Shift 2 is performing better based on the OEE data, which shows Shift 2 has higher Availability, Performance, and Quality percentages than Shift 1. For Shift 2, the OEE can be calculated using the factors provided: Availability of 95%, Performance of 95%, and Quality of 90%, resulting in an OEE of 85.5%. The TPT time for Shift 2 was 8 hours and 45 minutes based on the shift length, short breaks, meal break, and downtime.
Shift 2 is performing better based on the OEE data, which shows Shift 2 has higher Availability, Performance, and Quality percentages than Shift 1. For Shift 2, the OEE can be calculated using the factors provided: Availability of 95%, Performance of 95%, and Quality of 90%, resulting in an OEE of 85.5%. The TPT time for Shift 2 was 8 hours and 45 minutes based on the shift length, short breaks, meal break, and downtime.
Shift 2 is performing better based on the OEE data, which shows Shift 2 has higher Availability, Performance, and Quality percentages than Shift 1. For Shift 2, the OEE can be calculated using the factors provided: Availability of 95%, Performance of 95%, and Quality of 90%, resulting in an OEE of 85.5%. The TPT time for Shift 2 was 8 hours and 45 minutes based on the shift length, short breaks, meal break, and downtime.
1). Take a look at the following data for two production shifts.
Which shift is performing
better? What changes if any would you recommend? OEE Factor hift 1 hift ! "#ailability $%.%& $'.%& (erformance $'.%& $'.%& )uality $$.'& $*.%& OEE +'.1& +*.*& . !)The table below contains shift data, to be used for a complete OEE calculation-.i) .alculate the OEE using the factors of Availability, Performance, and Quality .ii)What is the T"/T time for the shift? 0tem 1ata hift 2ength + hours 3 4+% min. hort 5reaks ! 6 1' min. 3 7% min. 8eal 5reak 1 6 7% min. 3 7% min. 1own Time 49 minutes 0deal :un :ate *% pieces per minute Total (ieces 1$,!91 pieces :e;ect (ieces 4!7 pieces