Cheklist Pjm , Rkm Dan Lap Akhir
BEN HATTAMULLAH
SURAT KE AVAYA
ROHIMAH RIYANTO
Total Bangun Karya 2012
YNZ SUDIANTO
SMPN 2 WANAYASA 1
D KOMENG SUPRIYATNA
Daftar Isi Final
DOPAK
Speck&Harga Utk Email
PRIMA JOE
Boq Dorak Slp
SYAF
Contoh Rb Jembatan
BILLY JANTER
Contoh Rb Jembatan
ANDINI ADIN
1. Metode Oke
ISRA_HR
1...45678...11
Cheklist Pjm , Rkm Dan Lap Akhir
BEN HATTAMULLAH
SURAT KE AVAYA
ROHIMAH RIYANTO
Total Bangun Karya 2012
YNZ SUDIANTO
SMPN 2 WANAYASA 1
D KOMENG SUPRIYATNA
Daftar Isi Final
DOPAK
Speck&Harga Utk Email
PRIMA JOE
Boq Dorak Slp
SYAF
Contoh Rb Jembatan
BILLY JANTER
Contoh Rb Jembatan
ANDINI ADIN
1. Metode Oke
ISRA_HR
1...45678...11
Cheklist Pjm , Rkm Dan Lap Akhir
BEN HATTAMULLAH
SURAT KE AVAYA
ROHIMAH RIYANTO
Total Bangun Karya 2012
YNZ SUDIANTO
SMPN 2 WANAYASA 1
D KOMENG SUPRIYATNA
Daftar Isi Final
DOPAK
Speck&Harga Utk Email
PRIMA JOE
Boq Dorak Slp
SYAF
Contoh Rb Jembatan
BILLY JANTER
Contoh Rb Jembatan
ANDINI ADIN
1. Metode Oke
ISRA_HR
1...45678...11
DIREKTORAT JENDERAL BINA MARGA PAKET PELEBARAN JALAN DURI - KANDIS (MYC) SUMBER MATERIAL : COLD BIN 1. COARSE AGGREGATE (RETAINED NO 4 SIEVE) Sample 1 Sample 2 Sample 1 Sample 2 Sample 1 Sample 2 Sample 1 Sample 2 Weight of oven dry sample in air A (Gr) 2367 2454 2077 2108 1820.8 1600 Weight of saturated surface dry sample in air B (Gr) 2386 2474 2097 2126 1838 1614 Weight of saturated sample in air C (Gr) 1476 1532 1297 1315 1128 992 Sample 1 Sample 2 Average Sample 1 Sample 2 Average Sample 1 Sample 2 Average Sample 1 Sample 2 Average Bulk Specific Gravity (Gr/cc) A / (B-C) 2.601 2.605 2.603 2.596 2.599 2.598 2.565 2.572 2.568 0.000 0.000 0.000 App Specific Gravity (Gr/cc) A / (A-C) 2.657 2.662 2.659 2.663 2.658 2.661 2.628 2.632 2.630 0.000 0.000 0.000 Ssd Specific Gravity (Gr/cc) B / (B-C) 2.622 2.626 2.624 2.621 2.621 2.621 2.589 2.595 2.592 0.000 0.000 0.000 Absortion (%) (B-A)/A x 100 0.803 0.815 0.809 0.963 0.854 0.908 0.945 0.875 0.910 0.000 0.000 0.000 2. FINE AGGREGATE (PASSING NO 4 SIEVE) Sample 1 Sample 2 Sample 1 Sample 2 Sample 1 Sample 2 Sample 1 Sample 2 Weight of saturated surface dry sample in air 500 500 500 500 500 500 Weight of oven dry sample in air A (Gr) 492.3 492 490.8 490.6 492.1 493.3 Weight of picnometer filled with water B (Gr) 1270.1 1225 1225 1270.1 1225 1225 Weight of picnometer filled with saturated water C (Gr) 1575 1532 1531 1575 1529.5 1530 Sample 1 Sample 2 Average Sample 1 Sample 2 Average Sample 1 Sample 2 Average Sample 1 Sample 2 Average Bulk Specific Gravity (Gr/cc) A / (B+500-C) 0.000 0.000 0.000 2.523 2.549 2.536 2.530 2.515 2.522 2.517 2.530 2.523 App Specific Gravity (Gr/cc) A / (B+A-C) 0.000 0.000 0.000 2.627 2.659 2.643 2.656 2.642 2.649 2.623 2.620 2.621 Ssd Specific Gravity (Gr/cc) 500/(B+500-C) 0.000 0.000 0.000 2.563 2.591 2.577 2.577 2.563 2.570 2.558 2.564 2.561 Absortion (%) (500-A)/Ax100 0.000 0.000 0.000 1.564 1.626 1.595 1.874 1.916 1.895 1.605 1.358 1.482 3. AVERAGE SPESIFIC GRAVITY OF AGGREGAT 4. RESULT TEST CA 1 MA 1/2 FA + F SAND CA 