You are on page 1of 6

Project:

COMPUTED
SHEET:
BY
KN

Client:
Design of Footing Subjected to Moment

CHECKED DATE:
BY
Last revised 23-10-2010

FOOOTING:D:\OFFICE\ANALYSIS\3dframe.std

KN

Disclaimer

OF

JOB No:
16-Oct-14

REV

L
X

Node No: 17
Load case: 1

Material
FOOTING CONC. STRENGTH "fc' =

30

N/mm2

REBAR YIELD STRESS "fy" =

420

N/mm2

24.00

KN/M3

28.00

KN

DENSITY OF CONC."Wc" =

Loads
Horizontal Shear "Hx"(|| to "L") =
AXIAL LOAD "P" =

1635.00 KN

Horizontal Shear "Hy"(|| to "B") =

24.00

KN

MOMENT "Mx"(|| to "B") =

10.00

KN-M

MOMENT "My"(|| to "L") =

38.00

KN-M

Lever aram "d" =

0.60

Meters

P
NGL

Column Dimensions

Df

COLUMN WIDTH "c" =

700.00 mm

COLUMN DEPTH "b" =

700.00 mm

Base Dimensions

h
16, @ 180 mm C/C

FOOTING WIDTH "B" || to "Y"/"b" =

3.20

Meters

FOOTING LENGTH "L" || to "X"/"c" =

3.20

Meters.

FOOTING THICKNESS "h" =

0.60

Meters.

FOOTING EMBED. DEPTH "Df" =

2.50

meters.

Depth of over burden=

0.50

meters

200.00

KN/M2

16, @ 180 mm C/C

Soil Properties

NET BEARING CAPACITY "SBC" =


@ a depth of meters from NGL =

2.00

DENSITY OF SOIL "Ws" =

18.00

KN/M3

Surcharge=

10.00

kN/m

REINFORCING bars || to L =

16

201.06

REINFORCING bars || to B =

16

201.06

Reinforcement

CLEAR COVER. =

50.00

mm.

Add weight of soil


Results of Node no. 17 for Load case 1
Loads
Pu=1,635.00 KN, Mx=26.80 KN-M, My=52.40 KN-M
Footing Size
Provide 3.2 X 3.2 X 0.6 Meters Footing
Base Perssure
Net upward pressure (max)=174.17 KN/M < SBC =175 KN/M OK.

q(min)= 145.17 KN/M No tension

Punching Shear
Vu=2,083.05 KN < vc=4,178.68 KN. Footing is Safe in Punching shear.
Beam Shear
Vux=581.00 KN < vc=1,345.79 KN & Vuy=593.87 KN < vc=1,306.06 KN. Safe in wide beam Shear.
Reinforcement
rho(min)=

0.0020

rho(req )= 0.0018

As(Pro)= 1080 mm

Provide 16, @ 180 mm C/C OR Provide 6 16 pre Meter width. along X-direction"
rho(min)=

0.0021

rho(req )= 0.0019

As(Pro)= 1080 mm

Provide 16, @ 180 mm C/C OR Provide 6 16 per meter width. along Y-direction.

Project:

COMPUTED
SHEET:
BY
KN

Client:
Design of Footing Subjected to Moment

OF

JOB No:

CHECKED DATE:
BY
Last revised 23-10-2010

KN

16-Oct-14

REV

Caculations
Weight of Footing =

6.00

kN/m

kN/m

Surcharge=

10.00

kN/m

Total=

25.00

kN/m

Net SBC=

175.00

kN/m

Over burden=

Total Axial Load "P(tot)" =

1635.00 KN

Total Moment(||"L") = M + H * Df =

52.40

kN-M

Ecentricity e(Along "L") =M / P(tot) =

0.032

meters

Total Moment(||"B") = M + H * Df =

26.80

kN-M

Ecentricity e(Along "B") =M / P(tot) =

0.016

METERS

Net upward pre. q = (P / L * B) * ( 1 6 *e */L 6 * e /B)


q(max) =

174.17

KN/M2

< Net Bearing Capacity OK.

q(min) =

145.17

KN/M2

No tension

Effective depth "d"(Long.dir.)=

542

mm

4968

mm

Effective depth "d"(Short.dir.)=

526

mm

CHECK FOR PUNCHING SHEAR:


bo = 2*(c+d)+2*(b+d)
q1=

154.04

KN/M2

b1=c+d = 1242.00 mm
c = c / b =

q2 =

d/2

b2=b+d = 1242.00 mm
q(min)

vco1 =sqrt(fc')bod/3

d/2

2
165.3 KN/M

KN/M2

ACI 11.37

6268.02

KN/M2

ACI 11.35

4178.68

KN/M2

4178.68

q1

q(max)
q2

vco2 =((1+2/c)sqrt(fc')bod/6)

vco1 =

Vuo = 1.5*(0.5*(q(max)+q(min))*(L*B))-(0.5*(q1+q2)*(c+d)*(b+d))
Vuo=

2
2083.053 KN/M

OK

CHECK FOR WIDE BEAM SHEAR: (L-DIR):


q3=

167.75

KN/M2

vc = sqrt(fc')Bd

1345.79

KN/M2

Vu=1.5(0.5*(q3+q(max))By 581.00

KN/M2

Y=

0.708

METERS.

