VARIOUS EQUATIONS USED FOR MONITORING EFFICIENCY OF PLANT:1) GAS FACTOR = TOTAL GAS CONSUMED IN SCM / TOTAL GENERATION

IN KWH
2) HEAT RATE = GAS CONSUMED SCM * GCV OF GAS KCAL/SCM / TTL GENERATION IN KWH
3) EFFICIENCY = 860 / HEAT RATE.
4) DAILY CAPACITY GENERATION = CAPACITY OF UNIT MWH * 24
5) MONTHLY CAPACITY GENERATION = CAPACITY OF UNIT MWH *24 HRS * NO OF DAYS.
6) DAILY PLF ACTUAL = ACTUAL GENE. / DAILY CAPACITY GENERATION.
7) MONTHLY PLF ACTUAL = ACTUAL GENERATION OF MONTH / MONTHLY CAPACITY GENERATION.
8) FOR PLF WITH BD RSD ADD BD AND RSD IN TO ACTUAL GENERATION IN ABOVE EQUATIONS.
9) PAF ON RUNNING HOURS DAILY = NO OF RUNNING HOUR IN A DAY / ACTUAL HOUR OF THE DAY
10) PAF ON RUNNING HOURS MONTHLY = NO OF RUNNING HOUR IN MONTH / ACTUAL HOUR OF MONTH
11) YARD LOSSES = TOTAL EX BUS SENT OUT AS PER OUTGOING FEEDERS EX BUS GEN RCORDED IN GT1,.
STG1, GT2, STG2 METER
12) AUXILIARY CONSUMPTION = TTL GEN - TOTAL EX BUS SENT OUT AS PER OUTGOING FEEDERS.
13) % AGE AUXILIARY CONSUMPTION = AUXILIARY CONS / TTL GENERATION
14) GEN TRANS LOSS = GEN RECORDED EX BUS SENTOUT METER RD ACTUAL CONS RECORDED ON 6.6 KV BUS
15) GAS CONVERSION MMBTU TO SCM: - SCM= MMBTU *252000 / CAL. VALUE (GCV FOR GAIL & NCV FOR RIL)
16) GAS CONVERSION SCM TO MMBTU: - MMBTU = SCM * CAL VALUE (GCV FOR GAIL & NCV FOR RIL) / 252000
GERC DATA:- (FOR BOTH UNITS)
GERC APPROVED PAF = 80% ; AUXILIARY CONSUMPTION = 3%; HEAT RATE = 1950 KCAL/KWH;
EX BUS VARIABLE COST Rs 2.21/KWH, CONSIDERING GAS COST AS 10.82 Rs PER SCM & GCV 9834
PAF GERC = DECLARED CAPACITY (DC) / (CAPACITY OF UNIT * NO OF HOURS * (1-AUX CONS ie 0.03))
PLF GERC = SCHEDULE FROM SLDC / (CAPACITY OF UNIT * NO OF HOURS * (1-AUX CONS ie 0.03))
GAS DETAILS FOR CCPP 2:RIL GAS :ORIGIN K G BESIN
TRANSPORTER 1 :- RGTIL (KG BESIN TO ATAKPARDI)
TRANSPORTER 2 :- GSPL (ATAK PARDI TO DHUVARAN)

CONT QTY
14143MMBTU
14143 MMBTU
14143 MMBTU

COST OF GAS / TRANSPORTATION


.
$ 4.34 PER MMBTU
Rs. 67.64 PER MMBTU
Rs. 26.83 PER MMBTU

RIL GAS IS A NCV BASED GAS SO CONVERSION FROM SCM TO MMBTU IS DONE BY TAKING NCV AS CV.
VARIOUS BILLING COMPONENTS. :RIL:1)
2)
3)
4)

GAS COST :- $ 4.205 PER MMBTU


MARKET MARGIN :- $ 0.135 PER MMBTU
MONTHLY TAKE OR PAY LIABILITY:- MONTHLY OFF TAKE SHOULD BE MORE THAN 80% OF CONT QTY.
YEARLY TAKR OR PAY LIABILITY: - YEARLY OFF TAKE SHOULD BE MORE THAN 90% OF CONT QTY.