1 MA 1/2 FA+F SAND 100.00 4.70 0.75 0.00 Bulk Specific Gravity (Gr/cc) 2.603 2.539 2.523 2.523 0.00 95.30 99.25 100.00 App Specific Gravity (Gr/cc) 2.659 2.644 2.649 2.621 Ssd Specific Gravity (Gr/cc) 2.624 2.579 2.570 2.561 Absortion (%) 0.809 1.563 1.888 1.482 CA 1" MA 1/2 FA + Filler SNI 03-1969-1990 & SNI 03-1970-1990 PT ADHI KARYA ( PERSERO ) Tbk. PT ARTERI CIPTA RENCANA KONSULTAN SAND SPECIPIC GRAVITY TEST KONTRAKTOR SAND CA 1" MA 1/2 FA + Filler SAND CA 1" MA 1/2 CA 1" MA 1/2 FA + Filler FA + Filler SAND KONSULTAN KONTRAKTOR Percentage of aggregate retained No 4 sieve (%) Percentage of aggregate passing No 4 sieve (%) BINA MARGA PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) FILLER SUMBER MATERIAL : COLD BIN Average Individual Wt Individual Wt Passing Inch mm Retained (Gr) Retained (Gr) Retaind (%) Passing (%) Retained (Gr) Retained (Gr) Retaind (%) Passing (%) (%) 1 25.4 0 0 0.00 100.00 0 0 0.00 100.00 100.00 3/4 19.1 0 0 0.00 100.00 0 0 0.00 100.00 100.00 1/2 12.7 0 0 0.00 100.00 0 0 0.00 100.00 100.00 3/8 9.5 0 0 0.00 100.00 0 0 0.00 100.00 100.00 No. 4 4.76 0 0 0.00 100.00 0 0 0.00 100.00 100.00 No. 8 2.88 0 0 0.00 100.00 0 0 0.00 100.00 100.00 No. 16 1.19 0 0 0.00 100.00 0 0 0.00 100.00 100.00 No. 30 0.595 0 0 0.00 100.00 0 0 0.00 100.00 100.00 No. 50 0.297 0 0 0.00 100.00 0 0 0.00 100.00 100.00 No. 100 0.15 0.6 0.6 0.04 99.96 0.7 0.7 0.04 99.96 99.96 No. 200 0.074 5.9 5.9 0.36 99.64 6 6 0.37 99.63 99.63 1634 1613.5 Average Individual Wt Individual Wt Passing Inch mm Retained (Gr) Retained (Gr) Retaind (%) Passing (%) Retained (Gr) Retained (Gr) Retaind (%) Passing (%) (%) 1 25.4 3/4 19.1 1/2 12.7 3/8 9.5 No. 4 4.76 No. 8 2.88 No. 16 1.19 No. 30 0.595 No. 50 0.297 No. 100 0.15 No. 200 0.074 Sample 1 Sample 2 Weight Cumulative Weight Cumulative Sieve Size Sample 1 Sample 2 Weight Cumulative Weight Cumulative BINA MARGA KONSULTAN KONTRAKTOR SIEVE ANALYSIS TEST SNI 03-1968-1990 Total Weight Total Weight Sieve Size PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) SUMBER MATERIAL : COLD BIN 1" 3/4" 1/2" 3/8" # 4 # 8 # 16 # 30 # 50 #100 # 200 25.4 19 12.7 9.53 4.76 2.38 1.19 0.6 0.3 0.15 0.075 100.00 73.68 22.04 5.12 4.13 3.23 1.99 1.35 1.10 0.92 0.65 100.00 100.00 100.00 76.16 20.41 5.44 3.08 1.76 1.64 1.35 1.00 100.00 100.00 100.00 100.00 95.30 66.86 47.81 34.34 25.31 17.26 9.00 100.00 100.00 100.00 100.00 100.00 76.28 63.00 46.37 24.29 6.83 2.67 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 99.96 99.63 CA 1 " 31 31.00 22.84 6.83 1.59 1.28 1.00 0.62 0.42 0.34 0.29 0.20 MA 1/2 36 36.00 36.00 36.00 27.42 7.35 1.96 1.11 0.63 0.59 0.49 0.36 FA 23 23.00 23.00 23.00 23.00 21.92 15.38 11.00 7.90 5.82 3.97 2.07 SAND 8 8.00 8.00 8.00 8.00 8.00 6.10 5.04 3.71 1.94 0.55 0.21 FILLER 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.99 Total Campuran 100.00 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 4.84 100.00 100.00 90.00 80.00 56.00 34.60 22.30 16.70 13.70 11.00 8.00 100.00 90.00 71.00 58.00 37.00 23.00 15.00 10.00 7.00 5.00 4.00 Pb = 0,035(%CA) + 0,045(%FA) + 0,18(%FF) + K CA 73.56 FA 21.60 Pb = 5.42 % FF 4.84 K 1 SPEC GRADASI Spec Max MEDIUM AGREGATE 1/2" UKURAN SARINGAN Inch mm DATA MATERIAL BINA MARGA KONSULTAN KONTRAKTOR ANALISIS GRADASI KOMBINASI FINE AGGREGATE Spec Min COARSE AGREGATE 1 FILLER NATURAL SAND KOMPOSISI CAMPURAN 0 10 20 30 40 50 60 70 80 90 100 0 0 1 10 100 P e r s e n
