Professional Documents
Culture Documents
Ubicacin:
Item
Descripcin
01
OBRAS PROVISIONALES
OFICINA/ CASETA PARA GUARDIANIA Y DEPOSITO DE HERRAMIENTAS Y MATERIALES
m2
30.00
100.81
3,024.30
und
1.00
1,000.00
1,000.00
115.54
10.21
1,179.66
est
glb
glb
1.00
1.00
1.00
3,000.00
400.00
400.00
m2
m2
600.28
600.28
0.52
2.18
m3
m3
146.33
21.01
13.73
8.94
3,000.00
400.00
400.00
1,620.76
312.15
1,308.61
11,385.27
2,009.11
187.83
m3
720.83
6.87
4,952.10
m3
m2
179.31
16.20
22.70
10.24
4,070.34
165.89
27,530.15
25,894.16
m3
143.45
180.51
25,894.16
m3
3.00
203.61
757.49
610.83
m2
2.40
61.11
146.66
m2
m3
9.72
2.43
22.68
270.80
m3
m2
kg
39.02
520.30
3,147.45
282.83
22.68
3.72
m3
m2
kg
22.07
353.10
5,090.53
387.75
29.59
3.72
m3
m2
kg
14.35
157.80
2,333.56
347.02
32.78
3.72
m2
702.28
45.49
31,946.72
m2
21.00
16.24
m2
m2
m2
m2
277.84
260.15
247.17
215.18
16.19
13.57
15.37
15.37
341.04
15,134.78
4,498.23
3,530.24
3,799.00
3,307.32
1,451.52
54.00
16.23
876.42
54.00
10.65
m2
m
15.60
93.20
400.00
156.30
und
und
1.00
4.00
109.31
52.79
m2
1,000.34
4.93
Glb
1.00
20,000.00
575.10
20,807.16
6,240.00
14,567.16
320.47
109.31
211.16
4,931.68
4,931.68
20,000.00
20,000.00
235,794.35
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.03
04.03.01
04.03.02
05
05.01
05.01.01
05.01.02
05.01.03
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
06
06.01
06.02
07
07.01
07.02
07.03
07.04
08
08.01
08.02
09
09.01
09.02
10
10.01
10.02
11
11.01
12
12.01
DADOS DE CONCRETO
DADOS DE CONCRETO 1:8 CEMENTO HORMIGON + 25% PM
ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO (sobre dado)
GRADAS APOYADAS EN TERRENO
GRADAS APOYADAS: ENCOFRADO Y DESENCOFRADO NORMAL
GRADAS APOYADAS: CONCRETO f'c=140 kg/cm2
CONCRETO ARMADO
SOBRECIMIENTOS
SOBRECIMIENTOS CONCRETO f'c=140 kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
SOBRECIMIENTOS: ACERO DE REFUERZO fy=4200 kg/cm2
COLUMNAS
COLUMNAS: CONCRETO f'c=210 kg/cm2
COLUMNAS: ENCOFRADO Y DESENCOFRADO
COLUMNAS: ACERO DE REFUERZO fy=4200 kg/cm2
VIGAS
VIGAS: CONCRETO f'c=210 kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO
VIGAS: ACERO DE REFUERZO fy=4200 kg/cm2
ALBAILERIA
MURO DE SOGA DE LADRILLO ARTESANAL MACIZO K.K. DE ARCILLA 9x12x23 cm. UNA
CARAVISTA
JUNTA VERTICAL DE MURO CON TECKNOPOR e=2"
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO DE MUROS EXTERIORES
TARRAJEO FROTACHADO DE SOBRECIMIENTOS
TARRAJEO COLUMNAS
TARRAJEO DE VIGAS
REVESTIMIENTOS
REVESTIMIENTO DE PASOS Y CONTRAPASOS CON CEMENTO PULIDO
CANTONERA DE ALUMINIO EN PASOS DE ESCALERA
CARPINTERIA METALICA
PUERTA METALICA
CERCO METALICO
CERRAJERIA
CERRADURA PARA PUERTA INGRESO
CERROJO PARA PUERTA, DE 20"
PINTURA
PINTURA LATEX EN MUROS INTERIORES/EXTERIORES
FLETE TERRESTRE
FLETE TERRESTRE
COSTO DIRECTO
Gastos Generales 10%
Metrado
Precio S/.
