FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPON

( TKDN )

NILAI GABUNGAN
Rp

13,25

URAIAN PEKERJAAN

(1)
BARANG
I. MATERIAL LANGSUNG
( BAHAN BAKU )

DN

LN

(2)

(3)

7,406,750,000

1,205,750,000

1,126,250,000
8,533,000,000

198,750,000
1,404,500,000

III. MANAGEMENT PROYEK


DAN PEREKAYASAAN

662,500,000

IV. ALAT KERJA/ FASILITAS KERJA

662,500,000

V. KONTRUKSI DAN FABRIKASI

1,192,500,000

132,500,000

VI. JASA UMUM


B. SUB TOTAL BARANG JASA

662,500,000
3,180,000,000

132,500,000

II. PERALATAN ( BARANG JADI )


A. SUB TOTAL BARANG JASA

C. TOTAL BIAYA ( A + B )

###

1,537,000,000

###

###

###

% TKDN =
( GABUNGAN BARANG DAN JASA )
###
###

% TKDN =

86.88%

132,500,000.00

N TINGKAT KOMPONEN DALAM NEGRI


N)

ABUNGAN
13,250,000,000
TOTAL
Ribu
%
Rp
KDN
(4)
(5)

TKDN
BARANG/
JASA

GABUNGAN

(7)

(8)

###

86.00%

###

###

###
###

85.00%

###

###

662,500,000

100.00%

662,500,000

662,500,000

662,500,000

100.00%

662,500,000

662,500,000

###

90.00%

662,500,000
###

100.00%

###

###
662,500,000

###

###
662,500,000

###

No.
1.

Uraian Pekerjaan

Pekerjaan Perencanaan
Konsep Rancangan

Pra Rancangan

Pengembangan Design

Gambar Detail

2.

Pekerjaan Persiapan

3.

Pekerjaan Area Lantai 1


Pekerjaan Canopy Counter Chek In
Pekerjaan Finishing Interior

4.

DURASI

17

6
10

Pekerjaan Furnishing

Pekerjaan Signage

Pekerjaan Lain Lain

Pekerjaan Area Lantai 2


Pekerjaan Finishing Interior

10

Pekerjaan Furnishing

Pekerjaan Signage

Pekerjaan Lain Lain

#REF!

SCEDULE KURVA BARCHART


PEKERJAAN DESIGN & BUILD INTERIOR
BANDARA DEPATI AMIR PANGKAL PINANG

MIN
2

10

11

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

T
ERIOR
PINANG
MINGGU KE
12

13

14

15

16

17

18

19

20

21

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

22

23

24

25

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

REKAPITULASI
PEKERJAAN DESIGN & BUILD INTERIOR
BANDARA SULTAN TAHA JAMBI
TOTAL HARGA
No.

Uraian Pekerjaan

KONTRAK

KURANG

TAMBAH

AKHIR

1.

Biaya Perencanaan

Rp

475,136,000

Rp

Rp

2.

Pekerjaan Persiapan

Rp

582,750,000

Rp

Rp

3.

Pekerjaan Area Lantai 1


Pekerjaan Area Droop Off dan Chek In

Rp

958,802,456

Rp

920,613,656

Rp 1,170,834,256

Rp 1,209,023,056

Pekerjaan Finishing Interior

Rp 1,406,034,600

Rp

983,904,116

Rp 1,321,924,744

Rp 1,744,055,228

Pekerjaan Furnishing

Rp 1,064,723,500

Rp

406,902,700

Rp

357,837,500

Rp 1,015,658,300

Pekerjaan Signage

Rp

Rp

342,482,300

Rp 1,501,000,300

Rp 1,752,431,200

Pekerjaan Lain Lain

Rp 1,879,697,150

Rp 1,579,836,950

Rp

521,212,000

Rp

821,072,200

Pekerjaan Elektrikal

Rp

Rp

Rp

324,024,000

Rp

324,024,000

4.

593,913,200

47,513,600
-

Rp

522,649,600

Rp

582,750,000

Pekerjaan Area Lantai 2


Pekerjaan Finishing Interior

Rp 2,071,693,373

Rp 1,849,701,023

Rp 1,554,417,100

Rp 1,776,409,450

Pekerjaan Furnishing

Rp 1,194,903,700

Rp

313,240,600

Rp 2,039,674,000

Rp 2,921,337,100

Pekerjaan Signage

Rp

372,161,700

Rp

235,287,800

Rp

302,352,900

Rp

439,226,800

Pekerjaan Lain Lain

Rp 1,445,639,500

Rp

823,166,000

Rp

363,729,800

Rp

986,203,300

Pekerjaan Elektrikal

Rp

Rp

Rp

199,082,000

Rp

199,082,000

Subtotal II
PPn 10%
TOTAL
Pembulatan

Rp 12,045,455,179 Rp 7,455,135,145 Rp 9,703,602,200 Rp 14,293,922,234


Rp 12,045,455,179 Rp 7,455,135,145 Rp 9,703,602,200 Rp 14,293,922,234
Rp 1,204,545,518 Rp
745,513,515 Rp
970,360,220 Rp 1,429,392,223
###
###
###
###
###
###
###
###

Terbilang : "Dua puluh tiga milyar empat ratus tujuh puluh delapan juta
dua ratus ribu rupiah
Jakarta, 22 April 2014
PT.Karya Mentari Seraya

Harno Bastianto
Direktur

RENCANA ANGGARAN BIAYA


PEKERJAAN ADDENDUM
PEKERJAAN DESIGN & BUILD INTERIOR
PROYEK
LOKASI
JAMBI
LINGKUP PEKERJAANFINISHING INTERIOR - FURNISHING INTERIOR
BIAYA PERENCANAAN

NO

URAIAN PEKERJAAN

VOLUME
HARGA SAT
KODE SAT
KONTRAKKURANGTAMBAH AKHIR KONTRAK (Rp) BARU (Rp)

KONTRAK

JUMLAH TOTAL
KURANG
TAMBAH

AKHIR

BIAYA PERENCANAAN
- Konsep Rancangan

Ls

1.00

- Pra Rancangan

Ls

- Pengembangan Design
- Gambar Detail

1.00

2.00

###

###

1.00

1.00

###

###

###

Ls

1.00

1.00

###

###

###

Ls

1.00

1.00

###

###

###

SUB TOTAL ( PEKERJAAN PERSIAPAN ) :

###

###

Rp

###

###

###

RENCANA ANGGARAN BIAYA


PEKERJAAN ADDENDUM
PROYEK
LOKASI
LINGKUP PEKERJAAN

PEKERJAAN DESIGN & BUILD INTERIOR BANDARA SULTAN TAHA


JAMBI
FINISHING INTERIOR - FURNISHING INTERIOR
PERSIAPAN

NO

URAIAN PEKERJAAN

KODE SAT

VOLUME
KONTRAKKURANGTAMBAH AKHIR

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

KONTRAK

JUMLAH TOTAL
KURANG
TAMBAH

AKHIR

PEKERJAAN PERSIAPAN
-

Kebersihan dan Keamanan


Listrik
Proteksi dan Marking
Penyediaan Perlengkapan K3
(Kesehatan dan Keselamatan Kerja)
Mobilisasi Dan Akomodasi
Shop drawing dan Asbuilt drawing
Dokumentasi
Asuransi CAR
Asuransi Personal Accident
Direksi Keet + Alat Kantor
Bedeng Pekerja
Air kerja
Pembuangan sampah keluar lokasi
Penyediaan alat pemadam api
Biaya peralatan, scafolding dll
Sanitasi untuk pekerja dan staff
Biaya telephone proyek
Biaya Study Banding ke Korea

Bln
Bln
Ls
Ls

6.00
6.00
1.00
1.00

Ls
Ls
Mgg
Lot
Lot
Ls
Ls
BLN
Bln
Lot
Lot
Bln
Bln
Lot

1.00
1.00
25.00
1.00
1.00
1.00
1.00
6.00
6.00
15.00
1.00
6.00
6.00
1.00

6.00
6.00
1.00
1.00
1.00
1.00
25.00
1.00
1.00
1.00
1.00
6.00
6.00
15.00
1.00
6.00
6.00
1.00

Rp
Rp
Rp
Rp

7,500,000
7,500,000
25,000,000
25,000,000

Rp
Rp
Rp
Rp

45,000,000
45,000,000
25,000,000
25,000,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

150,000,000
10,000,000
300,000
82,000,000
17,500,000
60,000,000
25,000,000
2,500,000
3,500,000
1,550,000
15,000,000
1,250,000
1,500,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

150,000,000
10,000,000
7,500,000
82,000,000
17,500,000
60,000,000
25,000,000
15,000,000
21,000,000
23,250,000
15,000,000
7,500,000
9,000,000

SUB TOTAL ( PEKERJAAN PERSIAPAN ) :