L o l o s
(
%
)
Ukuran Saringan ( mm ) Grafik Analisis Gradasi Kombinasi No.200 No.100 No.50 No.30 No16 No.8 No.4 3/8 1/2 3/4 1 PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA PAKET PELEBARAN JALAN DURI - KANDIS (MYC) SOURCE OF MATERIAL :COLD BIN AGGREGATE SURFACE AREA Surface Area 1 " 100.00 0.41 3/4 " 91.84 0.41 1 x 0.41 1/2 " 75.83 0.41 3/8 " 62.00 0.41 0.41 No.4 40.55 0.41 0.17 No.8 26.44 0.82 0.22 No.16 19.76 1.64 0.32 No.30 14.66 2.87 0.42 No.50 10.70 6.14 0.66 No.100 7.29 12.29 0.90 No.200 4.84 32.77 1.58 TOTAL AGGREGATE SURFACE AREA : 4.67 M2/Kg PT ADHI KARYA ( PERSERO ) Tbk. KONTRAKTOR PT ARTERI CIPTA RENCANA KONSULTAN CALCULATION OF AGGREGATE SURFACE AREA AND Factor Sieve Size Percent S.A BINA MARGA KONSULTAN KONTRAKTOR Passing PT ADHI KARYA ( PERSERO ) Tbk. PEMERINTAH REPUBLIK INDONESIA KONTRAKTOR KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA PT ARTERI CIPTA RENCANA PAKET PELEBARAN JALAN DURI - KANDIS (MYC) KONSULTAN Specific Gravity Aggregate SOUESE MATERIAL : COLD BIN Engineer : Penetration Grade of Bitumen = AC 60/70 No Aggregate oven dry app Spesific Gravity of Bitument, T = 1.035 a CA 1 2.603 2.659 Date : Calibration Ring, Ring = 26.15 b MA 2.539 2.644 c FA+F 2.523 2.649 Mix To Be Laid At : d SAND 2.523 2.621 Spec Bitument Bulk Sp Gg Eff Sp Gg Max Sp Gr Volume Bulk Absortion Bit % eff AC Flow Marshall Agg Bitument No Content Of Total Of Total Combined In Air In Water SSD Of Density (% By Wt) BY Mix Eff AC Agg Air Void VMA % Voids Measure Adjust (mm) Qountient Surface Film Agg Agg Mix Specimen (Gr/cc) Of Tot Mix ( %) Filleds (Kg) (Kg/mm) Area (m 2 /Kg) Thickness(m) A B C D E F G H I J K L M N O P Q R S T U V % Bit By Refer Refer Refer From From From Refer Refer From From Refer Refer Wt Of Mix Note 1 Note 2 Note 3 Lab Lab Lab Note 4 Note 5 Lab Lab Drawing Note 6 4 6.00 2.553 2.602 2.386 1214.7 692.8 1220.8 528.0 2.301 52 1305 4.00 1286.9 730.0 1292.4 562.4 2.288 54 1214 4.10 1270.5 724.0 1276.0 552.0 2.302 48 1117 3.70 2.297 0.72 5.32 11.81 84.56 3.72 15.53 76.02 1212 3.93 308 4.67 11.60 5 6.50 2.553 2.602 2.369 1200.0 685.8 1208.3 522.5 2.297 40 1046 4.50 1230.0 698.0 1236.9 538.9 2.282 43 1046 4.30 1214.0 689.9 1221.0 531.1 2.286 35 879 4.60 2.288 0.72 5.83 12.89 83.80 3.42 16.30 79.05 990 4.47 222 4.67 12.78 1. B = (a+b+c+d+e) / (a/oven a + b/oven b + c/oven c + d/oven d ) 2. C ={ (a+b+c+d+e) / (a/app a + b/app b + c/app c + d/app d ) + B } / 2 REMARK 3. D = 100 / { (100-A)/C + A/T } a b c d e f , 4. J = 100(C-B)/(B*C)*T 31 36 23 8 2 0 5. K = A - (100 - A )/100 X J 6 R = 1000(A-J) / UT(100-A) If Q > 0,8 then formula shown for D shall not be used and shall de