Professional Documents
Culture Documents
S10
Hoja resumen
Obra
0302024
Localizacin
120101
Fecha Al
01/07/2012
001
1,442,457.71
002
255,321.80
003
364,331.87
004
189,208.16
005
103,920.96
006
EQUIPAMIENTO
99,109.50
S/.
(CD)
COSTO DIRECTO
2,454,350.00
2,454,350.00
GASTOS GENERALES 7%
171,804.50
UTILIDAD 8%
196,348.00
----------------
SUB TOTAL
2,822,502.50
IGV 18%
508,050.45
----------------
3,330,552.95
SUPERVISION 2%
66,611.06
EXPEDIENTE TECNICO
60,000.00
GASTOS ADMINISTRATIVOS 1%
33,305.53
---------------
TOTAL PRESUPUESTO
3,490,469.54
MANO DE OBRA
S/.
1,040,266.85
MATERIALES
S/.
1,277,939.14
EQUIPOS
S/.
128,394.29
SUBCONTRATOS
S/.
7,750.00
S/.
2,454,350.28
01/07/2012