METRADO DE VEREDAS

ZONA URBANA BUENOS AIRES (VIA PRINCIPAL) KM 42+800 - KM 43+503.10

Progresiva

42+800-42+928
42+928-42+946
42+946-42+980
42+980-43+021
43+021-43+031.84
43+040-43+046.10
43+046.10-43+190
43+190-43+208
43+208-43+283
43+283-43+301
43+301-43+376
43+376-43+394
43+394-43+470
43+470-43+503.10
Total

Ubicacin (Area)
Area Total
Base Granular
Concreto fc=140kg/cm2
Encofrado 0.15 m2/ml
Excavacin
Lado
Lado
Superficial Espesor Volumen
Espesor
Volumen
Lado
Lado
Total
Izquierdo Derecho
Izquierdo Derecho
m2
m
m3
m
m3
m
m3
m2
m2
m
m
192.00
192.00
384.00
0.10
38.40
0.15
57.60
129.50
129.50
259.00
38.85
21.28
24.33
45.61
0.10
4.56
0.15
6.84
20.40
20.40
40.80
6.12
51.00
51.00
102.00
0.10
10.20
0.15
15.30
68.00
68.00
136.00
20.40
61.50
61.50
123.00
0.10
12.30
0.15
18.45
82.00
82.00
164.00
24.60
16.26
16.26
0.10
1.63
0.15
2.44
23.18
23.18
3.48
17.93
19.72
37.65
0.10
3.77
0.15
5.65
18.42
18.51
36.93
5.54
241.86
241.86
483.72
0.10
48.37
0.15
72.56
287.80
287.80
575.60
86.34
30.80
27.00
57.80
0.10
5.78
0.15
8.67
22.70
22.70
3.41
112.50
112.50
225.00
0.10
22.50
0.15
33.75
150.00
150.00
300.00
45.00
36.80
33.79
70.59
0.10
7.06
0.15
10.59
24.30
25.72
50.02
7.50
112.50
112.50
225.00
0.10
22.50
0.15
33.75
150.00
150.00
300.00
45.00
28.83
24.59
53.42
0.10
5.34
0.15
8.01
22.40
20.80
43.20
6.48
114.00
114.00
228.00
0.10
22.80
0.15
34.20
152.00
152.00
304.00
45.60
3.15
46.05
49.20
0.10
4.92
0.15
7.38
7.00
31.90
38.90
5.84
210.13
315.19
2,294.33
344.15

METRADO DE VEREDAS
ZONA URBANA BUENOS AIRES ACCESOS / CALLES

Progresiva

42+937.20 Calle
s/nombre
43+199.00 Jr.
Arequipa
43+292.00 Jr.
Sucre
43+385.00 Jr.
Lima
43+481.00 Acc.
Tarapoto - I
43+596.00 Acc.
Paujizapa - D
43+031.84 Acc.
Sta. Rosillo - D
Total

Ubicacin (Area)
Lado
Lado
Izquierdo Derecho
m2
m2

Area Total
Base Granular
Concreto fc=140kg/cm2
Superficial Espesor Volumen Espesor
Volumen
m2

m3

m3

Encofrado 0.15 m2/ml


Excavacin
Lado
Lado
Total
Izquierdo Derecho
m
m3
m
m

45.61

43.60

89.21

0.10

8.92

0.15

13.38

63.20

42.56

0.00

42.56

0.10

4.26

0.15

6.38

58.16

40.58

38.92

79.50

0.10

7.95

0.15

11.93

43.18

45.83

89.01

0.10

8.90

0.15

0.00

0.00

0.00

0.10

0.00

0.00

0.00

0.00

0.10

0.00

0.00

0.00

0.10

61.20 124.40
0.00

18.66

58.16

8.72

58.74

64.54 123.28

18.49

13.35

57.54

62.37 119.91

17.99

0.15

0.00

0.00

0.00

0.00

0.00

0.00

0.15

0.00

0.00

0.00

0.00

0.00

0.00
30.03

0.15

0.00
45.04

0.00

0.00

0.00
425.75

0.00
63.86

METRADO DE VEREDAS
ZONA URBANA DE PICOTA Y ACCESOS A CALLES

Progresiva

58+570-58+673
58+550-58+659
58+667-58+760
58+679-58+764
58+766-58+831
58+770-58+835
58+837-58+940
58+840-58+946
58+964-58+968

