Flujo de caja el mar 28/08/12

Cronograma
mes 1
OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE LA OBRA
CARTEL DE IDENTIFICACION DE LA OBRA
TRABAJOS PRELIMINARES
ROCE Y LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
HABILITACION DE BADEN PROVISIONAL
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN EN SECO (CON MAQUINARIA)
EXCAVACION PARA ESTRUCTURAS EN MATERIAL CON BOLONERIA BAJO AGUA (CON MAQUINARIA)
RELLENO CON MATERIAL PROPIO CON EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO D<1KM.
SUB ESTRUCTURA
ESTRIBOS
CONCRETO f'c=175 kg/cm2+30% PG (SUB ZAPATA)
ACERO CORRUGADO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO CARA NO VISTA BAJO AGUA
ENCOFRADO Y DESENCOFRADO CARA VISTA BAJO AGUA
ENCOFRADO Y DESENCOFRADO CARA VISTA EN SECO
CONCRETO f 'c=210 kg/cm2 BAJO AGUA
CONCRETO f 'c=210 kg/cm2 EN SECO
SUPERESTRUCTURA
VIGA Y LOSA DE CONCRETO
ENCOFRADO Y DESENCOFRADO CARA VISTA EN SECO
ACERO CORRUGADO fy=4200 kg/cm2
CONCRETO f 'c=280 kg/cm2
VEREDAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO CARA VISTA EN SECO
ACERO CORRUGADO fy=4200 kg/cm2
CONCRETO f 'c=210 kg/cm2 EN SECO
LOSA DE APROXIMACION
ENCOFRADO Y DESENCOFRADO CARA VISTA EN SECO
ACERO CORRUGADO fy=4200 kg/cm2
CONCRETO f 'c=210 kg/cm2 EN SECO
FALSO PUENTE DE MADERA ROLLIZA
FALSO PUENTE DE MADERA ROLLIZA
SEALIZACION
PINTURA EN SARDINELES
SEALES INFORMATIVAS
SEALES PREVENTIVAS
SEALES REGLAMENTARIAS
VARIOS
JUNTAS DE DILATACION
DISPOSITIVOS DE APOYO
TUBOS DE DRENAJE
DISPOSITIVOS DE CONEXIN SISMICA
ACABADO EN VEREDAS
BARANDA METALICA (Fabricacion y Colocado)
PRUEBAS DE CALIDAD (CONCRETO Y SUELOS)
PLACA RECORDATORIA (Incluye Instalacin)
MITIGACION DE IMPACTO AMBIENTAL
CAPACITACION AMBIENTAL A LOS TRABAJADORES
RESTAURACION DEL AREA OCUPADA POR EQUIPOS Y MATERIALES
RESTAURACION DEL AREA UTILIZADA EN LA PREPARACION DE CONCRETO
RESTITUCION DE CANTERAS
COMPACTACION DE MATERIAL EXCEDENTE EN BOTADEROS
LIMPIEZA FINAL DE OBRA
FLETE
TRANSPORTE DE MATERIALES DE ECHARATI A PIE DE OBRA
ACCESOS
OBRAS PRELIMINARES
LIMPIEZA Y DESFORESTACION
TRAZO Y REPLANTEO EN ACCESOS
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO (INCL. PEINADO DE TALUDES)
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO D<1KM.
RELLENOS
RELLENO CON MATERIAL PRESTAMO CON EQUIPO
AFIRMADO DE ACCESOS
AFIRMADO A NIVEL DE RASANTE COMPACTADO E=20CM.
ENCAUSAMIENTO DEL RIO
OBRAS PRELIMINARES
ROCE Y LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA CON MAQUINARIA
ENRROCADO
ENROCADO
Total

mes 2

mes 3

mes 4

S/. 23,883.60
S/. 903.88
S/. 888.00
S/. 765.00
S/. 1,902.90
S/. 73,800.00
S/. 16,400.00

S/. 353.49

S/. 316.98

S/. 4,429.52
S/. 2,672.00

S/. 45,878.78
S/. 112,025.91
S/. 8,039.87
S/. 13,290.70

Total
S/. 23,883.60
S/. 903.88
S/. 888.00
S/. 765.00
S/. 2,573.37
S/. 73,800.00
S/. 16,400.00

S/. 4,368.64
S/. 8,311.19

S/. 4,429.52
S/. 2,672.00
S/. 4,368.64
S/. 8,311.19

S/. 2,451.88
S/. 25,576.78
S/. 109,020.53
S/. 32,010.88

S/. 45,878.78
S/. 112,025.91
S/. 8,039.87
S/. 15,742.58
S/. 25,576.78
S/. 109,020.53
S/. 32,010.88

S/. 4,886.53
S/. 19,629.56
S/. 25,036.79

S/. 29,049.73

-S/. 7,193.30

S/. 4,886.53
S/. 19,629.56
S/. 17,843.49

S/. 16.37
S/. 2,928.47
S/. 1,203.93

S/. 16.37
S/. 2,928.47
S/. 1,203.93

S/. 1,357.23
S/. 10,628.65
S/. 12,273.79

S/. 1,357.23
S/. 10,628.65
S/. 12,273.79

-S/. 8,982.43

S/. 20,067.30
S/. 72.06
S/. 2,460.00
S/. 1,066.00
S/. 964.91

S/. 17,966.43
S/. 3,296.40

S/. 72.06
S/. 2,460.00
S/. 1,066.00
S/. 964.91

S/. 6,314.00
S/. 655.89

S/. 17,966.43
S/. 3,296.40
S/. 338.24
S/. 1,093.96
S/. 358.23
S/. 6,584.83
S/. 6,314.00
S/. 655.89

S/. 338.24
S/. 1,093.96
S/. 358.23
S/. 6,584.83

S/. 4,157.08

S/. 3,875.11

S/. 634.47
S/. 886.25
S/. 848.00
S/. 11,220.00
S/. 3,080.00
S/. 573.00

S/. 8,666.66
S/. 886.25
S/. 848.00
S/. 11,220.00
S/. 3,080.00
S/. 573.00

S/. 41,944.36

-S/. 1,167.05

-S/. 729.61

S/. 40,047.70

S/. 2,054.17
S/. 234.19
S/. 18.48

S/. 381,125.29

S/. 255,884.63

Pgina 1

S/. 2,054.17
S/. 234.19
S/. 18.54
S/. 68.63

S/. 37.02
S/. 68.63

S/. 100,154.00

S/. 100,154.00

S/. 13,781.60

S/. 13,781.60

S/. 97.68
S/. 152.83

S/. 97.68
S/. 152.83

S/. 4,405.30

S/. 4,405.30

S/. 38,618.46

S/. 38,618.46

S/. 207,212.37

S/. 844,222.29