You are on page 1of 11

Material Report for plan: 3590.

spf

Page 1 of 4

Report Style: Standard Detailed

Thursday, April 19, 2001, 12:06 AM

Material
PREPARATION PRELIM
=========================
PERMITS & FEES
Subtotal

Description

Qty

Units

ARCHITECT & ENGINEERING


Subtotal
SITE WORK
Subtotal
DEMOLITION
Subtotal
UTILITY CONNECTIONS
Subtotal
CONST PERIOD FINANCING
Subtotal
EXCAVATION & FOUNDATION
=========================
EXCAVATION & BACKFILL
Concrete Slab
Stone (Slab)
Subtotal

4"

6 cuyd
9 cuyd

WATERPROOFING
Subtotal
TERMITE PROTECTION
Subtotal
ROUGH STRUCTURE
=========================
STRUCTURAL STEEL
Subtotal
FRAMING
Subtotal
FLOOR FRAMING
Subtotal
WALL FRAMING
2x4 Precut (B)
Wall Stud
Jack Stud
Gable Framing Studs
Opening Header
Opening Header
Opening Header
Opening Rough Sill
Wall Plate
Gable Framing Plates
Wall Sheathing
Subtotal
ROOF FRAMING
Common Truss
Gable Ladder Set
Roof Sheathing
Plywood H-Clip
Attic Vent

2"x4"x92 5/8"
2"x4"x45"
2"x4"x96"
2"x4"x4'5"
2"x10"x12'0"
2"x10"x3'7"
2"x10"x3'3"
2"x4"x3'0"
2"x4"
2"x4"
0 1/2"x4'0"x8'0"

62
2
6
9
2
2
2
1
249
75
25

each
each
each
each
each
each
each
each
feet
feet
shts

18'0"
11'9"x1'6"
0 3/4"x4'0"x8'0"

20
4
20
80
3

each
each
shts
each
each

Material Report for plan: 3590.spf

Page 2 of 4

Report Style: Standard Detailed

Thursday, April 19, 2001, 12:06 AM

Material

Description

Qty

Units

Subtotal
FRAMING LABOR
Subtotal
CONCRETE
Monolithic Footings
Rebar (Slab)
Rebar (Monolithic Ftg)
Wire Mesh (Slab)
Subtotal
ROUGH SHEET METAL
Gutter
Downspout
Fascia Cladding
Eave Start
Soffit
Subtotal
FULL ENCLOSURES
=========================
ROOFING
Roofing Felt
Shingles
Ridge Shingles
Subtotal

10"x24"

5 1/2"

5
222
170
443

cuyd
feet
feet
sqft

54
1
101
54
139

feet
each
feet
feet
sqft

2 rolls
20 bndl
27 feet

MASONRY
Subtotal
MASONRY MATERIALS
Subtotal
WINDOWS
BAY WINDOWS
BOW WINDOWS
GLASS BLOCK
SKYLIGHTS
Window Subtotal
DOORS EXTERIOR
DOORS INTERIOR
BIFOLD DOORS
POCKET DOORS
PATIO DOORS
FRENCH DOORS EXTERIOR
FRENCH DOORS INTERIOR
GARAGE DOORS
Door Subtotal
OPENING HARDWARE
Entrance Hardware

1 each

Material Report for plan: 3590.spf

Page 3 of 4

Report Style: Standard Detailed

Thursday, April 19, 2001, 12:06 AM

Material
Garage Door Opener
Shims
Subtotal
INSULATION
Slab Insulation
R-12 Wall Insulation
Vapor Barrier (Wall)
Air Retarder
Subtotal
EXTERIOR TRIM
Siding
Siding Starter
Siding J-Molding
Siding Dripcap
Outside Siding Corner
Shutters
Window Trim
Garage Door Frame
Subtotal

Description

2"
3 1/2"

16"x36"
6"
2"x6"

Qty

Units
1 each
1 bund

443
531
654
703

sqft
sqft
sqft
sqft

647
85
23
7
32
1
16
24

sqft
feet
feet
feet
feet
pair
feet
feet

652
33
1
1

sqft
lbs
ctn
roll

EXTERIOR PAINTING
Subtotal
FINISHING TRADES
=========================
DRYWALL
Drywall
Drywall Compound
Drywall Screws
Drywall Tape
Subtotal

0 1/2"

FLOORING
General Flooring
Subtotal
TRIM CARPENTRY
Door Casing
Window Casing
Door Jamb & Stop
Subtotal

405 sqft

4"
4"
3'0"x6'10"

18 feet
15 feet
1 set

CERAMIC TILE
Subtotal
CABINETS & VANITIES
Subtotal
FINISH PLUMBING
Subtotal
FINISH ELECTRICAL
Smoke Alarm
Subtotal
FINISH HVAC
Subtotal
INTERIOR DECORATION
Subtotal
COMPLETION & INSPECTION

1 each

Material Report for plan: 3590.spf

Page 4 of 4

Report Style: Standard Detailed


Material
=========================
BUILDING CLEAN-UP
Subtotal
LANDSCAPING
Subtotal
DRIVEWAY CONTRACT
Subtotal
EXTERIOR STRUCTURES
Subtotal
WALK THROUGH INSPECTION
Subtotal
=========================
TOTAL PROJECT COST

Thursday, April 19, 2001, 12:06 AM


Description

Qty

Units