Datos

Obra a Precios Unitarios


VALOR REF. TOTAL
PTO. OFERTA TOTAL
PTO. OFERTA TOTAL
Fecha
MONTOS
CONTRACTUAL

S/. 4,377,085.03
S/. 3,939,376.53
S/. 3,338,454.69 SIN I.G.V.
Setiembre 11
NETO

IGV

BRUTO

3,338,454.69

600,921.84

3,939,376.53

667,690.93

120,184.37

787,875.30

0.00

0.00

0.00

Adelanto Directo
Adelanto Materiales

FECHA DE INICIO

: 08.08.2012

FECHA DE TERM. CONT.

: 20.12.2012

FECHA DE TERM.

: 20.12.2012

FECHA DE PAGO ADELANTO DIRECTO

: Agosto 12

PLAZO DE EJECUCION

: 135 DIAS CALENDARIOS

DEPARTAMENTO

AYACUCHO

VALORIZACION DE AVANCE DE OBRA N 01


(DEL 08/08/2012 AL 31/08/2012)
OBRA
UBICACIN
PLAZO DE EJECUCION
ITEM

01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
03.02
04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
04.03.01.07
04.03.01.08
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX


: DISTRITO: XXXXXX; PROVINCIA: XXXXXXXXXXXXXX; DPTO. xxxxxxx
: 135 DIAS CALENDARIOS
INICIO DE OBRA
DESCRIPCION

OBRAS PROVISIONALES
CARTEL DE OBRA 2.40 X 4.80 M
CAMPAMENTO PROVISIONAL DE OBRA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
TRAZO, NIV.Y REPLANTEO DURANTE EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
RELLENO CON MATERIAL PROPIO
REMOCION DE DERRUMBES
DESBROCE Y LIMPIEZA
PAVIMENTOS
PERFILADO Y COMPACTACION DE SUBRASANTE
AFIRMADO
OBRAS DE ARTE Y DRENAJE
CUNETAS
CONFORMACION Y PERFILADO DE CUNETAS
TAJEAS (PASES DE AGUA)
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO
MAMPOSTERIA DE PIEDRA
ELIMINACION DE MATERIAL EXCEDENTE Dprom=30 m
ALCANTARILLAS
ALCANTARILLAS TMC
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 140 KG/CM2
CONCRETO CICLOPEO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
MAMPOSTERIA DE PIEDRA
ALCANTARILLA TMC 0= 24"
ELIMINACION DE MATERIAL EXCEDENTE Dprom=30 m
BADENES
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
ENCOFRADO Y DESENCOFRADO
MAMPOSTERIA DE PIEDRA
ELIMINACION DE MATERIAL EXCEDENTE Dprom=30 m

UNIDAD

UND
M2
GLB
KM

PRESUPUESTO
METRADO
P. UNIT.

: 08/08/2012

FIN DE OBRA

: 20/12/2012

ANTERIOR
SUB TOTAL

1.00
570.00
1.00
18.00

1,783.98
33.33
48,999.83
1,703.21

M3
M3
M3
M3
M3
HA

126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

4.07
14.76
28.83
5.25
8.76
923.13

M2
M3

53,850.00
8,073.00

1.20
16.88

15,970.00

1.48

M3
M3
M3
M2
KG
M3
M3

582.37
246.87
47.21
393.45
4,040.96
148.36
352.44

5.12
29.20
387.05
45.03
4.56
206.78
33.22

M3
M3
M3
M3
M2
M3
M
M3

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94

5.12
29.20
332.24
282.54
45.03
206.78
297.95
33.22

M3
M3
M2
M3
M3

669.96
326.60
458.90
357.25
392.54

5.12
29.20
45.03
206.78
33.22

100,439.69
1,783.98
18,998.10
48,999.83
30,657.78
1,659,771.90
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
200,892.24
64,620.00
136,272.24
271,843.05
23,635.60
23,635.60
106,992.73
2,981.73
7,208.60
18,272.63
17,717.05
18,426.78
30,677.88
11,708.06
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
120,543.53
3,430.20
9,536.72
20,664.27
73,872.16
13,040.18

METRADO

VALORIZADO

METRADO

1.00
285.00
0.30
18.00
61,294.66
3,000.00
10,000.00
1,170.00
1,452.00
0.48

ACTUAL
VALORIZADO

56,640.76
1,783.98
9,499.05
14,699.95
30,657.78
601,354.39
249,469.27
44,280.00
288,300.00
6,142.50
12,719.52
443.10

METRADO

100.00
50.00
30.00
100.00

1.00
285.00
0.30
18.00

48.26
40.90
30.81
21.09
18.70
26.67

61,294.66
3,000.00
10,000.00
1,170.00
1,452.00
0.48

ACUMULADO
VALORIZADO

56,640.76
1,783.98
9,499.05
14,699.95
30,657.78
601,354.39
249,469.27
44,280.00
288,300.00
6,142.50
12,719.52
443.10

05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
07
07.01
07.02

SEALIZACION
SEAL PREVENTIVA
SEAL REGLAMENTARIA
SEAL INFORMATIVA
POSTES KILOMETRICOS
TRANSPORTES
TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM
TRANSPORTE DE MATERIAL GRANULAR > 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE >1 KM
IMPACTO AMBIENTAL
RESTAURACION DE CANTERA
RESTAURACION DE PATIO DE MAQUINA Y CAMPAMENTO

UND
UND
UND
UND

76.00
4.00
2.00
19.00

825.06
725.44
2,603.44
162.10

M3K
M3K
M3K
M3K

7,272.00
29,823.95
110,134.19
51,229.22

6.06
2.04
5.00
1.60

M2
M2

2,124.33
570.00

0.75
0.56

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
737,546.88
44,068.32
60,840.86
550,670.95
81,966.75
52,509.89
1,593.25
319.20

07.03
07.04

ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTE

M2

15,150.00

2.31

34,996.50

REVEGETACION

HA

1.85

8,432.94

15,600.94

COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
IMPUESTO IGV
TOTAL DEL PRESUPUESTO

0.80%
4.00%
3.00%
18%
S/.

3,096,896.75
24,775.17
123,875.87
92,906.90
3,338,454.69
600,921.84
3,939,376.53

247,400.00

45,000.00
14,000.00

225,000.00
22,400.00

S/.

905,395.15
7,243.16
36,215.81
27,161.85
976,015.97
175,682.87
1,151,698.84

247,400.00

40.86
27.33

225,000.00
22,400.00

45,000.00
14,000.00

S/.

