Long -Term Permanent Works at Pasig-Potrero Bridge of SCT

APPROVED MATERIALS SOURCES


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Gabion/Matresses
(EASTERN WIRE)
R.M.C. Batching Plant (La Corona Ready Mix Conc.)
Reinforcing Steel Bars (Steel Asia Inc.)
Elastomeric Bearing Pad (Reymark Marketing Inc.)
Boulder Materials (Florida Blanca, Pampanga)
Wire Strand (FreyFill)
Common Borrow (Pasig-Potrero River)
Common Borrow from excavated materials
Aggregate Subbase Course (Florida Blanca)
Crushed Aggregate Base Course (Florida Blanca), on going test.
Subiccon Ready Mix Asphalt
(Olongapo City)

Prepared by :

NOEL C. BONDOC
QC Engineer, HCDC

Checked and Verified by:

ABEL C. MALLARI
Materials Inspector, PTCC

August 12, 2015