-03027

00

GENERAL

STANDARD DETAILS SITE LIGHT CUT SHEET 1

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9304

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5016

BP-1B-04-15035

CQB-ETA-CQ002-EGN-DRG-03028

00

GENERAL

STANDARD DETAILS SITE LIGHT CUT SHEET 2

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9305

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5017

BP-1B-04-15036

CQB-ETA-CQ002-EGN-DRG-03029

00

GENERAL

STANDARD DETAILS SITE LIGHT CUT SHEET 3

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9306

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ESU-BMD-5018

BP-1B-04-15037

CQB-ETA-CQ002-EGN-DRG-03030

00

GENERAL

STANDARD DETAILS SITE LIGHT CUT SHEET 4

5475

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9313

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ELP-BMD-4000

BP-1B-04-15043

CQB-ETA-CQ002-EGN-DRG-03037

00

GENERAL

STANDARD DETAILS LIGHTING STANDARD DETAILS SHEET 1

5225

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9314

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ELP-BMD-4001

BP-1B-04-15044

CQB-ETA-CQ002-EGN-DRG-03038

00

GENERAL

STANDARD DETAILS LIGHTING STANDARD DETAILS SHEET 2

5225

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9315

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ELP-BMD-4002

BP-1B-04-15045

CQB-ETA-CQ002-EGN-DRG-03039

00

GENERAL

STANDARD DETAILS LIGHTING STANDARD DETAILS SHEET 3

5225

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9316

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ELP-BMD-4003

BP-1B-04-15046

CQB-ETA-CQ002-EGN-DRG-03040

00

GENERAL

STANDARD DETAILS LIGHTING STANDARD DETAILS SHEET 4

5225

C (Not reqd)

Dwg superceeded by cracknell IFC (Not required)

9322

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ICT-BMD-4004

BP-1B-04-15052

CQB-ETA-CQ002-EGN-DRG-03046

00

GENERAL

ICT SERVICES STANDARD DETAILS (SHEET 2 OF 2)

5825

ELV drawing (WAP)

9323

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ICT-BMD-4005

BP-1B-04-15053

CQB-ETA-CQ002-EGN-DRG-03047

00

GENERAL

ICT SERVICES - SMART HOME SYSTEMS BLOCK DIAGRAM

5825

ELV drawing - ICT

9324

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ICT-BMD-4010

BP-1B-04-15054

CQB-ETA-CQ002-EGN-DRG-03048

00

GENERAL

ICT SERVICES - RESIDENTIAL NETWORK TOPOLOGY DIAGRAM

5825

ELV drawing - ICT

9325

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ICT-BMD-4011

BP-1B-04-15055

CQB-ETA-CQ002-EGN-DRG-03049

00

GENERAL

ICT SERVICES OFFICE/COMMERCIAL NETWORK TOPOLOGY DIAGRAM

5825

ELV drawing - ICT

9326

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ICT-BMD-4012

BP-1B-04-15056

CQB-ETA-CQ002-EGN-DRG-03050

00

GENERAL

ICT SERVICES NETWORK DISTRIBUTION RISER DIAGRAM

5825

ELV drawing - ICT

9333

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-SEC-BMD-4005

BP-1B-04-15063

CQB-ETA-CQ002-EGN-DRG-03057

00

GENERAL

SECURITY STANDARD DETAILS SHEET 6 OF 6

5825

ELV drawing - SECURITY

9335

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-FFA-BMD-4000

BP-1B-04-06070

CQB-ETA-CQ002-EGN-DRG-03059

00

GENERAL

FIRE ALARM STANDARD DETAILS

5300

ELV drawing - FIRE ALARM

9338

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-DWG-000-03-ADV-BMD-4001

BP-1B-04-15067

CQB-ETA-CQ002-EGN-DRG-03062

00

GENERAL

RESIDENCE DISTRIBUTED CONTROL SIGNAL FLOW DIAGRAM

5225

ELV drawing - LC / ICT / BMS

9339

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

Err:512

Err:512

CQB-ETA-CQ002-EGN-DRG-03063

00

GENERAL

ELECTRICAL CALCULATIONS

5225

NS

Not reqd

Not required

9340

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

Err:512

Err:512

CQB-ETA-CQ002-EGN-DRG-03064

00

GENERAL

LIGHTING - ELECTRICAL CALCULATIONS VOL A

5225

NS

Not reqd

Not required

9341

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-H-I1-I2-WD ELEC CALCS VOL B

Err:512

CQB-ETA-CQ002-EGN-DRG-03065

00

GENERAL

POWER / ELV ELECTRICAL CALCULATIONS VOL B

5225

NS

Not reqd

Not required

9342

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-H-I1-I2-TD ELEC CALCS VOL A