optained instead ASSTHO T 209 - 74 BINA MARGA KONSULTAN Weight (Gram) Volume % ot Total Stability E / H MIX PROPORTION ( % BY WT OF COMB AGGREGATE) G - F I x K / T BY THE MARSHALL METHOD (100-A)I /B 100(D - I) / D L + N ( L / O ) x 100 R/T KONTRAKTOR PROPERTIES OF HIGH DURABILITY ASPHALT MIXES PT ADHI KARYA ( PERSERO ) Tbk. PEMERINTAH REPUBLIK INDONESIA KONTRAKTOR KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA PT ARTERI CIPTA RENCANA PAKET PELEBARAN JALAN DURI - KANDIS (MYC) KONSULTAN SOUESE MATERIAL : COLD BIN Specific Gravity Aggregate Penetration Grade of Bitumen = AC 60/70 No Aggregate oven dry app Spesific Gravity of Bitument, T = 1.035 a CA 1 2.603 2.659 Calibration Ring, Ring = 26.15 b MA 2.539 2.644 c FA+F 2.523 2.649 d SAND 2.523 2.621 Spec Bitument Bulk Sp Gg Eff Sp Gg Max Sp Gr Volume Bulk Absortion Bit % eff AC Flow Marshall Agg Bitument No Content Of Total Of Total Combined In Air In Water SSD Of Density (% By Wt) BY Mix Eff AC Agg Air Void VMA % Voids Measure Adjust (mm) Qountient Surface Film Agg Agg Mix Specimen (Gr/cc) Of Tot Mix ( %) Filleds (Kg) (Kg/mm) Area (m 2 /Kg) Thickness(m) A B C D E F G H I J K L M N O P Q R S T U V % Bit By Refer Refer Refer From From From Refer Refer From From Refer Refer Wt Of Mix Note 1 Note 2 Note 3 Lab Lab Lab Note 4 Note 5 Lab Lab Drawing Note 6 1 5.00 2.553 2.602 2.419 1243.6 710.0 1247.8 537.8 2.312 1232.0 705.0 1238.5 533.5 2.309 2.311 0.73 4.31 9.62 85.98 4.48 14.10 68.21 2 5.50 2.553 2.602 2.402 1218.0 700.0 1223.1 523.1 2.328 1236.4 707.7 1240.0 532.3 2.323 2.326 0.73 4.81 10.82 86.08 3.19 14.01 77.20 3 6.00 2.553 2.602 2.386 1230.5 703.0 1233.5 530.5 2.320 1228.0 703.0 1231.0 528.0 2.326 2.323 0.72 5.32 11.94 85.51 2.64 14.58 81.88 1. B = (a+b+c+d+e) / (a/oven a + b/oven b + c/oven c + d/oven d ) 2. C ={ (a+b+c+d+e) / (a/app a + b/app b + c/app c + d/app d ) + B } / 2 REMARK 3. D = 100 / { (100-A)/C + A/T } a b c d e , 4. J = 100(C-B)/(B*C)*T 31 36 23 8 2 5. K = A - (100 - A )/100 X J 6 R = 1000(A-J) / UT(100-A) If Q > 0,8 then formula shown for D shall not be used 95.5 and shall de optained instead ASSTHO T 209 - 74 98.6515 101.251 BINA MARGA KONSULTAN KONTRAKTOR MIX PROPORTION ( % BY WT OF COMB AGGREGATE) ( L / O ) x 100 R/T Weight (Gram) G - F E / H I x K / T (100-A)I /B 100(D - I) / D L + N MARSHALL PRD PROPERTIES OF HIGH DURABILITY ASPHALT MIXES BY THE MARSHALL METHOD Volume % ot Total Stability PT ADHI KARYA ( PERSERO ) Tbk. PEMERINTAH REPUBLIK INDONESIA KONTRAKTOR KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA PT ARTERI CIPTA RENCANA PAKET PELEBARAN JALAN DURI - KANDIS (MYC) KONSULTAN SOUESE MATERIAL : COLD BIN Specific Gravity Aggregate Penetration Grade of Bitumen = AC 60/70 No Aggregate oven dry app Spesific Gravity of Bitument, T = 1.035 a CA 1 2.603 2.659 Calibration Ring, Ring = 26.15 b MA 2.539 2.644 c FA+F 2.523 2.649 d SAND 2.523 2.621 Spec Bitument Bulk Sp Gg Eff Sp Gg Max Sp Gr Volume Bulk Absortion Bit % eff AC Flow Marshall Agg Bitument No Content Of Total Of Total Combined