RGTIL:1) TRANSPORTATION CHARGES :- Rs 67.54 PER ACTUAL SHIP QTY


2) MONTHLY SHIP OR PAY PANELTY :- MONTHLY SHIP QTY SHOULD BE MORE THAN 90% OF CONT QTY
3) POSITIVE IMBALANCE CHARGE:- Rs. 67.54 PER MMBTU IF UNUSED GAS IN PIPE LINE IS MORE THAN 1414.3 MMBTU
4) NEGATIVE IMBALANCE CHARGE:- Rs. 202.62 PER MMBTU IF GAS OVERDRAWN FROM PIPE LINE IS MORE THAN 707
MMBTU
GSPL:1) CAPACITY CHARGES :- IF SHIP QTY IS <= CONT QTY THAN Rs 23.63 *14143 MMBTU & IF SHIP QTY IS > CONT QTY
THEN Rs 23.63 *ACTUAL MMBTU
2) COMODITY CHARGES: - Rs. 3.2 PER ACTUAL SHIP QTY IN MMBTU.
3) UNAUTHORISED OVERRUN CHARGES ABOVE 10 % :- Rs. 26.83 PER MMBTU OF QTY DRAWN MORE THAN 10% OF
SCHEDULED QTY.
4) POSITIVE IMBALANCE PANELTY :- Rs. 107.32 PER MMBTU IF UNUSED GAS IN PIPE LINE IS MORE THAN 1600
MMBTU
5) NEGATIVE IMBALANCE PANELTY :- Rs 107.32 PER MMBTU IF GAS OVERDRAWN FROM PIPE LINE IS MORE THAN
800 MMBTU.

GAS DETAILS FOR CCPP 1:AVAILABLE GAS FOR CCPP 1 IS FROM GAIL. GAIL GAS IS GCV BASED GAS. MMBTU ARE CALCULATED CONSIDERING
GCV AS CV
TYPE OF GASES
1) APM:- CONT QTY 200000 SCM PER DAY RATE PER SCM = Rs. 7.52667 PER SCM AT 10000 KCAL/SCM NCV
2) RLNG:- CONT QTY 250000SCM PER DAY. RATE PER MMBTU = INDIAN RS COMP Rs 42.61 PER MMBTU +
FOREIGN EXC COMP $ 6.5137 PER MMBTU
3) SPOT:- CONT QTY VARIES MONTHLY AS PER REQ. RATE:- PRESENT MARKET RATE OF GAS.
VARIOUS BILLING COMPONENTS:APM:1)
2)
3)
4)

GAS COST :- Rs 7.52667 PER SCM


MARKET MARGIN :- Rs. 0.2 PER SCM
PRE/ REBATE CHARGES:- REBATE OR PREMIUM FOR GAS NCV DIFF FROM CONTRACTED 10000KCAL/SCM.
FIXED TRANSPORTATION CHARGES:- Rs. 4651692 PER MONTH. (ALWAYS CHARGED IN 1ST HALF BILL)

RLNG:1) GAS COST :- INDIAN Rs COMPONENT = 42.61 PER MMBTU + FECOMPONENT $6.5137 PER MMBTU (VARIABLE)
2) TRANSPORATATION CHARGES: - Rs 19.83 PER MMBTU GAS TRANSPORTED.
GAS NOMINATION AND PROCUREMENT ACTION:CCPP UNIT 1:- GAIL ALLOCATES APM AND RLNG GAS DAILY. WE DONT HAVE ANY CONTROL OVER ALLOCATION.
OVER DRAWL 3% IS ALLOWED PER DAY SUBJECT TO 0% OVER DRAWL IN BILLING PERIOD.
CCPP UNIT 2:- DAILY NOMINATION IS GIVEN BY OPERATION SECTION AS PER REQUIREMENT FOR 5 POINT.
1) RIL 2) RGTIL ENTRY 3) RGTIL EXIT 4) GSPL ENTRY 5) GSPL EXIT
AGAINST THIS NOMINATION RIL, RGTIL AND GSPL GIVES SCHEDULE AT ALL THIS 5 POINT.
THIS MAY BE DIFFERENT FROM NOMINATED QTY. THIS IS ACTUAL USABLE QTY.