OK
q(min)

q(max)
q3

CHECK FOR WIDE BEAM SHEAR: (B-DIR):


167.61

KN/M2

1306.06

KN/M2

Vu=1.5(0.5*(q3+q(max))Ly1 593.87

KN/M2

q4=
vc = sqrt(fc')Ld

Y1=

0.724 METERS.

Y1

OK
q(min)

q(max)
q4

CHECK FOR FLEXURE (L-DIR):


q5=

162.84

KN/M2

Y2=

1.25

METERS.

MUL=1.5*(q5*y2 */2+1/2*(q(max)-q5)*y2*y2*2/3)
MUL =

199.68

KN-M/M

Rn=MUL/bd2

0.755

N/mm2

rho(min) = 0.0018*h/d

0.0020

ASL = rho * b * d

1080.00

Y2

rho(act) =

0.0018

rho =

0.0020

q(min)

mm2/M

q(max)
q5

Provide 16, @ 180 mm C/C OR Provide 6 16 pre Meter width.


CHECK FOR FLEXURE (B-DIR):
q6=

162.84

KN/M2

Y3=

1.25

METERS.

MUb=1.5*(q6*y32*/2+1/2*(q(max)-q6)*y3*y3*2/3)
MUB =
Rn=MUL/bd2
rho(min) = 0.0018*h/d
ASB = rho * b * d

199.68
0.80

N/mm2

0.0021
1080

Y3

KN-M/M

0.00199262
rho(act) =

0.0019

rho =

0.0021

mm2/M

Provide 16, @ 180 mm C/C OR Provide 6 16 per meter width.

q(min)

q(max)
q6

Node

L/C
1 1 UBC LOAD

Horizontal Vertical

Horizontal Moment

Fx kN

Fz kN

My kNm

Fy kN

Mx kNm

-22.849

-33.047

1 2 DEAD LOAD

4.278

120.865

1 3 LIVE LOAD

0.968

21.362

1 4 ULTIMATE LOAD

7.635

205.527

1 5 ULTIMATE

-26.257

107.986

1 6 ULTIMATE

-28.823

61.521

1 7 SERVICE

5.246

142.227

1 8 SERVICE

-11.716

97.732

2 1 UBC LOAD

-26.216

24.985

2 2 DEAD LOAD

19.566

561.318

2 3 LIVE LOAD

4.428

121.049

34.921

991.629

2 5 ULTIMATE

-10.489

779.307

2 6 ULTIMATE

-19.879

540.915

2 7 SERVICE

23.995

682.367

2 8 SERVICE

1.215

578.808

-24.479

-8.631

3 2 DEAD LOAD

-15.941

563.222

3 3 LIVE LOAD

-3.608

121.48

3 4 ULTIMATE LOAD

-28.451

995.027

3 5 ULTIMATE

-55.627

734.795

3 6 ULTIMATE

-49.352

494.558

3 7 SERVICE

-19.549

684.702

3 8 SERVICE

-33.076

557.181

4 1 UBC LOAD

-26.639

-6.751

8.792

436.907

1.99

92.891

15.692

769.585

4 5 ULTIMATE

-25.515

568.202

4 6 ULTIMATE

-30.18

383.562

4 7 SERVICE

10.782

529.798

4 8 SERVICE

-9.855

432.181

5 1 UBC LOAD

-21.456

23.444

5 2 DEAD LOAD

-16.696

204.919

5 3 LIVE LOAD

-3.779

40.386

5 4 ULTIMATE LOAD

-29.798

355.543

5 5 ULTIMATE

-52.405

299.68

5 6 ULTIMATE

-45.708

217.952

2 4 ULTIMATE LOAD

3 1 UBC LOAD

4 2 DEAD LOAD
4 3 LIVE LOAD
4 4 ULTIMATE LOAD

5 7 SERVICE

-20.474

245.305

5 8 SERVICE

-31.715

221.329

G
Mz kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

You might also like