GOPALA KRISHNA
ADE/400KV/APTRANSCO

INTERLOCKS

ISOLATOR
AND
EARTH SWITCH
INTERLOCKS
FOR
1. SINGLE MAIN BUS WITH TRANSFER BUS SYSTEM
2. DOUBLE MAIN BUS WITH TRANSFER BUS
SYSTEM
3. ONE AND HALF BREAKER SYSTEM

INTERLOCKS

STANDARD PRACTICE
1. FOR BUS ISOLATON: EACH BUS HAVING BUS ISOLATOR FOR
EACH BAY.
2. FOR CB ISOLATION: CIRCUIT BREAKER HAVING BOTH SIDES
ISOLATORS.
3. FOR LINE/ICT ISOLATION: LINE / ICT HAVING LINE ISOLATOR.
4. FOR BUS MAINTANENCE: EACH BUS HAVING BUS EARTH
SWITCH.
5. FOR CB MAINTANENCE: EACH ISOLATOR HAVING EARTH
SWITCH TOWARDS CB SIDE.
6. FOR LINE / ICT MAINTANENCE: EACH LINE / ICT HAVING LINE
EARTH SWITCH.

INTERLOCKS
ISOLATORS
1. ISOLATORS ARE NO LOAD SWITCHES. THEY ARE NOT PERMITTED TO
BREAK POWER CURRENT OR TO CONNECT DIFFERENT VOLTAGE SYSTEM.
2. MAKING OR BREAKING OF PARALLEL CIRCUITS IS PERMITTED.
3. AN ISOLATOR CONNECTED IN SERIES WITH A CB MAY BE OPERATED
WHEN CB IS OPEN AND IF NONE OF ADJACENT EARTH SWITCHES IS
CLOSED. EVEN IF ANOTHER ISOLATOR CONNECTED IN SERIES TO THE CB
IS OPEN THE ISOLATOR IS NOT ALLOWED TO OPERATED UNLESS THE CB
IS OPEN.
4. AN ISOLATOR CONNECTED TO A DUPLICATE BUSBAR OR AUXILIARY BUS
MAY BE OPERATED IF
i) NO LOAD IS CONNECTED AND NON OF THE EARTH SWITCH IS CLOSED.
ii) A PARALLELING CIRCUIT TO THE ISOLATOR IS PRESENT. (ONLY
THROUGH THE BUSCOUPLER FOR THE ISOLATORS THAT ARE CONNECTED
TO THE TRANSFER BUS.

EARTH SWITCH
1. OPERATED ONLY IF THE ISOLATORS ON BOTH THE SIDES ARE OPEN.
2. EARTH SWITCHES WHICH CAN EARTH AN INCOMING LINE DIRECTLY OR
THROUGH A CB CAN BE OPERATED IF AND ONLY IF THE LINE IS DEAD.

INTERLOCKS

INTERLOCKS
SINGLE BUS & TRANSFER BUS SYSTEM
T/F-2

T/F-1

TRANSFER BUS COUPLER

TRANSFER BUS

BUS
BAY1

FEEDER1

BAY2

BAY3

BAY4

BAY5

FEEDER2

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-A

89-AE
52-CB
89-LE1

FOR 89-A/BAY ISOLATOR OPERATION:


1. 52 CB/BAY IN OPEN CONDITION.
2. 89AE/BAY EARTH SWITCH OPEN CONDITION.
3. 89LE1/BAY EARTH SWITCH OPEN CONDITION.
4. BB189E BUSEARTH SWITCH OPEN CONDITION.
BB189E

89-L

52 CB/BAY
89-AE/BAY

FEEDER OR
ICT OR
REACTOR

89-LE2

89-LE1/BAY

OPEN
OPEN
OPEN

&

OPERATION

89A/BAY

OPEN

BB189E

52 CB

89-AE

89-LE1

OPEN

OPEN

OPEN

OPEN

89-A/BAY

INTER
LOCK
CONTACTOR

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-A

89-AE
52-CB
89-LE1

FOR 89-L ISOLATOR OPERATION:


1. 52 CB IN OPEN CONDITION.
2. 89AE EARTH SWITCH OPEN CONDITION.
3. 89LE1 EARTH SWITCH OPEN CONDITION.
4. 89LE2 LINE EARTH SWITCH OPEN CONDITION.
52 CB

89-L

89-AE
89-LE1

FEEDER OR
ICT OR
REACTOR

89-LE2

89-LE2

OPEN
OPEN
OPEN

&

OPERATION

89L

OPEN

52 CB

89-AE

89-LE1

89-LE2

89-L

OPEN

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-A

89-AE

FOR 89-AE EARTH SWITCH OPERATION:


1. 89-A ISOLATOR OPEN CONDITION.
2. 89-L ISOLATOR OPEN CONDITION.

52-CB
89-LE1

89-L

FEEDER OR
ICT OR
REACTOR

89-LE2

89-A

89-L

OPEN

OPEN

&

OPERATION

89-AE

89-A

89-L

89-AE

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-A

89-AE

FOR 89-LE1 EARTH SWITCH OPERATION:


1. 89-A ISOLATOR OPEN CONDITION.
2. 89-L ISOLATOR OPEN CONDITION.

52-CB
89-LE1

89-L

FEEDER OR
ICT OR
REACTOR

89-LE2

89-A

89-L

OPEN

OPEN

&

OPERATION

89-LE1

89-A

89-L

89-LE1

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-A

89-AE
52-CB
89-LE1

FOR 89-LE2 EARTH SWITCH OPERATION:


1. 89C BUS ISOLATOR OPEN CONDITION.
2. 89L LINE ISOLATOR OPEN CONDITION.
3. LINE DEAD CONDITION i.e U/V RELAY
OPERATED.
U/V RELAY

89-L
89-C

FEEDER OR
ICT OR
REACTOR

89-LE2

89-L

OPTD
OPEN

&

OPERATION

89-LE2

OPEN

U/V RELAY

89-C

89-L

89-LE2

OPTD

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-A

89-AE
52-CB

FOR 52 CB CIRCUIT BREAKER FOR REMOTE OPERATION:


1. 86-GA HSTR/MTR RESET CONDITION.
2. 86-GB HSTR/MTR RESET CONDITION.
3. 96-BB TBC HSTR/MTR RESET CONDITION.