905,395.15
7,243.16
36,215.81
27,161.85
976,015.97
175,682.87
1,151,698.84

ORIZACION DE AVANCE DE OBRA N 01


(DEL 08/08/2012 AL 31/08/2012)

ACUMULADO
%

METRADO

100.00
50.00
30.00
100.00

285.00
0.70
-

48.26
40.90
30.81
21.09
18.70
26.67

65,701.68
4,335.29
22,459.53
4,377.35
6,314.49
1.32
53,850.00
8,073.00

15,970.00
582.37
246.87
47.21
393.45
4,040.96
148.36
352.44

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94
669.96
326.60
458.90
357.25
392.54

SALDO
VALORIZADO

43,798.93
9,499.05
34,299.88
1,058,417.52
267,405.84
63,988.88
647,508.25
22,981.09
55,314.93
1,218.53
200,892.24
64,620.00
136,272.24
269,447.58
21,240.10
23,635.60
106,992.75
2,981.73
7,208.60
18,272.63
17,717.05
18,426.78
30,677.88
11,708.06
20,671.20
20,671.20
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
120,543.54
3,430.20
9,536.72
20,664.27
73,872.16
13,040.18

50.00
70.00
51.74
59.10
69.19
78.91
81.30
73.33
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

76.00
4.00
2.00
19.00

40.86
27.33

7,272.00
29,823.95
65,134.19
37,229.22
2,124.33
570.00
15,150.00
1.85

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
490,146.88
44,068.32
60,840.86
325,670.95
59,566.75
52,509.88
1,593.25
319.20
34,996.50
15,600.94
2,191,501.60
17,532.01
87,660.06
65,745.05
2,362,438.72
425,238.97
2,787,677.69

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

VALORIZACIN DE AVANCE DE OBRA N 02


(DEL 01/09/2012 AL 30/09/2012)
OBRA
UBICACIN
PLAZO DE EJECUCIN
ITEM

01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
03.02
04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
04.03.01.07
04.03.01.08
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX


: DISTRITO: XXXXXX; PROVINCIA: XXXXXXXXXXXXXX; DPTO. xxxxxxx
: 135 DAS CALENDARIOS
INICIO DE OBRA
: 08/08/2012
DESCRIPCIN

OBRAS PROVISIONALES
CARTEL DE OBRA 2.40 X 4.80 M
CAMPAMENTO PROVISIONAL DE OBRA
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO
TRAZO, NIV.Y REPLANTEO DURANTE EJECUCIN DE OBRA
MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
RELLENO CON MATERIAL PROPIO
REMOCION DE DERRUMBES
DESBROCE Y LIMPIEZA
PAVIMENTOS
PERFILADO Y COMPACTACIN DE SUBRASANTE
AFIRMADO
OBRAS DE ARTE Y DRENAJE
CUNETAS
CONFORMACIN Y PERFILADO DE CUNETAS
TAJEAS (PASES DE AGUA)
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
ALCANTARILLAS
ALCANTARILLAS TMC
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 140 KG/CM2
CONCRETO CICLOPEO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ALCANTARILLA TMC 0= 24"
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
BADENES
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m

FIN DE OBRA

PRESUPUESTO
UNIDAD

UND
M2
GLB
KM

METRADO

P. UNIT.

1.00
570.00
1.00
18.00

1,783.98
33.33
48,999.83
1,703.21

M3
M3
M3
M3
M3
HA

126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

4.07
14.76
28.83
5.25
8.76
923.13

M2
M3

53,850.00
8,073.00

1.20
16.88

15,970.00

1.48

M3
M3
M3
M2
KG
M3
M3

582.37
246.87
47.21
393.45
4,040.96
148.36
352.44

5.12
29.20
387.05
45.03
4.56
206.78
33.22

M3
M3
M3
M3
M2
M3
M
M3

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94

5.12
29.20
332.24
282.54
45.03
206.78
297.95
33.22

M3
M3
M2
M3
M3

669.96
326.60
458.90
357.25
392.54

5.12
29.20
45.03
206.78
33.22

: 20/12/2012

ANTERIOR
SUB TOTAL

100,439.69
1,783.98
18,998.10
48,999.83
30,657.78
1,659,771.90
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
200,892.24
64,620.00
136,272.24
271,843.05
23,635.60
23,635.60
106,992.73
2,981.73
7,208.60
18,272.63
17,717.05
18,426.78
30,677.88
11,708.06
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
120,543.53
3,430.20
9,536.72
20,664.27
73,872.16
13,040.18

METRADO

1.00
285.00
0.30
18.00
61,294.66
3,000.00
10,000.00
1,170.00
1,452.00
0.48

ACTUAL

VALORIZADO

56,640.76
1,783.98
9,499.05
14,699.95
30,657.78
601,354.39
249,469.27
44,280.00
288,300.00
6,142.50
12,719.52
443.10
-

METRADO

100.00
50.00
30.00
100.00
48.26
40.90
30.81
21.09
18.70
26.67

VALORIZADO

45,854.67
172.29
1,745.50
564.64
26,850.00

242,458.63
186,628.51
2,543.00
50,322.77
2,964.36
32,220.00
32,220.00

ACUMULADO
%

METRADO

345.06
146.53
27.85
233.10
2,396.86
87.38
212.11
-

63,365.63
1,766.71
4,278.68
10,779.34
10,496.49
10,929.68
18,068.44
7,046.29
-

1.00
285.00
0.30
18.00

36.11
2.35
5.38
10.18
-

107,149.33
3,172.29
11,745.50
1,734.64
1,452.00
0.48

49.86

26,850.00
0.00
0.00
0.00
0.00

59.25
59.36
58.99
59.25
59.31
58.90
60.18

345.06
146.53
27.85
233.10
2,396.86
87.38
212.11

118,002.86
-

VALORIZADO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
298.66
142.31
209.33
163.12
174.49

54,637.23
1,529.14
4,155.45
9,426.13
33,729.95
5,796.56

44.58
43.57
45.62
45.66
44.45

298.66
142.31
209.33
163.12
174.49

56,640.76
1,783.98
9,499.05
14,699.95
30,657.78
843,813.02
436,097.77
46,823.00
338,622.77
9,106.86
12,719.52
443.10
32,220.00
32,220.00
118,002.86
63,365.63
1,766.71
4,278.68
10,779.34
10,496.49
10,929.68
18,068.44
7,046.29
54,637.23
1,529.14
4,155.45
9,426.13
33,729.95
5,796.56

05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
07
07.01
07.02

SEALIZACIN
SEAL PREVENTIVA
SEAL REGLAMENTARIA
SEAL INFORMATIVA
POSTES KILOMTRICOS
TRANSPORTES
TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM
TRANSPORTE DE MATERIAL GRANULAR > 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE >1 KM
IMPACTO AMBIENTAL
RESTAURACIN DE CANTERA
RESTAURACIN DE PATIO DE MQUINA Y CAMPAMENTO

07.03
07.04

ACONDICIONAMIENTO DE DEPSITO DE MATERIAL EXCEDENTE

REVEGETACIN
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
IMPUESTO IGV
TOTAL DEL PRESUPUESTO

UND
UND
UND
UND

76.00
4.00
2.00
19.00

825.06
725.44
2,603.44
162.10

M3K
M3K
M3K
M3K

7,272.00
29,823.95
110,134.19
51,229.22

6.06
2.04
5.00
1.60

M2
M2

2,124.33
570.00

0.75
0.56

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
737,546.88
44,068.32
60,840.86
550,670.95
81,966.75
52,509.89
1,593.25
319.20

M2
HA

15,150.00
1.85

2.31
8,432.94

34,996.50
15,600.94

0.80%
4.00%
3.00%
18%
S/.

3,096,896.75
24,775.17
123,875.87
92,906.90
3,338,454.69
600,921.84
3,939,376.53

453,599.99
412,379.75
41,220.24
-

0.00
0.00
0.00
0.00
247,400.00

45,000.00
14,000.00

225,000.00
22,400.00
-

206,199.99

37,475.95
11,762.65

187,379.75
18,820.24
-

34.03
22.96

0.00
0.00
82,475.95
25,762.65
0.00
0.00

0.00

S/.

