You are on page 1of 10

Formwork

the term given to either temporary or


permanentmoldsinto whichconcreteor
similar materials are poured.

Formworks
Formula in Finding the Materials for Square
and Rectangular Column Forms

P = 2 ( a + b) + 0.20
P = lateral perimeter of the column
a = shorter side of the column
b = the longer side of the column
0.20 = constant value for the lapping of joints

Sample Formworks
Computation for Column

a. Solve for the Lateral


perimeter:
P = 2 ( a + b ) + 0.20
P = 2 ( 0.40 + 0.60 ) +
0.20
P = 2.20 m

b. Multiply the height


and number of
columns to get the
lateral surface area.
Area = P x H x No.
Columns
A = 2.20m x 5.0m x
10
A = 110 sq. meters
c. Divide areas by
2.88 to get number of
plywood

Sample Formworks
Computation for Column
(cont)
c. Divide areas by
2.88 to get number of
plywood

d. Solving the 2 x 2 wood


frame, multiply 29.67 board foot
39 Plywood x 29.67 = 1,157
board foot

Circular Column
1. Solve for the circumference of one
column
2. Multiply by column height to find the
surface area
3. Multiply the area by the number of
columns

Formworks
Formula in Finding the Materials for
Beams and Girder Forms

P = 2 ( a + b) + 0.10
P = lateral perimeter of the column
a = shorter side of the column
b = the longer side of the column
0.10 = constant value for the lapping of
joints

Board Foot of Wood Frame


for Column and Beam per
Plywood Form
Thickness of Plywood Form
Post
Beam

Size
of
Wood
6 mm
Fram
(1/4")
e
2" x

29.67

12 mm
(1/2")

6 mm
(1/4")

12 mm
(1/2")

20.33

25.06

18.66

Scaffoldings

The End for now

You might also like