Rp

582,750,000

Rp

Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,000,000
45,000,000
25,000,000
25,000,000
150,000,000
10,000,000
7,500,000
82,000,000
17,500,000
60,000,000
25,000,000
15,000,000
21,000,000
23,250,000
15,000,000
7,500,000
9,000,000

Rp

582,750,000

RENCANA ANGGARAN BIAYA


PEKERJAAN ADDENDUM
PEKERJAAN DESIGN & BUILD INTERIOR BANDARA SULTAN TAHA
JAMBI
FINISHING INTERIOR - FURNISHING INTERIOR
LANTAI 1

URAIAN PEKERJAAN

KODE

SAT

VOLUME
KONTRAK KURANG TAMBAH AKHIR

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

JUMLAH TOTAL
KURANG
TAMBAH

KONTRAK

AKHIR

LANTAI 1
PEKERJAAN AREA DROOP OFF
1 Ornament Krawangan
- Acrylik 10 mm Laser Cutting

m2

Ornament Krawangan
- Plaat tebal 2 mm. Fin powder coating
Sticker transparan pintu keberangkatan dan pintu kedatangan
PEKERJAAN COUNTER CHEK IN
1 Pekerjaan Back Droop Counter Chek in
- Rangka Hollo 4 x 4
- Multiplek 12mm
- Kaca Tinted 6 mm

718.40

718.40

Rp

1,124,215

Rp

807,636,056 Rp

807,636,056

Rp

un

12.00

12.00

Rp

67,303,005

Rp

lot

1.00

1.00

Rp

7,500,000

Rp

m2

84.00

2
-

Parapet Stainless Hairline 90 cm


Rangka Hollo 4 x 4
Multiplek 12mm
Plat Stainless 1,2 mm

m2

21.60

3
-

Plafond Dropp Aluminium Composit


Holo 4 x 4 cm Tebal 1,2 mm
Panel Aluminium Composit
Melaminto 3 mm warna putih

m2

48.00

84.00

21.60

48.00

Rp

822,400

Rp

69,081,600

Rp

1,260,000

Rp

27,216,000

Rp

914,500

Rp

43,896,000

Rp

Rp

Rp

- pemindahan titik sprinkler

ttk

3.00

3.00

Rp

459,000

Rp

Plafond drop ceiling area pintu kedatangan dan keberangkatan


- Rangka holo 40x40
- Alumunium composite panel warna sampagne

m2

37.75

37.75

Rp

1,084,000

Rp

6.00

30.00

13.00

13.00

Rp

539,000

6.00

30.00

50.00

50.00

4A Indirect Lighting LED string di plafond drop ceiling + instalasi

ttk

5 Instalasi Titik Lampu

24.00

m2

- Karpet tile batas antrian Check In dan Walk through warna hijau + strip merah

Rp

Rp

160,000

297,200

1A Pekerjaan Partisi Kaca area taman

PK

un

m2

290.40

290.40

792.00
Page 14

792.00

Rp
Rp

SUB TOTAL PEKERJAAN CANOPY :


PEKERJAAN FINISHING
1 Pekerjaan Partisi Kaca Tempered 12 mm
Frame Aluminium Powder Coating 4"
Kaca Tempered 12 mm

Rp

Rp

1,318,300

3,840,000

7,132,800

1,132,000
Rp

958,802,456 Rp

920,613,656

Rp

382,834,320 Rp

382,834,320

27,216,000

Rp

3,750,000

set

7,500,000

43,896,000

Rp

24.00

7,500,000 Rp

Rp

65.88

ttk

807,636,056

Rp

65.88

4 Lampu Down Light

Rp

69,081,600

m2

3A Plafond drop ceiling plywood fin. Duco


- Rangka hollow lapis plywood 12 mm
- Finishing duco warna kuning
- Background TV LCD ( excl. LCD TV, Bracket TV )
- Acrylic

807,636,056

247,050,000

Rp

247,050,000

1,377,000 Rp

1,377,000

40,921,000

Rp

40,921,000

Rp

960,000 Rp

4,800,000

Rp

7,007,000 Rp

7,007,000

Rp

1,783,200 Rp

8,916,000

Rp

56,600,000

Rp

56,600,000

Rp

1,170,834,256

Rp

1,209,023,056

Rp

Rp

Rp

lantai 1

URAIAN PEKERJAAN

KODE

SAT

VOLUME
KONTRAK KURANG TAMBAH AKHIR

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

JUMLAH TOTAL
KURANG
TAMBAH

KONTRAK

AKHIR

- Base plaat pondasi uk. 30x30x140 cm


- Tiang stainless steel hairline 4"
- Rangka spyder
- Kaca tempered 10 mm
1B Pekerjaan Atap Jalusi
- Rangka alumunium anodized 4"
- Jalusi alumunium anodized
Pekerjaan Pot tanaman gantung
- Rangka st. Plaat 2 mm hairline
2 Pekerjaan Cover Kolom
Hollo 4 x 4 cm t 1,2 mm
Aluminium Composit Panel

KT 1

m1

220.00

220.00

Rp

Rp

m'

18.00

18.00

Rp

Rp

un

120.00

95.00

25.00

Rp

4,982,800

Rp

597,936,000 Rp

473,366,000

Rp

124,570,000

Pekerjaan Cover Kolom H : 90 cm dia : 60 cm


- Backing plywood 9mm
- Stainless steel plaat 2 mm hairline
- Perpihan dan perbaikan kolom (ciping, aci dan cat )

un

95.00

95.00

Rp

11,507,000

Rp

1,093,165,000

Rp

1,093,165,000

Pekerjaan cover lisplang drop off


- Rangka holow 4 x 4 t : 1,2mm
- Alumunium composite panel

m2

146.88

146.88

Rp

875,000

Rp

128,520,000

Rp

128,520,000

Rp

89,515,800

Rp

56,712,704

Rp

144,077,184

Rp

17,149,300

Rp

32,000,280

3 Pekerjaan Wall Treatment


Rangka Hollo 4 x 4 cm t, 0,6 mm
Plywood 12 mm
HPL

Wt 3

m2

198.00

4 Pekerjaan Wall Treatment


Rangka Hollo 4 x 4 cm t, 0,6 mm
Plywood 12 mm
Tinted Glass 6 mm

Wt 1

m2

128.00

3 Pekerjaan Wall Treatment


Rangka Hollo 4 x 4 cm t, 0,6 mm
Plywood 12 mm
HPL
Digital Printing

Wt 4

m2

144.00

unit

2.00

m2

29.20

5 ATM Center
rangka Hollo 4 x 4 cm t,1,2 mm
Aluminium Composit Panel
6 Backdroop Information Center
Hollo 4 x 4 cm t, 1,2 mm
Plywood 12 mm
Ornamen Karawangan MDF 12 mm Laser Cutting

WT 2

7 Pintu Double
Kaca Tempered 12 mm + Fitting ex. Dorma

PT2

4.00

59.04

59.04

1.00

4.00

198.00

Rp

452,100

Rp

89,515,800

68.96

Rp

822,400

Rp

105,267,200

203.04

Rp

709,600

Rp

102,182,400

1.00

Rp

17,149,300

Rp

34,298,600

29.20

Rp

1,095,900

Rp

32,000,280

Rp

15,500,000

Rp

62,000,000

Ornamen stainless
- stainless plaat laser cutting

bh

2.00

2.00

Sticker cutting area lisplang counter check in


- Sticker 3M

m2

24.96

24.96

Pekerjaan Pintu area airline office


- Daun pintu kaca 6 mm rangka alumunium poder coating
- Kusen alumunium
- Asesories (engsel, handle, kunci dan doorcloser )

set

3.00

3.00

Rp

Rp

48,554,496

Rp

Rp

Rp

Rp

62,000,000

7,500,000

9,500,000

Rp

1,406,034,600

Rp

41,894,784

17,149,300

594,750

SUB TOTAL ( PEKERJAAN FINISHING ) :

Page 15

Rp

983,904,116

Rp

Rp

15,000,000

Rp

15,000,000

Rp

14,844,960

Rp

14,844,960

Rp

28,500,000

Rp

28,500,000

Rp

1,321,924,744

Rp

1,744,055,228

lantai 1

URAIAN PEKERJAAN

KODE

SAT

VOLUME
KONTRAK KURANG TAMBAH AKHIR

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

JUMLAH TOTAL
KURANG
TAMBAH

KONTRAK

AKHIR

PEKERJAAN FURNISHING
CHECK-IN AREA
1 Counter Check-in
Plywood 18 mm
HPL
Solid Surface