905,395.15
7,243.16
36,215.81
27,161.85
976,015.97
175,682.87
1,151,698.84

S/.

598,881.48
4,791.05
23,955.26
17,966.44
645,594.24
116,206.96
761,801.20

S/.

1,504,276.63
12,034.21
60,171.07
45,128.30
1,621,610.21
291,889.84
1,913,500.05

ZACIN DE AVANCE DE OBRA N 02


(DEL 01/09/2012 AL 30/09/2012)

ACUMULADO

SALDO
%

METRADO

100.00
50.00
30.00
100.00

285.00
0.70
-

84.37
43.25
36.19
31.27
18.70
26.67

19,847.01
4,163.00
20,714.03
3,812.71
6,314.49
1.32

49.86

27,000.00
8,073.00

15,970.00
59.25
59.36
58.99
59.25
59.31
58.90
60.18

237.31
100.34
19.36
160.35
1,644.10
60.98
140.33

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94
44.58
43.57
45.62
45.66
44.45

371.30
184.29
249.57
194.13
218.05

VALORIZADO

43,798.93
9,499.05
34,299.88
815,958.89
80,777.33
61,445.88
597,185.48
20,016.73
55,314.93
1,218.53
168,672.24
32,400.00
136,272.24
153,840.18
23,635.60
23,635.60
43,627.11
1,215.03
2,929.93
7,493.29
7,220.56
7,497.10
12,609.44
4,661.76
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
65,906.28
1,901.06
5,381.27
11,238.14
40,142.20
7,243.62

50.00
70.00
15.63
56.75
63.81
68.73
81.30
73.33
50.14
100.00

100.00
40.75
40.64
41.01
40.75
40.69
41.10
39.82

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
55.42
56.43
54.38
54.34
55.55

2,124.33
570.00

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
283,946.89
44,068.32
60,840.86
138,291.20
40,746.51
1,912.45
1,593.25
319.20

15,150.00
1.85

15,600.94
15,600.94

76.00
4.00
2.00
19.00

74.89
50.29

7,272.00
29,823.95
27,658.24
25,466.57

1,592,620.12
12,740.96
63,704.80
47,778.60
1,716,844.48
309,032.00
2,025,876.48

100.00
100.00
100.00
100.00
100.00
100.00
25.11
49.71
100.00
100.00
100.00

VALORIZACIN DE AVANCE DE OBRA PRINCIPAL N 03


(DEL 01/10/2012 AL 31/10/2012)
OBRA
UBICACIN
PLAZO DE EJECUCIN
ITEM

01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
03.02
04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
04.03.01.07
04.03.01.08
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX


: DISTRITO: XXXXXX; PROVINCIA: XXXXXXXXXXXXXX; DPTO. xxxxxxx
: 135 DAS CALENDARIOS
INICIO DE OBRA
DESCRIPCIN

OBRAS PROVISIONALES
CARTEL DE OBRA 2.40 X 4.80 M
CAMPAMENTO PROVISIONAL DE OBRA
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO
TRAZO, NIV.Y REPLANTEO DURANTE EJECUCIN DE OBRA
MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
RELLENO CON MATERIAL PROPIO
REMOCION DE DERRUMBES
DESBROCE Y LIMPIEZA
PAVIMENTOS
PERFILADO Y COMPACTACIN DE SUBRASANTE
AFIRMADO
OBRAS DE ARTE Y DRENAJE
CUNETAS
CONFORMACIN Y PERFILADO DE CUNETAS
TAJEAS (PASES DE AGUA)
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
ALCANTARILLAS
ALCANTARILLAS TMC
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 140 KG/CM2
CONCRETO CICLOPEO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ALCANTARILLA TMC 0= 24"
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
BADENES
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m

UNIDAD

UND
M2
GLB
KM

PRESUPUESTO
METRADO
P. UNIT.

: 08/08/2012

FIN DE OBRA

: 20/12/2012

ANTERIOR
SUB TOTAL

1.00
570.00
1.00
18.00

1,783.98
33.33
48,999.83
1,703.21

M3
M3
M3
M3
M3
HA

126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

4.07
14.76
28.83
5.25
8.76
923.13

M2
M3

53,850.00
8,073.00

1.20
16.88

15,970.00

1.48

M3
M3
M3
M2
KG
M3
M3

582.37
246.87
47.21
393.45
4,040.96
148.36
352.44

5.12
29.20
387.05
45.03
4.56
206.78
33.22

M3
M3
M3
M3
M2
M3
M
M3

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94

5.12
29.20
332.24
282.54
45.03
206.78
297.95
33.22

M3
M3
M2
M3
M3

669.96
326.60
458.90
357.25
392.54

5.12
29.20
45.03
206.78
33.22

100,439.69
1,783.98
18,998.10
48,999.83
30,657.78
1,659,771.90
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
200,892.24
64,620.00
136,272.24
271,843.05
23,635.60
23,635.60
106,992.73
2,981.73
7,208.60
18,272.63
17,717.05
18,426.78
30,677.88
11,708.06
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
120,543.53
3,430.20
9,536.72
20,664.27
73,872.16
13,040.18

METRADO

1.00
285.00
0.30
18.00
107,149.33
3,172.29
11,745.50
1,734.64
1,452.00
0.48
26,850.00

VALORIZADO

56,640.76
1,783.98
9,499.05
14,699.95
30,657.78
843,813.02
436,097.77
46,823.00
338,622.77
9,106.86
12,719.52
443.10
32,220.00
32,220.00

ACTUAL
VALORIZADO

METRADO

100.00
50.00
30.00
100.00

285.00
-

84.37
43.25
36.19
31.27
18.70
26.67

19,847.01
4,163.00
20,714.03
3,812.71
6,314.49
1.32

118,002.86
345.06
146.53
27.85
233.10
2,396.86
87.38
212.11

63,365.63
1,766.71
4,278.68
10,779.34
10,496.49
10,929.68
18,068.44
7,046.29
-

9,499.05
9,499.05
815,958.89
80,777.33
61,445.88
597,185.48
20,016.73
55,314.93
1,218.53
-

ACUMULADO
VALORIZADO

METRADO

50.00
-

1.00
570.00
0.30
18.00

15.63
56.75
63.81
68.73
81.30
73.33

126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

26,850.00
0.00
0.00
0.00
0.00

345.06
146.53
27.85
233.10
2,396.86
87.38
212.11

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
298.66
142.31
209.33
163.12
174.49

54,637.23
1,529.14
4,155.45
9,426.13
33,729.95
5,796.56

298.66
142.31
209.33
163.12
174.49

66,139.81
1,783.98
18,998.10
14,699.95
30,657.78
1,659,771.91
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
32,220.00
32,220.00
118,002.86
63,365.63
1,766.71
4,278.68
10,779.34
10,496.49
10,929.68
18,068.44
7,046.29
54,637.23
1,529.14
4,155.45
9,426.13
33,729.95
5,796.56

05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
07
07.01
07.02

SEALIZACIN
SEAL PREVENTIVA
SEAL REGLAMENTARIA
SEAL INFORMATIVA
POSTES KILOMTRICOS
TRANSPORTES
TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM
TRANSPORTE DE MATERIAL GRANULAR > 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE >1 KM
IMPACTO AMBIENTAL
RESTAURACIN DE CANTERA
RESTAURACIN DE PATIO DE MQUINA Y CAMPAMENTO

07.03
07.04

ACONDICIONAMIENTO DE DEPSITO DE MATERIAL EXCEDENTE

REVEGETACIN
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
IMPUESTO IGV
TOTAL DEL PRESUPUESTO

UND
UND
UND
UND

76.00
4.00
2.00
19.00

825.06
725.44
2,603.44
162.10

M3K
M3K
M3K
M3K

7,272.00
29,823.95
110,134.19
51,229.22

6.06
2.04
5.00
1.60

M2
M2

2,124.33
570.00

0.75
0.56

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
737,546.88
44,068.32
60,840.86
550,670.95
81,966.75
52,509.89
1,593.25
319.20

M2
HA

15,150.00
1.85

2.31
8,432.94

34,996.50
15,600.94

0.80%
4.00%
3.00%
18%
S/.

