Professional Documents
Culture Documents
cantidad
amarilla(flechas)
amarilla (bordes)
negra (sec. Plana)
negra(rampa)
1
15
19
4
2
1
1
ancho
5
5
Excavacion
0.5
2
concreto
acero 3/8"
pintura
alto
6.3
5
6.497 m3
106.12 kg
11.345 m2
20.659 m2
3.7 m3
amarilla
negra
excavacion
1.70
0 .5 0
concreto
acero 3/8"
acero 3/8"
pintura
largo
2.00
1.70
CORTE B-B
1.70
3.00
1.70
3.00
fc=280 kg/cm2
0.10
1.70
3.00
3/8" @ .35 m
0.20
0.10
1.70
3.00
3/8" @ .35 m
0.20
0.35
AREA
VOLUMEN
1.2994
6.497
1.5863
2.5
10
10.6594
0.74
PESO (kg/mt)
KG
0.56
0.56
52.92
53.2
Area total
6.3452
5
10
10.6594
3.7
1.70
5.0000
E B-B
.00
1.70
.00
1.70
0.10
.00
.35 m
0.50
1.70
0.10
.00
.35 m
0.50
1.70
0.10
concreto
acero 3/8"
acero 3/8"
pintura
1
13
19
4
2
1
1
1
amarilla(flechas)
amarilla (bordes)
negra (sec. Plana)
negra(rampa)
Excavacion
concreto
acero 3/8"
pintura
amarilla
negra
excavacion
1.70
largo
ancho
alto
4.5
6.3
4.5
4.5
4.5
0.5
2
4.5
5.8473 m3
93.744 kg
10.481 m2
12.33 m2
3.33 m3
2.00
1.70
0.50
CORTE B-B
1.70
3.00
1.70
3.00
fc=280 kg/cm2
0.10
1.70
3.00
3/8" @ .35 m
1.70
3.00
fc=280 kg/cm2
0.10
1.70
3.00
3/8" @ .35 m
0.20
0.35
AREA
VOLUMEN
1.2994
5.8473
1.4953
2.25
9
9.3187
0.74
PESO (kg/mt)
KG
Area total
0.56
0.56
45.864
47.88
5.9812
4.5
9
9.3187
3.33
1.70
4.50
TE B-B
3.00
1.70
3.00
1.70
0.10
/cm2
0.50
3.00
8" @ .35 m
1.70
3.00
1.70
0.10
/cm2
0.50
3.00
8" @ .35 m
1.70
0.10
Resalto Circular
metrado de pintura
amarilla
negra
m2
3.985
1.9788