CC

un

8.00

3 Working chair
Working chair ex Veroty Type Senator IV G

CH 1

un

14.00

SC

un

3.00

WC

un

57.00

4 Self Check-in

9.00

Rp

13,569,500

Rp

108,556,000

14.00

Rp

1,358,200

Rp

19,014,800

1.00

2.00

Rp

13,569,500

Rp

40,708,500

22.00

35.00

Rp

11,500,000

Rp

1.00

Rp

13,569,500

Rp

122,125,500

Rp

19,014,800

Rp

13,569,500

Rp

27,139,000

655,500,000 Rp

253,000,000

Rp

402,500,000

Plywood 18 mm
HPL
Solid Surface
5 Kursi Tunggu Tandem 4 seater ex Datascrip
Kursi tunggu fiber ( karakter hewan)
- Bahan fyber glass

un

4.00

4.00

Rp

10,667,000

Rp

42,668,000

Rp

42,668,000

Kursi tunggu custom


- Rangka hollow stainless steel 50x50 cm
- Solid wood fin. Melamic

un

11.00

11.00

Rp

8,750,000

Rp

96,250,000

Rp

96,250,000

6 FLIGT INFORMATION DISPLAY SYSTEM ( FIDS ) Tipe B 2 - Outdoor (exc. TV display)


Besi WF Cover Stainless
Acrylic 5 mm
Stikers 3M

un

FLIGT INFORMATION DISPLAY SYSTEM ( FIDS ) - Outdoor (exc. TV display)


- Rangka hollow cover stainles steel hairline
- Acrylic clear 5 mm
- Acrylic letter sign
- Instalasi kabel power dan outlet power
- Instalasi kabel data dan outlet data
- Bracket TV LCD 42"

un

FLIGT INFORMATION DISPLAY SYSTEM ( FIDS ) - indoor (exc. TV display)


- Rangka hollow cover stainles steel hairline
- Acrylic clear 5 mm
- Acrylic letter sign
- Instalasi kabel power dan outlet power
- Instalasi kabel data dan outlet data
- Bracket TV LCD 42"

2.00

un

7 FLIGT INFORMATION DISPLAY SYSTEM ( FIDS ) Tipe 2 - Indoor (excl. TV display)


Besi WF Cover Stainless
Hollo 4 x 4 cm
Acrylic 5 mm
Stikers 3M

8 Security Desk

2.00

2.00

2.00

un

1.00

17,972,400

2.00

2.00

Rp

Rp

Rp

Rp

SD 1

un

4.00

2.00

2.00

CH 1

un

4.00

2.00

2.00

SD 1

un

2.00

2.00

CH 1

un

2.00

2.00

Rp

Rp

35,944,800

Rp

Rp

Rp

Rp

Rp

65,550,000

24,237,600

1.00

35,944,800

48,475,200

Rp

48,475,200

74,250,000

Rp

Rp

1,358,200

Rp

11,661,500

1,358,200

Rp

131,100,000

Rp

Rp

13,537,500

131,100,000

74,250,000

Rp

74,250,000

27,075,000

54,150,000

Rp

27,075,000

Rp

Rp

5,432,800

Rp

2,716,400

Rp

2,716,400

Rp

23,323,000

Rp

23,323,000

Rp

2,716,400

Rp

2,716,400

Plywood 18 mm
HPL
Solid Surface
9 Security / screening chair ex Veroty
10 Screening desk
Plywood 18 mm
HPL
Top Stainless Steel Sheet 1,2 mm
- Screening chair ex Veroty

Page 16

lantai 1

URAIAN PEKERJAAN

KODE

11 Counter Information Center


Plywood 128 mm

SAT

VOLUME
KONTRAK KURANG TAMBAH AKHIR

Unit

1.00

Unit

1.00

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

JUMLAH TOTAL
KURANG
TAMBAH

KONTRAK

1.00

Rp

44,780,200

Rp

44,780,200

Rp

26,121,800

Rp

26,121,800

SUB TOTAL PEKERJAAN FURNISHING :

Rp

AKHIR
Rp

44,780,200

HPL
Solid Surface
12 Counter Internet Boot
Plywood 18 mm

1.00

Rp

26,121,800

1,064,723,500 Rp

406,902,700

Rp

HPL
Solid Surface
Rp

357,837,500

Rp

1,015,658,300

Rp

20,579,100

PEKERJAAN SIGNAGE
1 Signage Type Standing

A- 2

un

1.00

2 Signage Type Standing

A- 4

un

3.00

3 Signage Type Hanging

B-1

un

7.00

Signage Type Hanging area drop off ( keberangkatan & kedatangan )


Cover Rangka Penggantung Signage bahan acp + sticker cutting

1.00

Rp

20,579,100

Rp

20,579,100

3.00

Rp

38,871,700

Rp

116,615,100

Rp

116,615,100

Rp

7.00

Rp

15,320,000

Rp

107,240,000 Rp

107,240,000

Rp

B-1 Rev

un

2.00

2.00

Rp

248,750,000

Rp

497,500,000

Rp

497,500,000

B-2 Cover

un

5.00

5.00

Rp

4,464,000

Rp

22,320,000

Rp

22,320,000

4 Signage Type Hanging

B-2

un

3.00

3.00

6.00

Rp

15,320,000

Rp

45,960,000

Rp

45,960,000

Rp

91,920,000

5 Signage Type Wall Mounted

C -1

un

4.00

3.00

7.00

Rp

12,576,100

Rp

50,304,400

Rp

37,728,300

Rp

88,032,700

6 Signage Type Wall Mounted

C -2

un

4.00

2.00

Rp

20,990,700

Rp

83,962,800

Rp

41,981,400
94,876,000

Signage Type standing


7 Signage Type Wall Mounted
Signage Type Hanging
8 Signage Type Wall Mounted

2.00
2.00

C-2 G
C -3

un

2.00

C -5

9 Signage Lettering " KEBERANGKATAN "


10 Signage Lettering " KEDATANGAN "

2.00
3.00

C - 3G
un

7.00

un

1.00

un

1.00

2.00

2.00

Rp

Rp

47,438,000

Rp

35,579,000

29,405,300

3.00

Rp

58,810,600

Rp

Rp

41,981,400
Rp

94,876,000

Rp

Rp

106,737,000

Rp

106,737,000

Rp

44,588,000

58,810,600

Rp

5.00

Rp

8,917,600

Rp

62,423,200

1.00

Rp

26,066,900

Rp

26,066,900

Rp

26,066,900

1.00

Rp

21,951,100

Rp

21,951,100

Rp

21,951,100

Rp

17,835,200

D-1

un

6.00

6.00

Rp

92,084,000

Rp

552,504,000

Rp

552,504,000

D-2

un

1.00

1.00

Rp

67,500,000

Rp

67,500,000

Rp

67,500,000

Signage wall plate area Airline Office

un

1.00

1.00

Rp

625,000

Rp

625,000 Rp

625,000

Signage Self Check In

un

1.00

1.00

Rp

75,250,000

Rp

75,250,000

Rp

75,250,000

Rp

1,501,000,300

Rp

1,752,431,200

Rp

59,778,600

Signage Trolley Parking Bay area Droop Off dan Baggage Claim
Signage standing

SUB TOTAL PEKERJAAN SIGNAGE :

Rp

593,913,200 Rp

342,482,300

PEKERJAAN LAIN2
1 Trolley Station ( Pipa stainless steel 3" )

m'

86.00

2 Damper Stailess ( Pipa Stainless stell 3 " )

m'

172.00

86.00
-

172.00

Damper / Plint stainless steel hairline plaat 2 mm t: 30 cm + backing plywood 9 mm

m'

115.20

115.20

Plint alumunium h : 10 cm u/ partisi gypsum

m'

225.00

225.00

3 Pengatur antrean

un

75.00

4 Tempat Sampah Custom 4 Compartement

un

25.00

Tempat Sampah Custom 3 Compartement

un

75.00
-

25.00
15.00

Page 17

15.00

Rp

695,100

Rp

59,778,600

Rp

695,100

Rp

119,557,200

Rp

415,000

Rp

150,000

Rp

1,280,400

Rp

Rp

12,804,800

Rp

Rp

12,804,800

Rp

119,557,200

Rp
Rp

47,808,000

Rp

47,808,000

Rp

33,750,000

Rp

33,750,000

Rp

96,030,000

96,030,000
320,120,000 Rp

320,120,000

Rp
Rp

192,072,000

Rp

192,072,000

lantai 1

URAIAN PEKERJAAN

SAT

KODE

VOLUME
KONTRAK KURANG TAMBAH AKHIR

5 Pot Tanaman

un

42.00

6 Pot + Pohom Artifisial

set

15.00

7 Stickers Sanblas Laser Cuting

m2

Pot tanaman t : 100 cm


- bahan plat stainless
- tanaman hidup
Pekerjaan Toilet
- Box kaca cermin + indirect lighting
- Batu alam
- Ornamen bambu