89-LE1
86-GA
89-L
86-GB

FEEDER OR
ICT OR
REACTOR

89-LE2

96-BB

RESET
RESET

&

REMOTE
OPERATION

52-CB

RESET

86-GA

86-GB

96-BB

52-CB

RESET

RESET

RESET

INTER
LOCK
CONTACTOR

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-A

89-AE
52-CB

FOR 52 CB CIRCUIT BREAKER FOR LOCAL OPERATION:


1. 89-A ISOLATOR OPEN CONDITION.
2. 89-L ISOLATOR OPEN CONDITION.
3.
89-AE TBC EARTH SWITCH CLOSED CONDITION.
4.
89-LE1 EARTH SWITCH CLOSED CONDITION.

89-LE1
89-A
89-L

89-L
89-AE

FEEDER OR
ICT OR
REACTOR

89-LE2

89-LE1

89A

OPEN

OPEN
OPEN
CLOSE

&

LOCAL
OPERATION

52-CB

CLOSE

89L

89-AE

89-LE1

52CB

OPEN

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

INTERLOCKS

LINE BAY

BB189E

MAIN BUS(A)
BB389E
89-C

89-A

TRANSFER BUS( C )

89-C
52-CB

89-A

89-AE
52-CB
89-LE1

89-L

FEEDER OR
ICT OR
REACTOR

89-LE2

89-CE

89-AE

TRANSFER BUS COUPLER


FOR 89-C ISOLATOR OPERATION:
1. NO OTHER ISOLATOR IS CLOSED TO TRANSFER BUS C
2. BB389E EARTH SWITCH OPEN CONDITION.
3. 89LE2 EARTH SWITCH OPEN CONDITION.
4. 52 TBC CB IN OPEN CONDITION.
OR
1. 52 CB IN CLOSED POSITION.
2. 89-A ISOLATOR CLOSED CONDITION.
3. 89-L ISOLATOR CLOSED POSITION.
4. 89-A/TBC BAY BUS-A ISOLATOR CLOSED POSITION.
5. 89-C/TBC BAY BUS-C ISOLATOR CLOSED POSITION.
6. NO OTHER ISOLATOR IS CLOSED TO TRANSFER BUS C
7. ADDITIONAL INTERLOCK PROTECTION TRANSFERRED
MAY ALSO PUT THROUGH PROTECTION TRANSFER
SWITCH.

89-C/ LINE-1

LINE BAY

89-C/ LINE-2

89-C/ ICT-1

89-C/ ICT-2

+ VE

FOR LINE-1

FOR LINE-2

FOR ICT-1

FUTURE BAYS

INTERLOCKS

+ VE

FOR ICT-2

TO OBTAIN A CONTACT FOR NO OTHER ISOLATOR CLOSED TO BUSBARC


1. TO OBTAIN CONTACTS OF TRANSFER BUS COUPLER CIRCUIT
CLOSSED IT IS PREFERED TO USE CONTACTS OF AUXILIARY RELAY
ENERGISED UNDER THESE CONDITIONS.
2. TO MAKE SURE THE PROTECTION IS TRANSFERRED TO TBC CIRCUIT
BREAKER BEFORE THE ISOLATOR IS CLOSSED, CONTACT OF TRIP
TRANSFER SWITCH MAY BE UTILISED.

INTERLOCKS
52CB/TBC
89-LE2
BB389E
NO OTHER
ISOLATOR
CLOSED TO
BUSBAR-C

LINE BAY

OPEN
TTS

OPEN

&

OPEN

89-C/TBC
52CB/BAY
89-A

89-C/BAY

CLOSE

89-A/TBC

CLOSE

OR

TRANSFER

OPERATION

CLOSE
CLOSE

&

CLOSE

CLOSE
89L
NO OTHER CLOSE
ISOLATOR
CLOSED TO
BUSBAR-C

52CB/TBC

89LE2

BB389E

OPEN

OPEN

OPEN

NO OTHER
ISOLATOR
CLOSED TO
BUSBAR-C

89-C/BAY

CLOSE

INTER
LOCK
CONTACTOR

89C/TBC

52CB/BAY

89A/BAY

89L/BAY

NO OTHER
ISOLATOR
CLOSED TO
BUSBAR-C

CLOSE

CLOSE

CLOSE

CLOSE

CLOSE

TTS

89-A/TBC

CLOSE

INTERLOCKS

TBC BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-CE

52-CB

89-A

89-AE

FOR 89-A / TBC ISOLATOR OPERATION:


1. 52 CB / TBC IN OPEN CONDITION.
2. 89AE / TBC EARTH SWITCH OPEN CONDITION.
3. 89CE / TBC EARTH SWITCH OPEN CONDITION.
4. BB189E BUSEARTH SWITCH OPEN CONDITION.

TRANSFER BUS COUPLER


BB189E
52 CB / TBC
89-AE / TBC
89-CE / TBC

BB189E

OPEN

OPEN
OPEN
OPEN

&

OPERATION

89A / TBC

OPEN

52 CB/TBC

89-AE/TBC

89-CE/TBC

89-A/TBC

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-CE

52-CB

89-A

89-AE

FOR 89-C / TBC ISOLATOR OPERATION:


1. 52 CB / TBC IN OPEN CONDITION.
2. 89AE / TBC EARTH SWITCH OPEN CONDITION.
3. 89CE / TBC EARTH SWITCH OPEN CONDITION.
4. BB389E BUSEARTH SWITCH OPEN CONDITION.

TRANSFER BUS COUPLER


BB389E
52 CB / TBC
89-AE / TBC
89-CE / TBC

BB389E

OPEN

OPEN
OPEN
OPEN

&

OPERATION

89C / TBC

OPEN

52 CB/TBC

89-AE/TBC

89-CE/TBC

89-C/TBC

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-CE

52-CB

89-A

89-AE

FOR 89-AE / TBC EARTH SWITCH OPERATION:


1. 89-A / TBC ISOLATOR OPEN CONDITION.
2. 89-C / TBC ISOLATOR OPEN CONDITION.

TRANSFER BUS COUPLER


89-A / TBC

89-C/TBC

OPEN

OPEN

&

OPERATION

89-AE / TBC

89-A/TBC

89-C/TBC

89-AE/TBC

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-CE

52-CB

89-A

89-AE

FOR 89-CE / TBC EARTH SWITCH OPERATION:


1. 89-A / TBC ISOLATOR OPEN CONDITION.
2. 89-C / TBC ISOLATOR OPEN CONDITION.

TRANSFER BUS COUPLER


89-A / TBC

89-C/TBC

OPEN

OPEN

&

OPERATION

89-CE / TBC

89-A/TBC

89-C/TBC

89-CE/TBC

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-CE

52-CB

89-A

89-AE

FOR 52 CB / TBC CIRCUIT BREAKER FOR REMOTE OPERATION:


1. 86-GA / TBC HSTR/MTR RESET CONDITION.
2. 86-GB / TBC HSTR/MTR RESET CONDITION.
3. 96-BB / TBC HSTR/MTR RESET CONDITION.