In Air In Water SSD Of Density (% By Wt) BY Mix Eff AC Agg Air Void VMA % Voids Measure Adjust (mm) Qountient Surface Film Agg Agg Mix Specimen (Gr/cc) Of Tot Mix ( %) Filleds (Kg) (Kg/mm) Area (m 2 /Kg) Thickness(m) A B C D E F G H I J K L M N O P Q R S T U V % Bit By Refer Refer Refer From From From Refer Refer From From Refer Refer Wt Of Mix Note 1 Note 2 Note 3 Lab Lab Lab Note 4 Note 5 Lab Lab Drawing Note 6 1 MARSHALL STANDART PADA KADAR ASPHALT OPTIMUM 5.60 2.553 2.602 2.399 1238.5 706.8 1244.5 537.7 2.303 54 1313 3.15 1243.5 708.3 1248.3 540.0 2.303 50 1216 3.40 1245.0 710.0 1251.0 541.0 2.301 49 1192 3.40 2.302 0.73 4.92 10.94 85.13 4.02 14.96 73.10 1240 3.32 374 4.67 10.67 2 SETELAH PERENDAMAN 24 JAM PADA 60 C PADA KADAR ASPHALT OPTIMUM 5.60 2.553 2.602 2.399 1230.1 703.6 1236.2 532.6 2.310 49 1230 3.30 1244.5 708.6 1249.5 540.9 2.301 46 1119 3.50 1241.8 706.9 1246.8 539.9 2.300 45 1094 3.20 2.303 0.73 4.92 10.94 85.17 3.98 14.92 73.32 1148 3.33 344 4.67 10.67 1147.7 x 100 = 92.54 % 1240.3 3 5.60 2.553 2.602 2.399 1243.0 711.5 1246.5 535.0 2.323 1232.3 705.6 1236.0 530.4 2.323 1235.4 710.0 1238.4 528.4 2.338 2.328 0.73 4.92 11.06 86.08 2.95 14.01 78.94 1. B = (a+b+c+d+e) / (a/oven a + b/oven b + c/oven c + d/oven d ) 2. C ={ (a+b+c+d+e) / (a/app a + b/app b + c/app c + d/app d ) + B } / 2 REMARK 3. D = 100 / { (100-A)/C + A/T } a b c d e , 4. J = 100(C-B)/(B*C)*T 31 36 23 8 2 5. K = A - (100 - A )/100 X J 6 R = 1000(A-J) / UT(100-A) If Q > 0,8 then formula shown for D shall not be used and shall de optained instead ASSTHO T 209 - 74 Weight (Gram) Volume % ot Total Stability (100-A)I /B I x K / T 100(D - I) / D PROPERTIES OF HIGH DURABILITY ASPHALT MIXES BY THE MARSHALL METHOD G - F E / H MARSHALL PERCENTAGE REFUSAL DENSITY (PRD) ( L / O ) x 100 L + N BINA MARGA KONSULTAN KONTRAKTOR R/T RETAINED MARSHALL STABILITY AFTER SOAKING 24 HOUR : MIX PROPORTION ( % BY WT OF COMB AGGREGATE) PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) SUMBER MATERIAL : COLD BIN
1 Bulk Density 2.304 Gr/cc 2 Stability 1260 Kg 3 Flow 3.60 mm 4 Air Voids 4.00 % 5 Void Filleds 73.00 % 6 VMA 15.00 % 7 M, Q 345 KG/mm 8 VIM PRD 3.00 % 9 Asphalt 5.60 % BINA MARGA KONSULTAN HOT MIX DESIGN BY MARSHALL METHOD TEST PROPERTY CURVES KONTRAKTOR 700 800 900 1000 1100 1200 1300 1400 4.00 4.50 5.00 5.50 6.00 6.50 7.00 S t a b i l i t y
( K g )
% Asphalt by Total Mix STABILITY 1 2 3 4 5 6 7 8 9 4.00 4.50 5.00 5.50 6.00 6.50 7.00 A i r
V o i d s
( % )
% Asphalt by Total Mix AIR VOIDS 50 55 60 65 70 75 80 85 4.00 4.50 5.00 5.50 6.00 6.50 7.00 V o i d s
F i l l e d s
( % )
% Asphalt by Total Mix VOIDS FILLEDS
2.240 2.250 2.260 2.270 2.280 2.290 2.300 2.310 2.320 4.00 4.50 5.00 5.50 6.00 6.50 7.00 B u l k
D e n s i t y
( g r / c c )
% Asphalt by total Mix BULK DENSITY 2.0 2.5 3.0 3.5 4.0 4.5 5.0 4.00 4.50 5.00 5.50 6.00 6.50 7.00 F l o w
( m m )
% Asphalt by Total Mix FLOW 12.0 13.0 14.0 15.0 16.0 17.0 18.0 4.00 4.50 5.00 5.50 6.00 6.50 7.00 V
M
A
( % )