879.00

42.00

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

JUMLAH TOTAL
KURANG
TAMBAH

KONTRAK

Rp

3,429,800

Rp

144,051,600

Rp

617,374,500 Rp

617,374,500

Rp

522,785,250 Rp

522,785,250

15.00

Rp

41,158,300

879.00

Rp

594,750

Rp

AKHIR
-

Rp

144,051,600

Rp

Rp

un

14.00

14.00

Rp

14,375,000

Rp

un
lbr
btg

6.00
60.00
96.00

6.00
60.00
96.00

Rp
Rp
Rp

2,750,000
350,000
92,000

Rp
Rp
Rp

201,250,000

Rp

201,250,000

16,500,000 Rp
21,000,000 Rp
8,832,000 Rp

16,500,000
21,000,000
8,832,000

SUB TOTAL PEKERJAAN LAIN LAIN :

Rp

1,879,697,150

Rp

1,579,836,950

Rp

521,212,000

Rp

821,072,200

PEKERJAAN ELEKTRIKAL
Pekerjaan Instalasi Kabel
1 Instalasi Kabel Power Signage menggunakan kabel NYY 2X 2,5 mm ex Supreme
2 Instalasi Jaringan Kabel Data menggunakan kabel CAT 6 ex Belden
3 Instalasi Jaringan Kabel Telepon menggunakan kabel CAT 6 ex Belden
4 Instalasi Kabel Sound/Speaker
5 Kabel feeder NYY 4x16 mm

m'
m'
m'
m'
m'

2,735.00
1,000.00
130.00
170.00
10.00

2,735.00
1,000.00
130.00
170.00
10.00

Rp
Rp
Rp
Rp
Rp

74,000
25,000
25,000
25,000
250,000

Rp
Rp
Rp
Rp
Rp

202,390,000 Rp
25,000,000 Rp
3,250,000 Rp
4,250,000 Rp
2,500,000 Rp

202,390,000
25,000,000
3,250,000
4,250,000
2,500,000

Pekerjaan Armature
1 Stop kontak 1P Single Outlet ex Panasonic
2 Outlet telepon ex Panasonic
3 Outlet Data ex AMP

bh
bh
bh

58.00
1.00
12.00

58.00
1.00
12.00

Rp
Rp
Rp

35,000
74,000
74,000

Rp
Rp
Rp

2,030,000 Rp
74,000 Rp
888,000 Rp

2,030,000
74,000
888,000

Pekerjaaan Pemasangan Panel


1 Wall mounted steel enclosure uk. 30x40 cm + asesories
2 Arus Pengenal MCB 10 A

unit
unit

1.00
10.00

1.00
10.00

Rp
Rp

6,428,000
78,000

Rp
Rp

6,428,000 Rp
780,000 Rp

6,428,000
780,000

Pekerjaaan Testing & Commisioning


1 Testing & Commissioning Sistem Elektrikal, test fungsi

ls

1.00

1.00

Rp

6,428,000

Rp

6,428,000 Rp

6,428,000

bh

40.00

40.00

bh

80.00

80.00

Rp

807,000

Rp

Relokasi sprinkler dan heat detector area counter check in

unit

10.00

10.00

Rp

459,000

Relokasi speaker area counter check in

bh

4.00

4.00

Rp

214,000

Pekerjaaan Armature Lampu


1 Lampu membrane 200 cm
- Rangka stainless
- Cover bahan membrane
2 Lampu RM TL 2 x 36 W
- Cover Acrylic

Rp

SUB TOTAL PEKERJAAN ELEKTRIKAL:

Rp

SUB TOTAL LANTAI 1

Rp

Page 18

5,903,170,906

Rp

Rp

4,233,739,722

64,560,000

Rp

Rp

64,560,000

Rp

4,590,000 Rp

4,590,000

Rp

856,000 Rp

856,000

Rp

324,024,000

Rp

324,024,000

Rp

5,196,832,800

Rp

6,866,263,984

lantai 1

RENCANA ANGGARAN BIAYA


PEKERJAAN ADDENDUM
PROYEK
LOKASI
LINGKUP PEKERJAAN

PEKERJAAN DESIGN & BUILD INTERIOR BANDARA SULTAN TAHA


JAMBI
FINISHING INTERIOR - FURNISHING INTERIOR
LANTAI 2

NO

URAIAN PEKERJAAN

KODE

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

VOLUME
KONTRAK

KURANG

TAMBAH

AKHIR

JUMLAH TOTAL
KONTRAK

KURANG

TAMBAH

AKHIR

PEKERJAAN FINISHING
1 Pekerjaan Wall Treatment
Rangka Hollo 4 x 4 cm t, 0,6 mm
Plywood 12 mm
Tinted Glass 6 mm

WT 1

2 Pekerjaan Wall Treatment


Rangka Hollo 4 x 4 cm t, 0,6 mm
Plywood 12 mm
Ornamen Karawangan MDF 12 mm Laser Cutting
3 Pekerjaan Partisi Kaca Tempered 12 mm
Frame Aluminium Powder Coating 4"
Kaca Tempered 12 mm
4 Pekerjaan Cover Kolom
Hollo 4 x 4 cm t 1,2 mm
Aluminium Composit Panel

m2

132.00

m2

Sticker cutting motif Angso dua

39.60

132.00

Rp

39.60

Rp

594,750

64.50

Rp

822,400

Rp

108,556,800

1,095,900

Rp

70,685,550

Rp

23,552,100

Rp

108,556,800

Rp

23,552,100

Rp

70,685,550

WT 2

m2

64.50

PK

un

346.56

346.56

Rp

1,318,300

Rp

456,870,048

Rp

456,870,048

Rp

KT 1

un

36.00

36.00

Rp

4,982,800

Rp

179,380,800

Rp

179,380,800

Rp

m2

Pekerjaan Cover Balok Beton dan ducting AC


Hollo 4 x 4 cm t 1,2 mm
Aluminium Composit Panel
5 Lantai Karpet
Karpet 50 x 50 cm ex Interface

II

SAT

m2

2,063.00

434.00

434.00

1,140.00

1,140.00

2,063.00

Rp

Rp

875,000

555,100

Rp

Rp

1,145,171,300

Rp

379,750,000

1,145,171,300

Rp

379,750,000

Rp

5 Lantai Karpet - Perubahan type karpet


Karpet 50 x 50 cm ex Interface

m2

6 Lantai Vinyl 30 cm

m1

112.25

112.25

Rp

199,500

Rp

22,393,875

Rp

22,393,875

Rp

7 Balok Palsu Pembungkus Splinkler

m2

42.00

42.00

Rp

1,092,500

Rp

45,885,000

Rp

45,885,000

Rp

8 Hand Railling
Pipa Stainless 3"

m1

60.00

Rp

712,500

Rp

42,750,000

SUB TOTAL PEKERJAAN FINISHING :

Rp

2,071,693,373

Rp

1,849,701,023

54.00

114.00

Rp

976,000

Rp

1,112,640,000

Rp

1,112,640,000

Rp

38,475,000

Rp

81,225,000

Rp

1,554,417,100

Rp

1,776,409,450

PEKERJAAN FURNISHING
1 Counter Imigrasi
Plywood 18 mm
HPL
Solid Surface

CI

2 Counter Internet Boot


Plywood 128 mm

unit

5.00

5.00

Rp

19,719,400

Rp

98,597,000

Rp

98,597,000

Rp

unit

3.00

2.00

1.00

Rp

13,569,500

Rp

40,708,500

Rp

27,139,000

Rp

13,569,500

unit

2.00

2.00

Rp

12,347,400

Rp

24,694,800

Rp

24,694,800

HPL
Solid Surface
3 Boarding Desk

BD

Plywood 18 mm
lantai 2

Page 19

NO

URAIAN PEKERJAAN

KODE

SAT

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

VOLUME
KONTRAK

KURANG

TAMBAH

AKHIR

JUMLAH TOTAL
KONTRAK

KURANG

TAMBAH

AKHIR

HPL
Solid Surface
4 Counter Transit

TD

unit

2.00

2.00

Rp

13,569,500

Rp

27,139,000

Rp

27,139,000

Rp

5 Working chair
Working chair ex Veroty Type Senator IV G

CH 1

unit

14.00

8.00

6.00

Rp

1,358,200

Rp

19,014,800

Rp

10,865,600

Rp

8,149,200

6 Kursi Tunggu Tandem 4 seater ex Datascrip

WC

unit

84.00

13.00

71.00

Rp

11,500,000

Rp

966,000,000

Rp

149,500,000

Rp

816,500,000

Rp

181,339,000

Plywood 18 mm
HPL
Solid Surface

un

Kursi tunggu fiber ( karakter hewan)