Err:512

CQB-ETA-CQ002-EGN-DRG-03066

00

GENERAL

LIGHTING - ELECTRICAL CALCULATIONS VOL A

5225

NS

Not reqd

Not required

9343

GENERAL

OVER ALL

IMPACT

GENERAL ELECTRICAL

P1B-H-I1-I2-TD ELEC CALCS VOL B

Err:512

CQB-ETA-CQ002-EGN-DRG-03067

00

GENERAL

POWER / ELV ELECTRICAL CALCULATIONS VOL B

5225

NS

Not reqd

Not required

9345

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

BP-1B-04-26169

CQB-ETA-CQ002-EGN-DRG-03069

00

GENERAL

STANDRAD DETAILS LIGHTING STANDRAD DETAILS SHEET - 5

5225

C (Not reqd)

NOT REQUIRED - DWG SUPERCEEDED BY LIGHTING INSTALLATION DWG

9348

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

BP-1B-04-19071

CQB-ETA-CQ002-EGN-DRG-03072

00

GENERAL

TYPICAL INSTALLATION DETAIL - Switch socket l Keypad

5225

NS

Approved dwg/NS

9360

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

Err:512

CQB-ETA-CQ002-EGN-DRG-03084

00

GENERAL

5225

NS

Not reqd

Not required

9365

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

BP-1B-04-22938

CQB-ETA-CQ002-EGN-DRG-03089

00

GENERAL

LIGHTING INSTALLATION DETAIL - AF20-4 , AF20-8, AF20-8E

5225

NS

Approved dwg/NS

9375

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

BP-1B-04-31477

CQB-ETA-CQ002-EGN-DRG-03099

00

GENERAL

TYPICAL INSTALLATION DETAIL - AH21

5225

NS

Approved dwg/NS

9392

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

BP-1B-04-37940

CQB-ETA-CQ002-EGN-DRG-03116

00

GENERAL

TYPICAL INSTALLATION DETAIL FOR LIGHT FIXTURE AMR11, AMR16,


AMR17 & ACF5

5225

28-Oct-15

ETA

9404

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

BP-1B-04-39628

CQB-ETA-CQ002-EGN-DRG-03128

01

GENERAL

TYPICAL INSTALLATION DETAIL FOR LIGHT FIXTURE


(AMR17/AMR11/AMR16 & ACF5 )

5225

28-Oct-15

ETA

9409

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

CQB-ETA-CQ002-EGN-DRG-03133

00

GENERAL

TYPICAL INSTALLATION DETAIL FOR LIGHT FIXTURE F44 & F67 & E1 & L9

5225

31-Oct-15

ETA

9410

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

CQB-ETA-CQ002-EGN-DRG-03134

01

GENERAL

TYPICAL INSTALLATION DETAIL FOR LIGHT FIXTURE (L2&F52&AH22)

5225

31-Oct-15

ETA

9411

GENERAL

OVER ALL

NON-IMPACT

GENERAL ELECTRICAL

Err:512

CQB-ETA-CQ002-EGN-DRG-03135

00

GENERAL

TYPICAL INSTALLATION DETAIL FOR LIGHT FIXTURE L5 & L1 & F28 & F56E

5225

31-Oct-15

ETA

Err:512

PHASE 1B - BARAHAT AL NOUQ COOL POOL STANDBY DISTRIBUTION


SCHEMATIC DIAGRAMS
PHASE 1B - BARAHAT AL NOUQ COOL POOL DISTRIBUTION BOARD
SCHEDULES
(SHEET-5)
PHASE 1B BHRAHATH AL NOUQ ICT SERVICES FLOOR PLAN FOR COOL
POOL AREA A ( SHEET 01 OF 02)

U/R

U/R

ETA

ETA
ETA
ETA

C
C

Not reqd

USER:
USER:
OLD :SECURITY DOOR
OLD :SECURITY
SCHEDULEDOOR
SCHEDULE

USER:
USER:
OLD:SECURITY SCHEDULES
OLD:SECURITY SCHEDULES

USER:
USER:
OLD:SECURITY SCHEDULES
OLD:SECURITY SCHEDULES

USER:
USER:
OLD:SECURITY SCHEDULES
OLD:SECURITY SCHEDULES

USER:
USER:
OLD:SECURITY SCHEDULES
OLD:SECURITY SCHEDULES

USER:
USER:
OLD:SECURITY SCHEDULE
OLD:SECURITY SCHEDULE

USER:
USER:
OLD:SECURITY SCHEDULE
OLD:SECURITY SCHEDULE

USER:
USER:
OLD:FIRE ALARM OLD:FIRE
RISER DIAGRAMS
ALARM RISER
DIAGRAMS

USER:
USER:
OLD:FIRE ALARM OLD:FIRE
RISER DIAGRAMS
ALARM RISER
DIAGRAMS

USER:
USER:
OLD:SECURITY CAMERA
OLD:SECURITY
SCHEDULE
CAMERA
SCHEDULE

USER:
USER:
OLD:FIRE ALARM OLD:FIRE
CALCULATIONS
ALARM
CALCULATIONS

You might also like