% Asphalt by Total Mix V M A 100 150 200 250 300 350 400 450 500 4.00 4.50 5.00 5.50 6.00 6.50 7.00 M a r s h a l l
Q u o t i e n t
% Asphalt By Total Mix MARSHALL QUOTIENT 0 1 2 3 4 5 6 7 8 9 4 4.5 5 5.5 6 6.5 7 Stability (Kg) Bulk Density Air Voirs Flow (mm) Voids Filleds (%) VMA MQ PRD VIM 75 X 2 VIM 400 x 2 Blows PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 % BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I 34 Medium Aggregate 36 11.11 CM Hot Bin II 26 Fine Aggregate 17 6.17 CM Hot Bin III 18 Natural Sand 6 1.44 Cm Hot Bin IV 20 Filler 2 Filler 2 Asphalt 5.1 Asphalt 5.10 Aditif 0.3 Aditif 0.30 COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 # 200 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 4.39 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 4.37 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 7.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 3.00 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Spec Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA PAKET PELEBARAN JALAN DURI - KANDIS (MYC) NOMOR : / EXT / AK / DK(MYC) / / 2011 TANGGAL KETERANGAN HASIL TES LAPIS PONDASI LABORATORIUM AGREGATE KELAS - B LAPIS PONDASI AGREGATE KELAS - A AC - BASE COURSE AC - BINDER COURSE AC - WEARING COURSE BETON KLASS - 400 LAIN - LAIN MATERIAL SERTIFIKAT CONTOH LAIN LAIN CATATAN PERMINTAAN UNTUK DISETUJUI UNTUK MENGETAHUI DISPOSITION DISETUJUI DISETUJUI DNG CATATAN TDK DISETUJUI CATATAN UNTUK DISETUJUI DIAJUKAN OLEH PT. ADHI KARYA (PERSERO) EDRIZAL ZARKASI PROJECT MANAGER DIKETAHUI OLEH D A R M A W I , ST NIP. 19750220200502 SITE ENGINEER PT ADHI KARYA ( PERSERO ) Tbk. KONTRAKTOR PT ARTERI CIPTA RENCANA KONSULTAN DISETUJUI OLEH PPK 3 (DURI - PEKANBARU) ( SURAT PENGAJUAN ) URAIAN PT ARTERI CIPTA RENCANA TRANSMITTAL KONSULTAN KONTRAKTOR CONSULTING ENGINEERS PT ADHI KARYA(PERSERO) DIVISI KONSTRUKSI III PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA BALAI BESAR PELAKSANA JALAN NASIONAL II ASPALT CONCRETE BINDER COURSE ( A C - B C ) PT ARTERI CIPTA RENCANA SATUAN KERJA NON VERTIKAL TERTENTU PELAKSANA JALAN NASIONAL WILAYAH I PROV RIAU PEKERJAAN KEGIATAN PPK - 3 ( DURI - PEKANBARU) PAKET JOB MIX DESIGN PELEBARAN JALAN DURI - KANDIS (MYC) No Kontrak : HK.02.03/PPK-DP/50 TANGGAL 30 JUNI 2011 PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1" 31 6.99 Cm Hot Bin I Medium Aggregate 36 11.12 CM Hot Bin II Fine Aggregate 23 7.75 CM Hot Bin III Natural Sand 8 1.88 Cm Hot Bin IV Filler 2 Filler Asphalt 5.6 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 91.84 75.83 62.00 40.55 26.44 19.76 14.66 10.70 7.29 Hot Bin 100.00 92.07 75.81 61.34 40.90 26.26 18.92 14.62 9.42 6.06 Spec Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 Spec Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 73.56 Coarse Aggregate Fraction ( CA) 73.74 Fine Aggregate Fraction (Fa ) 21.60 Fine Aggregate Fraction (Fa ) 21.38 Filler Fraction ( FF ) (FF) 4.84 Filler Fraction ( FF ) (FF) 4.88 Asphalt Content 5.60 Asphalt Content 5.60 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.553 