- Bahan fyber glass
7 Rack Sepatu Mushola
Plywood 18 mm
HPL

CR

8 Bench

III

17.00

17.00

Rp

10,667,000

Rp

181,339,000

unit

2.00

2.00

Rp

4,344,400

Rp

8,688,800

Rp

8,688,800

unit

2.00

2.00

Rp

5,030,400

Rp

10,060,800

Rp

10,060,800

FIDS / TV Display Cover ducting diffuser AC area Boarding Lounge


- Rangka hollow cover stainles steel hairline
- Acrylic clear 5 mm
- Acrylic letter sign
- Instalasi kabel power dan outlet power
- Instalasi kabel data dan outlet data
- Bracket TV LCD 42"

un

5.00

5.00

Rp

85,392,000

Rp

426,960,000

Rp

426,960,000

Ceiling Canopy ACP - AS D.E area Boarding Lounge ( diluar area tenant )
- relokasi sprinkler
- relokasi grill ac + box diffuser + flexible

m2

434.00

434.00

Rp

1,500,000

Rp

651,000,000

Rp

651,000,000

Panel Composite listplang area boarding lounge

m2

289.00

289.00

Rp

875,000

Rp

252,875,000

Rp

252,875,000

Ornamen gantung bahan fiberglass motif hewan (burung origami )

un

18.00

18.00

Rp

3,500,000

Rp

63,000,000

Rp

63,000,000

Plafond Canopy ACP - area Rg. Tunggu


- Cutting sticker motif khas Jambi

m2

250.00

250.00

Rp

1,858,000

Rp

464,500,000

Rp

464,500,000

Rp

2,039,674,000

Rp

2,921,337,100

Rp

37,728,300

Rp

61,737,300

Rp

57,987,400

SUB TOTAL PEKERJAAN FURNISHING :

Rp

1,194,903,700

Rp

313,240,600

3.00

Rp

12,576,100

Rp

88,032,700

Rp

50,304,400

3.00

Rp

20,579,100

Rp

41,158,200

2.00

Rp

28,993,700

Rp

57,987,400

PEKERJAAN SIGNAGE
1 Signage Type Standing

A- 1

unit

7.00

2 Signage Type Standing

A- 2

un

2.00

3 Signage Type Standing

A- 3

un

2.00

- Signage Type Standing

A- 4

un

2.00

2.00

Rp

38,871,700

Rp

77,743,400

Rp

77,743,400

Rp

- Signage Type Hanging

B-1

un

7.00

7.00

Rp

15,320,000

Rp

107,240,000

Rp

107,240,000

Rp

Signage type standing

C-1

un

6.00

6.00

12,576,100

Rp

75,456,600

Rp

75,456,600

Signage type hanging

C-1 G

un

2.00

2.00

12,576,100

Rp

25,152,200

Rp

25,152,200

Signage type hanging

C-3 G

un

2.00

2.00

Rp

35,579,000

Rp

71,158,000

Rp

71,158,000

Signage type hanging

D -3

un

2.00

2.00

Rp

18,584,000

Rp

37,168,000

Rp

37,168,000

un

1.00

1.00

Rp

30,917,000

Rp

30,917,000

Rp

30,917,000

Signage lost & found

4.00
1.00

lantai 2

Rp

20,579,100

Page 20

NO

URAIAN PEKERJAAN

KODE

IV PEKERJAAN LAIN2
1 Tempat Sampah Custom 3 Compartement

B-1

un

HARGA SAT
KONTRAK (Rp)
BARU (Rp)

VOLUME
KONTRAK

KURANG

un

Signage " GATE 1 & 2 " pintu keberangkatan


- Signage Type Hanging

SAT

TAMBAH
2.00

AKHIR
2.00

Rp

JUMLAH TOTAL
KONTRAK

KURANG

TAMBAH

20,961,000

Rp 15,320,000
SUB TOTAL PEKERJAAN SIGNAGE :

Rp
Rp

372,161,700

Rp

235,287,800

AKHIR

Rp

41,922,000

Rp

41,922,000

Rp

302,352,900

Rp

439,226,800

un

25.00

25.00

Rp

12,804,800

Rp

320,120,000

Rp

320,120,000

2 Pot Tanaman

un

18.00

18.00

Rp

2,286,500

Rp

41,157,000

Rp

41,157,000

3 Pot + Pohom Artifisial

set

20.00

Rp

41,158,300

Rp

823,166,000

4 Pengatur antrean

bh

60.00

Rp

1,280,400

Rp

76,824,000

Hand railing stainless steel dia 3" + acrylic bening 8 mm


5 Stickers Sanblas Laser Cuting
Pot tanaman t : 100 cm
- bahan plat stainless = tanaman hidup
Pekerjaan Toilet
- Box kaca cermin + indirect lighting
- Batu alam
- Ornamen bambu

m2
m2

20.00

60.00
25.40

310.00

25.40
310.00

Rp

Rp

2,917,000

594,750

Rp

Rp

823,166,000

Rp

Rp

74,091,800

Rp

76,824,000

Rp

74,091,800

Rp

184,372,500

un

18.00

18.00

Rp

14,375,000

Rp

258,750,000

Rp

258,750,000

unit
lbr
btg

4.00
40.00
64.00

4.00
40.00
64.00

Rp
Rp
Rp

2,750,000
350,000
92,000

Rp
Rp
Rp

11,000,000
14,000,000
5,888,000

Rp
Rp
Rp

11,000,000
14,000,000
5,888,000

Rp

363,729,800

Rp

986,203,300

SUB TOTAL ( PEKERJAAN FURNISHING ) :

Rp

184,372,500

1,445,639,500

Rp

823,166,000

VI PEKERJAAN ELEKTRIKAL
Pekerjaan Instalasi Kabel
1 Instalasi Kabel Power Signage menggunakan kabel NYY 2X 2,5 mm ex Supreme
2 Instalasi Jaringan Kabel Data menggunakan kabel CAT 6 ex Belden
3 Kabel feeder NYY 4x16 mm

m'
m'
m'

2,250.00
700.00
10.00

2,250.00
700.00
10.00

Rp
Rp
Rp

74,000
25,000
250,000

Rp
Rp
Rp

166,500,000
17,500,000
2,500,000

Rp
Rp
Rp

166,500,000
17,500,000
2,500,000

Pekerjaan Armature
1 Stop kontak 1P Single Outlet ex Panasonic
3 Outlet Data ex AMP

bh
bh

40.00
6.00

40.00
6.00

Rp
Rp

35,000
74,000

Rp
Rp

1,400,000
444,000

Rp
Rp

1,400,000
444,000

Pekerjaaan Pemasangan Panel


3 Arus Pengenal MCCB / Breaker 50 A
4 Arus Pengenal MCB 10 A

bh
bh

1.00
10.00

1.00
10.00

Rp
Rp

1,178,000
78,000

Rp
Rp

1,178,000
780,000

Rp
Rp

1,178,000
780,000

Pekerjaan Coring Lantai


1 Coring lantai 2"

ttk

6.00

6.00

Rp

392,000

Rp

2,352,000

Rp

2,352,000

Pekerjaaan Testing & Commisioning


1 Testing & Commissioning Sistem Elektrikal, test fungsi

ls

1.00

1.00

Rp

6,428,000

Rp

6,428,000

Rp

6,428,000

unit

26.00

26.00

Pekerjaaan Armature Lampu


1 Lampu membrane 75 cm
- Rangka stainless
- Cover bahan membrane

Rp

SUB TOTAL ( PEKERJAAN FURNISHING ) :

Rp

SUB TOTAL (KEBERANGKATAN LT.2 ) :

Rp

lantai 2

5,084,398,273

Rp

Rp

3,221,395,423

Rp

Rp

199,082,000

Rp

199,082,000

Rp

4,459,255,800

Rp

6,322,258,650

Page 21

ANALISA HARGA SATUAN UPAH PEKERJA DAN BAHAN

NO

URAIAN PEKERJAAN

KOEF

SAT

Pek. Plafond Droop Plywood fin. Duco


Material
Rangka Hollo 4 x4 t 1,2 mm
Plywood 12 mm
Melaminto putih 3 mm
Alat bantu dan Material Bantu
Bahan finishing
Bongkar pasang plafond eksisting
Lampu LED stripe
Upah + Mesin
Tenaga Perakitan dan Pasang

HARGA
SATUAN
E

JML
BAHAN
F=CxE

JML
UPAH
G=CxE

Pek. Partisi Kaca Area Taman


Material
Tiang Stainless steel dia 4"
Kaca polos 10mm tempered
Silicone sealent kaca 300ml
Spider kaca
Pondasi beton
Alat bantu dan Material Bantu
Upah + Mesin
Tenaga Perakitan dan Pasang

m2

2.0000
1.0500
1.0500
1.0000
1.0000
1.0000
1.5000

btg
m2
m2
ls
ls
ls
m'