Parcial S/.
9,003.96
878.49
220.45
658.04
91,320.85
34,544.94
11,036.03
11,800.40
11,708.51
37,942.64
8,557.64
10,448.23
18,936.77
18,833.26
4,979.74
5,172.68
8,680.84
32,287.76
S/. 235,794.35
23,579.44
Utilidad 5%
11,789.72
SUB TOTAL
S/. 271,163.51
IGV
INTANGIBLE
EXPEDIENTE TCNICO
S/. 48,809.43
S/. 319,972.94
S/. 11,500.00
SUPERFICIN
S/. 15,000.00
CAPACITACIN
S/. 5,000.00
TANGIBLE
TOTAL PRESUPUESTO
S/.
31,500.00
S/. 351,472.94
Ubicacin:
MARCABAL, DISTRITO DE
Item
Descripcin
01
OBRAS PROVISIONALES
01.01
m2
30.00
100.81
3,024.30
01.02
und
1.00
1,000.00
1,000.00
01.03
115.54
10.21
1,179.66
01.04
est
1.00
3,000.00
3,000.00
01.05
glb
1.00
400.00
400.00
01.06
glb
1.00
400.00
02
OBRAS PRELIMINARES
02.01
m2
600.28
0.52
312.15
02.02
m2
600.28
2.18
1,308.61
03
MOVIMIENTO DE TIERRAS
03.01
m3
146.33
13.73
03.02
m3
21.01
8.94
187.83
03.03
m3
720.83
6.87
4,952.10
03.04
m3
179.31
22.70
4,070.34
03.05
m2
16.20
10.24
04
CONCRETO SIMPLE
04.01
CIMIENTOS
Metrado
Precio S/.
Parcial S/.
9,003.96
400.00
1,620.76
11,385.27
2,009.11
165.89
27,530.15
25,894.16
m3
143.45
180.51
m3
3.00
203.61
610.83
m2
2.40
61.11
146.66
m2
9.72
22.68
m3
2.43
270.80
04.02
04.03
878.49
05
CERCO MTALICO
5.01
06
CARPINTERIA METALICA
6.01
25,894.16
757.49
DADOS DE CONCRETO
220.45
658.04
154059.8
ML
229.94
670.00
154,059.80
PUERTA METALICA
m2
15.60
400.00
6,240.00
6.02
CERCO METALICO
93.20
156.30
14,567.16
07
CERRAJERIA
07.01
und
1.00
109.31
109.31
07.02
und
4.00
52.79
08
PINTURA
08.01
09
FLETE TERRESTRE
09.01
FLETE TERRESTRE
20807.16
320.47
211.16
4931.6762
m2
1,000.34
4.93
4,931.68
20,000.00
Glb
1.00 20,000.00
20000
249,659.24
COSTO DIRECTO
Gastos Generales 10%
S/. 249,659.24
24,965.92
Utilidad 5%
12,482.96
SUB TOTAL
S/. 287,108.13
IGV
INTANGIBLE
S/. 51,679.46
S/. 338,787.59
EXPEDIENTE TCNICO
S/. 11,500.00
SUPERFICIN
S/. 15,000.00
CAPACITACIN
TANGIBLE
TOTAL PRESUPUESTO
S/. 5,000.00
S/. 31,500.00
S/. 370,287.59
PRESUPUESTO CLIENTE
AMPLIACIN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO CENTRO POBLADO
PROVINCIA DE SNCHEZ CARRIN - LA LIBERTAD.