3,096,896.75
24,775.17
123,875.87
92,906.90
3,338,454.69
600,921.84
3,939,376.53

640,853.80
8,216.10
550,670.95
81,966.75
-

0.00
0.00
0.00
0.00
453,599.99

82,475.95
25,762.65

412,379.75
41,220.24
-

187,253.81
4,027.50
27,658.24
25,466.57

8,216.10
138,291.20
40,746.51
-

25.11
49.71

0.00
4,027.50
110,134.19
51,229.22
0.00
0.00

0.00

S/.

1,504,276.63
12,034.21
60,171.07
45,128.30
1,621,610.21
291,889.84
1,913,500.05

S/.

1,012,711.75
8,101.69
40,508.47
30,381.35
1,091,703.27
196,506.59
1,288,209.85

S/.

2,516,988.38
20,135.91
100,679.54
75,509.65
2,713,313.48
488,396.43
3,201,709.90

DE AVANCE DE OBRA PRINCIPAL N 03

EL 01/10/2012 AL 31/10/2012)

ACUMULADO
%

SALDO
VALORIZADO

METRADO

100.00
100.00
30.00
100.00

0.70
-

100.00
100.00
100.00
100.00
100.00
100.00

49.86

27,000.00
8,073.00

15,970.00
59.25
59.36
58.99
59.25
59.31
58.90
60.18

237.31
100.34
19.36
160.35
1,644.10
60.98
140.33

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94
44.58
43.57
45.62
45.66
44.45

371.30
184.29
249.57
194.13
218.05

34,299.88
34,299.88
168,672.24
32,400.00
136,272.24
153,840.18
23,635.60
23,635.60
43,627.11
1,215.03
2,929.93
7,493.29
7,220.56
7,497.10
12,609.44
4,661.76
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
65,906.28
1,901.06
5,381.27
11,238.14
40,142.20
7,243.62

70.00
50.14
100.00

100.00
40.75
40.64
41.01
40.75
40.69
41.10
39.82

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
55.42
56.43
54.38
54.34
55.55

2,124.33
570.00

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
96,693.08
44,068.32
52,624.76
1,912.45
1,593.25
319.20

15,150.00
1.85

15,600.94
15,600.94

76.00
4.00
2.00
19.00

100.00
100.00

7,272.00
25,796.45
-

579,908.37
4,639.26
23,196.33
17,397.25
625,141.21
112,525.41
737,666.63

100.00
100.00
100.00
100.00
100.00
86.50
100.00
100.00
100.00

VALORIZACIN DE AVANCE DE OBRA PRINCIPAL N 04


(DEL 01/11/2012 AL 30/11/2012)
OBRA
UBICACIN
PLAZO DE EJECUCIN

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX


: DISTRITO: XXXXXX; PROVINCIA: XXXXXXXXXXXXXX; DPTO. xxxxxxx
: 135 DAS CALENDARIOS
INICIO DE OBRA

ITEM

DESCRIPCIN

01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
03.02
04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
04.03.01.07
04.03.01.08
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05

OBRAS PROVISIONALES
CARTEL DE OBRA 2.40 X 4.80 M
CAMPAMENTO PROVISIONAL DE OBRA
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO
TRAZO, NIV.Y REPLANTEO DURANTE EJECUCIN DE OBRA
MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
RELLENO CON MATERIAL PROPIO
REMOCION DE DERRUMBES
DESBROCE Y LIMPIEZA
PAVIMENTOS
PERFILADO Y COMPACTACIN DE SUBRASANTE
AFIRMADO
OBRAS DE ARTE Y DRENAJE
CUNETAS
CONFORMACIN Y PERFILADO DE CUNETAS
TAJEAS (PASES DE AGUA)
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
ALCANTARILLAS
ALCANTARILLAS TMC
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 140 KG/CM2
CONCRETO CICLOPEO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ALCANTARILLA TMC 0= 24"
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
BADENES
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m

UNIDAD

UND
M2
GLB
KM

METRADO

PRESUPUESTO
P. UNIT.

1.00
570.00
1.00
18.00

1,783.98
33.33
48,999.83
1,703.21

M3
M3
M3
M3
M3
HA

126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

4.07
14.76
28.83
5.25
8.76
923.13

M2
M3

53,850.00
8,073.00

1.20
16.88

15,970.00

1.48

M3
M3
M3
M2
KG
M3
M3

582.37
246.87
47.21
393.45
4,040.96
148.36
352.44

5.12
29.20
387.05
45.03
4.56
206.78
33.22

M3
M3
M3
M3
M2
M3
M
M3

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94

5.12
29.20
332.24
282.54
45.03
206.78
297.95
33.22

M3
M3
M2
M3
M3

669.96
326.60
458.90
357.25
392.54

5.12
29.20
45.03
206.78
33.22

SUB TOTAL

100,439.69
1,783.98
18,998.10
48,999.83
30,657.78
1,659,771.90
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
200,892.24
64,620.00
136,272.24
271,843.05
23,635.60
23,635.60
106,992.73
2,981.73
7,208.60
18,272.63
17,717.05
18,426.78
30,677.88
11,708.06
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
120,543.53
3,430.20
9,536.72
20,664.27
73,872.16
13,040.18

: 08/08/2012

FIN DE OBRA

METRADO

1.00
570.00
0.30
18.00
126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80
26,850.00
345.06
146.53
27.85
233.10
2,396.86
87.38
212.11
298.66
142.31
209.33
163.12
174.49

ANTERIOR
VALORIZADO

66,139.81
1,783.98
18,998.10
14,699.95
30,657.78
1,659,771.91
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
32,220.00
32,220.00
118,002.86
63,365.63
1,766.71
4,278.68
10,779.34
10,496.49
10,929.68
18,068.44
7,046.29
54,637.23
1,529.14
4,155.45
9,426.13
33,729.95
5,796.56

: 20/12/2012
ACTUAL
VALORIZADO

METRADO

100.00
100.00
30.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00

49.86
-

13,980.00
5,827.50

59.22
59.25
59.36
58.99
59.25
59.31
58.90
60.18
-

44.58
43.57
45.62
45.66
44.45

ACUMULADO
%

115,144.20
16,776.00
98,368.20
-

METRADO

1.00
570.00
0.30
18.00

126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

25.96
72.19

40,830.00
5,827.50
0.00
0.00
0.00
345.06
146.53
27.85
233.10
2,396.86
87.38
212.11