78,000.00
160,000.00
75,000.00
150,000.00
350,000.00
250,000.00
85,000.00

156,000.00
168,000.00
78,750.00
150,000.00
350,000.00
250,000.00
127,500.00

156,000.00
168,000.00
78,750.00
150,000.00
350,000.00
250,000.00
127,500.00

1.0000

set

2,469,800.00

2,469,800.00

2,469,800.00
3,750,050.00
3,750,000.00

1.0000

m2

0.5000 m1
1.0500 m2
0.6500 Tube
1.5000 bh
0.5000 bh
1.0000 ls

4,125,000.00
950,000.00
37,000.00
950,000.00
750,000.00
250,000.00

1.0000

1,700,000.00

set

2,062,500.00
997,500.00
24,050.00
1,425,000.00
375,000.00
250,000.00

2,062,500.00
997,500.00
24,050.00
1,425,000.00
375,000.00
250,000.00
1,700,000.00

Jumlah
Dibulatkan
4

Pek. Cover Kolom Stainless T 90 cm


Material
Plywood 12 mm
Plaat stainless SUS 304 tebal 2 mm
Silicone sealent kaca 300ml
Perapihan kolom ( cipig, dan aci )
Alat bantu
Upah + Mesin
Tenaga Perakitan dan Pasang

Pek. Atap Jalusi


Material
Kusen Alumunium 4 "
Louver alumunium
Sealent
Alat Bantu dan Material Pendukung
Upah + Mesin
Tenaga Perakitan dan Pasang

1,700,000.00
6,834,050.00
6,834,000.00

1.0000 Unit
1.0800 m2
1.0000 m'
0.6500 tube
1.0000 ls
1.0000 ls

160,000.00
6,500,000.00
37,000.00
750,000.00
250,000.00

1.0000

3,810,150.00

set

172,800.00
6,500,000.00
24,050.00
750,000.00
250,000.00

172,800.00
6,500,000.00
24,050.00
750,000.00
250,000.00
3,810,150.00

Jumlah
Dibulatkan
5

1.0000

Jumlah
Dibulatkan
3

TOTAL

3,810,150.00
11,507,000.00
11,507,000.00

1.0000 Unit
1.0000 m'
1.0000 m'
1.0000 Tube
1.0000 lot
1.0000

set

150,000.00
975,000.00
37,000.00
153,000.00

150,000.00
975,000.00
37,000.00
153,000.00

150,000.00
975,000.00
37,000.00
153,000.00

1,000,000.00

1,000,000.00

1,000,000.00

Jumlah
Dibulatkan

Pek. Pot Tanaman Gantung


Material
Hollo 2 x 4 cm t 0,6 mm
Plaat st. Steel tebal 2mm
Alat Bantu dan Material Pendukung
Upah + Mesin
Tenaga Perakitan dan Pasang
Jumlah
Dibulatkan

2,315,000.00
2,315,000.00

1.0000

m'

1.5000
1.0000
1.0000

btg
m'
lot

150,000.00
3,000,000.00
250,000.00

1.0000

org

1,525,000.00

225,000.00
3,000,000.00
250,000.00

225,000.00
3,000,000.00
250,000.00
1,525,000.00

1,525,000.00
5,000,000.00
5,000,000.00

ANALISA HARGA SATUAN UPAH PEKERJA DAN BAHAN

NO

URAIAN PEKERJAAN

KOEF

SAT

Pek. Plafond Droop Plywood fin. Duco


Material
Rangka Hollo 4 x4 t 1,2 mm
Plywood 12 mm
Melaminto putih 3 mm
Alat bantu dan Material Bantu
Bahan finishing
Bongkar pasang plafond eksisting
Lampu LED stripe
Upah + Mesin
Tenaga Perakitan dan Pasang

HARGA
SATUAN
E

1.0000

m2

2.0000
1.0500
1.0500
1.0000
1.0000
1.0000
1.5000

btg
m2
m2
ls
ls
ls
m'

144,000.00
160,000.00
75,000.00
150,000.00
350,000.00
250,000.00
85,000.00

1.0000

set

2,469,800.00

1.0000

m2

Jumlah
Dibulatkan
3

Pek. Partisi Kaca Area Taman


Material
Tiang Stainless steel dia 4"
Kaca polos 10mm tempered
Silicone sealent kaca 300ml
Spider kaca
Pondasi beton
Alat bantu dan Material Bantu
Upah + Mesin
Tenaga Perakitan dan Pasang

0.5000 m1
1.0500 m2
0.6500 Tube
1.5000 bh
0.5000 bh
1.0000
ls

4,125,000.00
950,000.00
37,000.00
950,000.00
750,000.00
250,000.00

1.0000

set

1,700,000.00

1.0000

Unit

1.0800
1.0000
0.6500
1.0000
1.0000

m2
m'
tube
ls
ls

160,000.00
6,500,000.00
37,000.00
750,000.00
250,000.00

1.0000

set

3,810,150.00

1.0000

Unit

1.0000
1.0000

m'
m'

Jumlah
Dibulatkan
4

Pek. Cover Kolom Stainless T 90 cm


Material
Plywood 12 mm
Plaat stainless SUS 304 tebal 2 mm
Silicone sealent kaca 300ml
Perapihan kolom ( cipig, dan aci )
Alat bantu
Upah + Mesin
Tenaga Perakitan dan Pasang
Jumlah
Dibulatkan

Pek. Atap Jalusi


Material
Kusen Alumunium 4 "
Louver alumunium

150,000.00
975,000.00

Sealent
Alat Bantu dan Material Pendukung

1.0000 Tube
1.0000 lot

37,000.00
153,000.00

Upah + Mesin
Tenaga Perakitan dan Pasang

1.0000

set

1.0000

m'

1.5000
1.0000
1.0000

btg
m'
lot

150,000.00
3,000,000.00
250,000.00

1.0000

org

1,525,000.00

1.0000

m2

2.0000
2.0000
1.3000
1.0000

lbr
lbr
m2
ls

190,000.00
138,000.00
48,000.00
350,000.00

1.5000
1.0000
1.0000

m'
ls
ls

85,000.00
250,000.00
216,885.00

1.2000
1.2000
0.0250
1.0000

org
org
org
ls

85,000.00
76,000.00
90,000.00
250,000.00

1.0000

m2

2.0000
1.6000
1.0000

btg
m2
ls

1,000,000.00

Jumlah
Dibulatkan

Pek. Pot Tanaman Gantung


Material
Hollo 2 x 4 cm t 0,6 mm
Plaat st. Steel tebal 2mm
Alat Bantu dan Material Pendukung
Upah + Mesin
Tenaga Perakitan dan Pasang
Jumlah
Dibulatkan

Plafond drop ceiling plywood fin. Duco


- Rangka hollow lapis plywood 12 mm
- Finishing duco warna kuning
- Background TV LCD ( excl. LCD TV, Bracket TV )
- Acrylic
Plafond drop ceiling plywood fin. Duco
Material
Plywood 9 mm
Melaminto 3 mm
rangka hollow 40x40, t=0,6
finishing duco warna kuning
Acrylic putih 5 mm
LED strip, ex. China
Pek. Bongkaran
Alat bantu + material pendukung + over head 10 %
Upah
Tukang Terampil
Pekerja
Mandor
Installasi ME (AC,Listrik,Data)
Jumlah
Dibulatkan
Pekerjaan cover lisplang drop off
- Rangka holow 4 x 4 t : 1,2mm
- Alumunium composite panel

Pekerjaan Plafond droop ceiling area pintu kedatangan dan kebera


Material
rangka hollow 40x40, t=0,6
Alumunium composit panel warna sampagne
Alat bantu + material pendukung + over head 10 %

48,000.00
420,000.00
115,200.00

Upah
Tukang Terampil
Pekerja
Mandor
Jumlah
Dibulatkan

1.2000
1.2000
0.0250

org
org
org

85,000.00
76,000.00
90,000.00

Karpet tile batas antrian Check In dan Walk through warna hijau + strip merah
3

Karpet tile
Material
Karpet tile 50x50 ex. Interface
List pancing Alumunium
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Mandor
Jumlah
Dibulatkan

1.0000

m2

1.0000
2.0000
1.0000

m2
m'
ls

500,000.00
75,000.00
97,500.00

1.2000
0.0250

org
org

76,000.00
90,000.00

1.0000

unit

1.0000
1.0000
1.0000
1.0000

m2
m'
ls
ls

190,000.00
2,000,000.00
750,000.00
441,000.00

1.2000
1.2000
0.0250

org
org
org

76,000.00
85,000.00
90,000.00

1.0000

unit

1.0000
1.0000
1.0000

m2
m'
ls

55,000.00
420,000.00
71,250.00

1.2000
1.2000
0.0250

org
org
org

76,000.00
85,000.00
90,000.00

Pekerjaan Cover Kolom H : 90 cm dia : 60 cm


- Backing plywood 9mm
- Stainless steel plaat 2 mm hairline
- Perpihan dan perbaikan kolom (ciping, aci dan cat )
4