Calle s/n 58+552 (i)


Calle s/n 58+552 (d)
Jr. Sucre 58+663.6 (d)
Jr. Sucre 58+677.5 (i)
Jr. Bolognesi 58+759.5 (d)
Jr. Miguel Grau 58+828.7 (d)
Jr. Tupac Amaru 58+945.7 (i)
Total

Ubicacin (Area)
Area Total
Base Granular
Concreto fc=140 kg/m2 (m3)
Encofrado (m2)
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
Va Principal
144.00
144.00
0.10
14.40
21.60
4.54
26.14
17.03
17.03
214.00
214.00
0.10
21.40
32.10
6.32
38.42
23.70
23.70
305.50
305.60
0.10
30.56
45.84
5.10
50.94
19.13
19.13
165.05
165.05
0.10
16.51
24.76
4.17
28.93
15.65
15.65
114.15
114.15
0.10
11.42
17.12
3.46
20.58
12.99
12.99
213.70
213.70
0.10
21.37
32.06
3.68
35.74
13.82
13.82
230.00
230.00
0.10
23.00
34.50
5.77
40.27
21.63
21.63
322.35
322.35
0.10
32.24
48.35
6.03
54.38
22.63
22.63
48.00
0.10
4.80
7.20
1.60
8.80
6.00

45.90
45.81
70.59
25.80
21.00
18.36
13.92

45.90
45.81
70.59
25.80
21.00
18.36
13.92

Calles / Accesos
0.10
4.59
6.89
0.10
4.58
6.87
0.10
7.06
10.59
0.10
2.58
3.87
0.10
2.10
3.15
0.10
1.84
2.75
0.10
1.39
2.09
199.82

0.95
1.04
1.30
0.86
0.70
0.61
0.46

7.84
7.91
11.89
4.73
3.85
3.36
2.55
346.32

3.56
3.92
4.86
3.23
2.63
2.30
1.74

3.56
3.92
4.86
3.23
2.63
2.30
1.74
174.82

Excav.
m3

4.54
6.32
5.10
4.17
3.46
3.68
5.77
6.03
1.60

0.95
1.04
1.30
0.86
0.70
0.61
0.46
46.59

METRADO DE VEREDAS
CASERIO SHIMBILLO

Progresiva

47+980 - 48+000
48+000 - 48+030
48+030 - 48+050
Total

Ubicacin (Area)
Area Total
Base Granular
Concreto fc = 140 kg/cm2 (m3)
Encofrado (m2)
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
27.00
45.00
27.00

27.00
45.00
27.00

54.00
90.00
54.00

0.075
0.075
0.075

4.05
6.75
4.05
14.85

8.10
13.50
8.10

3.20
4.80
3.20

11.30
18.30
11.30
40.90

6.00
9.00
6.00

6.00
9.00
6.00

12.00
18.00
12.00
42.00

Excavacin
m3

3.20
4.80
3.20
11.20

METRADO DE VEREDAS
CASERIO CHINCHA ALTA

Progresiva

48+710 - 48+730
48+730 - 48+760
48+760 - 48+780
Total

Ubicacin (Area)
Area Total
Base Granular
Concreto fc = 140 kg/cm2 (m3)
Encofrado (m2)
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
27.00
45.00
27.00

