PRESUPUESTO ANALITICO DE COSTO DIRECTO


PROYECTO: CONSTRUCCION DE ESTADIO MUNICIPAL I ETAPA - CONSTRUCCION DE TRIBUNAS LADO ESTE DEL ESTADIO MUNICIPAL DE VITOC
UBICACIN : VITOC - CHAMCHAMAYO - JUNIN
FECHA

: AGOSTO 2013

Cadena

Mod.

de Gast

Aplic.

6.5.11

Especificacin del Gasto

Und.

Cant.

PRESUPUESTO
P. Unit.

P. Parc.

APLICACIONES DIRECTAS

Sub total
156,424.05

10 Retribuciones y Compromisos a Plazo Fijo

86,258.98

Personal de Obra
0.8240000

TOPOGRAFO

mes

5.00

98.19

490.97

80.1945833

OPERARIO

mes

5.00

9556.56

47782.82

22.7576667

OFICIAL

mes

5.00

2410.64

12053.19

55.9537500

PEON

mes

5.00

5186.40

25932.00

0.09

156424.05

14078.16

0.0153

156424.05

2393.29

11 Obligaciones del Empleador

16,471.45

ESSALUD(9%)
Accidentes de Trabajo (1.53%)

13 Gastos Variables y Ocasionales

53,653.45

vacaciones truncas

glb.

0.10

156424.05

15642.41

CTS

glb.

0.15

156424.05

23463.61

Refrigerio y movilidad

glb.

0.05

156424.05

7821.20

Zona de emergencia

glb.

0.01

156424.05

1564.24

AFP 3.30%

GLB

0.033

156424.05

5161.99

Bonificaciones

BIENES Y SERVICIOS

487,388.29

29 Materiales de construccin

434,744.06

ACERO CONSTRUCCION CORRUGADO

KG

6.25

13,136.51

ACERO CORRUGADO 0 3/8"

KG

6.25

7.42

82,103.19
46.38

AGUA

M3

5.00

77.69

388.45

ALAMBRE NEGRO RECOCIDO # 16

KG

7.20

826.34

5,949.65

ALAMBRE NEGRO RECOCIDO # 8

KG

7.20

232.85

1,676.52

ALAMBRE TW # 12 AWG

1.30

60.06

78.08

ANGULO 1"x1"x1/8" x6m. AREQUIPA

PZA

41.30

8.64

356.83

ANGULO 2"x2"x1/4" x6m. AREQUIPA

PZA

52.60

6.03

317.18

ANGULO 3/4"x3/4"x1/8"x 6m. AREQUIPA

PZA

32.60

5.40

176.04

ARENA FINA

M3

150.00

39.18

5,877.00

ARENA GRUESA

M3

120.00

94.35

11,322.00

BARRA DE Cu 30 mmx3mmx25cm

UND

68.00

6.00

408.00

BISAGRA CAPUCHINA PLOMA 3 1/2" X 3 1/2"

PAR

7.20

33.00

237.60

BRIDA DE ACERO DE 1 1/2"

PZA

17.30

180.00

3,114.00

CABLE TW # 14 AWG 2.5 MM2

1.60

90.90

145.44

CAJA DE DESAGUE DE 12"X24"

UND

155.00

8.00

1,240.00

CAJA GALV. PARA TABLERO 24" x 33"

UND

4.25

2.00

8.50

CAJA OCTOGONAL GALV. 4" X 2 1/8 "

UND

4.25

2.00

8.50

CAJA OCTOGONAL GALV. LIVIANA 4"x4"x2 1/2

UND

4.25

5.86

24.91

CAJA RECTANG GALV 4"X2 1/8"

UND

4.25

2.00

8.50

CASETA Y ALMACEN

GLB

3,500.00

1.00

3,500.00

CEMENTO PORTLAND TIPO I (42.5KG)

BOL

21.50

2,249.27

48,359.31

CEMENTO PORTLAND TIPO I (EN FCA.)S-PUB

BOL

21.50

9.76

209.84

CERAMICO COLOR OSCURO DE .30 X .30

M2

21.30

102.06

2,173.88

CERAMICO TIPO PIEDRA NORDICA 30 X 30 CMS.