TRANSFER BUS COUPLER


86-GA/TBC
86-GB/TBC
96-BB/TBC

RESET
RESET

&

REMOTE
OPERATION

52-CB/TBC

RESET

86-GA/TBC

86-GB/TBC

96-BB/TBC

52-CB/TBC

RESET

RESET

RESET

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS(A)
BB389E

TRANSFER BUS( C )
89-C

89-CE

52-CB

89-A

89-AE

FOR 52 CB / TBC CIRCUIT BREAKER FOR LOCAL OPERATION:


1. 89-A / TBC ISOLATOR OPEN CONDITION.
2. 89-C / TBC ISOLATOR OPEN CONDITION.
3.
89-AE / TBC EARTH SWITCH CLOSED CONDITION.
4.
89-CE / TBC EARTH SWITCH CLOSED CONDITION.

TRANSFER BUS COUPLER


89-A/TBC
89-C/ TBC
89-AE / TBC
89-CE / TBC

89A/TBC

OPEN

OPEN
OPEN
CLOSE

&

LOCAL
52-CB / TBC
OPERATION

CLOSE

89C/TBC

89-AE/TBC

89-CE/TBC

52CB/TBC

OPEN

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

INTERLOCKS

BUS BAY

BB189E

MAIN BUS(A)
BB389E
89-C

89-A

TRANSFER BUS( C )

89-C
89-A

52-CB
89-AE
52-CB
89-LE1

89-L

89-CE

89-AE

TRANSFER BUS COUPLER


FOR BB189E EARTH SWITCH OPERATION:
1. ALL BAYS BUS-A ISOLATORS OPEN CONDITION
89-A/BAY1

FEEDER OR
ICT OR
REACTOR

89-LE2

89-A/BAY2

OPEN
OPEN

&

UP TO NO OF BAYS

89-A/BAYn

OPERATION

BB189E

OPEN

89-A /BAY1

89-A/BAY2

OPEN

OPEN

UP TO NO OF BAYS

89-A / BAY n

BB189E

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

BUS BAY

BB189E

MAIN BUS(A)
BB389E
89-C

89-A

TRANSFER BUS( C )

89-C
89-A

52-CB
89-AE
52-CB
89-LE1

89-L

89-CE

89-AE

TRANSFER BUS COUPLER


FOR BB389E EARTH SWITCH OPERATION:
1. ALL BAYS BUS-C ISOLATORS OPEN CONDITION
89-C/BAY1

FEEDER OR
ICT OR
REACTOR

89-LE2

89-C/BAY2

OPEN
OPEN

&

UP TO NO OF BAYS

89-C/BAYn

OPERATION

BB389E

OPEN

89-C /BAY1

89-C/BAY2

OPEN

OPEN

UP TO NO OF BAYS

89-C / BAY n

BB389E

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

INTERLOCKS
DOUBLE MAIN BUS & TRANSFER BUS SYSTEM
T/F-1

T/F-2

BUS-2

BAY3
BAY1

BAY2

FEEDER1 FEEDER2

BAY4

TRANSFER BUS

BAY5

TRANSFER BUS
COUPLER

BUS COUPLER

BUS-1

BAY6

BAY7

BAY8

FEEDER3 FEEDER4

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

FOR 89-A/BAY ISOLATOR OPERATION:

MAIN BUS-2(B)
TRANSFER BUS( C )
89-A

89-B

89-C

89-B/BAY
52CB/BAY
89-A/BC

89-LE1

89-B/BC
89-L

FEEDER OR
ICT OR
REACTOR
OF BAY

52CB/TBC

89-B/BAY

CLOSE

OPEN

89-AE/BAY

&

OPEN

89-B/BAY

52-CB

89-LE2

OPEN

89-LE1/BAY

BB389E
89-AE

OPEN

52CB/BAY

CLOSE
CLOSE
CLOSE
CLOSE

&

OR

BB189E
OPEN

&

OPERATION
89-A/BAY

CLOSE

52CB/BAY

89LE1/BAY

89-AE/BAY

89-B/BAY

BB189E

89-A/BAY

OPEN

OPEN

OPEN

OPEN

OPEN

89-B/BC

52 CB/BC

89-A/BC

INTER
LOCK
CONTACTOR

CLOSE

CLOSE

52CB/BAY

CLOSE

CLOSE

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

FOR 89-B/BAY ISOLATOR OPERATION:

MAIN BUS-2(B)
TRANSFER BUS( C )
89-A

89-B

89-C

89-A/BAY
52CB/BAY
89-A/BC

89-LE1

89-B/BC
89-L

FEEDER OR
ICT OR
REACTOR
OF BAY

52CB/TBC

89-A/BC

CLOSE

OPEN

89-AE/BAY

&

OPEN

89-A/BAY

52-CB

89-LE2

OPEN

89-LE1/BAY

BB389E
89-AE

OPEN

52CB/BAY

CLOSE
CLOSE
CLOSE
CLOSE

&

OR

BB289E
OPEN

&

OPERATION
89-B/BAY

CLOSE

52CB/BAY

89LE1/BAY

89-AE/BAY

89-A/BAY

BB289E

89-B/BAY

OPEN

OPEN

OPEN

OPEN

OPEN

89-B/BC

52 CB/BC

89-A/BAY

INTER
LOCK
CONTACTOR

CLOSE

CLOSE

52CB/BAY

CLOSE

CLOSE

INTERLOCKS
52CB/TBC
89-LE2/BAY
BB389E
NO OTHER
ISOLATOR
CLOSED TO
BUSBAR-C

FOR 89-C/BAY ISOLATOR OPERATION:

OPEN
TTS

OPEN

&

OPEN

52CB/BAY

CLOSE

89-B/TBC
89-B/BAY
89-A/TBC
89-A/BAY

89L/BAY

CLOSE
CLOSE
CLOSE
CLOSE

&
&

OPEN

OPEN

OPEN

89B/TBC

CLOSE
CLOSE
CLOSE

&

FOR 89-C/BAY ISOLATOR OPERATION:


BB389E

89-C/BAY

OR

89LE2

OPERATION

NO OTHER CLOSE
ISOLATOR
CLOSED TO
BUSBAR-C

52CB/TBC

TTS

OR

TRANSFER

89-C/TBC

FEEDER BAY

CLOSE
89-A/TBC

CLOSE

NO OTHER
ISOLATOR
CLOSED TO
BUSBAR-C

89-C/BAY

CLOSE

INTER
LOCK
CONTACTOR

89B/BAY

CLOSE
89A/BAY

89C/TBC

52CB/BAY

89L/BAY

NO OTHER
ISOLATOR
CLOSED TO
BUSBAR-C

CLOSE

CLOSE

CLOSE

CLOSE

CLOSE

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

89-B

89-C

FOR 89-L/BAY ISOLATOR OPERATION:

52-CB

52 CB/BAY
89-LE1/BAY
89-LE2/BAY

89-LE1

89-AE/BAY

89-L

OPEN
OPEN
OPEN
OPEN

&

OPERATION

89L/BAY

OPEN
ICT HV TE
(FOR ICT ONLY)

89-LE2

FEEDER OR
ICT OR
REACTOR
OF BAY

52 CB/BAY

OPEN

ICT HV TE

OPEN
(FOR ICT ONLY)

89-AE/BAY

OPEN

89-LE1/BAY

89-LE2/BAY

89-L

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

89-B

89-C

FOR 89-AE/BAY ISOLATOR OPERATION:


52-CB
89-L/BAY

OPEN

89-LE1

89-A/BAY

OPEN

89-L

89-B/BAY

OPEN

& OPERATION

89-AE/BAY

89-LE2

FEEDER OR
ICT OR
REACTOR
OF BAY

89A/BAY

OPEN

89-B/BAY

OPEN

89-L/BAY

89-AE/BAY

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

89-B

89-C

FOR 89-LE1/BAY ISOLATOR OPERATION:


52-CB
89-L/BAY

OPEN

89-LE1

89-A/BAY

OPEN

89-L

89-B/BAY

OPEN

& OPERATION

89-LE1/BAY

89-LE2

FEEDER OR
ICT OR
REACTOR
OF BAY

89A/BAY

OPEN

89-B/BAY

OPEN

89-L/BAY

89-LE1/BAY

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

89-B

89-C

FOR 89-LE2/BAY ISOLATOR OPERATION:


52-CB

89-LE1

89-L/BAY

OPEN

89-C/BAY

OPEN

LINE U/V
89-L

LV-89T

OPTD

& OPERATION

1-89LE2

(FOR LINE)

OPEN

(FOR ICT)

89-LE2

FEEDER OR
ICT OR
REACTOR
OF BAY

LV-89T

OPEN
(FOR ICT)

LINE U/V

OPTD
(FOR LINE)

89-C/BAY

OPEN

89-L/BAY

89-LE2

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

52-CB

89-B

89-C

FOR 52 CB/BAY CIRCUIT BREAKER FOR REMOTE OPERATION:


1. 86-GA HSTR/MTR RESET CONDITION.
2. 86-GB HSTR/MTR RESET CONDITION.
3. 96-BB TBC HSTR/MTR RESET CONDITION.

89-LE1
89-L

86-GA
86-GB

89-LE2

FEEDER OR
ICT OR
REACTOR
OF BAY

96-BB

RESET
RESET

&

REMOTE
OPERATION

52-CB/BAY

RESET

86-GA

86-GB

96-BB

52-CB/BAY

RESET

RESET

RESET

INTER
LOCK
CONTACTOR

INTERLOCKS

FEEDER BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

52-CB

89-B

89-C

FOR 52 CB /BAYCIRCUIT BREAKER FOR LOCAL OPERATION:


1. 89-A ISOLATOR OPEN CONDITION.
2. 89-L ISOLATOR OPEN CONDITION.
3.
89-AE TBC EARTH SWITCH CLOSED CONDITION.
4.
89-LE1 EARTH SWITCH CLOSED CONDITION.

89-LE1

89-A

89-L

89-L
89-AE

89-LE2

89-LE1

FEEDER OR
ICT OR
REACTOR
OF BAY

89A

OPEN

OPEN
OPEN
CLOSE

&

LOCAL
52-CB/BAY
OPERATION

CLOSE

89L

89-AE

89-LE1

52-CB/BAY

OPEN

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

89-B

89-C

52-CB

FOR 89-A / TBC ISOLATOR OPERATION:


1. 52 CB / TBC IN OPEN CONDITION.
2. 89AE / TBC EARTH SWITCH OPEN CONDITION.
3. 89CE / TBC EARTH SWITCH OPEN CONDITION.
4. BB189E BUSEARTH SWITCH OPEN CONDITION.
5. 89-B/TBC ISOLATOR OPEN CONDITION

89-CE

BB189E

TRANSFER
BUS
COUPLER

52 CB / TBC
89-AE / TBC
89-CE / TBC
89-B / TBC
89-B/TBC

OPEN

BB189E

OPEN

OPEN
OPEN
OPEN
OPEN

&

OPERATION

89A / TBC

OPEN

52 CB/TBC

89-AE/TBC

89-CE/TBC

89-A/TBC

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

89-B

89-C

52-CB

FOR 89-B / TBC ISOLATOR OPERATION:


1. 52 CB / TBC IN OPEN CONDITION.
2. 89AE / TBC EARTH SWITCH OPEN CONDITION.
3. 89CE / TBC EARTH SWITCH OPEN CONDITION.
4. BB289E BUSEARTH SWITCH OPEN CONDITION.
5. 89-A/TBC ISOLATOR OPEN CONDITION

89-CE

BB289E

TRANSFER
BUS
COUPLER

52 CB / TBC
89-AE / TBC
89-CE / TBC
89-A / TBC
89-A/TBC

OPEN

BB289E

OPEN

OPEN
OPEN
OPEN
OPEN

&

OPERATION

89B / TBC

OPEN

52 CB/TBC

89-AE/TBC

89-CE/TBC

89-B/TBC

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

52-CB

89-B

89-C

FOR 89-C / TBC ISOLATOR OPERATION:


1. 52 CB / TBC IN OPEN CONDITION.
2. 89AE / TBC EARTH SWITCH OPEN CONDITION.
3. 89CE / TBC EARTH SWITCH OPEN CONDITION.
4. BB389E BUSEARTH SWITCH OPEN CONDITION.

89-CE

BB389E

TRANSFER
BUS
COUPLER

52 CB / TBC
89-AE / TBC
89-CE / TBC

BB389E

OPEN

OPEN
OPEN
OPEN

&

OPERATION

89C / TBC

OPEN

52 CB/TBC

89-AE/TBC

89-CE/TBC

89-C/TBC

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

52-CB

89-B

89-C

FOR 89-AE / TBC EARTH SWITCH OPERATION:


1. 89-A / TBC ISOLATOR OPEN CONDITION.
2. 89-B / TBC ISOLATOR OPEN CONDITION.
3. 89-C / TBC ISOLATOR OPEN CONDITION.

