You are on page 1of 4

SAMPLE PROJECT

Project:
Subject:

Page

of

FOOTING F5.0

Updated on

Client:
Addres:

5/5/2006

Design:

Date:

Checked:

Date:

01/25/15

'file:///var/www/apps/conversion/tmp/scratch_1/258321213.xls'#$Spread

Allow. Soil Pressure=

2.00 Ksf

LOAD ANALYSIS

Ppier
Psoil
P ftg=

1.33 x
23.23 x
5.00 x

1.33 x
5.00 x

Pa (Max.)=
Pa (Min.)=
1.33 x
0.15 =
1.33 x
0.12 =
1.00 x
0.15 =
Total Pa (Max.)=
Total Pa (Min.)=
V(Service)=

M(due to VDL)

0.00 x 3.66 =

M(due to VLL)

0.00 x 3.66 =

M(due to VWL)

2.00 x 3.66 =
Additional M(Service)=
Total Moment(Service)=

Dead Load
5.75 K
2.75 K
0.35 K
3.72 K
3.75 K
13.57 K
10.57 K

Live Load
3.30 K

Net Uplift(Wind)
4.00 K

3.30 K

4.00 K

Total Ps (Service)=

20.87 k

2.00 k

Total V (service) =

2.00 k

0.00
0.00
7.33
0.00 K-Ft

7.33 K-Ft Total M s(Service)=

0.00 K-Ft

STABILITY CHECK

7.33 K-Ft

CASE 1

Total Uplift:
0.6 W =

4.00 K
6.34 K

20.87 K

SF= Pg / Pu =

6.34 K / 4.00 K =

7.33 K-Ft
1.6

>

1.5

OK, No Uplift

2.00 K
3.66

e=Ms/Ps=

7.33

where,d/6=

/ 20.87

= 0.35 Ft

<d/6, Case 1

BAR SIZE
q2

0.83 Ft

0.74 Ksf =q 3
q1

0.48 Ksf
SOIL PRESSURE DISTRIBUTION ( CASE I )
q 1= (P/BL )*( 1 +6e/L) =
q 2= (P/BL )*( 1 -6e/L) =
q3 ( At column edge)=

Due to DL
0.77 Ksf
0.31 Ksf
0.48 Ksf

LL & WL
0.42 Ksf
0.17 Ksf
0.26 Ksf

Total
1.19 Ksf
0.48 Ksf
0.74 Ksf

OK, <1.25xAllow. Soil Pre


OK,No Tension
L=

0 0.00
fc'=
fy=
Ms(DL)=
Ms(LL)=
Mu(Short)=
Mu(Long)=
In short way
In long way
USE Bott.
USE Bott.

1.19 Ksf

5.00

0.00 Ft

3.0 Ksi
60.0 Ksi
SHORT WAY LONG WAY
5.68 K-Ft
5.68 K-Ft
2.62 K-Ft
2.62 K-Ft
1.2

X 5.68 +

1.2
As req'd
0.28 in2
0.28 in2

X 5.68 +

5 #5
5 #5

0
0

CASE 2
0.00 K
1.6

X 2.62 =

11.01 K-Ft

1.6 X 2.62 =
As min (0.18 %)
1.30 in2
<--USE
1.30 in2
<--USE

11.01 K-Ft

0.00 K-Ft
0.00 K

0.00

in shorter direction
in longer direction
0.00 Ksf

0
f1

Note: USE TOP, In case of net uplift


e
P
kd
0.00

Project:

SAMPLE FOOTING

Subject:

FOOTING F7.0 x 10.0

Page

of
Updated on

Client:
Addres:

5/5/2006

Design:

Date:

Checked:

Date:

01/25/15

'file:///var/www/apps/conversion/tmp/scratch_1/258321213.xls'#$Combined

Allow. Soil Pressure=


Left catilever: Middle
3.50 Ft
5.50 Ft

2.00 Ksf
Right Cantilever
1.00 Ft

LOAD ANALYSIS

Ppier
Psoil
P ftg=

1.33 x
92.67 x
7.00 x

P1 =
P2=
Pa (Min.)=
1.33 x
0.15 =
1.33 x
0.12 =
1.50 x
0.15 =
Total Pa (Max.)=
Total Pa (Min.)=
H(Service)=

1.33 x
10.00 x

M(due to VDL)

0.00 x 4.16 =

M(due to VLL)

0.00 x 4.16 =

M(due to VWL)

0.00 x 4.16 =
Additional M(Service)=
Total Moment(Service)=

Dead Load
15.00 K
6.00 K
12.00 K
0.35 K
14.82 K
15.75 K
51.93 K
42.93 K

Live Load
32.00 K
13.00 K

Wind (Up or Down)


6.00 K
4.00 K

45.00 K

10.00 K

Total Ps (Service)=

89.93 k

Total V (service) =

0.00 k

0.00
0.00
0.00
0.00 K-Ft

0.00 K-Ft Total M s(Service)=

0.00 K-Ft

STABILITY CHECK

CASE 1

Total Uplift:
0.6 x W

10.00 K
25.76 K

SF= Pg / Pu =

25.76 K / 10.00 K =

47.00 K

19.00
0.00 K

Resultant Force=
e of Resultant=
0.08 Ft
Moment of Resultant:
e=Ms/Ps=
5.50
where,d/6=

0.00 K-Ft

2.6

0.00 K-Ft

>
1.5
OK, No Uplift

4.16

66.00 k
3.50 Ft

5.50 Ft

1.00 Ft

66.00 k
x0.08 =
5.50 K-Ft
/ 89.93
= 0.06 Ft <d/6, Case 1
q2

1.67 Ft

1.28 Ksf =q 3
q1

1.24 Ksf
SOIL PRESSURE DISTRIBUTION ( CASE I )
q 1= (P/BL )*( 1 +6e/L) =
q 2= (P/BL )*( 1 -6e/L) =
q3 ( At column edge)=

Due to DL
0.77 Ksf
0.71 Ksf
0.74 Ksf

LL & WL
0.56 Ksf
0.52 Ksf
0.54 Ksf

Total
1.33 Ksf
1.24 Ksf
1.28 Ksf

OK
OK,No Tension

L=

fc'=

3.0 Ksi
fy=
SHORT WAY LONG WAY
Ms(DL)=
30.47 K-Ft
49.87 K-Ft
Ms(LL)=
21.98 K-Ft
35.98 K-Ft
Ms(DL)@top=
2.24 K-Ft
Ms(LL)@top=
1.87 K-Ft
Mu(Short)=
1.2
X 30.47 +
Mu(Long)=
Mu(Long)@ top

1.2
1.2

X 49.87 +
X 2.24 +

1.33 Ksf

10.00

60.0 Ksi
CASE 2
47.00 K
1.6

X 21.98 =

71.73 K-Ft

1.6
1.6

X 35.98 =
X 1.87 =

117.41 K-Ft
5.69 K-Ft

19.00 K

0.00 K

0.00 K-Ft

0.00
3.50 Ft
In short way
In long way
In long way
USE Bott.
USE Bott.
USE Top.

As req'd
1.15 in2
2.00 in2

0
0

0.08 in2

0
9 #6
6 #6
6 #6

As min (0.18 %)
3.89 in2
<--USE
2.72 in2
<--USE
2.72 in2
<--USE
in shorter direction
in longer direction
in longer direction

5.50 Ft

1.00 Ft

0.00 Ksf

0
f1

e
kd

kd
0.00