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

298.66
142.31
209.33
163.12
174.49

05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
07
07.01
07.02

SEALIZACIN
SEAL PREVENTIVA
SEAL REGLAMENTARIA
SEAL INFORMATIVA
POSTES KILOMTRICOS
TRANSPORTES
TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM
TRANSPORTE DE MATERIAL GRANULAR > 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE >1 KM
IMPACTO AMBIENTAL
RESTAURACIN DE CANTERA
RESTAURACIN DE PATIO DE MQUINA Y CAMPAMENTO

07.03
07.04

ACONDICIONAMIENTO DE DEPSITO DE MATERIAL EXCEDENTE

REVEGETACIN
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
IMPUESTO IGV
TOTAL DEL PRESUPUESTO

UND
UND
UND
UND

76.00
4.00
2.00
19.00

825.06
725.44
2,603.44
162.10

M3K
M3K
M3K
M3K

7,272.00
29,823.95
110,134.19
51,229.22

6.06
2.04
5.00
1.60

M2
M2

2,124.33
570.00

0.75
0.56

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
737,546.88
44,068.32
60,840.86
550,670.95
81,966.75
52,509.89
1,593.25
319.20

M2
HA

15,150.00
1.85

2.31
8,432.94

34,996.50
15,600.94

0.80%
4.00%
3.00%
18%
S/.

3,096,896.75
24,775.17
123,875.87
92,906.90
3,338,454.69
600,921.84
3,939,376.53

4,027.50
110,134.19
51,229.22
-

640,853.80
8,216.10
550,670.95
81,966.75
-

S/.

2,516,988.38
20,135.91
100,679.54
75,509.65
2,713,313.48
488,396.43
3,201,709.90

13.50
100.00
100.00
-

0.00
0.00
0.00
0.00
72,034.65
35,314.65
36,720.00
-

5,827.50
18,000.00
-

S/.

187,178.85
1,497.43
7,487.15
5,615.37
201,778.80
36,320.18
238,098.98

5,827.50
22,027.50
110,134.19
51,229.22
0.00
0.00
0.00

N DE AVANCE DE OBRA PRINCIPAL N 04


(DEL 01/11/2012 AL 30/11/2012)

ACUMULADO
VALORIZADO

66,139.81
1,783.98
18,998.10
14,699.95
30,657.78
1,659,771.91
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
147,364.20
48,996.00
98,368.20
118,002.86
63,365.63
1,766.71
4,278.68
10,779.34
10,496.49
10,929.68
18,068.44
7,046.29
54,637.23
1,529.14
4,155.45
9,426.13
33,729.95
5,796.56

SALDO
VALORIZADO

METRADO

100.00
100.00
30.00
100.00

0.70
-

100.00
100.00
100.00
100.00
100.00
100.00

75.82
72.19

13,020.00
2,245.50

15,970.00
59.25
59.36
58.99
59.25
59.31
58.90
60.18

237.31
100.34
19.36
160.35
1,644.10
60.98
140.33

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94
44.58
43.57
45.62
45.66
44.45

371.30
184.29
249.57
194.13
218.05

34,299.88
34,299.88
53,528.04
15,624.00
37,904.04
153,840.18
23,635.60
23,635.60
43,627.11
1,215.03
2,929.93
7,493.29
7,220.56
7,497.10
12,609.44
4,661.76
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
65,906.28
1,901.06
5,381.27
11,238.14
40,142.20
7,243.62

70.00
24.18
27.81

100.00
40.75
40.64
41.01
40.75
40.69
41.10
39.82

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
55.42
56.43
54.38
54.34
55.55

712,888.45
35,314.65
44,936.10
550,670.95
81,966.75
-

S/.

2,704,167.23
21,633.34
108,166.69
81,125.02
2,915,092.28
524,716.61
3,439,808.89

2,124.33
570.00

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
24,658.43
8,753.67
15,904.76
1,912.45
1,593.25
319.20

15,150.00
1.85

34,996.50
15,600.94

76.00
4.00
2.00
19.00

100.00
100.00

1,444.50
7,796.45
-

392,729.52
3,141.83
15,709.18
11,781.88
423,362.41
76,205.23
499,567.64

100.00
100.00
100.00
100.00
19.86
26.14
100.00
100.00
100.00
100.00

val_05_Dic

VALORIZACIN DE AVANCE DE OBRA PRINCIPAL N 05


(DEL 01/12/2012 AL 31/12/2012)
OBRA
UBICACIN
PLAZO DE EJECUCIN
ITEM

01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
03.02
04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
04.03.01.07
04.03.01.08
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX


: DISTRITO: XXXXXX; PROVINCIA: XXXXXXXXXXXXXX; DPTO. xxxxxxx
: 135 DAS CALENDARIOS
INICIO DE OBRA
DESCRIPCIN

OBRAS PROVISIONALES
CARTEL DE OBRA 2.40 X 4.80 M
CAMPAMENTO PROVISIONAL DE OBRA
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO
TRAZO, NIV.Y REPLANTEO DURANTE EJECUCIN DE OBRA
MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
RELLENO CON MATERIAL PROPIO
REMOCION DE DERRUMBES
DESBROCE Y LIMPIEZA
PAVIMENTOS
PERFILADO Y COMPACTACIN DE SUBRASANTE
AFIRMADO
OBRAS DE ARTE Y DRENAJE
CUNETAS
CONFORMACIN Y PERFILADO DE CUNETAS
TAJEAS (PASES DE AGUA)
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
ALCANTARILLAS
ALCANTARILLAS TMC
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
CONCRETO F'C= 140 KG/CM2
CONCRETO CICLOPEO F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ALCANTARILLA TMC 0= 24"
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m
BADENES
EXCAVACIN NO CLASIFICADA PARA ESTRUCTURAS
RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO
ENCOFRADO Y DESENCOFRADO
MAMPOSTERA DE PIEDRA
ELIMINACIN DE MATERIAL EXCEDENTE Dprom=30 m

UNIDAD

UND
M2
GLB
KM

METRADO

PRESUPUESTO
P. UNIT.

: 08/08/2012

FIN DE OBRA

: 20/12/2012

ANTERIOR
SUB TOTAL

1.00
570.00
1.00
18.00

1,783.98
33.33
48,999.83
1,703.21

M3
M3
M3
M3
M3
HA

126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

4.07
14.76
28.83
5.25
8.76
923.13

M2
M3

53,850.00
8,073.00

1.20
16.88

15,970.00

1.48

M3
M3
M3
M2
KG
M3
M3

582.37
246.87
47.21
393.45
4,040.96
148.36
352.44

5.12
29.20
387.05
45.03
4.56
206.78
33.22

M3
M3
M3
M3
M2
M3
M
M3

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94

5.12
29.20
332.24
282.54
45.03
206.78
297.95
33.22

M3
M3
M2
M3
M3

669.96
326.60
458.90
357.25
392.54

5.12
29.20
45.03
206.78
33.22

100,439.69
1,783.98
18,998.10
48,999.83
30,657.78
1,659,771.90
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
200,892.24
64,620.00
136,272.24
271,843.05
23,635.60
23,635.60
106,992.73
2,981.73
7,208.60
18,272.63
17,717.05
18,426.78
30,677.88
11,708.06
20,671.19
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
120,543.53
3,430.20
9,536.72
20,664.27
73,872.16
13,040.18

