The examples shown in this document are intended to serve as a preparation guide. The user should take in consideration that some of the pages reflect the approved seal before the Board of Technical Registration added the requirement of showing the P.E. expiration date under the seal.
The P.E. should seal the details according to the Boards requirements (P.E. stamp, signature, the date the detail was issued inside the stamp and the expiration date under the stamp).