Calculations for RCC Sewerpipe Haunching

i/D

II

Bc

Bed Vol

III = (I) + 2*(II)

IV = 0.25*(III) or
100mm
whichever is
higher

V = (III) + 500mm

VI = 0.5*(III)

VII

300

40

380

100.0

880

190

0.088

350

75

500

125.0

1000

250

0.125

400

75

550

137.5

1050

275

0.144

450

75

600

150.0

1100

300

0.165

500

75

650

162.5

1150

325

0.187

600

85

770

192.5

1270

385

0.244

700

85

870

217.5

1370

435

0.298

800

95

990

247.5

1490

495

0.369

900

100

1100

275.0

1600

550

0.440

1000

115

1230

307.5

1730

615

0.532

1100

115

1330

332.5

1830

665

0.608

1200

120

1440

360.0

1940

720

0.698

1400

135

1670

417.5

2170

835

0.906

ipe Haunching
Haunch Vol

Total Concrete m3

Rate per m

VIII

IX

0.145

0.233

522.6

0.195

0.320

716.0

0.216

0.360

806.9

0.237

0.402

901.5

0.260

0.446

999.9

0.314

0.559

1251.6

0.362

0.660

1478.0

0.421

0.790

1770.1

0.478

0.918

2057.4

0.549

1.081

2421.3

0.605

1.214

2719.1

0.670

1.368

3064.8

0.812

1.718

3849.1

Calculations for uPVC Sewerpipe Haunching


Bc

Bed Vol Haunch Vol

III = (I) + 2*(II)

IV = 0.25*(III) or
100mm
whichever is
higher

V = (III) + 500mm

VI = 0.5*(III)

VII

VIII

160

100.0

660

80

0.066

0.060

200

100.0

700

100

0.070

0.075

250

100.0

750

125

0.075

0.094

315

100.0

815

157.5

0.082

0.119

Haunching
Total Concrete

Rate per m

IX

0.126

282.0

0.145

324.9

0.169

378.9

0.201

450.2