Ubicacin:
Item
Descripcin
01
01.01
01.02
01.03
01.04
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.05
02.05.01
02.06
02.06.01
02.07
02.07.01
02.07.02
02.07.03
02.08
02.08.01
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.03
03.03.01
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01
03.08
OBRAS PROVISIONALES
CASETA DE GUARDIANIA Y ALMACEN
CERCO PERIMETRICO PROVISIONAL P/OBRA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
CINTA PLASTICA SEALIZADORA P/LIMITE DE SEGURIDAD DE OBRA
RESERVORIO DE AGUA DE 50M3
OBRAS PRELIMINARES
TRAZO Y REPLANTEO INICAL
TRAZO Y REPLANTEO FINAL
PRUEBA DE CALIDAD DE CONCRETO( PRUEBA A LA COMPRENSIN)
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO
DENSIDAD
DEDE
CAMPO)
MOVIMIENTO
TIERRAS
EXCAVACION EN TERRENO NORMAL
CONFORMACION DE RELLENO CONTROLADO C/AFIRMADO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO F'c: 140 KG/CM2 PARA SOLADO Y/O SUB-BASE e=0.2 m
ENCOFRADO Y DESENCOFRADO PARA SOLADOS Y/O SUB-BASES
CONCRETO ARMADO
CONCRETO f'c=175 kg/cm2 PARA LOSAS DE FONDO PISO
ENCOFRADO Y DESENCOFRADO PARA LOSAS DE FONDO PISO
ACERO ESTRUCTURAL TRABAJADO PARA LOSAS DE FONDO PISO
CONCRETO f'c=175 kg/cm2 PARA LOSAS DE TECHO
ENCOFRADO Y DESENCOFRADO PARA LOSAS DE TECHO
ACERO ESTRUCTURAL TRABAJADO PARA LOSAS LOSA DE TECHO
CONCRETO f'c=175 kg/cm2 PARA MUROS REFORZADOS
ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS
ACERO ESTRUCTURAL TRABAJADO PARA MUROS
REVOQUES, ENLUCIDOS Y MOLDADURAS
TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN RESERVORIO
APOYADO
CIELO RASOS
CIELO RASO INCLUYE VIGAS EMPOTRADAS CON MORTERO 1:5 X 1.5
cm
PISOS Y PAVIMENTOS
FALSO PISO F'C: 140 KG/CM2 e=10 CM
CONTRAPISOS C/MORTERO 1:4 E:3cm (base 2cm 1:4, acabado 1cm 1:2)
ACABADO PULIDO DE PISO CON MORTERO 1:2 X 1.5 cm DE ESPESOR
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO CON MORTERO 1:5 DE E=2
cm
H=30 cm
PINTURAS
PINTADO DE MURO INTERIOR CON LATEX VINILICO (VINILATEX O
SIMILAR)
PINTADO DE MURO EXTERIOR CON LATEX ACRILICO (SUPERLATEX O
SIMILAR)
PINTADO DE CIELO RASO CON LATEX VINILICO (VINILATEX O
SIMILAR)
PINTADO EXTERIOR DE RESERVORIO A LA CpAL
VARIOS
PRUEBA HIDRAULICA/DESINF P/RESERVORIO APOYADO 50M3
WATER STOP DE NEOPRENE DE 6" PROVISION Y COLOCADO DE
JUNTA
REGLA GRADUADA INDICADOR DE NIVELES PARA RESERVORIO
HIPERCLORADOR
ACCESORIOS PARA RESERVORIO
CASETA DE VALVULAS PARA RESERVORIO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO fc = 140 kg/cm2
CONCRETO ARMADO
CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
REVOQUES, ENLUCIDOS Y MOLDADURAS
TARRAJEO INTERIOR Y EXTERIOR CON MORTERO 1:5 X 1.5 cm
PINTURAS
PINTURA A ESMALTE
OTROS
TAPA METALICA SANITARIA 0.60 x 0.60 m
ACCESORIOS PARA CASETA DE VLVULAS PARA RESERVORIO
Und.
Metrado
Precio S/.