Pekerjaan Cover Kolom H : 90 cm dia : 60 cm


Material
Plywood 9 mm
Stainless steel plat 2mm hairline
Perapihan dan perbaikan kolom
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Tukang terampil
Mandor
Jumlah
Dibulatkan

Pekerjaan cover lisplang drop off


- Rangka holow 4 x 4 t : 1,2mm
- Alumunium composite panel
5

Pekerjaan Cover listplang drop off


Material
hollow 4x4 t:1.3 mm
ACP
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Tukang terampil
Mandor
Jumlah
Dibulatkan

Signage Type Hanging area drop off (1,7x16 m)


Material
Body Milky acrylic 5mm + cutting sticker
hollow 40x40
lampu TL + instalasi (TL5 28 w)
plywood 12 mm
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Tukang terampil
Mandor
Instalasi ME
Jumlah
Dibulatkan

10

Signage Type standing (C2 G)


Material
Body Milky acrylic 5mm + cutting sticker
pipa blacksteel finish cat, dia 20
ACP
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Tukang terampil
Mandor
Instalasi ME
Jumlah
Dibulatkan

11

Signage Type standing (D1)


Material
Body Milky acrylic 5mm + cutting sticker
side body Galvanize plate 2 mm
finish powder coating col. White
pipa blacksteel finish cat, dia 20
ACP
Ornamen kerawangan
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Tukang terampil
Mandor
Instalasi ME
Jumlah
Dibulatkan

12

Signage Type standing (D2)


Material
Body Milky acrylic 5mm + cutting sticker
side body Galvanize plate 2 mm
finish powder coating col. White
pipa blacksteel finish cat, dia 20
ACP
Alat bantu + material pendukung + over head 10 %

1.0000

unit

64.0000
128.0000
96.0000
1.0000
1.0000

m2
m'
unit
lbr
ls

240,000.00
48,000.00
850,000.00
220,000.00
15,498,600.00

1.2000
1.2000
0.0250
1.0000

org
org
org
ls

76,000.00
85,000.00
90,000.00
2,000,000.00

1.0000

unit

1.0000
1.0000
0.5000
1.0000

ls
ls
m2
ls

7,500,000.00
1,000,000.00
420,000.00
1,306,500.00

1.2000
1.2000
0.0250
1.0000

org
org
org
ls

76,000.00
85,000.00
90,000.00
2,000,000.00

1.0000

unit

1.0000

ls

15,000,000.00

1.0000
4.0000
0.2250
1.0000

ls
m2
m2
ls

1,000,000.00
420,000.00
1,200,000.00
2,652,000.00

1.2000
1.2000
0.0250
1.0000

org
org
org
ls

76,000.00
85,000.00
90,000.00
2,000,000.00

1.0000

unit

1.0000

ls

15,000,000.00

1.0000
0.5000
1.0000

ls
m2
ls

1,000,000.00
420,000.00
2,431,500.00

Upah
Pekerja
Tukang terampil
Mandor
Instalasi ME
Jumlah
Dibulatkan

13

Pot. Tanaman
Material
pot tanaman model silinder finish stainless t : 100 cm
Tanaman walisongo kuning t:100-150, dia tajuk 3
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Tukang terampil
Mandor
Jumlah
Dibulatkan

13

Signage Type standing (C3-G)


Material
Body Milky acrylic 5mm + cutting sticker
pipa blacksteel finish cat, dia 20
ACP
Alat bantu + material pendukung + over head 10 %

Upah
Pekerja
Tukang terampil
Mandor
Instalasi ME
Jumlah
Dibulatkan
14

Pekerjaan stainless plaat laser cutting


Material
Stainless steel plat 2mm hairline
Alat bantu + material pendukung + over head 10 %
Upah
Pekerja
Tukang terampil
Mandor
Jumlah
Dibulatkan

1.2000
1.2000
0.0250
1.0000

org
org
org
ls

76,000.00
85,000.00
90,000.00
2,000,000.00

1.0000

unit

1.0000
1.0000
1.0000

ls
ls
ls

3,500,000.00
87,500.00
538,125.00

1.2000
1.2000
0.0250

org
org
org

76,000.00
85,000.00
90,000.00

1.0000

unit

1.0000

LS

15,000,000.00

0.5
1.0000

m2
ls

420,000.00
2,281,500.00

1.2000
1.2000
0.0250
1.0000

org
org
org
ls

76,000.00
85,000.00
90,000.00
2,000,000.00

1.0000

unit

1.0000
1.0000

m'
ls

2,000,000.00
300,000.00

1.2000
1.2000
0.0250

org
org
org

76,000.00
85,000.00
90,000.00

Signage Self Check In


- Multiplex plywood 18mm ( 1 muka )

lbr

3000000

- Melaminto 18mm ( 2 muka )

lbr

250000

- HPL ex. Taco

lbr

190000

- Lem Kuning

ltr

15000

- Lem Kayu
- Skrup

kg

0.5

15000

bh

200

1000

- Engsel Sendok

bh

25000

- Handle (huben)

bh

25000

- Granit Nero+ongkos tukang

m2

1300000

- Zink+kran (model standart)

bh

2500000

- lampu TL T4

ttk

850000

- LED strip

rol

250000

- Stop kontak

ttk

250000

- Saklar

ttk

95000

- Growmet

ttk

20000

- Acrilic 6mm

lbr

464285.714285714

- hollow
- hairline

btg
m2

15
2.1

48000
714285.71428572

- Tukang kayu
- Mandor

m2
m2

11.7
11.7

450,000.00
100,000.00

Alat bantu & material pendukung + over head 10%


TOTAL

ls

FLIGT INFORMATION DISPLAY SYSTEM ( FIDS ) - Outdoor (exc. TV display)


- Multiplex plywood 18mm ( 1 muka )
lbr
- Lem Kuning
ltr
- Skrup
bh
- Growmet
ttk
- Acrilic 5mm
lbr
- acrylic huruf
ls
- hollow
btg
- stinless hairline
m2
- instalasi ME
ttk
- Tukang kayu
m2
- Mandor
m2
Alat bantu & material pendukung + over head 10%

ls

4,434,160.71

5
300000
1.5
15000
40
1000
4
20000
4 464285.71428572
1
2000000
10
48000
4.105 714285.71428572
4
250000
10
450000
10
100000
1

2311767.8571429

TOTAL
FLIGT INFORMATION DISPLAY SYSTEM ( FIDS ) - indoor (exc. TV display)
- Multiplex plywood 18mm ( 1 muka )
lbr
- lem kuning
ltr
- skrup
bh
- Growmet
ttk
- Acrilic 5mm
lbr
- acrylic huruf
ls
- hollow
btg
- stinless hairline
m2
- instalasi ME
ttk
- Tukang kayu
m2
- Mandor
m2
Alat bantu & material pendukung + over head 10%

5.00
1.50
40.00
4.00
4.00
1.00
10.00
3.87
4.00
9.00
9.00

ls

1.00
TOTAL

JML
BAHAN
F=CxE

JML
UPAH
G=CxE

TOTAL
H

288,000.00
168,000.00
78,750.00
150,000.00
350,000.00
250,000.00
127,500.00

288,000.00
168,000.00
78,750.00
150,000.00
350,000.00
250,000.00
127,500.00

2,469,800.00

2,469,800.00
3,882,050.00
3,882,000.00

2,062,500.00
997,500.00
24,050.00
1,425,000.00
375,000.00
250,000.00

2,062,500.00
997,500.00
24,050.00
1,425,000.00
375,000.00
250,000.00
1,700,000.00

1,700,000.00
6,834,050.00
6,834,000.00

172,800.00
6,500,000.00
24,050.00
750,000.00
250,000.00

172,800.00
6,500,000.00
24,050.00
750,000.00
250,000.00
3,810,150.00

3,810,150.00
11,507,000.00
11,507,000.00

150,000.00
975,000.00

150,000.00
975,000.00

6,696,850.00

37,000.00
153,000.00

37,000.00
153,000.00

1,000,000.00

1,000,000.00

1,125,000.00

2,315,000.00
2,315,000.00

225,000.00
3,000,000.00
250,000.00

225,000.00
3,000,000.00
250,000.00
1,525,000.00

1,525,000.00
5,000,000.00
5,000,000.00

380,000.00
276,000.00
62,400.00
350,000.00

380,000.00
276,000.00
62,400.00
350,000.00

127,500.00
250,000.00
216,885.00

127,500.00
250,000.00
216,885.00

102,000.00
91,200.00
2,250.00
250,000.00

102,000.00
91,200.00
2,250.00
250,000.00

di gbr 9mm, di BQ 12 mm??