89-CE

TRANSFER
BUS
COUPLER

89-A / TBC
89-B / TBC
89-C/TBC

89-A/TBC

OPEN

OPEN
OPEN
OPEN

&

OPERATION

89-AE / TBC

89-B/TBC

89-C/TBC

89-AE/TBC

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

52-CB

89-B

89-C

FOR 89-CE / TBC EARTH SWITCH OPERATION:


1. 89-A / TBC ISOLATOR OPEN CONDITION.
2. 89-B / TBC ISOLATOR OPEN CONDITION.
3. 89-C / TBC ISOLATOR OPEN CONDITION.

89-CE

TRANSFER
BUS
COUPLER

89-A / TBC
89-B / TBC
89-C/TBC

89-A/TBC

OPEN

OPEN
OPEN
OPEN

&

OPERATION

89-CE / TBC

89-B/TBC

89-C/TBC

89-CE/TBC

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

52-CB

89-CE

TRANSFER
BUS
COUPLER

89-B

89-C

FOR 52 CB / TBC CIRCUIT BREAKER FOR REMOTE OPERATION:


1. 86-GA / TBC HSTR/MTR RESET CONDITION.
2. 86-GB / TBC HSTR/MTR RESET CONDITION.
3. 96-BB / TBC HSTR/MTR RESET CONDITION.
86-GA/TBC
86-GB/TBC
96-BB/TBC

RESET
RESET

&

REMOTE
OPERATION

52-CB/TBC

RESET

86-GA/TBC

86-GB/TBC

96-BB/TBC

52-CB/TBC

RESET

RESET

RESET

INTER
LOCK
CONTACTOR

INTERLOCKS

TBC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )
89-AE

89-A

52-CB

89-B

89-C

FOR 52 CB / TBC CIRCUIT BREAKER FOR LOCAL OPERATION:


1. 89-A / TBC ISOLATOR OPEN CONDITION.
2. 89-B / TBC ISOLATOR OPEN CONDITION.
3. 89-C / TBC ISOLATOR OPEN CONDITION.
4.
89-AE / TBC EARTH SWITCH CLOSED CONDITION.
5.
89-CE / TBC EARTH SWITCH CLOSED CONDITION.

89-CE
89-A/TBC

TRANSFER
BUS
COUPLER

89-B/TBC
89-C/ TBC
89-AE / TBC
89-CE / TBC
89A/TBC

89B/TBC

OPEN

OPEN

OPEN
OPEN
OPEN

&

LOCAL
52-CB / TBC
OPERATION

CLOSE
CLOSE

89C/TBC

89-AE/TBC

89-CE/TBC

52CB/TBC

OPEN

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

INTERLOCKS

BC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)
89-A

89-AE

89-B

52-CB

89-BE

FOR 89-A / BC ISOLATOR OPERATION:


1. 52 CB / BC IN OPEN CONDITION.
2. 89AE / BC EARTH SWITCH OPEN CONDITION.
3. 89BE / BC EARTH SWITCH OPEN CONDITION.
4. BB189E BUSEARTH SWITCH OPEN CONDITION.

BUS COUPLER
BB189E
52 CB / BC
89-AE / BC
89-BE / BC

BB189E

OPEN

OPEN
OPEN
OPEN

&

OPERATION

89A / BC

OPEN

52 CB/BC

89-AE/BC

89-BE/BC

89-A/BC

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

BC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)
89-A

89-AE

89-B

52-CB

89-BE

FOR 89-B / BC ISOLATOR OPERATION:


1. 52 CB / BC IN OPEN CONDITION.
2. 89AE / BC EARTH SWITCH OPEN CONDITION.
3. 89BE / BC EARTH SWITCH OPEN CONDITION.
4. BB289E BUSEARTH SWITCH OPEN CONDITION.

BUS COUPLER
BB289E
52 CB / BC
89-AE / BC
89-BE / BC

BB289E

OPEN

OPEN
OPEN
OPEN

&

OPERATION

89B / BC

OPEN

52 CB/BC

89-AE/BC

89-BE/BC

89-B/BC

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

BC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)
89-A

89-AE

89-B

52-CB

89-BE

FOR 89-AE / BC EARTH SWITCH OPERATION:


1. 89-A / BC ISOLATOR OPEN CONDITION.
2. 89-B / BC ISOLATOR OPEN CONDITION.

BUS COUPLER
89-A / TBC

89-B/TBC

OPEN

OPEN

&

OPERATION

89-AE / BC

89-A/BC

89-B/BC

89-AE/BC

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

BC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)
89-A

89-AE

89-B

52-CB

89-BE

FOR 89-BE / BC EARTH SWITCH OPERATION:


1. 89-A / BC ISOLATOR OPEN CONDITION.
2. 89-B / BC ISOLATOR OPEN CONDITION.

BUS COUPLER
89-A / BC

89-B/BC

OPEN

OPEN

&

OPERATION

89-BE / BC

89-A/BC

89-B/BC

89-BE/BC

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS

BC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)
89-A

89-AE

89-B

52-CB

89-BE

BUS COUPLER

FOR 52 CB / BC CIRCUIT BREAKER FOR REMOTE OPERATION:


1. 86-GA / BC HSTR/MTR RESET CONDITION.
2. 86-GB / BC HSTR/MTR RESET CONDITION.
3. 96-BB / BC HSTR/MTR RESET CONDITION.
86-GA/BC
86-GB/BC
96-BB/BC

RESET
RESET

&

REMOTE
OPERATION

52-CB/BC

RESET

86-GA/BC

86-GB/BC

96-BB/BC

52-CB/BC

RESET

RESET

RESET

INTER
LOCK
CONTACTOR

INTERLOCKS

BC BAY

BB189E

MAIN BUS-1(A)
BB289E

MAIN BUS-2(B)
89-A

89-AE

89-B

52-CB

89-BE

FOR 52 CB / BC CIRCUIT BREAKER FOR LOCAL OPERATION:


1. 89-A / BC ISOLATOR OPEN CONDITION.
2. 89-B / BC ISOLATOR OPEN CONDITION.
3. 89-AE / BC EARTH SWITCH CLOSED CONDITION.
4. 89-BE / BC EARTH SWITCH CLOSED CONDITION.