Parcial S/.
und
m
und
m
1.00
40.00
1.00
1,500.00
226.98
24.77
1,614.94
1.69
m2
m2
glb
glb
26.01
26.01
10.00
10.00
1.65
2.15
45.25
40.79
m3
m3
m3
104.40
27.84
76.56
7.00
57.75
6.67
m3
m2
27.04
2.60
530.21
37.82
m3
m2
kg
m3
m2
kg
m3
m2
kg
5.41
2.60
864.10
5.41
22.85
919.31
9.57
95.68
983.53
507.44
42.13
6.66
507.44
42.13
6.66
597.34
57.12
6.66
m2
41.40
24.90
m2
20.25
25.53
m2
m2
m2
27.04
27.04
20.25
80.44
33.15
13.21
10.40
7.92
m2
m2
m2
m2
41.40
52.92
20.25
52.92
10.50
10.50
9.85
5.02
m3
m2
und
und
glb
50.00
0.36
1.00
1.00
1.00
28.09
5.17
575.00
92.60
253.00
m
m
1.96
1.96
0.40
1.65
m3
m3
2.94
3.67
13.33
6.67
m3
0.27
529.59
m3
m2
kg
0.05
1.20
4.55
574.82
38.57
5.77
m2
4.13
16.66
m2
4.13
12.44
und
1.00
216.67
5,367.72
226.98
990.80
1,614.94
2,535.00
63,167.61
959.24
42.92
55.92
452.50
407.90
2,849.22
730.80
1,607.76
510.66
14,435.21
14,336.88
98.33
36,172.31
2,745.25
109.54
5,754.91
2,745.25
962.67
6,122.60
5,716.54
5,465.24
6,550.31
1,030.86
1,030.86
516.98
516.98
3,338.98
2,175.10
896.38
267.50
82.37
82.37
1,455.48
434.70
555.66
199.46
265.66
2,326.96
1,404.50
1.86
575.00
92.60
253.00
2,421.05
4.01
0.78
3.23
63.67
39.19
24.48
142.99
142.99
101.27
28.74
46.28
26.25
68.81
68.81
51.38
51.38
216.67
216.67
1,772.25
03.08.01
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.04
04.04.01
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.06
05.06.01
05.06.02
05.07
05.07.01
05.07.02
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.02.03
06.02.04
06.03
06.03.01
06.03.02
06.04
06.04.01
06.05
06.05.01
06.05.02
06.05.03
06.06
06.06.01
07
07.01
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.03
07.03.01
07.03.02
07.04
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
NIVELACION Y COMPACTACION
CONCRETO SIMPLE
CONCRETO fc = 140 kg/cm2
PIEDRA 4" ASENTADA CON MORTERO 1:8
ENCOFRADO Y DESENCOFRADO
CONCRETO ARMADO
CONCRETO f'c=175 kg/cm2
HABILITACIN Y COLOCACIN DE ACERO 3/8"
ENCOFRADO Y DESENCOFRADO
TARRAJEO
TARRAJEO INTERIORES
TARRAJEO EXTERIORES
VALVULAS Y ACCESORIOS
VALVULA Y ACCESORIOS 3 "
VALVULA Y ACCESORIOS 2 1/2 "
OTROS
TAPA METALICA SANITARIA 0.60 x 0.60 m
PINTURA ESMALTE EN MUROS EXTERIORES
VALVULA DE CONTROL
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
NIVELACION Y COMPACTACION
LECHO DE GRAVA
CONCRETO SIMPLE
CONCRETO fc = 140 kg/cm2
ENCOFRADO Y DESENCOFRADO
TARRAJEO
TARRAJEO INTERIORES
VALVULAS Y ACCESORIOS
VLVULAS Y ACCESORIOS 4"
VLVULAS Y ACCESORIOS 3"
VLVULAS Y ACCESORIOS 2 1/2"
VARIOS
TAPA SANITARIA METLICA 0.4 x 0.4 m e=1/8"
VALVULA DE PURGA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
NIVELACION Y COMPACTACION
LECHO DE GRAVA
CONCRETO SIMPLE
CONCRETO fc = 140 kg/cm2
