You are on page 1of 1

PRESSURE EQUIPMENT

INSPECTION REQUIREMENTS
IDENTIFICATION
Unit:
Train 3 - Unit 06
Tag No:
03-V0604
Equipment Name:
HP MR SUCTION DRUM
VESSEL/CONFINED SPACE ENTRY REQUIRED: YES NO
CLEANING & PURGING REQUIREMENTS
Water Wash Caustic Wash Fuel Gas Purge Air Purge
Steaming N2 Purge Other: As Per Operations Requireents
OPENING FOR INSPECTION
an!a"s #es No Open Man !a" MH
$nternal an !a"s #es No
Channel Co%er #es No
&un'le remo%e' #es No
Other Opening #es No
Comments:
SUPPORT SERVICES REQUIRED FOR INSPECTION
(emister )emo%e' #es No Reo#e a portion o$ %eister to a&&ess top %oe'
Schoepentoeter )emo%e #es No
$nsulation )emo%al #es No
Sca**ol'ing )equire' #es No To a&&ess t(e %eister'
echanical Cleaning #es No Po!er )rus( !e*%s an% 6+)an% on eit(er si%e as per
inspe&tor,s instru&tions'
+ighting )equire' #es No Han% -aps. #esse* sa$e
Comments: /' A&tua* !e*% 0 s(e** &*eanin1 a" in&rease or %e&rease'
2' 230V po!er !it( e3tension )oar% at #esse*'
INSPECTION
,isual $nspection #es No
Ultrasonic $nspection #es No Ran%o t(i&4ness &(e&4 as %ire&te% )" Inspe&tion
("e Penetrant #es No
agnetic Particle #es No On !e*%s an% HA5 on %oes an% on s(e** as per Inspe&tion
instru&tions as per inspe&tor,s %is&retion'
E''" Current #es No
)a'iograph" #es No
Comments:
ADDITIONAL REQUIREMENTS
-"'ro.Pneumatic Test #es No
P), Ser%icing #es No Re$er to PRV Ser#i&in1 Requireents -ist
Other #es No
Comments
MANPOWER
/atar gas $nspector #es No I 6atar 7as Inspe&tor
N(E Technicians #es No UT Te&(ni&ians'
$nspection Time / T!e*#e-(our s(i$ts
PREPARED BY
Signature:
Name:
Title:
(ate:
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000

You might also like