CostPlanning@aGlance(aneasywaytoremember)

*CarryoutduringDesignStage(PreContractStage)
*SystematicApproachtokeeptheprojectwithin'AllocatedBudget'
*Mainlythereare2methods;Elemental&ComparativeMethod
UsingElementalMethod
*AsperRIBAplanofwork;
Incept'n

Feasibility

OutlineProposal

SchemeDesign

DetailDesign

PreliminaryCost
Estimate

OutlineCostPlan(Using
CostAnalysis&OtherCost
Data(currentmarket
rate),etc.)

WhenDesignimproves,Specification&
Drawingsaredeveloped.Then;

FinalCostChecking
(KnownasEngineer's
Estimation)

UnitMethod
CubeMethod
SuperficialMethod
ElementalMethod,etc.

FixBudget

Substructure
Superstructure
Finishes
Fittings&Fixtures,etc.

PrepareCostLimits(Cost
Targets),Include
Contingenciesforthe
elements1015%

etc.

CostCheck basedonQTY&Spec.
KeepCostLimitswithinelements

DetailedCostPlan/Reduce%of
contingenciessinceaccuracyofthe
information(QTY&Spec.)

FinalCostPlan

*GiveRiskRegisterCostPlanispreparedbasedonwhichinformation,NotconsideranyfutureLegislationChanges&AuthorityFees,etc.
n

*IncludeInflationTherearefewMethods;(a)Indices(b)Inf.Amount=(1+i) 1(c)Contingencies(Note:'a'isnotpracticingUAE)
*ExclusionsLandCost,AuthorityFeesandanyCostduetoLitigationchanges,etc.
*ConsultancyFeeApp.37%fromtheConstructionCosts

Page 1 of 1