M2

22.00

28.38

624.36

CERRADURA EXTERIOR DE DOS GOLPES

UND

42.00

9.00

378.00

CINTA AISLANTE

RLL

3.00

0.70

2.10

CLAVOS PARA MADERA C/C 2"

KG

6.80

66.64

453.15

CLAVOS PARA MADERA C/C 3"

KG

6.80

396.57

2,696.68

CLAVOS PARA MADERA C/C 3/4"

KG

6.80

24.72

168.10

CODO DE 90 PVC SAL DE 2"

UND

3.50

2.00

7.00

CODO DE 90 PVC SAL DE 4"

UND

4.25

2.00

8.50

CODO DE 90C/R PVC SAP P/AGUA DE 1/2"

UND

1.20

34.60

41.52

COLA SINTETICA FULLER

GLN

62.00

2.02

125.24

CONEXION A CAJA PVC SAP 3/4"

PZA

10.00

6.00

60.00

CONEXIONES A CAJA PVC SEL 3/4"

PZA

10.00

6.00

60.00

CONTAC ELECTROMAGNETICO DE 25 AMP.

UND

21.40

6.00

128.40

COSTALILLOS

PZA

0.80

1,760.00

1,408.00

CURVA PVC SAP LUZ 3/4"

PZA

1.00

5.65

5.65

CURVAS PVC SEL 3/4"

PZA

1.00

6.00

6.00

FIJADOR DE PLANCHA DE POLICARBONATO

UND

0.45

4,514.40

2,031.48

FLETE TRANSPORTE LOCAL

KG

0.01

414.59

4.15

FLUORES. RECTO ISPE 1X40 W C/EQ + PANT

UND

28.00

2.00

56.00

FUSIBLE Y PORTA FUSIBLE DE 20 A

UND

15.25

6.00

91.50

HORMIGON

M3

78.00

18.48

1,441.44

HORMIGON (PUESTO EN OBRA)

M3

78.00

30.24

2,358.72

IMPRIMANTE

GLN

22.00

22.80

501.60

INODORO TQUE. BAJO NORMAL BLANCO C/A.

UND

220.00

4.00

880.00

INTERRUP.DE BAKELITA 250 V - 15A

PZA

5.50

2.00

11.00

INTERRUPTOR SIMPLE BIPOLAR BAKELITA

UND

4.50

1.80

8.10

INTERRUPTOR TERMOMAGNETICO

PZA

42.00

6.00

252.00

LADRILLO CORRIENTE 6 x 12 x 24 CM

UND

0.35

12,474.00

4,365.90

LAVATORIO 23"X17" P/GRIF.4" BLANCO C/A

UND

115.00

6.00

690.00

LIJA PARA MADERA

UND

4.50

0.84

3.78

MADERA ANDAMIAJE

P2

3.50

116.89

409.12

MADERA CEDRO DE PUCALLPA CEPILLADA

P2

5.10

205.79

1,049.53

MADERA ESCOGIDA PARA REGLAS (CEDRO)

P2

3.85

6.09

23.45

MADERA EUCALIPTO EN BRUTO

P2

3.25

660.00

2,145.00

MADERA TORNILLO CEPILLADA

P2

4.75

2,894.99

13,751.20

MADERA TORNILLO INC.CORTE P/ENCOFRADO

P2

4.25

9,932.14

42,211.60

MANIJA DE BRONCE PARA PUERTAS

PZA

15.60

7.00

109.20

NIVEL

DIA

50.00

2.47

123.50

PEGAMENTO PARA PVC 1/4 GLN

UND

15.80

2.69

42.50

PEGAMENTO PARA PVC AGUA FORDUIT

GLN

56.00

0.22

12.32

PEGAMENTO PLASTICO P/PVC CCP

GLN

56.00

0.44

24.64

PERFILES DE ACERO 3/4" X 2.40 M.

PZA

75.24

328.32

24,702.80

PERNO HEXAGONAL P/BRIDA DE 2" INC.TUERCA

UND

1.90

1,170.00

2,223.00

PERNOS HEXAGONALES DE 3/4" x 3 1/2"

PZA

1.30

9.00

11.70

PICAPORTE DE ACERO DE 3"

PZA

12.60

2.00

25.20

PIEDRA CHANCADA DE 1/2"

M3

155.00

173.96

26,963.80

PIEDRA GRANDE

M3

65.00

330.01

21,450.65

PIEDRA GRANDE DE 8"

M3

50.00

13.74

687.00

PIEDRA MEDIANA DE 6"