METRADO

1.00
570.00
0.30
18.00
126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80
40,830.00
5,827.50
345.06
146.53
27.85
233.10
2,396.86
87.38
212.11
298.66
142.31
209.33
163.12
174.49

VALORIZADO

66,139.81
1,783.98
18,998.10
14,699.95
30,657.78
1,659,771.91
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
147,364.20
48,996.00
98,368.20
118,002.86
63,365.63
1,766.71
4,278.68
10,779.34
10,496.49
10,929.68
18,068.44
7,046.29
54,637.23
1,529.14
4,155.45
9,426.13
33,729.95
5,796.56

ACTUAL
VALORIZADO

METRADO

100.00
100.00
30.00
100.00

0.70
-

100.00
100.00
100.00
100.00
100.00
100.00

75.82
72.19
-

13,020.00
2,245.50
15,970.00

59.25
59.36
58.99
59.25
59.31
58.90
60.18
-

237.31
100.34
19.36
160.35
1,644.10
60.98
140.33
104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94

44.58
43.57
45.62
45.66
44.45

371.30
184.29
249.57
194.13
218.05

34,299.88
34,299.88
53,528.04
15,624.00
37,904.04
153,840.18
23,635.60
23,635.60
43,627.11
1,215.03
2,929.93
7,493.29
7,220.56
7,497.10
12,609.44
4,661.76
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
65,906.28
1,901.06
5,381.27
11,238.14
40,142.20
7,243.62

ACUMULADO
%

METRADO

70.00
-

1.00
570.00
1.00
18.00
126,996.34
7,335.29
32,459.53
5,547.35
7,766.49
1.80

24.18
27.81

53,850.00
8,073.00
0.00
0.00
15,970.00

40.75
40.64
41.01
40.75
40.69
41.10
39.82
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

582.37
246.87
47.21
393.45
4,040.96
148.36
352.44

55.42
56.43
54.38
54.34
55.55

669.96
326.60
458.90
357.25
392.54

104.89
61.42
3.12
13.50
98.21
3.48
21.00
62.94

val_05_Dic

05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
07
07.01
07.02

SEALIZACIN
SEAL PREVENTIVA
SEAL REGLAMENTARIA
SEAL INFORMATIVA
POSTES KILOMTRICOS
TRANSPORTES
TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM
TRANSPORTE DE MATERIAL GRANULAR > 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE >1 KM
IMPACTO AMBIENTAL
RESTAURACIN DE CANTERA
RESTAURACIN DE PATIO DE MQUINA Y CAMPAMENTO

07.03
07.04

ACONDICIONAMIENTO DE DEPSITO DE MATERIAL EXCEDENTE

REVEGETACIN
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
IMPUESTO IGV
TOTAL DEL PRESUPUESTO

UND
UND
UND
UND

76.00
4.00
2.00
19.00

825.06
725.44
2,603.44
162.10

M3K
M3K
M3K
M3K

7,272.00
29,823.95
110,134.19
51,229.22

6.06
2.04
5.00
1.60

M2
M2

2,124.33
570.00

0.75
0.56

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
737,546.88
44,068.32
60,840.86
550,670.95
81,966.75
52,509.89
1,593.25
319.20

M2
HA

15,150.00
1.85

2.31
8,432.94

34,996.50
15,600.94

0.80%
4.00%
3.00%
18%
S/.

3,096,896.75
24,775.17
123,875.87
92,906.90
3,338,454.69
600,921.84
3,939,376.53

712,888.45
35,314.65
44,936.10
550,670.95
81,966.75
-

5,827.50
22,027.50
110,134.19
51,229.22
-

S/.

2,704,167.23
21,633.34
108,166.69
81,125.02
2,915,092.28
524,716.61
3,439,808.89

80.14
73.86
100.00
100.00
-

76.00
4.00
2.00
19.00

1,062.1650
456.00

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
15,357.02
4,406.60
10,950.43
46,589.68
796.62
255.36

13,635.00
1.67

31,496.85
14,040.85

727.16
5,367.86
-

S/.

377,507.90
3,020.06
15,100.32
11,325.24
406,953.52
73,251.63
480,205.15

100.00
100.00
100.00
100.00
100.00

0.00
76.00
4.00
2.00
19.00
6,554.66
27,395.36
110,134.19
51,229.22
1,062.17
456.00
13,635.00
1.67

val_05_Dic

CIN DE AVANCE DE OBRA PRINCIPAL N 05


(DEL 01/12/2012 AL 31/12/2012)

ACUMULADO
VALORIZADO

100,439.69
1,783.98
18,998.10
48,999.83
30,657.78
1,659,771.91
516,875.10
108,268.88
935,808.25
29,123.59
68,034.45
1,661.63
200,892.24
64,620.00
136,272.24
271,843.04
23,635.60
23,635.60
106,992.74
2,981.73
7,208.60
18,272.63
17,717.05
18,426.78
30,677.88
11,708.06
20,671.19
537.04
1,793.46
1,036.59
3,814.29
4,422.40
719.59
6,256.95
2,090.87
120,543.52
3,430.20
9,536.72
20,664.27
73,872.16
13,040.18

SALDO
VALORIZADO

METRADO

100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00

val_05_Dic

S/.

73,893.10
62,704.56
2,901.76
5,206.88
3,079.90
728,245.48
39,721.25
55,886.53
550,670.95
81,966.75
46,589.68
796.62
255.36

100.00
100.00
100.00
100.00
100.00

31,496.85
14,040.85
3,081,675.13
24,653.40
123,267.01
92,450.25
3,322,045.79
597,968.24
3,920,014.04

90.14
91.86
100.00
100.00

717.34
2,428.59
-

50.00
80.00

1,062.17
114.00

9,301.40
4,347.07
4,954.33
5,920.21
796.62
63.84

90.00
90.00

1,515.00
0.19

3,499.65
1,560.09
15,221.62
121.77
608.86
456.65
16,408.90
2,953.60
19,362.49

9.86
8.14
50.00
20.00
10.00
10.00

RESUMEN DE LA VALORIZACIONES
:
:
:

CONTRATISTA
INSPECTOR
OBRA

CONSORCIO CAD
XXXXXXXXXXXXXXX
18.060 KM

MONTOS

NETO

IGV

BRUTO

CONTRACTUAL

3,338,454.69

600,921.84

3,939,376.53

Adelanto Directo

667,690.93

120,184.37

787,875.30

0.00

0.00

0.00

Adelanto Materiales

REINTEGRO
N

VALORIZACION

MONTO BRUTO

ADELANTO DIRECTO EN EFECTIVO

ADELANTO EN MATERIALES

REAJUSTE PPTO

SUB TOTAL
AMORTIZACION

DEDUCCION

AMORTIZACION

DEDUCCION

PRINCIPAL

1
2
3
4

VALORIZACIN N 01 (AL 31.08.12)


VALORIZACIN N 02 (AL 30.09.12)
VALORIZACIN N 03 (AL 31.10.12)
VALORIZACIN N 04 (AL 30.11.12)

VALORIZACIN N 05 (AL 31.12.12)


MONTO TOTAL

976,015.97
645,594.24
1,091,703.27
201,778.80

7,808.13
2,582.38
3,275.11
-375.71

195,203.19
129,118.85
218,340.65
40,355.76

0.00
-512.38
-1,083.04
-360.32

788,620.91
519,570.15
877,720.77
161,407.65

406,953.52

0.00

84,672.48

-645.96

322,927.00

3,322,045.79

13,289.91

667,690.93

-2,601.70

2,670,246.47

N DE CONTRATO

XXXXX-2012-MTC/21

FECHA DE INICIO

: 08.08.2012

FECHA DE TERM. CONT.

