Professional Documents
Culture Documents
Load-In Plan
People Available
Monday
Kat
Gonner
Morgan
Andrew
Neil
Robert
Roy
ALL DAY
Tuesday
Neil
Andrew
Jorge
Kat
Roy
ALL DAY
8-10am, 1-1:30pm, 3:30-4:30
8-10am
8-10am, 1-4:30pm
8-10am, 2:30-4:30pm
Tools Needed
Monday
2-Tape Measures
5/16 Box and Sockets Fabric Stapler
1-Long Tape
7/16 Box and Sockets Rope
6-Bolt Plates
Tech Screws
Sander
3-Screw Guns
4-EEE Hinges
K-Gun
3" Screws
4- Fixed Hinges
3/4" Staples
1 1/4" Screws
K-Gun
8- 8' or longer Spansets 3/4" Staples
Skids
Glue
Air Compressor
Air Hose
Skill Saw
Saw Gide
Tuesday
Air Compressor
Air Hose
Plummers Strap
1 1/4" Screws
Glue
Load-In Chiefs
Kat
Andrea
Car Help
Ken
Lincoln's Challenge
Step 2
Step 3
Polaroid Stories
Load-In Plan
Monday (Part 1)
People Available
Kat
Gonner
Morgan
Andrew
Neil
Robert
Roy
ALL DAY
8-10am, 1-4:30pm
8-10am, 2:30-4:30pm
Tools Needed
2-Tape Measures
5/16 Box and Sockets
1-Long Tape
7/16 Box and Sockets
6-Bolt Plates
Tech Screws
3-Screw Guns
4-EEE Hinges
3" Screws
4- Fixed Hinges
1 1/4" Screws
K-Gun
8- 8' or longer Spansets
3/4" Staples
Skids
Glue
Air Compressor
Air Hose
Skill Saw
Saw Gide
Phase 1
Teams
Car
Captain Ken
Morgan
Neil
Lincoln's
Studio
Kat
Andrew
Gonner
Robert
Roy
Team Car
Step 1
Collect Materials
-Spansets, Skid, OSB, Fork Lift
Step 2
Step 3
Move Car
Team Studio
Step 1
Collect Materials
- Collect Tools
- Pull Down Walls
- Collect Jacks from Hallway
Robert, Roy
Andrew, Gonner
Kat
Step 2
All
Step 3
All
Polaroid Stories
Load-In Plan
Monday (Part 2)
Step 4
Ladder Install
Andrew, Robert, Kat
- Place Brackets in north side of E16
- Stand Ladder up to mark Holes
- Drill 7/16 Holes
- Bolt to brackets, Screw to Platform
Step 5
Wall Install
Gonner, Roy
- Screw base SR1 and SL2 to Platform
- EEE Hinge SR2 and SL1 to Platform
- Hinged Together
- Attach Jacks Between
- SL1 and SL2
- SR1 and SR2
- End of Returns
Phase 2
Teams
Captain
Car
Kat
Andrea
Ken
Platforms
Neil
Robert
Grid
Andrew
Morgan
Gonner
Roy
Team Car
Step 1
Whatever notes need to happen to car
- Kat will jump to Team Grid when done
Team Platforms
Step 1
Fence Install
All
- Post are labled on bottom and have their hardware
- Attach to wall
- Tech Screw barbed wire mounts
Step 2
Foam Siding
All
- Cut down Back to flush
- Attach luaun Strips to groove
- Screw in through back of legs or framing with 3" Screws
Team Grid
Step 1
Attach Wall Brackets
Andrew
Step 2
Morgan, Gonner
Polaroid Stories
Load-In Plan
Tuesday Part 1
People Available
Neil
Andrew
Jorge
Kat
Roy
Robert
Teams
Captain
Tunnel
Kat
Tools Needed
Fabric Stapler
Air Compressor
Rope
Air Hose
Sander
Plummers Strap
K-Gun
1 1/4" Screws
3/4" Staples
Glue
ALL DAY
Wall
Neil
Jorge
Grid
Andrew
Robert
Car
Andrea
Roy
Team Tunnel
Step 1
Hang black duve under platform, Attach facing
Step 2
Step 3
Lay carpet
Step 4
Team Wall
Step 1
All
Step 2
Install Speakers
All
- Get speaker mount from props
- Drill holes into mount so it can be through bolted to the wall
-Match drill to wall
- Bolt speaker to wall
Step 3
Step 4
All
Polaroid Stories
Load-In Plan
Tuesday (Part 2)
Step 5
All
Step 6
All
Step 4
Install Conduit
All
- Cut Conduit to fit from under speaker mount to platform floor
- Attach below speaker mount using plumbers strap
Team Grid
Step 1
Step 2
Handrail Install
Step 3
Team Car
Step 1
Step 2
Step 3
Prep Trunk
- Need to cut a sheet of OSB to the shape of the trunk floor to create a flat surfcace
- Attach trunk liner to OSB
-Rig latch to not lock