M3

72.00

6.34

456.48

PINTURA ANTICORROSIVA EPOX-USO NAVAL

GLN

38.00

0.65

24.70

PINTURA ESMALTE SINTETICO

GLN

35.00

1.08

37.80

PINTURA LATEX

GLN

28.00

18.25

511.00

PLANCHA DE POLICARBONATO

PLN

48.60

586.87

28,521.88

PLANCHA ACERO 1.6mm x 1.22m x 2.40m

PLN

65.00

2.48

161.20

PLATINA DE FIERRO 1/8" x 1 1/2" x 6m

PZA

26.60

0.65

17.29

PLOMO ELECTROLITICO

KG

9.50

9.76

92.72

PORCELANA

KG

8.52

37.82

322.23

PORTABARRA AISLADOR DE 75 A

UND

8.63

12.00

103.56

RAMAL TEE SIMPLE PVC SAL DE 2"

UND

6.00

53.57

321.42

REGISTRO DE BRONCE DE 4"

UND

12.30

2.00

24.60

REGLA DE MADERA

P2

3.25

4.85

15.76

SILICONA

UND

15.30

7.20

110.16

SOLDADURA

KG

9.50

410.40

3,898.80

SOLDADURA CELLOCORD

KG

9.50

155.70

1,479.15

SOLDADURA CELLOCORD P 3/16"

KG

9.50

14.46

137.37

SPOT LIGTH CROMADO

UND

42.00

2.00

84.00

SUMIDERO CROMADO DE 2"

UND

8.50

4.00

34.00

TABLERO GEN. C/FUSIBLES DE 4 CIRCUITOS

UND

35.00

1.00

35.00

TAPA C/MARCO FF DE DESAGUE 12" X 24"

PZA

125.00

8.00

1,000.00

TEE 1 1/2"x1 1/2"x1/8" x6m. A. AREQUIPA

PZA

49.20

1.62

79.70

TEE 1"x1"x1/8" x6m. A. AREQUIPA

PZA

45.18

5.53

249.85

TEE 3/4"x3/4"x1/8" x6m. A. AREQUIPA

PZA

32.10

0.94

30.17

TEE SANITARIA SIMPLE PVC SAL DE 4"

UND

6.00

2.00

12.00

TEKNOPOR DE 1" x 4' x 8'

PLN

15.30

240.00

3,672.00

TEODOLITO

DIA

75.00

2.47

185.25

TERMINALES DE COBRE DE 125 A

PZA

3.25

6.00

19.50

TIMER ORBIS DE 72 HRS DE RESERVA 16 AMP

UND

23.00

2.00

46.00

TIZA

BOL

2.30

6.18

14.21

TOMACORRIENTE DOBLE PLANO BAKELITA

UND

4.50

3.00

13.50

TRIPLAY DE 8 MM

M2

16.20

8.64

139.97

TUB. PVC SAL P/DESAGUE DE 2"

2.55

47.37

120.79

TUB. PVC SAL P/DESAGUE DE 4"

3.15

151.95

478.64

TUB. PVC SAP PRESION P/AGUA C-10 R. 1/2"

1.65

61.36

101.24

TUB. PVC SEL P/INST. ELECT. DE 5/8" x 3m

UND

7.25

2.64

19.14

TUBO FIERRO NEGRO DE 1 1/2"

18.45

821.34

15,153.72

TUBO FIERRO NEGRO DE 1"

16.30

1,125.00

18,337.50

TUBO FIERRO NEGRO DE 2"

19.52

1,530.00

29,865.60

TUBO FO.GALV.ST.ISO-I 1 1/2"

14.56

204.86

2,982.76

TUBO FO.GALV.ST.ISO-I 1"

13.10

195.10

2,555.81

TUBO FO.GALV.ST.ISO-I 2"

15.60

19.51

304.36

TUBO PVC SAP (LUZ) (E/C) 3/4" X 3 M.

PZA

6.28

18.20

114.30

TUBO PVC SEL (E/C) 3/4" X 3.00 M.

PZA

6.28

7.50

47.10

UNION PVC SEL 3/4"

PZA

1.00

3.00

3.00

UNION SIMPLE PRESION PVC SAP (LUZ) 3/4"

PZA

1.30

17.33

22.53

VALVULA COMPUERTA DE BRONCE ROS. DE 1/2"

UND

8.60

2.00

17.20

VIDRIO TRANSPARENTE INCOLORO CRUDO MEDIODOBLE

P2

3.25

63.00

204.75

PRESUPUESTO ANALITICO DE COSTO DIRECTO


PROYECTO: CONSTRUCCION DE ESTADIO MUNICIPAL I ETAPA - CONSTRUCCION DE TRIBUNAS LADO ESTE DEL ESTADIO MUNICIPAL DE VITOC
UBICACIN : VITOC - CHAMCHAMAYO - JUNIN
FECHA
: AGOSTO 2013
Cadena Mod. Especificacin del Gasto
de Gast Aplic.

