You are on page 1of 3

HYDRAULIC PUMPING SYSTEMS

WELL DATA SUMMARY SHEET


Customer:

Contact:

Field & Well:


Location:
Date:
1

Perforation Vertical Depth (at mid-perfs)

ft

Pump Vertical Depth

ft

Pump Installation Type: (1) Parallel (2) Casing

Casing ID

in

Upstring Tubing ID (for Parallel installation only)

in

Downstring Tubing ID

in

Downstring Tubing OD

in

Tubing Length

ft

Pipe Condition (1) = New (2) = Avg. ( 3) - Old

10

Oil Gravity

API

11

Water Cut

12

Water Specific Gravity

S.G.

13

Producing GOR

scf/stb

14

Gas Specific Gravity (Air =1.00)

S.G.

15

Separator Pressure

psi

16

Static BHP @ perforations

psi

17

Flowing BHP @ perforations

psi

18

Well Test Flow Rate

BPD

19

Wellhead Temperature

Deg F

20

Bottom Hole Temperature

Deg F

21

Vented Gas = ( 1 ) Unvented Gas = ( 2 )

22

Power Fluid (1) Oil (2) Water

23

Power Fluid Gravity

API or S.G.

24

Bubble Point Pressure (will be calculated if unknown)

psi

25

Wellhead Pressure

psi

Desired Production:

BPD at

PSI Producing BHP

Mobil Phone
01-9631-3789

Tel. 01-440-2293
Fax 01-421-8599

Comments:

WEATHERFORD DEL PERU S.R.L

HYDRAULIC PUMPING SYSTEMS


WELL DATA SUMMARY SHEET
Customer:

Contact:

Field & Well:


Location:
Date:
1

Perforation Vertical Depth (at mid-perfs)

Pump Vertical Depth

Pump Installation Type (1) Parallel (2) Casing

Casing ID

mm

Upstring Tubing ID (for Parallel installation only)

mm

Downstring Tubing ID

mm

Downstring Tubing OD

mm

Tubing Length

Pipe Condition (1) = New (2) = Avg. ( 3) - Old

10

Oil Gravity

API

11

Water Cut

12

Water Specific Gravity

S.G.

13

Producing GOR

M3/M3

14

Gas Specific Gravity (Air =1.00)

S.G.

15

Separator Pressure

kpa

16

Static BHP @ perforations

Mpa

17

Flowing BHP @ perforations

Mpa

18

Well Test Flow Rate

M3/D

19

Wellhead Temperature

Deg C

20

Bottom Hole Temperature

Deg C

21

Vented Gas = ( 1 ) Unvented Gas = ( 2 )

22

Power Fluid (1) Oil (2) Water

23

Power Fluid Gravity

API or S.G.

24

Bubble Point Pressure (will be calculated if unknown)

Mpa

25

Wellhead Pressure

kpa

Desired Production:

M3/D at

Mpa Producing BHP

Mobil Phone

Tel. 01-440-2293

Comments:

Luis Gutierrez
WEATHERFORD DEL PERU S.R.L
luis.gutierrez@weatherford.com

01-9631-3789

Fax 01-421-8599

You might also like