2.552 - Effective Spgr By Total Aggregate Gr/cc 2.602 2.602 Bitument Content By weight of Mix % 5.6 5.6 Eff. Asphalt Content % 4.916 4.916 3.5 Absorption Asphalt (% By Wt Total Aggregate) % 0.73 0.72 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.96 14.97 Min 13 Void In Mix ( Vim ) % 4.02 4.04 3.5 - 5.0 Void In Refusal % 2.95 2.98 Min 2.5 Voids Filled With Bitument ( VFB ) % 73.10 73.02 Min 60 Marshall Stability ( MS ) Kg 1240 1247 Min 1800 Retained Marshall Stability After Soaked 24 H at 60 C % 92.54 93.65 Min 90 Marshall Flow ( MF ) MM 3.32 3.37 Min 4.5 Marshall Quotiont ( MQ ) Kg / mm 374 370 Min 300 Aggregate Surface Area M2/ kg 4.67 4.44 - Bitumen Film Thickness ( BFT ) MMicron 10.67 11.23 Min 7.5 Temperature Mix c 150 150 - SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN PEMERINTAH REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM PT ARTERI CIPTA RENCANA PT ADHI KARYA ( PERSERO ) Tbk. DIREKTORAT JENDERAL BINA MARGA KONSULTAN KONTRAKTOR PAKET PELEBARAN JALAN DURI - KANDIS (MYC) UNIT 1. Abration Test By Loss Angelis ( % ) 29.15 Max 30 2.Coating and Stripping ( % ) > 95 Min 95 3. Specific Gravity Of Bitumen ( % ) 1.033 Min 1.0 BY WT OF TOTAL AGREGATE Coarse Aggregate 1.5" 39 8.50 Cm Hot Bin I Medium Aggregate 36 11.11 CM Hot Bin II Fine Aggregate 17 6.17 CM Hot Bin III Natural Sand 6 1.44 Cm Hot Bin IV Filler 2 Filler Asphalt 5.1 Asphalt Aditif 0.3 Aditif COMBINED AGGREGATE SIEVE SIZE 1.5 " 1 " 3/4 " 1/2 " 3/8 " # 4 # 8 # 16 # 30 # 50 # 100 Cold Bin 100.00 94.89 80.42 65.58 51.49 31.91 20.59 15.66 11.85 9.42 6.22 Hot Bin 100.00 94.20 80.76 66.10 51.69 31.82 20.45 14.90 11.56 9.27 5.85 Spec Max 100 100.00 90.00 76.00 66.00 39.50 26.80 18.10 13.60 11.40 9.00 Spec Min 100 90.00 73.00 55.00 45.00 28.00 19.00 12.00 7.00 5.00 4.50 AGGREGATE FRACTION BY AGGREGATE MIX COMPOSITION % Spec % Coarse Aggregate Fraction ( CA) 79.41 Coarse Aggregate Fraction ( CA) 79.55 Fine Aggregate Fraction (Fa ) 16.20 Fine Aggregate Fraction (Fa ) 16.08 Filler Fraction ( FF ) (FF) 4.39 Filler Fraction ( FF ) (FF) 4.37 Asphalt Content 5.10 Asphalt Content 5.10 Total 100 Total 100 MARSHALL TEST DESCRIPTION COLD BIN HOT BIN SPECIFICATION Bulk Sp Gr By Total Aggregate Gr/cc 2.569 2.569 - Effective Spgr By Total Aggregate Gr/cc 2.611 2.612 Bitument Content By weight of Mix % 5.1 5.1 Eff. Asphalt Content % 4.520 4.510 4 Absorption Asphalt (% By Wt Total Aggregate) % 0.61 0.62 Max 1.2 Void In Mineral Aggregate ( VMA ) % 14.67 14.72 14 EMPLOYER CONSULTANT CONTRACTOR BINA MARGA QUALITY ENGINEER QUALITY CONTROL Date : Date : Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE DESCRIPTION MATERIAL TEST TEST RESULT. SPEC. COLD BIN % MATERIAL OPEN GATE COLD BIN HOT BIN SOURCES 35 TON/HOURS Pangkalan Bangkinang Bangkinang Bangkinang Semen Type I Exxon Asia Pasific Pte Ltd COLD BIN MIX COMPOSITION HOT BIN Void In Mix ( Vim ) % 4.57 4.63 3.5 - 5.0 Void In Refusal % 3.25 3.26 Min 2.5 Voids Filled With Bitument ( VFB ) % 68.89 68.57 63 Marshall Stability ( MS ) Kg 2284 2270 Min 800 Retained Marshall Stability After Soaked 24 H at 60 C % 93.59 93.55 Min 90 Marshall Flow ( MF ) MM 4.85 4.80 Min 3.0 Marshall Quotiont ( MQ ) Kg / mm 471 473 Min 250 Aggregate Surface Area M2/ kg 4.09 4.01 - Bitumen Film Thickness ( BFT ) MMicron 11.19 11.41 Min 7.5 Temperature Mix c 150 150 - EMPLOYER CONSULTANT CONTRACTOR Date : Date : Date : BINA MARGA QUALITY ENGINEER QUALITY CONTROL PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 43 25 18 12 2 5.60 0.30 # 200 4.84 4.88 8.0 4.0 Spec SPECIFICATION 3.5 - 5.0 SUMMARY TEST RESULT JOB MIX FORMULA AC - BINDER COURSE SPEC. HOT BIN PT ADHI KARYA ( PERSERO ) Tbk. % BY WT OF TOTAL AGREGATE 34 26 18 20 2 5.10 0.30 # 200 4.39 4.37 7.00 3.00 Spec SPECIFICATION CONTRACTOR QUALITY CONTROL Date : SUMMARY TEST RESULT JOB MIX FORMULA AC - BASE COURSE SPEC. HOT BIN 3.5 - 5.0 CONTRACTOR Date : QUALITY CONTROL
deruikirSuper Fast and Easy File Hosting
PutLocker isn't just another file hosting site. It allows you to store all your files in one place, manage them, and share them with your friends and family if you choose to.
Unlimited Uploads
No limits on number of files you can upload
Unlimited Downloads
Share files to as many people as you want
Share Huge Files
Our size limits are the highest in the industry
Unlimited Storage
Store as much content you want
Mobile Access
Your files are available via your smart phone
Leading Security
Rest easy - your data is safe with us
Get a Free Account Today
Get an account today, and enjoy all the features of the site!
Awesome file management system
No limits on sharing and uploading
No time limits on streaming
Share files up to 1GB
Want M
terface
USB SuperSpeed USB (USB 3.0) port Type A Connector with charging function x 1*4, SuperSpeed USB (USB 3.0) port Type A Connector x 1
Network (RJ-45)Connector 1000BASE-T/100BASE-TX/10BASE-T x 1
Display Output Connector Analogue RGB, Mini D-Sub 15 pin x 1
Headphone Stereo, Mini Jack x 1
Adapun Pengujian Yang Dilakukan Terhadap Karakteristik Agregat Antara Lain : A. Analisis Saringan A.1 Analisis Saringan Agregat Kasar Tabel 4.1 Hasil Analisis Saringan Agregat Kasar
terface
USB SuperSpeed USB (USB 3.0) port Type A Connector with charging function x 1*4, SuperSpeed USB (USB 3.0) port Type A Connector x 1
Network (RJ-45)Connector 1000BASE-T/100BASE-TX/10BASE-T x 1
Display Output Connector Analogue RGB, Mini D-Sub 15 pin x 1
Headphone Stereo, Mini Jack x 1
terface
USB SuperSpeed USB (USB 3.0) port Type A Connector with charging function x 1*4, SuperSpeed USB (USB 3.0) port Type A Connector x 1
Network (RJ-45)Connector 1000BASE-T/100BASE-TX/10BASE-T x 1
Display Output Connector Analogue RGB, Mini D-Sub 15 pin x 1
Headphone Stereo, Mini Jack x 1
terface
USB SuperSpeed USB (USB 3.0) port Type A Connector with charging function x 1*4, SuperSpeed USB (USB 3.0) port Type A Connector x 1
Network (RJ-45)Connector 1000BASE-T/100BASE-TX/10BASE-T x 1
Display Output Connector Analogue RGB, Mini D-Sub 15 pin x 1
Headphone Stereo, Mini Jack x 1