Professional Documents
Culture Documents
ORGANIZING COMMITTEE
Jakarta
13 Desember 2013
This document is confidential and is intended solely for the use and information of
the client to whom it is addressed.
HASNUR GROUP
Confidential
HASNUR GROUP
Role Design
Menyusun mikro proses elemen OMS
Mengembangkan sistem & prosedur elemen OMS
Monitoring penyusunan dokumen elemen elemen OMS
Memfasilitasi sosialisasi & implementasi elemen OMS
Pre & final assesment implementasi elemen OMS
Confidential
HASNUR GROUP
Responsibility
No
Elemen
Ruang Lingkup
Forecasting &
Planning
Operation
Mine
Compliance
Report
Evaluation
Process
Management
Audit
dan
Dokumen
Kontrol
&
PIC
: Standarisasi Tahap 1
Confidential
HASNUR GROUP
: Standarisasi Tahap 1
Perhitungan Cadangan
Standar Drawing
Daily Meeting
Operation
Mine
Land Bank*
Infrastructure*
Pembebasan
Lahan
Dewatering
Drainage
Jalan Komoditas
Jalan Tambang
Lighting
Mine Compliance
Kewajiban Pemilik IUP
Kewajiban Pemilik IPPKH
Confidential
Loading &
Hauling
(Waste & Coal)
Land
Clearing
Land clearing
Soil Management
Pengelolaan Overburden
Disposal Management
Pengiriman Produk
Commodity
Processing*
Commodity
Transport*
Pengendalian Produk
Stockpile Management
Pencemaran dan kerusakan lingkungan
Com Dev dan pengaduan masyarakat
Process
Management*
Rehabilitasi*
Revegetasi
Pemantauan Revegetasi
Riset dan Pengembangan
Audit &
Dok. Kontrol
HASNUR GROUP
3 Monthly
Monthly
Weekly
: Standarisasi Tahap 1
Daily
Production
Land
Clearing
Ripping/
Drilling &
Blasting
Land clearing
Ripping/Drilling
Coal Pit Activity Drainage system ROM Stock pile mngmt
Blasting Activity
Waste Removal Dewatering
Weight bridge system
Blast Material Inspection
Changeshift
Disposal Mngmt Road maintenance
Perizinan & pengadaan
Pengeluaran & Pengangkutan
Confidential
Loading &
hauling
( Coal & Waste)
Pit
Service
Commodity
Transport
Process
Management
Audit &
Dok. Kontrol
Calender of Event
No
Nama Pertemuan
Frekuensi
Pimpinan
Peserta
OMS Level 2
Mingguan
Koordinator
OC/Wakil
Anggota OC
OMS Level 1
Bulanan
Steering
Committee
Steering
Committee
Organizing
Committee
Agenda
Review
kemajuan
penyusunan
setiap elemen
OMS
Rencana
pengembangan
berikutnya.
Jumat,
pukul
14-15
Review
kemajuan
penyusunan
setiap elemen
OMS
Support
Requirement
Senin,
pukul
10 - 12
Confidential
Jadwal
HASNUR GROUP
Disclaimer
This document contains certain results of operation, and may also contain
certain projections, plans, strategies, policies and objectives of the Company,
which could be treated as forward looking statements within the meaning of
applicable law. Forwards looking statements, by their nature, involve risks and
uncertainties that could cause actual results and development to differ
materially from those expressed or implied in these statements. HASNUR GROUP
does not guarantee that any action, which should have been taken in reliance on
this document will bring specific results as expected.
Confidential