di gambar tdk disebutkan acrylic


1,445,900.00

2,108,235.00
2,108,200.00

96,000.00
672,000.00
115,200.00

96,000.00
672,000.00
115,200.00

768,000.00

102,000.00
91,200.00
2,250.00

102,000.00
91,200.00
2,250.00
1,078,650.00
1,078,600.00

500,000.00
150,000.00
97,500.00

500,000.00
150,000.00
97,500.00

91,200.00
2,250.00

91,200.00
2,250.00
840,950.00
840,900.00

190,000.00
2,000,000.00
750,000.00
441,000.00

190,000.00
2,000,000.00
750,000.00
441,000.00

91,200.00
102,000.00
2,250.00

91,200.00
102,000.00
2,250.00
3,576,450.00
3,576,400.00

55,000.00
420,000.00
71,250.00

55,000.00
420,000.00
71,250.00

91,200.00
102,000.00
2,250.00

91,200.00
102,000.00
2,250.00
741,700.00
741,700.00

650,000.00

2,940,000.00

475,000.00

15,360,000.00
6,144,000.00
81,600,000.00
220,000.00
15,498,600.00

15,360,000.00
6,144,000.00
81,600,000.00
220,000.00
15,498,600.00

91,200.00
102,000.00
2,250.00
2,000,000.00

91,200.00
102,000.00
2,250.00
2,000,000.00
121,018,050.00
121,018,000.00

7,500,000.00
1,000,000.00
210,000.00
1,306,500.00

7,500,000.00
1,000,000.00
210,000.00
1,306,500.00

91,200.00
102,000.00
2,250.00
2,000,000.00

91,200.00
102,000.00
2,250.00
2,000,000.00
12,211,950.00
12,211,900.00

15,000,000.00

15,000,000.00

1,000,000.00
1,680,000.00
270,000.00
2,652,000.00

1,000,000.00
1,680,000.00
270,000.00
2,652,000.00

91,200.00
102,000.00
2,250.00
2,000,000.00

91,200.00
102,000.00
2,250.00
2,000,000.00
22,797,450.00
22,797,400.00

15,000,000.00

15,000,000.00

1,000,000.00
210,000.00
2,431,500.00

1,000,000.00
210,000.00
2,431,500.00

lampu TL yg dipakai??berapa watt??jenis??


103,324,000.00

8,710,000.00

17,680,000.00

16,210,000.00

91,200.00
102,000.00
2,250.00
2,000,000.00

91,200.00
102,000.00
2,250.00
2,000,000.00
20,836,950.00
20,836,900.00

3,500,000.00
87,500.00
538,125.00

3,500,000.00
87,500.00
538,125.00

91,200.00
102,000.00
2,250.00

91,200.00
102,000.00
2,250.00
4,321,075.00
4,321,000.00

15,000,000.00

15,000,000.00

210,000.00
2,281,500.00

210,000.00
2,281,500.00

91,200.00
102,000.00
2,250.00
2,000,000.00

91,200.00
102,000.00
2,250.00
2,000,000.00
19,686,950.00
19,686,900.00

2,000,000.00
300,000.00

2,000,000.00
300,000.00

91,200.00
102,000.00
2,250.00

91,200.00
102,000.00
2,250.00
2,495,450.00
2,495,400.00

9000000
0
0

3,587,500.00

15,210,000.00

45000
7500
200000
0
0
0
0
6800000
0
500000
95000
80000
4178571.42857143

720000
1500000

5,265,000.00
1,170,000.00
29,561,071.43
4,434,160.71
33,995,232.14

1500000
22500
40000
80000
1857142.85714286
2000000
480000
2932142.85714286
1000000
4500000
1000000
15411785.7142857
2311767.85714286
17723553.5714286

300,000.00
15,000.00
1,000.00
20,000.00
464,285.71
2,000,000.00
48,000.00
714,285.71
250,000.00
450,000.00
100,000.00
2,203,553.57

1,500,000.00
22,500.00
40,000.00
80,000.00
1,857,142.86
2,000,000.00
480,000.00
2,760,714.29
1,000,000.00
4,050,000.00
900,000.00
14,690,357.14
2,203,553.57
16,893,910.71

(6,834,000)

###

#VALUE!

#VALUE!

DAFTAR HARGA SATUAN MATERIAL


NO
1
2
3
4
5
6
7
8
9
10
11

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

JENIS MATERIAL
Besi hollow 2x4cm (pj. 4m') tebal 0.6mm, dicat meni
Besi hollow 4x4cm (pj. 4m') tebal 0.6mm, dicat meni
Besi hollow 4x4cm (pj. 4m') tebal 1,2mm, dicat meni
Kaca polos 12mm tempered
Sealent
Kaca polos 8mm
Kaca cermin 5mm
Acrylik Colour 10 mm
Aluminium Composite t=4 ex Seven
Plywood Megateak, t=3m
Plywood t=6mm
Plywood t=9mm
Plywood t=12mm
Plywood t=16mm
Plywood t=18mm
Plywood nyatoh
Melaminto 3mm
Multiplex 3mm
Multiplex 6mm
Multiplex 9mm
Multiplex 12mm
Multiplex 15mm
Multiplex 18mm
Melamik Sanding Sealer
Melamik Clear Top Coat
Lem Kuning Hafferin
Wood Filler
Thinner High gloss
Amplas Halus
Rel laci ex Haffele
Engsel Sendok
Handle ex Hafele
central lock
frame stainless steel
laser cutting
frame allumunium powder coated 4"
HPL ex.Taco
pvc edging match to laminate
plat stainless tebal. 4mm warna hairline
plat stainless 10cm tebal 1,2 mm warna hairline
solid surface ex. IDKU
tinted glass 6mm
digital print
font stainless
neon box
carpet tile 50x50 ex Interface
lantai vinyl 30 cm
gypsum board 9 mm ex Jayaboard
handrail pipa stainless 3"

Type SATUAN
btg
btg
btg
m2
Tube
m2
m2
m2
m2
lmbr

lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
kg
kg
kg
kg
ltr
lmbr
set
set
bh
bh
m1
m2
m2
m2
m1
m1
m1
m2
m2
m2
ls
unit
m2
m2
m2
m1

HARGA 2013
32,000
40,000
120,000
450,000
26,500
198,000
200,000
1,050,000
350,000
115,000
135,000
180,000
190,000
240,000
270,000
115,000
78,000
56,000
110,000
135,000
168,000
210,000
240,000
38,000
37,500
35,000
27,500
12,500
2,500
45,000
20,000
15,000
35,000
155,000
450,000
140,000
220,000
100,000
265,000
185,000
2,000,000
450,000
350,000
250,000
300,000
500,000
250,000
120,000
500,000

lighting
1 lampu downlight ex.Osram
2 cat dinding ex Dulux Pearl Glow
furniture
1 Working chair ex Veroty Type Senator IV G - Morelli
signage
1 side body Galvanize plate 2 mm finish powder coating col. White
Body Milky acrylic 5mm + cutting sticker
2 struktur penyangga H beam
3 struktur besi sling penggantung/tanam
4 tempat sampah 4 kompartment ex Quarto

unit
m2

255,000
27,000

15,000,000
ls
ls
unit

1,000,000
500,000
10,125,000

HARGA 2014 INFLASI 20 %


38,400
48,000
144,000
540,000
31,800
237,600
240,000
1,260,000
420,000
138,000
150,000
190,000
220,000
260,000
295,000
138,000
93,600
67,200 multiplex lebih mHl 10rb daripada plywood dan melaminto
132,000
162,000
201,600
252,000
300,000
45,600
45,000
42,000
33,000
15,000
3,000
55,000
25,000
18,000
42,000
186,000
540,000
168,000
264,000
120,000
318,000
222,000
2,400,000
540,000
420,000
300,000
360,000
600,000
300,000
144,000
600,000
0

0
306,000
32,400
0
0
0
18,000,000
0
1,200,000
600,000
12,150,000

DAFTAR HARGA SATUAN UPAH


No. JENIS/UPAH

SATUAN

HARGA SATUAN

1 Pekerja
2 Pekerja Setengah Terampil
3 Pekerja Terampil

Orang/Hari
Orang/Hari
Orang/Hari

76,000
65,000
75,000

4 Tukang Kaca terampil

Orang/Hari

75,000

5 Tukang Kayu Setengah Terampil


6 Tukang Kayu Terampil
7 Kepala Tukang Kayu

Orang/Hari
Orang/Hari
Orang/Hari

85,000
85,000
85,000

8 Tukang Besi terampil


9 Tukang Finishing Melamic terampil
10 Kepala Tukang Finishing Melamic

Orang/Hari
Orang/Hari
Orang/Hari

55,000
70,000
85,000

11 Mandor

Orang/Hari

90,000

12
13
14
15

installasi listrik
Installasi ME atm
Installasi ME check in counter
Installasi ME FIDS

unit
unit
unit
unit

250,000
15,000,000
2,000,000
2,000,000

88
13
17.33333