Other Relevant aspects

with the sistem MRP


(material requierements
planning)

Feedback
Involves taking all information (stock
data, BOM, master file) and make
the necessary calculations.

Total Change
That means, that all the information
(stock, costumer order) this
information has to be in the
computer to make the process more
efficient

Lot
We mix the two previous methods .
this system in specific has the
information on line for the limited
access , but this not actualize the
changes immediately

Safety Stock
Is the quantity of stock that you
should have, if it happens something
with the order of materials that you
already order before.

Principal Challenges of the


MRP system

Accuracy Data
Knowledege user
PMP overloader
Compromise of the direction
Insensintivity capacity