GASTOS GENERALES

DATOS GENERALES
OBRA:
Edificio multifamiliar reducto
PLAZO:
6.00 Meses
CD:
S/.

GASTOS GENERALES VARIABLES


1. REMUNERACIN DEL PERSONAL
ITEM
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00

DESCRIPCIN
Ing. Residente
Ingeniero de produccin
Ingeniero frente 1
Ingeniero frente 2
Supervisor de seguridad
Administrador
Almacenero
Asistente de almacn

UND

CANTIDAD

Mes
Mes
Mes
Mes
Mes
Mes
Mes
Mes

TIEMPO
(MESES)

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

7.0
6.0
6.0
6.0
6.0
6.0
6.0
5.0

PRECIO
S/.
14,900.00
8,195.00
5,215.00
5,215.00
4,470.00
6,705.00
2,533.00
1,788.00
Total

TOTAL
S/.
104,300.00
49,170.00
31,290.00
31,290.00
26,820.00
40,230.00
15,198.00
8,940.00
307,238.00

2. GASTOS ADMINISTRATIVOS
ITEM
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00

DESCRIPCIN
tiles de oficina
Computadoras
Impresora A3
Consumo de Agua
Consumo de Luz
Telfono Obra - Speedy
Nextel con linea telefono
Nextel solo radio
Ploteo de planos
Mobiliario de oficina
Reparaciones menores
Movilidad
Ensayos de Laboratorio
Gastos post venta
Apertura y cierre de planillas

UND
Mes
Und
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Glb
Mes
Mes
Mes
Mes
Glb

CANTIDAD

TIEMPO
(MESES)

1.00
6.00
1.00
1.00
1.00
1.00
2.00
6.00
1.00
1.00
2.00

6.0
1.0
1.0
6.0
6.0
6.0
7.0
6.0
6.0
1.0
6.0

PRECIO
S/.
214.55
1,609.13
1,379.25
551.70
858.20
567.03
168.58
55.17
20.00
1,532.50
91.15

TOTAL
S/.
1,287.30
9,654.78
1,379.25
3,310.20
5,149.20
3,402.18
2,360.12
1,986.12
120.00
1,532.50
1,093.80

132.00
1.00
1.00

2.0
12.0
1.0

7.00
3,800.00
1,072.75

1,848.00
45,600.00
1,072.75

Total

78,508.90

GASTOS GENERALES FIJOS


SEGUROS Y OTROS
ITEM

DESCRIPCIN

1.00 Pliza Car


2.00 Carta Fianzas
C.F. Fiel cumplimiento
C.F.Adelanto efectivo
C.F. Adelanto de materiales
C.F.Garantia
3.00 Sencico 0.2%

UND

CANTIDAD

Glb

0.25%

TIEMPO
MESES
1.00

Trim
Trim
Trim
Trim
Glb

1.00
1.00
1.00
1.00
1.00

2.00
2.00
2.00
2.00
1.00

PRECIO
S/.

TOTAL
S/.
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Total
GASTOS OFICINA CENTRAL
ITEM

DESCRIPCIN

1.00 Gastos Constructora (1%)

0.00
TOTAL

UND

CANTIDAD

Glb

1.00

TIEMPO
(MESES)
1.00

PRECIO
S/.
0.00
Total

TOTAL GASTOS GENERALES VARIABLES (S/.)


TOTAL GASTOS GENERALES FIJOS (S/.)
TOTAL GASTOS GENERALES (S/.)

#DIV/0!
#DIV/0!
#DIV/0!

TOTAL
S/.
0.00
0.00

385,746.90
0.00
385,746.90