Professional Documents
Culture Documents
INSTALLANTION MANUAL
12V
220/110/80V
Step6:
Hot
Cold
Step7:
Remove the protective layer on the ABS tray the roof
That will make it look nice
ADL-8308B Size:150*83*215cm
ADL-8312B Size:170*83*215cm
-8-
Step4:
Part Of Accessories
A1
A2
Wall Frame
Rail
B1
B2
A3
A4
B9
A6
B3
B4
B10
B11
B5
B6
B12
B16
B17
B18
B7
Roof shower
Handle shower
B13
Water proof
B15
A7
Magnetic strip
Doorknob
B8
A5
B14
Side seal
B19
B20
B21
Glass rack
B22
These drwings are just for reference The accessories have many different styles
and something maybe have been fixed on already please check it
Part Of Tools
-2-
- 7-
Step3:
Step1:
This shower room is designed to position
at a corner The fioor drain need to be a
feasible position
Connect drainpipe with deainer bend on the tray
and insert the other end into drain hole the ground
Move bathtub at suitable place and level
tray with leveling pole lf it is not level
you just adjust screw to level it and
fasten lock nuts
A
-6-
-3-
Step2:
B11
A4
A3
Water proof
A7
A2
B9
Rail
A1
Wall Frame
B11
B10
A5
Water proof
A2
A1
Rail
Wall Frame
B9
B22
B7
Roof shower
B1
B9
B2
B3
-4-
B6
-5-