27.00
45.00
27.00

54.00
90.00
54.00

0.075
0.075
0.075

4.05
6.75
4.05
14.85

8.10
13.50
8.10

3.20
4.80
3.20

11.30
18.30
11.30
40.90

6.00
9.00
6.00

6.00
9.00
6.00

12.00
18.00
12.00
42.00

Excavacin
m3

3.20
4.80
3.20
11.20

METRADO DE VEREDAS
ZONA URBANA PUCACACA

Ubicacin (Area)
Area Total
Base Granular
Concreto fc = 140 kg/cm2 (m3)
Encofrado (m2)
Excavacin
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
m3
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
Calle Arequipa
50+360 - 50+372.5
64.55
15.00
79.55
0.075
5.97
11.93
1.82
13.75
3.05
3.75
6.80
1.82
50+372.5 - 50+384
61.75
13.20
74.95
0.075
5.62
11.24
2.08
13.32
4.35
3.45
7.80
2.08
50+384 - 50+390
10.50
7.80
18.30
0.075
1.37
2.75
0.72
3.47
0.90
1.80
2.70
0.72
50+390 - 50+400
15.00
13.50
28.50
0.075
2.14
4.28
1.20
5.48
1.50
3.00
4.50
1.20
50+400 - 50+410
15.00
13.50
28.50
0.075
2.14
4.28
1.42
5.70
2.33
3.00
5.33
1.42
50+410 - 50+440
225.00
60.00
285.00
0.075
21.38
42.75
3.84
46.59
5.48
9.00
14.48
3.84
50+440 - 50+460
30.00
27.00
57.00
0.075
4.28
8.55
2.40
10.95
3.00
6.00
9.00
2.40
50+460 - 50+468
80.92
80.92
0.075
6.07
12.14
0.78
12.92
2.92
2.92
0.78
50+475.5 - 50+483
95.47
95.47
0.075
7.16
14.32
0.80
15.12
3.00
3.00
0.80
Total
56.11
127.29
56.53
15.06
Progresiva

METRADO DE VEREDAS
ACCESO AL VALLE OESTE

Ubicacin (Area)
Area Total
Base Granular
Concreto fc = 140 kg/cm2 (m3)
Encofrado (m2)
Excavacin
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
m3
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
Paradero
51+100 - 51+120
27.00
27.00
54.00
0.075
4.05
8.10
3.20
11.30
6.00
6.00
12.00
3.20
51+120 - 51+150
45.00
45.00
90.00
0.075
6.75
13.50
4.80
18.30
9.00
9.00
18.00
4.80
51+150 - 51+170
27.00
27.00
54.00
0.075
4.05
8.10
3.20
11.30
6.00
6.00
12.00
3.20
Progresiva

51+060 (Isla)
51+075 (Isla)
Total

56.250
30.875

0.075
0.075

Interseccin
4.22
8.44
2.32
4.63
21.38

6.88
1.62

15.32
6.25
62.47

25.80
6.52
74.32

6.88
1.62
19.70

METRADO DE VEREDAS
CASERIO VILLANUEVA

Progresiva

54+670 - 54+690
54+690 - 54+720
54+720 - 54+740
Total

Progresiva

54+670 - 54+690
54+690 - 54+720
54+720 - 54+740
Total

Progresiva

54+670 - 54+690
54+690 - 54+720
54+720 - 54+740
Total

Ubicacin (Area)
Area Total
Base Granular
Concreto fc = 140 kg/cm2 (m3)
Encofrado (m2)
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
27.00
45.00
27.00

27.00
45.00
27.00

54.00
90.00
54.00

0.075
0.075
0.075

4.05
6.75
4.05
14.85

8.10
13.50
8.10

3.20
4.80
3.20

11.30
18.30
11.30
40.90

6.00
9.00
6.00

6.00
9.00
6.00

12.00
18.00
12.00
42.00

Ubicacin (Area)
Area Total
Base Granular
Concreto fc = 140 kg/cm2 (m3)
Encofrado (m2)
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
27.00
45.00
27.00

27.00
45.00
27.00

54.00
90.00
54.00

0.075
0.075
0.075

4.05
6.75
4.05
14.85

8.10
13.50
8.10

3.20
4.80
3.20

11.30
18.30
11.30
40.90

6.00
9.00
6.00

6.00
9.00
6.00

12.00
18.00
12.00
42.00

Ubicacin (Area)
Area Total
Base Granular
Concreto fc = 140 kg/cm2 (m3)
Encofrado (m2)
Lado
Lado
Superficie Espesor Volumen
Losa Uas H=0.20 Volumen
Lado
Lado
Total
Izquierdo Derecho
m2
m
m3
e = 0.15
A=0.20
Total
Izquierdo Derecho
m2
27.00
45.00
27.00

27.00
45.00
27.00

54.00
90.00
54.00

0.075
0.075
0.075

4.05
6.75
4.05
14.85

8.10
13.50
8.10

3.20
4.80
3.20

11.30
18.30
11.30
40.90

6.00
9.00
6.00

6.00
9.00
6.00

12.00
18.00
12.00
42.00

Excavacin
m3

3.20
4.80
3.20
11.20
Excavacin
m3

3.20
4.80
3.20
11.20

Excavacin
m3

3.20
4.80
3.20
11.20