WASHDOWN AREA SETDOWN. 1:80 GRADE TO


PIT. REFER TO HYDRAULIC DRAWINGS FOR
CONFIRMATION OF EXTENT & LOCATION.
MAINTAIN SLAB THICKNESS & REINFORCEMENT
COVER THROUGHOUT.

A1

A3

LOCALLY RAMP UP TO DOOR.


(TYPICAL TO ALL DOOR LOCATIONS.)

B
FB3

FOOTING SCHEDULE

VERANDAH SLAB SET DOWN. REFER TO


ARCHITECTURAL AND CIVIL DRAWINGS
FOR LEVELS AND DETAILS. BROOM FINISH.

FB3

FB3

FB3

MARK

SIZE (W x D)

REINFORCEMENT

FB1

300 W x 600 D

3-N16 BARS TOP & BTM, W8-800 LIGATURES

FB2

300 W x 600 D

3-N16 BARS TOP & BTM, W8-800 LIGATURES

FB3

300 W x 600 D

3-N16 BARS TOP & BTM, W8-800 LIGATURES

P1

600 Sq x 300 D

SLAB THICKENING FOR VEHICLE HOIST.


SL92 MESH BOTTOM.

FB3

150

FB3

FB3

FB3

FB3

SL92 TOP,
30 COVER

EXISTING SERVICES PIPE.


(C.O.S.)
CJ

EXISTING SERVICES PIPE.


(C.O.S.)
FB1

FB1

FB1

FB1

LEGEND

FB3

2A
3

CJ

DENOTES 2-N16 CRACK CONTROL BARS x 2000 LONG,


TIED TO UNDERSIDE OF MESH.

FB3

FB1

FB1

SL92 TOP,
30 COVER

130

SL92 TOP,
30 COVER

SL92 TOP,
30 COVER

130

DENOTES STEP IN FOOTING BEAM. REFER TO DETAIL


ON S101.
DENOTES BACK-HOE PIER x 1000 LONG, ON EITHER
SIDES OF EXISTING SERVICES PIPE. FOUNDED 150
(MIN) BELOW ADJACENT PIPE. LIGATURES TO BE AT
400 CTS WHERE FOOTING BEAMS SPAN OVER PIPE.

P1

P1

5A
CJ

CJ

FB3

FB1

P1

P1

150
FB1

DENOTES SLAB REINFORCEMENT AND COVER.

4A

FB3

DENOTES SLAB THICKNESS.

DENOTES CONTROL JOINT IN MASONRY VENEER


WALL. REFER TO SHEET S101 FOR DETAILS.

6
FB1

A4 B1

B2

CONFIRM LOCATION & TYPE OF HOIST


WITH SCHOOL & PROVIDE PAD TO SUIT.

NOTES: 1.) ALL INTERNAL FOOTINGS 'FB2' (U.N.O.)


2.) CONCRETE F'c=32 MPa
3.) REFER TO STEEL FRAMING PLANS FOR
COLUMN & BASE PLATE LOCATIONS.

FOOTING AND CONTROL JOINT PLAN


SCALE 1:100

1000

2000

4000

SCALE (mm) 1:100

6000

CJ

AU

PROVIDE 15mm LIP / REBATE FOR ROLLER


DOOR OPENING AND LOCALLY RAMP SLAB
UP TO ROLLER DOOR.
(TYPICAL TO ALL ROLLER DOOR
LOCATIONS.)

A2

FB1
CJ

FB1

RAFT FOOTING NOTES


1.

FOOTING PLAN TO BE READ IN CONJUNCTION WITH SOIL REPORT FOR GUIDANCE. THE CONTRACTOR SHALL EXAMINE AND COMPLY WITH ALL
RECOMMENDATIONS OUTLINED IN THE SOIL REPORT.

2.

ALL FOOTING BEAM / PAD SIZES TO BE AS INDICATED ON DRAWING AND FOOTING SCHEDULE.

3.

ALL RAFT FOOTINGS AND SLABS ON GROUND SHALL BE FOUNDED IN CERTIFIED CONTROLLED FILL / NATURAL SOIL.

4.

FOOTINGS MUST NOT BE FOUNDED IN NON ENGINEERED FILL, SOFTENED OR DISTURBED NATURAL SOILS OR ORGANIC TOPSOIL. WHERE ENCOUNTERED AT
FOUNDING LEVEL, EXCAVATIONS MUST BE DEEPENED.

5.

BASE COURSE FOR SLAB TO BE 100mm THICK LAYER OF QUARRY RUBBLE OR APPROVED UNDERFLOOR FILL COMPACTED TO 98% MMDD.

6.

WHERE VAPOUR BARRIER IS REQUIRED, THE WORKING SURFACE MUST BE FREE OF ANY SHARP AGGREGATE WHICH COULD DAMAGE THE VAPOUR BARRIER,
AND BLINDING SAND SHALL BE PROVIDED WHERE NECESSARY.

7.

PLACE 0.2mm THICK POLYETHYLENE MEMBRANE ('FORTECON' OR EQUIVALENT) TO UNDERSIDE OF SLAB AND BEAMS. LAP ALL JOINTS BY 300 MINIMUM AND
SEAL WITH 50 WIDE TAPE. TAPE ALL PENETRATIONS TO ENSURE MAINTENANCE OF BARRIER.

8.

SPLICES AND LAPS IN ALL BARS TO BE 50xDIA UNO ON DESIGN DRAWINGS.

9.

SPLICES IN FABRIC TO OVERLAP OF ONE PANEL PLUS 25mm UNO ON DESIGN DRAWINGS

10.

ALL REINFORCEMENT SHALL BE SECURELY SUPPORTED IN ITS CORRECT POSITION DURING CONCRETING BY APPROVED BAR CHAIRS, SPACERS OR SUPPORT
BARS. REFER TO ARCHITECTURAL DRAWINGS FOR PRECISE LOCATION AND DEPTH OF FLOOR SLAB SETDOWNS AND REBATES.

11.

FORMWORK SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH AS 3610. ALL WORK AND MATERIALS SHALL COMPLY WITH AS2870 AND AS3798 AND
THE STANDARDS REFERENCED THEREIN, EXCEPT WHERE VARIED BY THE CONTRACT DOCUMENTS.

12.

ALL FOOTING EXCAVATIONS SHALL BE CLEANED OF LOOSE MATERIAL AND WATER PRIOR TO AND DURING CONSTRUCTION OF THE FOOTINGS.

13.

UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL PROVIDE FORMWORK WHERE THE SIDES OF THE FOOTING EXCAVATIONS ARE NOT STABLE. WHERE
OVER-EXCAVATION IS REQUIRED IN ORDER TO ACHIEVE THE REQUIRED FOUNDING LEVELS, THE ADDITIONAL EXCAVATION SHALL BE BACKFILLED WITH GRADE
N12 MASS CONCRETE.

14.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT FOOTING EXCAVATIONS ARE INSPECTED BY A SUITABLY QUALIFIED ENGINEER IN ORDER TO
VERIFY THE ADEQUACY OF THE FOUNDATION BEARING CAPACITY.

15.

ALL EXPOSED CONCRETE FACES TO USE CLASS 2C FORMWORK IN ACCORDANCE WITH AS3610.