BUS COUPLER
89-A/BC
89-B/BC
89-AE/BC
89-BE/BC
89A/BC

89B/BC

OPEN

OPEN

OPEN
OPEN
CLOSE

&

LOCAL
OPERATION

52-CB / BC

CLOSE

89-AE/BC

89-BE/BC

52CB/BC

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

INTERLOCKS
BB189E

BUS ES

MAIN BUS-1(A)

BB289E

MAIN BUS-2(B)

BB389E

TRANSFER BUS( C )

89-AE

89-A

52-CB

89-LE1
89-L

89-LE2

FEEDER OR
ICT OR
REACTOR
OF BAY

89-B

89-C

89-AE

89-A

52-CB

89-CE

TRANSFER
BUS
COUPLER

89-B

89-C

89-A

89-B

89-AE

52-CB

89-BE

BUS COUPLER

BUS EARTH SWITCH

INTERLOCKS

BB289E

BB189E
89-A/BAY1
89-A/BAY2

OPEN

UP TO NO OF BAYS

89-A/BAYn

OPEN

89-B/BAY1

OPEN

&

OPERATION

BB189E

OPEN

89-B/BAY2

89-A/BAY2

OPEN

OPEN

89-B /BAY1

89-B/BAY2

OPEN

OPEN

89-C /BAY1

89-C/BAY2

OPEN

OPEN

89-C/BAY1

OPEN

UP TO NO OF BAYS

89-B/BAYn

89-A /BAY1

UP TO NO OF BAYS

UP TO NO OF BAYS

UP TO NO OF BAYS

BB389E

&

OPERATION

BB289E

OPEN

89-C/BAY2

BB189E

OPEN

INTER
LOCK
CONTACTOR

89-B / BAY n

BB289E

OPEN

INTER
LOCK
CONTACTOR

89-C / BAY n

BB389E

OPEN

INTER
LOCK
CONTACTOR

OPEN

UP TO NO OF BAYS

89-C/BAYn

89-A / BAY n

OPEN

&

OPERATION

BB389E

OPEN

FOR BUS EARTH SWITCH


OPERATION, ALL ISOLATORS
CONNECTED TO CONCERNED
BUS ARE TO BE OPENED.

INTERLOCKS

DIA5

BAY15

BAY16
BAY17

BAY13

DIA6

BAY14

BAY8
BAY9

BAY6

FEEDER11

BAY18

DIA4
BAY10

DIA3

BAY5

BAY2
BAY3

FEEDER9

FEEDER7

BAY11

DIA2

BAY1

BUS-1 DIA1

FEEDER5

BAY12

FEEDER3

BAY4

FEEDER1

I-CONFIGUARATION

BAY7

INTERLOCKS

BUS-2

FEEDER2

FEEDER4

FEEDER6

FEEDER8

FEEDER10

FEEDER12

INTERLOCKS

D-CONFIGUARATION
FEEDER5

FEEDER10
BAY14

BAY13

BAY7

DIA1

FEEDER9

BAY8

BAY3

BAY1

BAY2

FEEDER6

DIA3

BAY15

FEEDER2

BAY9

FEEDER1

DIA5

BUS-1

BAY5

FEEDER3

BAY11

FEEDER4

FEEDER7

FEEDER8

DIA6

BAY18

BAY16

DIA4

BAY12

BAY10

DIA2

BAY6

BAY4

BUS-2

BAY17

FEEDER11

FEEDER12

INTERLOCKS

ONE & HALF BREAKER SYSTEM


BB1-89E

BUS-2 BB2-89E

BUS-1

1-89

3-89
1-89E

3-89E

3-52CB

1-52CB

3-89AE

1-89AE

3-89A

1-89A

1-PH NEUTRAL
GROUNDING
REACTOR

UUU

LINE
SHUNT
REACTOR

UUU

1-89RE

2-89A

1-89R

2-89AE

1-89L

1-89LE

2-89B
2-52CB

2-89BE

3-89T

3-89TE

LINE 1
T/F-1

INTERLOCKS
BB1-89E

BAY 1

BUS-1

1-89
1-89E

1-52CB

FOR 1-89 ISOLATOR OPERATION:


BB189E

1-89AE

1-89AE

1-89A

UUU

UUU

LINE SHUNT REACTOR

1-89RE

1-89E

1-89R

1-52CB

OPEN
OPEN
OPEN

& OPERATION

1-89

OPEN

1-89L
BB189E

1-89AE

1-89E

OPEN

OPEN

OPEN

1-52 CB

1-89

OPEN

INTER
LOCK
CONTACTOR

1-89LE

LINE 1

INTERLOCKS
BB1-89E

BAY 1

BUS-1

1-89
1-89E

1-52CB

1-89AE

FOR 1-89E ISOLATOR OPERATION:


1-89A

& OPERATION1-89E

1-89A

UUU

UUU

LINE SHUNT REACTOR

1-89RE

1-89

1-89R

OPEN

OPEN

1-89L
1-89A

1-89

OPEN

OPEN

1-89E

1-89LE

LINE 1

INTER
LOCK
CONTACTOR

INTERLOCKS
BB1-89E

BAY 1

BUS-1

1-89
1-89E

1-52CB

1-89AE
1-89A

UUU

UUU

LINE SHUNT REACTOR

1-89RE

1-89R

FOR 1-89A ISOLATOR OPERATION:


1-89AE
1-89E
1-52CB

OPEN
OPEN

& OPERATION1-89A

OPEN

1-89L
1-89AE

1-89E

OPEN

OPEN

1-52 CB

1-89A

OPEN

INTER
LOCK
CONTACTOR

1-89LE

LINE 1

INTERLOCKS
BB1-89E

BAY 1

BUS-1

1-89
1-89E

1-52CB

1-89AE

FOR 1-89AE EARTH SWITCH OPERATION:


1-89A

& OPERATION 1-89AE

1-89A

UUU

UUU

LINE SHUNT REACTOR

1-89RE

1-89

1-89R

OPEN

OPEN

1-89L
1-89A

1-89

OPEN

OPEN

1-89AE

1-89LE

LINE 1

INTER
LOCK
CONTACTOR

INTERLOCKS
BB1-89E

BUS-1

BAY 1
FOR 1-89L ISOLATOR OPERATION:
IL
INTER LOCK FACILITY:
WHEN 1-89R CLOSES ONLY
PERMIT TO CLOSE 1-89L AND
1-89L OPENS ONLY
PERMIT TO OPEN 1-89R.

