MODEL : DAIHATSHU DK-20 NATURE OF JOB : ROUTINE MAINTENANCE NAME OF JOB : CLEANING OF CYL.HEAD AFTER DISASSEMBLING & CHECK FOR HEAD TIGHTENING TORQUE. TOOLS : Spanner, allen key, rod, hydraulic jack, chain block, cyl. head hanger, cyl. head fixing nut, copa slip . PROCEDURE : CHECKS BEFORE DISMANTLING; Confirm that generator is completely stopped. Make sure that power supply is cut off & a tap is put on panel. Close v/v of air tank.
OVERHAULING ; Open v/v at end of cooling water inlet main pipe to drain cooling water remaining in the jacket. Remove the exhaust pipe cover in cyl head side. Remove the heat box cover. Remove the cyl. Head top cover. Disconnect all piping around the head. Take off the rocker arm holder. Remove the push rod. Disconnect the high pressure fuel hose. Remove the nozzle holder. Unscrew the exhaust pipe mounting bolt. Mount a cylinder head hanger in the head top face. Mount a hydraulic jack on the cyl. Head bolt. Disconnect the cyl.head fixing nut. CLEANING ; Replace the rubber ring located at intake pipe bottom end with new one. When lowering the head take care not to damage fit up surface of oring. Scrape carbon deposit from combustion chamber wall completely and check for crack and corrosion. Replace cyl.head packing with new one. Check for corrosion on fit up surface of oring for cooling water guide & gas leakage from packing. Replace the push rod rubber seal with new one. Clean upper surface of cyl. head. ASSEMBLING ; When lifting the cyl. Head lift it horizontally. Take care not to allow water inside jacket to enter cylinder. When mounting cyl. Head take special care so as not to dent packing. Tight exhaust pipe bolts prior to tightening cyl.head bolts.