ENCOFRADO Y DESENCOFRADO
TARRAJEO
glb
1.00
1,772.25
m
m
12,986.00
12,986.00
0.40
1.65
m
m
m
12,986.00
12,986.00
12,986.00
3.07
0.40
1.00
m
m
m
m
m
glb
177.00
2,159.00
5,293.00
317.00
5,040.00
1.00
15.18
12.68
10.98
5.18
3.28
17,734.90
12,986.00
0.18
1,772.25
211,094.48
26,621.30
5,194.40
21,426.90
58,047.42
39,867.02
5,194.40
12,986.00
124,088.28
2,686.86
27,376.12
58,117.14
1,642.06
16,531.20
17,734.90
2,337.48
2,337.48
13,898.39
m2
m2
27.60
10.80
2.00
1.65
m3
m3
m2
5.40
6.78
8.40
13.33
6.67
1.40
m3
m2
m2
0.06
0.40
1.44
529.59
67.55
38.57
m3
var
m2
3.49
63.00
46.92
574.82
22.18
38.57
m2
m2
28.80
22.80
25.60
23.89
glb
glb
1.00
1.00
3,788.50
1,720.00
und
m2
6.00
21.60
216.67
12.89
m2
m2
12.00
4.32
2.00
1.65
m3
m3
m2
m3
38.40
48.00
4.32
0.19
13.33
6.67
1.40
162.00
m3
m2
1.20
24.00
529.59
38.57
m2
13.92
25.60
glb
glb
glb
1.00
1.00
1.00
362.25
1,372.50
1,031.25
und
12.00
160.00
m2
m2
11.16
7.32
2.00
1.65
m3
m3
m2
m3
9.66
12.08
7.32
0.10
13.33
6.67
1.40
162.00
m3
m2
0.66
13.20
529.59
38.57
73.02
55.20
17.82
128.96
71.98
45.22
11.76
114.34
31.78
27.02
55.54
5,213.16
2,006.12
1,397.34
1,809.70
1,281.97
737.28
544.69
5,508.50
3,788.50
1,720.00
1,578.44
1,300.02
278.42
7,503.53
31.13
24.00
7.13
868.86
511.87
320.16
6.05
30.78
1,561.19
635.51
925.68
356.35
356.35
2,766.00
362.25
1,372.50
1,031.25
1,920.00
1,920.00
3,596.08
34.40
22.32
12.08
235.79
128.77
80.57
10.25
16.20
858.65
349.53
509.12
159.74
07.04.01
07.05
07.05.01
07.05.02
07.06
07.06.01
08
08.01
08.01.01
08.01.02
08.02
08.02.01
TARRAJEO INTERIORES
VALVULAS Y ACCESORIOS
VLVULAS Y ACCESORIOS PURGA 3"
VLVULAS Y ACCESORIOS PURGA 2 1/2"
VARIOS
TAPA SANITARIA METLICA 0.4 x 0.4 m e=1/8"
CONEXIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m2
6.24
25.60
glb
glb
1.00
1.00
316.25
1,031.25
und
6.00
160.00
m2
m2
950.04
950.04
2.00
1.65
m3
142.51
13.33
08.02.02
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.05
08.05.01
08.06
08.06.01
08.06.02
08.06.03
08.06.04
09
09.01
09.01.01
10
10.01
10.01.01
11
11.01
m3
178.13
6.67
m3
m2
kg
219.24
1,368.36
4,596.48
529.59
38.57
5.77
m2
1,368.36
16.66
m2
1,368.36
12.44
m
und
und
und
600.00
504.00
504.00
504.00
5.80
45.55
39.10
56.10
glb
1.00
35,000.00
glb
glb
1.00
1.00
8,000.00
10,000.00
CAPACITACIN
TOTAL PRESUPUESTO
SON :
159.74
1,347.50
316.25
1,031.25
960.00
960.00
316,199.37
3,467.65
1,900.08
1,567.57
3,087.79
1,899.66
1,188.13
195,406.65
116,107.31
52,777.65
26,521.69
22,796.88
22,796.88
17,022.40
17,022.40
74,418.00
3,480.00
22,957.20
19,706.40
28,274.40
35,000.00
35,000.00
35,000.00
8,000.00
8,000.00
8,000.00
10,000.00
S/. 676,248.23
67,624.82
67,624.82
S/. 811,497.88
S/. 957,567.49
11,500.00
15,000.00
5,000.00
S/. 989,067.49