You are on page 1of 2

ZAPATA AISLADA Z1

DATOS
PD =
PL =
*t =
m =
Df =

18.5
0.6
1
1.68
1.8

Ton
Ton
Kg/cm2
Ton/m3
m

fc =
fy =
S/C piso =
hf =

210
4200
300
1.80

Kg/cm2 CM =
Kg/cm2 CV =
Kg/cm2
m

1.4
1.7

* Por factor de seguridad

CALCULOS PRELIMINARES
1
Esfuerzo neto del terreno
2
Area de la zapata

Largo

3
4
5

n =
Azap =

T =
S =

comprobacion Iv1
: =
Iv2 =
Carga ultima
Pu =
Area de la zapata
Azap. =
Reaccion neta del terreno: Wnu =

6.68 Ton/m2
2.86 m2
Lado =
1.69
usar
1.7
Seccion columna
0.5
1.95 m
b
1.45 m
Area de zapata a usar:
2.00
0.50 m
0.50 m
26.92 Ton
3.00 m2
8.97 Ton/m2

ALTURA DE LA ZAPATA
POR PUNZONAMIENTO

usar :

1 Condicion de diseo
a=
531.24
b=
405.16
c=
-22.44
d=
0.05
h=
0.15
h=
0.60
d correg. =
50.59

Recub. inf.

m
m
m
cm

7.5 cm

3/8"
1/2"
5/8"
3/4"
1"

VERIFICACION POR CORTANTE

Vdu =
=
Vn =

-0.08 Ton
0.85
-0.09 Ton

Cortante ultimo
Cortante nominal

Cortante que toma el concreto

Vc =

58.28 Ton

DISEO POR FLEXION


Momento ultimo

Mu =
a=
b=
w =
As =

1.68 Ton-m
284760
72557518.64
0.0000
0
cm2

>

Vn

OK!!!!!

Perim(cm)

0.95
1.27
1.59
1.91
2.54

x
x
x

1.69 m
1.7 m
1.00 m
t

1.50 m2

Verificacin :
As mn =
13.66
cm2
As
<
As mn
n =
6.83

S =
22.18
cm
Usar :
7 5/8" @ 0.20

O.K.!!!!!!!
7
.

En direccin transversal:
Ast =
18.21
cm2
n =
9.11

S =
22.89
Usar :
9 5/8" @ 0.20

con 1/2"
con 1/2"

3/8"
1/2"
5/8"
3/4"
1"

Area (cm2)

0.71
1.29
2.00
2.84
5.10

9
con 1/2"
con 1/2"

LONGITUD DE DESARROLLO DEL REFUERZO


ld =
0.43
m
Longitud disponible
Longitud de desarrollo

1.2.3.-

Ld =
Ld > =
Ld > =

49.39
45.73
30

cm.
cm.
cm.

Como espaciamiento s = 18 cm > 15 cm.

lde =

39.51

S=

cm.

<

Ldisponible =

43.00 cm

2.00
9 5/8" @ 0.20

T=

7 5/8" @ 0.20

1.5

O.K.!!!!!!!

You might also like