& process all HR info Also called HRMS HR mgt system HRIS integrated all these program thru a common database It combines separate HR system into a centralized DB Database stores information Data entry past & new data to be entered Information retrieval info retrieval from Db HRIC HR info center Data quality & integrity retrieval shd be error free
Planning Analysis Design Maintenance Implementati on Info Plannning Developing long range strategy Better utilisation of resource, better performance of HR funs Defining the requirement what HRIS has to do Evaluating the present system Resource requirements are analyzed Identify the HRIS projects available in the market Identify the project team System Investigation
Forming an investigation team Environmental assessment Feasibility analysis(economic & technical) Developing goals for system development Submitting system investigation report to top mgt Getting approval
Study of existing system ability to satisfy user needs Assemble an analysis team Collect appropriate data Analyse data & requirement Prepare system analysis report of existing system & requirement Consists 2 stages Preliminary Final (overlaps with implementation stage) Preliminary Finalising functional requirements Finalising technical requirement ( hardware,software) Acquire (hardware/software) Technical design Reengineering business processes - rethinking and radically redesigning an organization's existing resources.
Final design is detailed & system is built Pre-requisites Training train HR to use HRIS Tailoring the system best fit the needs of org Data entry feed data Testing pre run Roll out - begin
HRIS is run parallel with the old system. Compare both system errors are modified.