Unit
Quantit
Prix unitaire
INSTALLATION
Gnie civil matriaux
ENS
1.00
1,400.00
35.00
28.00
Transport
2.00
400.00
ENS
1.00
800.00
16.00
28.00
Forfait d'installation
Main d'oeuvre d'installation
Branchements
ENS
1.00
500.00
Fournitures diverses
ENS
1.00
250.00
ENS
1.00
850.00
Transports
2.00
400.00
16.00
28.00
16.00
28.00
5% heures
42.00
28.00
DEMONTAGE
Forfait dmontage
ENTRETIEN
Entretien du matriel
LOCATION
Location centrale bton 1500L
Mois
5.71
3,300.00
Mois
5.71
886.00
Mois
5.71
1,200.00
TOTAL MATERIEL =
CODE COULEUR
39,677.14
POSTE DE DEPENSE
PARAMETRES
CODE COULEUR
RESULTAT
METHODES BTP
Unit
Quantit
Prix unitaire
Tonnes
#NAME?
170.00
Tonnes
#NAME?
15.00
Tonnes
#NAME?
15.00
m3
#NAME?
2.00
litres
#NAME?
3.50
litres
#NAME?
2.00
#NAME?
TOTAL MATERIAUX =
#NAME?
Unit
Btonnier
jours
Unit
Quantit
120.00
196.00
23,520.00
Quantit
Prix unitaire
m3
18.00
2.00
kWh
21,000.00
0.11
TOTAL CONSOMMATIONS =
PRESTATIONS EXTERNES
Prix unitaire
2,346.00
Unit
Quantit
Prix unitaire
Essais de rsistance
25.00
250.00
Etude BA
1.00
3,000.00
9,250.00
SOUS TOTAL
ER
HYPOTHESES DE CALCUL
Quantit de bton totale
Dure du gros-uvre
6,038.00 m3
120.00 jours
28.00 / h
7.00 h
25.00 kWh
1.00 unit
PARAMETRES DIVERS
Perte sur les matriaux
Litres d'eau de lavage par jour
5%
150 litres/jour
Prix total
39,677.14
#NAME?
23,520.00
CONSOMMATIONS
2,346.00
PRESTATIONS EXTERNES
9,250.00
#NAME?
#NAME?
Formule
Ciment
Sable
Gravier
150.0 kg
920.4 kg
1,380.6 kg
200.0 kg
873.8 kg
1,310.8 kg
250.0 kg
827.3 kg
1,240.9 kg
300.0 kg
780.8 kg
1,171.1 kg
350.0 kg
734.2 kg
1,101.3 kg
Eau
Adjuvant 1
Adjuvant 2
83.3 litres
0.0 litres
0.0 litres
111.1 litres
0.0 litres
0.0 litres
138.9 litres
0.5 litres
0.3 litres
166.7 litres
0.7 litres
0.2 litres
194.4 litres
0.2 litres
0.4 litres