You are on page 1of 6

Probability

Probability Range(Lower)
0.05
0.1
0.2
0.3
0.2
0.15

Cumulative Probability
0
0.05
0.05
0.15
0.15
0.35
0.35
0.65
0.65
0.85
0.85
1

Tires Demand

Day
0
1
2
3
4
5

Random Number
Simulated Demand
1
0.52
2
0.37
3
0.82
4
0.69
5
0.98
6
0.96
0.33
0.5
0.88
0.9

3
3
4
4
5
5
2
3
5
5

Probability
0.13
0.17
0.15
0.25
0.2
0.1

Probability Range (Lower)


0
0.13
0.3
0.45
0.7
0.9

Cumulative Probability
0.13
0.3
0.45
0.7
0.9
1

Probability
0.05
0.15
0.5
0.2
0.1

Probability Range (Lower)


0
0.05
0.2
0.7
0.9

Cumulative Probability
0.05
0.2
0.7
0.9
1

No.Arrivals
0
1
2
3
4
5

Daily Unloading Rate


1
2
3
4
5

Day
1
2
3
4
5
6
7
8
9
10

No.delayed
0
0
0
0
3
2
1
0
2
4

RN1
0.52
0.06
0.5
0.88
0.53
0.3
0.1
0.47
0.99
0.37

No. of nightly arrives


3
0
3
4
3
2
0
3
5
2

Total to be unloaded
3
0
3
4
6
4
1
3
7
6

RN2
0.37
0.63
0.28
0.02
0.74
0.35
0.24
0.03
0.29
0.6

Daily unloaded rate


3
3
3
1
4
3
3
1
3
3

You might also like