Und.

Cant.
P. Unit.

PRESUPUESTO
P. Parc.

30 Bines de Consumo

Sub total

4,647.76

Herramientas
HERRAMIENTAS MANUALES

EST.

1.00

4,647.76

4647.76

EST

115.00
135.60

1.52
18.00

174.80
2,440.80

37 Alquiler de Bienes

27,203.76

ANDAMIO METAL TABLAS-ALQUILER


CAMION DE IZAJE

EST

CAMION VOLQUETE 4x2 140-210 HP 6 M3.

HM

85.00

97.84

8,316.40

CARGADOR RETROEXCAVADOR 62 HP 1 YD3

HM

185.00

47.26

8,743.10

CIZALLA P/FIERRO CONST. HASTA 1"

UND

42.00

10.53

442.26

COCINILLA A GAS I/ACCESORIOS/PLOMO

HM

5.00

19.51

97.55

COMPACTADOR VIBR. TIPO PLANCHA 7 HP

HM

9.50

41.27

392.07

MEZCLADORA CONCRETO TAMBOR 18HP 11P3

HM

22.30

121.90

2,718.37

MEZCLADORA CONCRETO TROMPO 18HP 7P3

HM

14.20

9.14

129.79

MEZCLADORA CONCRETO TROMPO 8 HP 9 P3

HM

17.60

4.85

85.36

MOTOSOLDADORA DE 250 AMP.

HM

5.00

116.02

580.10

SOLDADORA ELECT. MONOF. ALTERNA 225 AMP.

HM

5.30

581.73

3,083.17

VIBRADOR DE CONCRETO 4 HP 2.40"

HM

9.50

100.45

954.28

WINCHE MANUAL

HM

0.01

9.76

0.10

1.0000

20,792.71

20,792.71

39 Otros Servicios de Terceros

FLETE

20,792.71

GLB

TOTAL S/

643,812.34

DESAGREGADO DEL PRESUPUESTO ANALITICO GASTOS GENERALES


PROYECTO: CONSTRUCCION DE ESTADIO MUNICIPAL I ETAPA - CONSTRUCCION DE TRIBUNAS LADO ESTE DEL ESTADIO MUNICIPAL DE VITOC
UBICACIN : VITOC - CHAMCHAMAYO - JUNIN
FECHA
: AGOSTO 2013
Cadena Mod.
Especificacin del Gasto
de Gast Aplic.
BIENES Y SERVICIOS
20 Viticos y asignaciones
Residente de Obra
Personal Administrativo

Und.

Cant.
P. Unit.

PRESUPUESTO
P. Parc.

mes
mes

4.00
3.00

400.00
800.00

1600.00
2400.00

22 Vestuario

mes

3.00

500.00

1500.00

24 Alimentos para personal

mes

3.00

1500.00

4500.00

27 Servicios no Personales
Ing. Residente de Obra
Capataz
Topgrafo
Asistente
Administrador
Almacenero

mes
mes
mes
mes
mes
mes

4.00
3.00
3.00
3.00
3.00
3.00

5500.00
0.00
0.00
2500.00
0.00
1500.00

22000.00
0.00
0.00
7500.00
0.00
4500.00

30 Bines de Consumo
Materiales de Oficina y Escritorio
Copia, revelado y legalizaciones

mes
Glb.

3.00
1.00

950.00
2338.19

2850.00
2338.19

32 Pasajes y Gastos de Transporte


Camioneta
Transporte de personal

mes
mes

3.00
3.00

1200.00
3200.00

3600.00
9600.00

37 Alquiler de bienes
Teodolito
Nivel

mes
mes

3.00
3.00

0.00
0.00

0.00
0.00

39 Otros Servicios de Terceros


Placa Recordatiria
Diseo de mezcla 100, 140, 175, 210 kg/cm2
Pruebas de cantera
Pruebas de compactacin

Unid.
Unid.
Unid.
Unid.