: 20.12.2012

FECHA DE TERM.

: 20.12.2012

AVANCE FISICO EJCUTADO


IGV

18% MONTO NETO A PAGARSE

ACTUAL
%

ACUMULADO

141,951.76
93,522.63
157,989.74
29,053.38

930,572.67
613,092.78
1,035,710.50
190,461.03

29.24

29.24

19.34

48.57

32.70

81.27

6.04

87.32

58,126.86

381,053.86

12.19

99.51

480,644.37

3,150,890.84

CLCULO DEL COEFICIENTE DE REAJUSTE (K)

OBRA

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX

CONTRATISTA:

DEPARTAMENTO

AYACUCHO

INSPECCIN:

CONSORCIO CAD
XXXXXXXXXX

PLAZO EJECUCIN:

135

septiembre-11

VALOR REFERENCIAL

FRMULA POLINMICA

K = 0.154 * (Mr / Mo) + 0.077 * (DCAr /DCAo) + 0.080* (DFr /DFo) +0.383*(Mr/Mo)+0.176*(Mr/Mo)+0.130 * (Ir / Io)
Io
SIMBOLO

IU

DESCRIPCIN

COEF.
%
INCIDENC
INCIDENCIA
IA

Ir

Ir
I. BASE
SET. 2011
INDICE

REAJUSTE
AGOSTO 2012
INDICE

Ir

Ir

REAJUSTE
SEPTIEMBRE 2012

REAJUSTE
OCTUBRE 2012

INDICE

INDICE

Ir

REAJUSTE NOVIEMBRE
2012
INDICE

REAJUSTE
DICIEMBRE 2012
INDICE

47

MANO DE OBRA INCL. LEYES SOCIALES

0.154

100.0%

448.29

470.79

0.162

470.75

0.162

470.79

0.162

470.79

0.162

470.79

0.162

DCA

02
21
28

ACERO DE CONSTRUCCIN LISO


CEMENTO PORTLAND TIPO I
DINAMITA

0.077

12.987%
42.857%
44.156%

541.66
354.74
365.54

476.32
354.74
497.72

0.009
0.033
0.046

437.12
354.74
494.13

0.008
0.033
0.046

434.04
354.74
491.19

0.008
0.033
0.046

432.20
354.74
488.66

0.008
0.033
0.045

432.84
354.74
490.73

0.008
0.033
0.046

DF

30
32

DLAR
FLETE TERRESTRE

0.080

66.250%
33.750%

362.16
431.91

352.41
449.56

0.052
0.028

349.29
449.56

0.051
0.028

349.36
450.67

0.051
0.028

348.90
450.67

0.051
0.028

350.24
450.67

0.051
0.028

49

MAQUINARIA Y EQUIPO IMPORTADO

0.383

100.0%

239.12

231.78

0.371

230.11

0.369

229.22

0.367

227.56

0.364

228.18

0.365

48

MAQUINARIA Y EQUIPO NACIONAL

0.176

100.0%

330.74

327.55

0.174

325.98

0.173

325.11

0.173

324.30

0.173

324.97

0.173

39

INDICE GENERAL DE PRECIOS AL CONS.

0.130

100.0%

367.72

377.50

0.133

379.42

0.134

381.48

0.135

380.86

0.135

380.33

0.134

COEFICIENTE DE REAJUSTE: K=

1.000

1.008

1.004

1.003

0.999

1.000

CLCULO DEL COEFICIENTE DE REAJUSTE (Ka)

OBRA

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX

CONTRATISTA:

DEPARTAMENTO

AYACUCHO

INSPECCIN:

septiembre-11

VALOR REFERENCIAL

PLAZO EJECUCIN:

FRMULA POLINMICA

K = 0.154 * (Mr / Mo) + 0.077 * (DCAr /DCAo) + 0.080* (DFr /DFo) +0.383*(Mr/Mo)+0.176*(Mr/Mo)+0.130 * (Ir / Io)

SIMBOLO

IU

DESCRIPCIN

COEF.
%
INCIDENC
INCIDENCIA
IA

Io

Ir
I. BASE
SET. 2011
INDICE

REAJUSTE
AGOSTO 2012
INDICE

Ka

47

MANO DE OBRA INCL. LEYES SOCIALES

0.154

100.0%

448.29

470.79

0.162

DCA

02
21
28

ACERO DE CONSTRUCCIN LISO


CEMENTO PORTLAND TIPO I
DINAMITA

0.077

12.987%
42.857%
44.156%

541.66
354.74
365.54

476.32
354.74
497.72

0.009
0.033
0.046

DF

30
32

DLAR
FLETE TERRESTRE

0.080

66.250%
33.750%

362.16
431.91

352.41
449.56

0.052
0.028

49

MAQUINARIA Y EQUIPO IMPORTADO

0.383

100.0%

239.12

231.78

0.371

48

MAQUINARIA Y EQUIPO NACIONAL

0.176

100.0%

330.74

327.55

0.174

39

INDICE GENERAL DE PRECIOS AL CONS.

0.130

100.0%

367.72

377.50

0.133

COEFICIENTE DE REAJUSTE: K=

1.000

1.008

CONSORCIO CAD
XXXXXXXXXX
135

CLCULO DE REINTEGRO POR REAJUSTE

OBRA

: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX

CONTRATISTA

CONSORCIO CAD

PROPIETARIO

MTC
AYACUCHO

INSPECCIN

XXXXXXXXXXXXXX

PLAZO EJECUCIN

: 135 D.C.

FECHA DE INICIO

: 08.08.2012

DEPARTAMENTO

PRESUPUESTO CONTRATO S/.:

VALORIZACIN
Valoriz. N 01
Valoriz. N 02
Valoriz. N 03
Valoriz. N 04
Valoriz. N 05

TOTAL

3,939,376.53

Real

Monto Mensual
Programado

976,015.97
645,594.24
1,091,703.27
201,778.80
406,953.52

3,322,045.79

328,173.70
1,253,050.11
1,215,671.34
375,713.57
165,845.97

3,338,454.69

FECHA DE TRMINO : 20.12.2012

Monto Acumulado
Real
Programado
976,015.97
1,621,610.21
2,713,313.48
2,915,092.28
3,322,045.79

328,173.70
1,581,223.81
2,796,895.15
3,172,608.72
3,338,454.69

3,322,045.79

3,338,454.69

REAJUSTE TOTAL ACUM.


