You are on page 1of 8

OBRA:

REPARACION DE VIVIENDAS OBREROS BLOCK H-31 - SAN JUAN

CLIENTE:

SHOUGANG HIERRO PERU S.A.A.

VALORIZACION N 02

511,783.36

MONTO CONTRACTUAL (S/.)


ADENDA 1
ADENDA 2

511,783.36

TOTAL (S/.)

RESUMEN GENERAL DE VALORIZACIONES

ITEM

DESCRIPCION
1 ADELANTO 20%
2 VALORIZACION
3 VALORIZACION
4 VALORIZACION
5 VALORIZACION
6 VALORIZACION

TOTAL (S/.)

N
N
N
N
N

01
02
03
04
05

FECHA

7/23/2010
8/31/2010

MONTO
VALORIZADO DESCUENTO (20%) VALORIZACION
(S/.)
POR ADELANTO (S/.)
(S/.)

54,984.32 180,817.24

54,984.32
180,817.24

235,801.56

235,801.56

LORIZACIONES

I.G.V.
(19%) (S/.)

IMPORTE DE
VALORIZACION

FONDO DE IMPORTE
GARANTIA
NETO A
(5%) (S/.) PAGAR (S/.)

10,447.02
34,355.28

65,431.34
215,172.52

2,749.22
9,040.86

62,682.12
206,131.66

44,802.30

280,603.86

11,790.08

268,813.78

OBRA:

REPARACION DE VIVIENDAS OBREROS BLOCK H-31 - SAN JUAN

CONTRATISTA: CONSORCIO MARCONA


F. INICIO VALORIZACION

8/16/2010

F. CORTE VALORIZACION

8/31/2010

VALORIZACION N 02

ITEM

DESCRIPCION
1 TOTAL COSTO DIRECTO CONTRACTUAL
COSTO DIRECTO ADENDA 1
COSTO DIRECTO ADENDA 2
COSTO DIRECTO TOTAL
2 GASTOS GENERALES
21.247348%
3 UTILIDADES
10.623673%
4 TOTAL VALORIZACION
5 AMORTIZACION DE ADELANTO EFECTIVO (20%)

MONTO CONTRACTUAL
511,783.36

511,783.36
108,740.39
54,370.19
674,893.94

6 IGV 19%
7 TOTAL NETO VALORIZADO
8 RETENCION FONDO DE GARANTIA (5%)
TOTAL NETO A COBRAR

SR. XU FU CHUN
GERENTE DE INGENIERIA
SHOUGANG HIERRO PERU S.A.A.

ACUMULADO ANTERIOR
%
TOTAL
0%
0
0%
0
0%
0

S/.

ING. JULIO ALVAREZ


SUBGERENTE DE INGENIERIA
SHOUGANG HIERRO PERU S.A.A.

VALORIZACION N 01
%
8.15%
0.00%
0.00%

NABIL MOHARAM
COORDINADOR DE OBRA
SHOUGANG HIERRO PERU S.A.A.

ING. GUILLERMO RUFASTO


JEFE DE SUPERVISION
GMI

VALORIZACION N 01
TOTAL
41,695.53

VALORIZACION N 02
%
TOTAL
137,116.74
26.79%

ACUMULADO ACTUAL
%
TOTAL
178,812.27
34.94%
0.00%
0.00%

41,695.53
8,859.19

137,116.74
29,133.67

178,812.27
37,992.86

4,429.60

14,566.83

18,996.43

54,984.32

180,817.24

235,801.56

54,984.32
10,447.02
65,431.34

180,817.24
34,355.28
215,172.52

235,801.56
44,802.30
280,603.86

2,749.22

9,040.86

11,790.08

62,682.12

###

###

ING. JORGE GARAVITO


JEFE DE DEPARTAMENTO DE CONSTRUCCION
SHOUGANG HIERRO PERU S.A.A.

ING. HUMBERTO PARIONA R.


RESIDENTE DE OBRA
CONSORCIO MARCONA

OBRA:

REPARACION DE VIVIENDAS OBREROS BLOCK H-31 - SAN JUAN

CLIENTE:

SHOUGANG HIERRO PERU S.A.A.


VALORIZACION N 02

CONTRATISTA: CONSORCIO MARCONA


DEPARTAMENTO:

ICA

PROVINCIA:

NAZCA

DISTRITO:

SAN JUAN

HOJA RESUMEN
VALORIZACION N 02

SEGN CONTRATO

FECHA CORRESPONDIENTE

AL 31 DE AGOSTO 2010

MONTO TOTAL VALORIZADO

180,817.24 (VER CUADROS ADJUNTOS)

AMORTIZACION POR ADELANTO DEL 20% (S/.)

-------------------------------

VALOR VENTA DE VALORIZACION N 01 (S/.)


I.G.V.

180,817.24
19%

TOTAL A FACTURAR (S/.)


RETENCION POR FONDO DE GARNTIA (S/.)
TOTAL A RECIBIR POR VALORIZACION N 02 (S/.)

34,355.28
215,172.52

5%

9,040.86 (DEL MONTO TOTAL VALORIZADO


206,131.66

(VER CUADROS ADJUNTOS)

(DEL MONTO TOTAL VALORIZADO)