You are on page 1of 1
FIRST ANGLE PROJECTION ALL SIMENSIONS THE INTREST OF THE co) ETRIMENTAL TO of BHARAT HEAVY ELECTRICALS LIMITED 2 WENT F ED DIRECTLY © N THs vey] oaTe [_ovtereD revoste | ayrerer HECK: HECK EL NOMENCLATURE K GAIN OF THE SYSTEM = 100/(% STEADY STATE SPEED REGULATION] 20 Tt GOVERNOR TIME CONSTANT 0.02 Fo 0.1 set (selectable) te DERIVATIVE GAIN X GOVERNOR TIME CONSTANT 0.0 Fo 10 sec (selectable) B CONTROL VAVLE ACTUATOR TIME CONSTANT O.1 sec Pur = CVOPEN 2.0 pu per sec Foown = CVCLOSE 5.0 pu per sec Pan = MINIMUM POWER LIMIT 00 Puax_= MAXIMUM POWER LIMIT 1023 Fup = HIGH PRESSURE TURBINE POWER FRACTION 0275 i INTERMEDIATE PRESSURE TURBINE POWER FRACTION 0.35 fip__= LOW PRESSURE TURBINE POWER FRACTION = 0375 Tow__= HP TURBINE TIME CONSTANT (HP CONTROL VALVE TO HP EXHAUST) 0.208 sec TRH__= REHEAT TIME CONSTANT (HP EXHAUST TO P EXHAUSTI ™* 5 sec [varies from 4 to 10 sed ‘Teo = CROSS OVER TIME CONSTANT (IP EXHAUST TO LP EXHAUST] 0.653 sec ‘Dw __= SPEED DEVIATION i MECHANICAL POWER i INTIAL POWER Pov __= POWER AT VALVE OUTLET ‘S____= DIFFERENTIAL OPERATOR ILAPLACE TRANSFORM) voc ~ DEPENDS ON STEAM VOLUME ENTRAPPED IN CRH & HRH PIPES AND REHEATER GEN, DIM, LIMITS , FITS , & TOLERANCES AS PER P.S ~ HY0230261 Be ry PROJECT :-HINDALCO MAHAN ALUMINIUM PROJECT. 6Xi50 MW STG HINDALCO ADITYA ALUMINIUM PROJECT. 6X150 MW STG I TYPE OF TURBINE :— K30—16+N30 — 2X3.2(M) I = : es neu] cescunon eS ae ave aE BHARAT HEAVY ELECTRICALS LTD. aN {MHS 15.02.10 DAO 130210 a s weiour (ofter re |e, fel = op “IE - |e HING NE a © |B s fle a I= |= & [BLOCK DIAGRAM FOR STEAM TURBINE | ° 4-10903-00413/ 00 lsu 2 NO_OF SHT 2

You might also like