1-89
1-89E

1-52CB

1-89AE

1-89R

CLOSE

OR
PUSH
DC
INTERLOCK
2-52CB
BYPASS
PB
1-89LE

1-89A
1-89R

UUU

IL

UUU

LINE SHUNT REACTOR

1-89RE

1-89L

1-52CB

OPEN
OPEN

& OPERATION

1-89L

OPEN

DC INTERLOCK
BYPASS PB

PUSH
1-89R

2-52 CB

1-89LE

1-52 CB

1-89L

OPEN

INTER
LOCK
CONTACTOR

1-89LE
CLOSE

LINE 1

OPEN

OPEN

INTERLOCKS
BB1-89E

BAY 1

BUS-1

1-89
1-89E

1-52CB

1-89AE

FOR 1-89LE EARTH SWITCH OPERATION:


1-89L

& OPERATION 1-89LE

1-89A

UUU

UUU

LINE SHUNT REACTOR

1-89RE

LINE U/V RELAY

1-89R

OPEN

OPTD

1-89L
LINE U/V
RELAY

1-89L

1-89LE

OPTD

OPEN

INTER
LOCK
CONTACTOR

1-89LE

LINE 1

INTERLOCKS
BB1-89E

BAY 1

BUS-1

1-89
1-89E

FOR 1-89R ISOLATOR OPERATION:


1-52CB
1-89RE
2-52CB

1-89AE

1-89L

1-89A

OPEN
OPEN

& OPERATION

1-89L

OPEN

1-89R

UUU

IL

UUU

LINE SHUNT REACTOR

1-89RE

1-52CB

OPEN

1-89L
1-89RE

2-52 CB

1-89LE

1-52 CB

1-89L

OPEN

INTER
LOCK
CONTACTOR

1-89LE
OPEN

LINE 1

OPEN

OPEN

INTERLOCKS
BB1-89E

BAY 1

BUS-1

1-89
1-89E

1-52CB

FOR 1-89RE EARTH SWITCH OPERATION:

1-89AE
1-89A

UUU

UUU

LINE SHUNT REACTOR

1-89RE

1-89R

OPEN

OPERATION

1-89RE

1-89R

1-89L
1-89R

1-89RE

OPEN

INTER
LOCK
CONTACTOR

1-89LE

LINE 1

INTERLOCKS
BB1-89E

BUS-1

1-52 CB

BAY1

LOCAL
1-89E

1-89
1-89E

CLOSE

&
1-89AE

1-52CB

LOCAL
OPERATION

1-52 CB

CLOSE

1-89 AE

1-89 E

1-52 CB

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

1-89AE
1-89A

UUU

UUU

LINE SHUNT REACTOR

1-89RE

1-89R

1-89L
1-89LE

REMOTE

86-GA/BAY1
86-GB/BAY1
96-BB/BAY1

86-GA/BAY1

RESET
RESET

&

REMOTE
1-52 CB
OPERATION

RESET

86-GB/BAY1

96-BB/BAY1

1-52 CB

RESET

RESET

INTER
LOCK
CONTACTOR

LINE 1
RESET

INTERLOCKS
2-89A
2-89AE

BAY 2
2-89B

2-52CB

2-89BE

FOR 2-89A ISOLATOR OPERATION:

2-52 CB
289-AE
289-BE

OPEN
OPEN

&

OPERATION

2-89A

OPEN

2-52 CB

289-AE

289-BE

2-89A

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS
2-89A
2-89AE

BAY 2
2-89B

2-52CB

2-89BE

FOR 2-89B ISOLATOR OPERATION:

2-52 CB
289-AE
289-BE

OPEN
OPEN

&

OPERATION

2-89B

OPEN

2-52 CB

289-AE

289-BE

2-89B

OPEN

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS
2-89A
2-89AE

BAY 2
2-89B

2-52CB

2-89BE

FOR 2-89AE EARTH SWITCH OPERATION:

289-A
289-B

OPEN
OPEN

&

OPERATION

2-89AE

289-A

289-B

2-89AE

OPEN

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS
2-89A
2-89AE

BAY 2
2-89B

2-52CB

2-89BE

FOR 2-89BE EARTH SWITCH OPERATION:

289-A
289-B

OPEN
OPEN

&

OPERATION

2-89BE

289-A

289-B

2-89BE

OPEN

OPEN

INTER
LOCK
CONTACTOR

2-52 CB

INTERLOCKS

BAY2

LOCAL
2-89A
2-89AE

2-89BE

2-89B
2-52CB

CLOSE

&

2-89BE
2-89AE

REMOTE

86-GA/BAY2
86-GB/BAY2
96-BB/BAY2

LOCAL
OPERATION

2-52 CB

CLOSE

2-89 AE

2-89 BE

2-52 CB

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

RESET
RESET

&

REMOTE
2-52 CB
OPERATION

RESET

FOR HALF DIA ONLY

86-GA/BAY2

RESET

86-GB/BAY2

RESET

96-BB/BAY2

2-52 CB

RESET
FOR HALF DIA ONLY

INTER
LOCK
CONTACTOR

INTERLOCKS
BB2-89E

BAY 3

BUS-2

3-89
3-89E

3-52CB

FOR 3-89 ISOLATOR OPERATION:


3-89AE
BB289E

3-89A

3-89AE
3-89E
3-52CB

OPEN
OPEN
OPEN

& OPERATION

3-89

OPEN

3-89T
3-89TE

ICT

BB289E

3-89AE

3-89E

OPEN

OPEN

OPEN

3-52 CB

3-89

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS
BB2-89E

BAY 3

BUS-2

3-89
3-89E

3-52CB

FOR 3-89E EARTH SWITCH OPERATION:


3-89AE
3-89A

3-89A

OPEN

& OPERATION3-89E
3-89

OPEN

3-89T
3-89TE

ICT

3-89A

3-89

OPEN

OPEN

3-89E

INTER
LOCK
CONTACTOR

INTERLOCKS
BB2-89E

BAY 3

BUS-2

3-89
3-89E

3-52CB

FOR 3-89A ISOLATOR OPERATION:


3-89AE
3-89A

3-89AE
3-89E
3-52CB

OPEN
OPEN
OPEN

&

OPERATION

3-89A

3-89T
3-89TE

ICT

3-89AE

3-89E

OPEN

OPEN

3-52 CB

3-89A

OPEN

INTER
LOCK
CONTACTOR

INTERLOCKS
BB2-89E

BAY 3

BUS-2

3-89
3-89E

3-52CB

FOR 3-89AE EARTH SWITCH OPERATION:


3-89AE
3-89A

3-89A

OPEN

& OPERATION3-89AE
3-89

OPEN

3-89T
3-89TE

ICT

3-89A

3-89

OPEN

OPEN

3-89AE

INTER
LOCK
CONTACTOR

INTERLOCKS
BB2-89E

BAY 3

BUS-2

3-89
3-89E

3-52CB

FOR 3-89T ISOLATOR OPERATION:


3-89AE
LV89TE2

3-89A

2-52 CB
3-89TE
3-52CB

OPEN
OPEN
OPEN

& OPERATION

3-89T

3-89TE

3-52 CB

3-89T

OPEN

INTER
LOCK
CONTACTOR

OPEN

3-89T
3-89TE

LV89TE2

OPEN

ICT

2-52CB

OPEN

OPEN

INTERLOCKS
BB2-89E

BAY 3

BUS-2

3-89
3-89E

3-52CB

FOR 3-89TE EARTH SWITCH OPERATION:


3-89AE
3-89T

3-89A

OPEN

& OPERATION3-89TE
LV89T

OPEN

3-89T
3-89TE

ICT

3-89T

LV89T

OPEN

OPEN

3-89TE

INTER
LOCK
CONTACTOR

INTERLOCKS
BB2-89E

BUS-2

3-52 CB
LOCAL

3-89
3-89E

3-89E

3-52CB

3-89AE
3-89A

REMOTE

86-GA/BAY3
86-GB/BAY3

3-89TE

96-BB/BAY3

86-GA/BAY3

ICT

CLOSE

&
3-89AE

3-89T

BAY3

RESET

LOCAL
OPERATION

3-52 CB

CLOSE

3-89 AE

3-89 E

3-52 CB

CLOSE

CLOSE

INTER
LOCK
CONTACTOR

RESET
RESET

&

REMOTE
3-52 CB
OPERATION

RESET

86-GB/BAY3

96-BB/BAY3

3-52 CB

RESET

RESET

INTER
LOCK
CONTACTOR

INTERLOCKS

BUS EARTH SWITCH


BB289E

BB189E
1-89/ DIA1
4-89/ DIA2
7-89/ DIA3

OPEN

3-89/ DIA1

OPEN

6-89/ DIA2

OPEN

&

OPERATION

9-89/ DIA3

BB189E

OPEN
OPEN
OPEN

&

OPERATION

BB289E

UP TO NO OF DIAS
OPEN

UP TO NO OF DIAS
OPEN

DIA N

DIA N

FOR BUS EARTH SWITCH OPERATION, ALL ISOLATORS


CONNECTED TO CONCERNED BUS ARE TO BE OPENED.
1-89/DIA1

4-89/DIA2

7-89/DIA3

OPEN

OPEN

OPEN

3-89/DIA1

6-89/DIA2

9-89/DIA3

OPEN

OPEN

OPEN

UP TO NO OF DIAS

UP TO NO OF BAYS

DIA N

BB189E

OPEN

INTER
LOCK
CONTACTOR

DIA N

BB289E

OPEN

INTER
LOCK
CONTACTOR

ISOLATOR
INTERLOCKS

NOTE: All Earth Switches in


the Bay are towards Circuit
Breaker side only. The Line
and Transformer
Earth Switches are towards
Line & Transformer.
O: OPEN
C: CLOSE
A: ACTED

BB189E : BUSBAR-1 EARTH SWITCH .


BB289E : BUSBAR-2EARTH SWITCH .
UV RELAY: UNDER VOLTAGE RELAY.

S.NO

ISOLATOR
OPEN/CLOSE

EQUIPMENT-1

EQUIPMENT-2

EQUIPMENT-3

EQUIPMENT-4

INTERLOCKS REQUIRED FOR CONCERNED ISOLATOR / EARTH SWITCH OPEN OR CLOSE

BAY - 1
1

1 - 89

ISO

BB189 E

189 AE

189 E

152 CB

1 89 E

ES

189 A

189

--

--

1 89 A

ISO

189 AE

189 E

152 CB

--

1 89 AE

ES

189 A

189

--

--

1 89 L

ISO

189 LE

152 CB

252 CB

--

1 89 LE

ES

189 L

UV RELAY

--

--

2 89 A

ISO

289 BE

289 AE

252 CB

--

2 89 AE

ES

289 B

289 A

--

--

2 89 B

ISO

289 BE

289 AE

252 CB

--

10

2 89 BE

ES

289 B

289 A

--

--

11

3 89

ISO

BB289 E

389 AE

389 E

352 CB

12

3 89 E

ES

389 A

389

--

--

13

3 89 A

ISO

389 AE

389 E

352 CB

--

14

3 89 AE

ES

389 A

389

--

--

15

3 89 T

ISO

LV89 E2

389 TE

252 CB

352 CB

16

3 89 TE

ES

389 T

LV89 T

--

--

BAY - 2

BAY - 3

BB189E
1-89AE
1-89E
1-52CB
1-52CB
1-89AE
1-89E
1-52CB
1-89LE
2-52CB
1-89
1-89A
1-89
1-89A
1-89L
U/V RLY

ISOLATOR & CB INTERLOCKS

OPEN
OPEN
OPEN

& OPERATION

1-89

1-89E

OPEN

1-89AE

OPEN

2-89AE

OPEN
OPEN

& OPERATION

1-89A

3-89E
3-89AE

OPEN
OPEN
OPEN

2-89BE

& OPERATION

86GR-A

1-89L

86GR-B
96BB

OPEN
OPEN

&
&

86GR-A

OPERATION

1-89AE

86GR-A
86GR-B

OPEN
ACTED

1-89E

86GR-B

OPEN
OPEN

OPERATION

&

OPERATION

1-89LE

96BB

2-89A
2-52CB
2-89AE
2-89BE

OPEN
OPEN
OPEN

2-89B

& OPERATION
2-89A

2-89A
2-89B

CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE

OPEN
LOCAL
CLOSE

& 1-52CB

RESET

& 2-52CB

REMOTE
CLOSE

& 1-52CB
REMOTE
CLOSE

& 2-52CB

RESET

OPEN
OPEN
OPEN
OPEN

&

REMOTE
CLOSE

OPEN
3-89A

OPERATION

&

& OPERATION
2-89BE

OPEN
OPEN
OPEN

3-89T

OPERATION

OPEN

&

OPEN
OPEN

3-89E

3-89AE

3-52CB

& OPERATION
2-89AE

OPEN
OPEN

& 3-52CB

RESET
RESET

&

LOCAL
CLOSE

RESET
RESET

3-89

OPERATION

LOCAL
CLOSE

RESET
RESET

OPEN

3-89TE

OPERATION

OPERATION

OPERATION

2-52CB
2-89AE
2-89BE

&
&
&

BB289E
3-89AE
3-89E
3-52CB
3-52CB
3-89AE
3-89E
3-52CB
3-89TE
2-52CB
LV89E2

OPEN
OPEN

3-89
3-89A

OPEN
OPEN
OPEN
OPEN

3-89
3-89A
3-89T
LV89T

OPEN
OPEN
OPEN

& OPERATION
2-89B