Safety Examination 2013

Name:

Date:

Designation:

Marks Obtained:

/100

Part I
2*20=40 Marks
1. What is Suspend load?
2. Explain different types of lifting Equipments ?
3. What is the use of out riggers in Mobile crane?
4. What is Maximum efficiency of a hand spliced sling?
5. How many times web slings carry beyond load?
6. What are possibilities cause of sling damage?
7. How many minimum clamps provided in a iron sling socket?
8. Explain different parts of wire rope sling?
9. How many strand are there in one wire rope sling?
10.How many wires are there in a strand?
11.Web sling said to be damaged in case of ---------- minimum wires damaged.
12.How to check hook?
13.What is the suitable angle to lift any material?
14. Equipments permitted to lift beyond SWL. (Yes/No)
15.How many types lifting tools are there?
16.What is the SWL of a 24 mm web sling?
17.Which type of materials avoided in web sling?
18.What is minimum length of Guide rope?
19.Which is appropriate position to lift any material? (Vertically/Horizontally)
20.Contact number of IPL safety officer & TIEJUN Ambulance Driver?

Part II (Answer any Six)


Marks
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.

6*10=60

Explain safe hoisting Procedures day and Night ?


What is cause of Equipment Collapse?
What is importance of hand signal in lifting process?
What is usage of load chart?
What actions should be taken in an Emergency situation?
What are the safety precaution to be taken to avoid fire incident during Gas cutting?
What is the responsibility of Site Engg. Rigger, Operator, helper during Hosting?
What is safe procedures for container Loading Unloading?
What is the procedure of housekeeping?
What speed control ? why it is necessary?