REAJUSTE ANTERIOR ACUM.
REAJUSTE RECONOCIDO ACTUAL

Mes
Reajuste

Agosto
Septiembre
Octubre
Noviembre
Diciembre

1.008
1.004
1.003
0.999
1.000

Real

Reajuste
Programado

Reconocido

7,808.13
2,582.38
3,275.11
-201.78
0.00

2,625.39
5,012.20
3,647.01
-375.71
0.00

7,808.13
2,582.38
3,275.11
-375.71
0.00

13,463.84

10,908.89

13,289.91

13,463.84

10,908.89

13,289.91

13,463.84

10,908.89

13,289.91

Deduccin
Directo
Materiales

Reajuste
Total

0.00
-512.38
-1083.04
-360.32
-645.96

0.00
0.00
0.00
0.00
0.00

7,808.13
3,094.76
4,358.15
-15.39
645.96

-2601.70

0.00

15,891.61

-2,601.70

0.00

15,891.61

-2,601.70

0.00

15,891.61

AMORTIZACIN DEL ADELANTO DIRECTO


: REHAB. CAMINO VECINAL XXXXXXXXXXXXXXXXXXXXXXX
MTC
AYACUCHO

OBRA
PROPIETARIO
DEPARTAMENTO

3,939,376.53

PRESUPUESTO CONTRATO S/.:

DESCRIPCION

VAL.MES Sin
Reaj.

ADELANTO

VALORIZACIN N 01
VALORIZACIN N 02
VALORIZACIN N 03
VALORIZACIN N 04
VALORIZACIN N 05

agosto-12
septiembre-12
octubre-12
octubre-12
diciembre-12

ADELANTO OTORGADO
SIN I.G.V.

667,690.93
20.00%
976,015.97
645,594.24
1,091,703.27
201,778.80
406,953.52

TOTAL A LA FECHA

AMORTIZACIN ACUMULADO ACTUAL


AMORTIZACIN ACUMULADA ANTERIOR
AMORTIZACIN DEL MES

CON I.G.V.

787,875.30
20.00%

O DIRECTO

CONTRATISTA

: CONSORCIO CAD

INSPECCIN

EDUARDO MENDOZA DAVALOS

PLAZO EJECUCIN

: 135 D.C.

FECHA DE INICIO

: 08.08.2012

FECHA DE TRMINO

: 20.12.2012

AMORTIZACION
AMORTIZACION

SALDO POR AMORTIZ.

Amort=VB * 20.00%

(SIN I.G.V)

195,203.19
129,118.85
218,340.65
40,355.76
84,672.48

667,690.93

667,690.93
0.00
667,690.93

472,487.74
343,368.89
125,028.24
84,672.48
-

0.00

DEDUCCIN DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO

:MTC
AYACUCHO

CONTRATISTA

DEPARTAMENTO
VALOR REF. TOTAL

: S/.4'377,085.03

PLAZO EJECUCIN

PTO. OFERTA TOTAL

3,939,376.53
3,338,454.69

PROPIETARIO

PTO. OFERTA TOTAL

SUPERVISOR EXTERNO

FECHA DE INICIO

SIN I.G.V.

FECHA DE TRMINO
FECHA PAGO ADEL. DIRECTO

ADELANTO OTORGADO
N
DESCRIPCION
ADELANTO DIRECTO
1

FECHA

MONTO SIN IGV

Ka-ago-2012

: 07.08.2012

667,690.93

20.00

1.008

(K) COEF. DE REAJUSTE DE LA VALORIZACIN


(Ka) COEF. DE REAJUSTE DEL MES EN QUE SE OTORG EL A.D.

VAL No.

MES

1
2
3
4
5

Agosto-2012
Setiembre-2012
Octubre-2012
Noviembre-2012
Diciembre-2012

DEDUCCION = AMORTIZACION x (K/Ka -1)

MONTO S/.

MONTO S/.

FACTOR DE

EJECUTADO

AMORTIZADO

AMORTIZ.

976,015.97
645,594.24
1,091,703.27
201,778.80
406,953.52

195,203.19
129,118.85
218,340.65
40,355.76
84,672.48

20.0000
20.0000
20.0000
20.0000
20.0000

ACUMULADO ACTUAL
DEDUCCIN ACTUAL

Ka

1.008
1.008
1.008
1.008
1.008

1.008
1.004
1.003
0.999
1.000

:CONSORCIO CAD
XXXXXXXXXXXX
: 135 DIAS CALENDARIOS
: 08.08.2012
: 20.12.2012
: 07.08.2012

RTIZACION x (K/Ka -1)


REAJUSTE
QUE NO CORRESP.
(A/C)*Vo*(Kr/Ka - 1)

0.00
(512.38)
(1,083.04)
(360.32)
(645.96)

-2,601.70
-2,601.70

"CONSORCIO CAD"
PROPIETARIO

:MTC

CONTRATISTA

:CONSORCIO CAD

DEPARTAMENTO

AYACUCHO
: S/.4'377,085.03
: S/. 3'939,376.53

SUPERVISOR EXTERNO

XXXXXXXXXXXXXXXXX

PLAZO EJECUCIN

: 135 DIAS CALENDARIOS

FECHA DE INICIO

: 08.08.2012

FECHA DE TRMINO

: 20.12.2012

FECHA PAGO ADEL. DIRECTO

: 07.08.2012

VALOR REF. TOTAL


PTO. OFERTA TOTAL

GRFICO DE AVANCE DE OBRA


PROGRAMADO ACUMULADO - EJECUTADO ACUMULADO
AVANCES MENSUALES
MES

AVANCE
MENSUAL
PROGRAMADO

120.00%

AVANCE
MENSUAL
EJECUTADO

Aug-12

328,173.70

Sep-12

1,253,050.11

645,594.24

Oct-12

1,215,671.34

1,091,703.27

Nov-12

375,713.57

201,778.80

Dec-12

165,845.97

406,953.52

100.00%

100.00%

95.03%
83.78%

80.00%

60.00%
47.36%
40.00%
TOTAL

3,338,454.69

2,346,029.82

20.00%
9.83%
0.00% 0.00%
INICIO

0.00%
41127

0.00%
41153

0.00%
41183

0.00%
41214

MONTOS VALORIZADOS PROGRAMADOS

MONTOS VALORIZADOS EJECUTADOS

MONTOS TOTAL
MES

PARCIAL

MONTOS TOTAL

PORCENTAJES
ACUMUL.

S/

S/

PARCIAL

ACUMUL.

MES

0.00

0.00

0.00%

0.00%

INICIO

Aug-12

328,173.70

9.83%

9.83%

Aug-12

1,581,223.81

37.53%

47.36%

Sep-12

2,796,895.15

36.41%

83.78%

Oct-12

3,172,608.72

11.25%

95.03%

Nov-12

Dec-12

328,173.70
1,253,050.11
1,215,671.34
375,713.57
165,845.97

3,338,454.69

4.97%

100.00%

Dec-12

TOTAL

3,338,454.69

Oct-12
Nov-12

100.00%

PARCIAL
S/

INICIO
Sep-12

0.00%
41244

TOTAL

0.00

0.00

100.00%

Monto Valorizado
programado

Monto Valorizado
Ejecutado

0.00%
41244
MONTOS VALORIZADOS EJECUTADOS
MONTOS TOTAL

PORCENTAJES

ACUMUL.

PARCIAL

ACUMUL.

S/

0.00

0.00%

0.00%

0.00

0.00%

0.00%

0.00

0.00%

0.00%

0.00

0.00%

0.00%

0.00

0.00%

0.00%

0.00

0.00%

0.00%

0.00%

0.00%