1.00
3.00
0.00
2.00

800.00
350.00
180.00
120.00

800.00
1050.00
0.00
240.00

TOTAL GASTOS GENERALES (GG)


GASTOS GENERALES=(GG/CD)x100

Sub total
64,478.19
4,000.00

1,500.00
4,500.00
34,000.00

5,188.19

13,200.00

0.00

2,090.00

TOTAL S/

64,478.19
%

10.00

64,478.19

DESAGREGADO DEL PRESUPUESTO ANALITICO DE SUPERVISION


PROYECTO: CONSTRUCCION DE ESTADIO MUNICIPAL I ETAPA - CONSTRUCCION DE TRIBUNAS LADO ESTE DEL ESTADIO MUNICIPAL DE VITOC
UBICACIN : VITOC - CHAMCHAMAYO - JUNIN
FECHA
Cadena
de Gast

: AGOSTO 2013
Mod.
Especificacin del Gasto
Aplic.
10 Retribuciones y Compromisos a Plazo Fijo

Und.

Cant.
P. Unit.

PRESUPUESTO
P. Parc.

0.00

BIENES Y SERVICIOS
20 Viticos y asignaciones
Movilidad y Viaticos Supervisor

mes

3.00

500.00

1500.00

23 Combustible
Combustible y Lubricantes

glb

3.00

0.00

0.00

27 Servicios no Personales
Evaluador de expediente tcnico

glb

1.00

0.00

0.00

Mes
glb

3.00
1.00

500.00
1005.60

1500.00
1005.60

32 Pasajes y Gastos de Transporte


Camioneta supervisor

Mes

3.00

1200.00

3600.00

33 Servicios de Consultoria
Ing. Supervisor
Asistente
Secretaria
Topgrafo
Ayudante de topgrafo
Pen

mes
mes
mes
mes
mes
mes

4.00
3.00
3.00
3.00
3.00
3.00

6800.00
0.00
1800.00
0.00
0.00
0.00

27200.00
0.00
5400.00
0.00
0.00
0.00

37 Alquiler de bienes
Teodolito
Nivel

mes
mes

3.00
3.00

0.00
0.00

0.00
0.00

39 Otros Servicios de Terceros


Prueba de compactacin
Diseo de mezcla 100, 140, 175, 210 kg/cm2
Pruebas de cantera

Unid.
Unid.
Unid.

5
5.00
0.00

120.00
350.00
0.00

600.00
1750.00
0.00

30 Bines de Consumo
Materiales de Oficina y Escritorio
Copia y revalado supervisor
Otros

SUPERVISION DE OBRA
SUPERVISION DE OBRA=(SUPER/CD+GG)x100

Sub total

42,555.60
1,500.00

0.00

0.00

2,505.60

3,600.00

32,600.00

0.00

2,350.00

TOTAL S/

42,555.60
%

10.00

42,555.60

PRESUPUESTO ANALITICO POR OBJETO DEL GASTO


PROYECTO: CONSTRUCCION DE ESTADIO MUNICIPAL I ETAPA - CONSTRUCCION DE TRIBUNAS LADO ESTE DEL ESTADIO
MUNICIPAL DE VITOC
UBICACIN : VITOC - CHANCHAMAYO - JUNIN
FECHA

: AGOSTO 2013

Cadena

Mod.

de Gast

Aplic.

Especificacin del Gasto

COSTO
PARCIAL

SUB TOTAL

TOTAL

6.00 GASTOS DE CAPITAL


6.5 INVERSIONES
6.5.11 APLICACIONES DIRECTAS
6.5.11

156,424.05

10 RETRIBUCIONES Y COMPLEMENTOS A PLAZO FIJO

86258.98

11 OBLIGACIONES DEL EMPLEADOR


ESSALUD (9%)
ACCIDENTES DE TRABAJO (1.53%)

16471.45
14078.16
2393.29

13 GASTOS VARIABLES Y OCACASIONALES


BONIFICACIONES

53653.45
9385.44

VACACIONES TRUNCAS

15642.41

CTS

23463.61

AFP 3.30%

5161.99

BIENES Y SERVICIOS

594,422.08

20 VIATICOS Y ASIGNACIONES

5500.00

22 VESTUARIO

1500.00

23 COMBUSTIBLE

0.00

24 ALIMENTOS PARA PERSONAL

4500.00

27 SERVICIOS NO PERSONALES

34000.00

29 MATERIALES DE CONSTRUCCION

434744.06

30 BIENES DE CONSUMO

12341.55

32 PASAJES Y GASTOS DE TRANSPORTE

16800.00

33 SERVICIOS DE CONSULTORIA

32600.00

37 ALQUILER DE BIENES

27203.76

39 OTROS SERVICIOS DE TERCEROS

25232.71

TOTAL S/

743,369.22